sorcer coordinators meeting. november 14, 2011. sorcer stimulating obtaining results in communities...

7
SORCER Coordinators meeting. November 14, 2011

Upload: naomi-porter

Post on 20-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SORCER Coordinators meeting. November 14, 2011. SORCER Stimulating Obtaining Results in Communities in relation to Energy- efficiency and Renewables Integrated

SORCER

Coordinators meeting. November 14, 2011

Page 2: SORCER Coordinators meeting. November 14, 2011. SORCER Stimulating Obtaining Results in Communities in relation to Energy- efficiency and Renewables Integrated

SORCER

Stimulating Obtaining Results in Communities in relation to

Energy-efficiency and Renewables

Integrated ProjectCall FP6-2005-TREN-4

CONCERTO II

Contract nr:TREN/07/FP6EN/S07.70576/038588

SORCER

Page 3: SORCER Coordinators meeting. November 14, 2011. SORCER Stimulating Obtaining Results in Communities in relation to Energy- efficiency and Renewables Integrated

Sorcer content

ApeldoornSewage digester, with poultry sludge (1.5 MWe)District heating Zuidbroek (2500 dwellings)EPC (shell based) of 0.82.65 GJ/dwelling*year additional energy saving (e.g. 400 Wp PV/dwelling)Woodchips peak boiler

HillerødLow temperature district heatingSolar collectors6000 m2 Class 1 Ecobuildings (-50%)20000 m2 Class 2 Ecobuildings (-25%)Biomass gasifierRenovated buildingsPV

Page 4: SORCER Coordinators meeting. November 14, 2011. SORCER Stimulating Obtaining Results in Communities in relation to Energy- efficiency and Renewables Integrated

Zuidbroek 54 months highlights

About 800 dwellings deliveredBiogas CHP completePV grant setup for developers and house owners complete, about 50 kWp done, agreements on about 40 kWp, preliminary agreement on 135 kWp for housing corporationsSuccessful congress in ApeldoornMonitoring gives valuable results both for dwellings as for district heating system(Temporary) Permit for 2.8 MW woodchips boiler (construction can start)

Page 5: SORCER Coordinators meeting. November 14, 2011. SORCER Stimulating Obtaining Results in Communities in relation to Energy- efficiency and Renewables Integrated

Hillerød 54 months highlights

3000 m2 solar thermal field completeBiomass boiler finished and in operationClass 1 buildings completedNew buildings added to WP8. These include town hall, city college, office administration building, conference centre, dormitory1500 m2 of low energy class 2 buildings reporting measurementsPV plants on Town Hall, Klaverfabrikken, Hillerød Varme head quarter completedGasifier under constructionControl of low temperature district heating nearly implemented

KEMA
check
Page 6: SORCER Coordinators meeting. November 14, 2011. SORCER Stimulating Obtaining Results in Communities in relation to Energy- efficiency and Renewables Integrated

Yet to do

Complete PV plans in Zuidbroek and HillerødComplete refurbishment activities in HillerødEnergy efficient street lightingComplete woodchips boiler and municipal building in Apeldoorn Monitoring

Extension to 6 years has been asked

KEMA
check with peter
Page 7: SORCER Coordinators meeting. November 14, 2011. SORCER Stimulating Obtaining Results in Communities in relation to Energy- efficiency and Renewables Integrated

Progress summary

Duration

Budget

RES el.

RES thermal

Solar space

New buildings

Refurb. buildings

Poly-generation

Other

0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

~ 7.7Mio.

~ 1958 kW

~ 4000 kW

~ 0 m²

~ 230000 m²

~ 17600 m²

750 kW

100%

SORCER

60 months

data as of: november 2011, after submittal of 48 month amendment