sorcer coordinators meeting. november 14, 2011. sorcer stimulating obtaining results in communities...
TRANSCRIPT
SORCER
Coordinators meeting. November 14, 2011
SORCER
Stimulating Obtaining Results in Communities in relation to
Energy-efficiency and Renewables
Integrated ProjectCall FP6-2005-TREN-4
CONCERTO II
Contract nr:TREN/07/FP6EN/S07.70576/038588
SORCER
Sorcer content
ApeldoornSewage digester, with poultry sludge (1.5 MWe)District heating Zuidbroek (2500 dwellings)EPC (shell based) of 0.82.65 GJ/dwelling*year additional energy saving (e.g. 400 Wp PV/dwelling)Woodchips peak boiler
HillerødLow temperature district heatingSolar collectors6000 m2 Class 1 Ecobuildings (-50%)20000 m2 Class 2 Ecobuildings (-25%)Biomass gasifierRenovated buildingsPV
Zuidbroek 54 months highlights
About 800 dwellings deliveredBiogas CHP completePV grant setup for developers and house owners complete, about 50 kWp done, agreements on about 40 kWp, preliminary agreement on 135 kWp for housing corporationsSuccessful congress in ApeldoornMonitoring gives valuable results both for dwellings as for district heating system(Temporary) Permit for 2.8 MW woodchips boiler (construction can start)
Hillerød 54 months highlights
3000 m2 solar thermal field completeBiomass boiler finished and in operationClass 1 buildings completedNew buildings added to WP8. These include town hall, city college, office administration building, conference centre, dormitory1500 m2 of low energy class 2 buildings reporting measurementsPV plants on Town Hall, Klaverfabrikken, Hillerød Varme head quarter completedGasifier under constructionControl of low temperature district heating nearly implemented
Yet to do
Complete PV plans in Zuidbroek and HillerødComplete refurbishment activities in HillerødEnergy efficient street lightingComplete woodchips boiler and municipal building in Apeldoorn Monitoring
Extension to 6 years has been asked
Progress summary
Duration
Budget
RES el.
RES thermal
Solar space
New buildings
Refurb. buildings
Poly-generation
Other
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
~ 7.7Mio.
~ 1958 kW
~ 4000 kW
~ 0 m²
~ 230000 m²
~ 17600 m²
750 kW
100%
SORCER
60 months
data as of: november 2011, after submittal of 48 month amendment