General Information
I Capital City: Bishkek
I Official Language: Kyrgyz
I Government: Unitary Parliamentary
Republic
I Area: 200 thsd km2
I Population: 5,5 mln.
I Currency: Som*
* (KGS 48.5 = USD1)
Ministry of Economy of the Kyrgyz Republic
In the Sphere of Economic Reforms
In Social SphereIn the sphere of Infrastructure Development
Participation of donor communities in priority sectors of the Kyrgyz Republic
Ministry of Economy of the Kyrgyz Republic
Technical assistance by Donors since 2007 (in mln. USD)
Asian Development Bank4%
GIZ (Germany)15%
JICA (Japan)33%
Islamic Development Bank3%
SECO (Switzerland)4%
USAID (USA)27%
TIKA (Turkey)14%
Ministry of Economy of the Kyrgyz Republic
Technical Assistance by Sectors since 2007 (in %)
Agriculture1%
Transportation18%
Economic development and re-forms10%
Capacity Building17%
Education4%
Food Security12%
Environment4%
Healthcare18%
Finance2%
Culture11%
Energy0%
Emergency2%
Ministry of Economy of the Kyrgyz Republic
Increasing welfare of the citizens through
rehabilitation and strengthening of the investment climate
Reforming of the government
regulation towards elimination of
bureaucratic barriers
Development Policy Priorities
Priorities of the Development Program of the Government of the Kyrgyz Republic
Intensive economic development and
modernization through
ınfrastructure development
Ministry of Economy of the Kyrgyz Republic
Donor Community
Sustainable Development
Technical Cooperation
Joint Actions
Government of the Kyrgyz Republic
Partnership towards economic development of the Kyrgyz Republic
Ministry of Economy of the Kyrgyz Republic
Agriculture
(20 mln.)
Purchase of construction equipment for Department of Water Resources and Land Reclamation (10 mln.)
The completion of the irrigation system and introduction of new irrigated lands(8.3 mln)
Infrastructure and road maintenance(40mln)
Construction and reconstruction of roads in Bishkek (30 mln)
Purchase of Road Machinery and Equipment (9.6 mln):
Financing agricultural machinery leasing (1 mln.)
Energy(5 mln.)
Construction of a high-voltage double-circuit transmission line (5 mln.)
Preferential credit of Turkey
Ministry of Economy of the Kyrgyz Republic
Main sectors for contracting companies
Infrastructure
Transportation and logistics
Ministry of Economy of the Kyrgyz Republic
Energy
Infrastructural Project (active)Ministry of Economy of the Kyrgyz Republic
The Project on Regional Improvement of Boarder Cervices of the Kyrgyz Republic (ADB).Objective: The Project will support development of transport corridors and development of the trade in CAREC region.Amount of investments: 9,5 mln. US dollars.Period of realization: Till 2017.
Project includes: Boarder Crossing Point Improvement including: Reconstruction and construction of Customs checkpoints, sanitary and quarantine facilities, veterinary control posts; Modernization and equipment of terminals, provision of enabling infrastructure such as power facilities, water supply and wastewater facilities, paved passageways and sidewalks and communication facilities.
Infrastructural Project (active)Ministry of Economy of the Kyrgyz Republic
The project on rehabilitation of the road Тaraz-Talas-Susamyr (III Phase) (IBRD).
Objective: The Project is aimed on rehabilitation of transport corridors.Amount of investments: 22,075 mln. US dollars.Period of realization : 2013-2017 yearsProject includes: Clearing and earthworks uprooting roadside, removal of the existing coverage, preparing fabric of the existing road, construction of embankment and excavation
Energy Project (active)
Ministry of Economy of the Kyrgyz Republic
The project to improve power supply in Bishkek and Osh (IBRD)
Objective: Improve power supply in Bishkek and Osh.Amount of investments: 23,08 mln. US dollars.Period of realization : 2013-2017 years
Project includes: Reconstruction of several substations and construction of a high-voltage double-circuit transmission line.
Reconstruction of Airport OSH Amount of required investments: 118,1 mln USD USD Investment period: 12 years
Infrastructural Project (perspective)
Ministry of Economy of the Kyrgyz Republic
Infrastructural Project (perspective)Ministry of Economy of the Kyrgyz Republic
Construction of Railway "China-Kyrgyzstan-Uzbekistan".
Period of realization: till 2017 Amount of Investments: 1,340 mln. USD
Infrastructural Project (perspective)Ministry of Economy of the Kyrgyz Republic
Kyrgyzstan-Chinese Gas PipelineRoute of gas pipeline: Turkmenistan-Uzbkistan-Kyrgyzstan-Tajikistan-China.Length on the territory of KR: 225 kmInvestment period: 2 yearsAmount of investments: 1 ,700 mln. USD
Energy Project (perspective)Ministry of Economy of the Kyrgyz Republic
Construction of Kambar-Ata HES-1 (Hydro Electric Station) Period of realization: 2013-2018 (20) years Amount of Investments: 3 ,400 mln. USD
Energy Project (perspective)Ministry of Economy of the Kyrgyz Republic
Construction of Hydro Electric Station on Naryn river.
Period of realization: 2013-2017 years Amount of Investments: 412 mln. USD
Ferrosilicoaluminium plant constructionLocation: Tash-Kumyr in Jalal-Abad OblastProject objective: construction of a ferrosilicoaluminum plantRequired amount of investment :USD $50,000,000
POSCO in the Kyrgyz Republic
Ministry of Economy of the Kyrgyz Republic
Quartz sand and industrial silicon plant construction
Location: Tash-Kumyr in Jalal-Abad OblastProject objective: annual quartz sand production output – 6,000,000 tonnes, industrial silicon – 1,200,000 tonnes Required amount of investment: USD $8,500,000