Secret fix pressed plank system, complete with rail and bracket support. System Fully Independently CWCT Tested and Certified. SOTECH OPTIMA IPC

Upload: others

Post on 06-Mar-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

Secret fix pressed plank system, complete with rail and bracket support.

System Fully Independently CWCT Tested and Certified.

S O T E C H O P T I M A I P C

Page 2: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

Only the top cutout of eachpanel fully engages the carrierhook.

Panel security screw.

Datum

Top of slot

5mm

5mm

Lower hooks on same panelare spaced to leave a 5mmexpansion gap.

For s

lots

/hoo

ks c

trs s

ee n

otes

bel

owD

imD

im

Fac

e H

eigh

t

Top of slot

Face Height 951mm+ 100mm down from top of panel face150mm up from bottom of panel faceAdditionally equally spaced intermediate holes max 700cts

Face Height 401>950 100mm down from top of panel face150mm up from bottom of panel face

Face Height 251>400 50mm down from top of panel face100mm up from bototm of panel face

Only the top hole of each panel makes contact with a support hook, all other hooksare 5mm lower to allow for expansion.

Typical Slot Setout Info.

Hook Centres.3mm Solid Aluminium - 400mm ctrs.

(ACM is shown in the details above which also apply to 3mm solid Aluminium.)

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima FCHook Arrangement

FC-01 08.04.16

1:4 A

Sotech Optima IPC | Solid Aluminium System Details

Contents

3. Vertical Joint......................................................................4. Horizontal Joint..................................................................5. External Corner..................................................................6. Internal Corner...................................................................7. Horizontal Panel Window Interface....................................8. Horizontal Panel Window Jamb Detail...............................9. Vertical Panel Joint............................................................10. Vertical Panel, Horizontal Joint..........................................11. Horizontal Panel, Alternative Head Detail..........................12. Vertical Laid Panels - Window Jamb..................................13. Horizontal Panel, Vertical Movement Joint.........................

2

(IPC-01)(IPC-02)(IPC-03)(IPC-04)(IPC-05)(IPC-06)(IPC-07)(IPC-08)(IPC-09)(IPC-10)(IPC-11)

Page 3: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

Sotech Optima IPC | Solid Aluminium System Details

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree Bkt - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

8

35

To S

uit U

Val

ueS

FS to

sui

t loa

ds

Cla

ddin

g Zo

ne

Top

Hat

Faca

de S

ubst

rate

& W

eath

er L

ine

9Breathable Membrane. By Others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

Panel ModulePanel Module

T Profile - 60/80

4

Optional Colour Match Strip

15

58 7

6 9 8 10

121511 14 13

3

1

2

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCVertical Joint

IPC-01 08.04.16

1:3 A

3

(IPC-01)(IPC-02)(IPC-03)(IPC-04)(IPC-05)(IPC-06)(IPC-07)(IPC-08)(IPC-09)(IPC-10)(IPC-11)

Page 4: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree Bkt - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

9Breathable Membrane. By Others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

T Profile - 60/80Optional Colour Match Strip

15

Cladding Zone

To Suit U Value

Facade Substrate & Weather Line

SFS to suit loads

Bkt

Mod

ule

Sub

ject

To C

alcs

ClosedJoint

Pla

nk M

odul

e

OpenJoint

2

527

6

8

10

12

15

1114

13

Top Hat

9

1

208

35

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCHorizontal Joint

IPC-02 08.04.16

1:3 A4

Page 5: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree Bkt - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

9Breathable Membrane. By Others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

T Profile - 60/80Optional Colour Match Strip

15

1

Cladding Zone Facade Substrate & Weather Line

Panel ModuleTo Suit Module

5 27

14

15

To S

uit M

odul

eP

anel

Mod

ule

9 8

35

Top Hat

To Suit U Value SFS to suit loads

2 43

8

8

13

12

6

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCExternal Corner

IPC-03 08.04.16

1:3 A

5

Page 6: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree Bkt - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

9Breathable Membrane. By others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

T Profile - 60/80Optional Colour Match Strip

15

Panel Module

1

14

32 4

1015

98

12

Facade Substrate & Weather Line Cladding Zone

Top Hat

35SFS to suit loads To suit U value

To S

uit M

odul

e

8

8

To Suit Module

Pan

el M

odul

e

6

10 11

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCInternal Corner

IPC-04 08.04.16

1:3 A6

Page 7: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree Bkt - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

9Breathable Membrane. By Others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

T Profile - 60/80Optional Colour Match Strip

15

Cladding ZoneTo Suit U Value

Primary Structure & Weather Line

Pan

el M

odul

e

To S

uit D

etai

l

35

Wind loadbracket

Pan

el M

odul

e

To S

uit D

etai

l

Pan

el M

odul

e

Wind loadbracket

1

15

8

15x6 WeepHole

23

578

1 16

EPDM or similar. By Others.16

106

Indicative Window System

9

13

12

14

SFS to suit loads

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCVertical Window Interface

IPC-05 08.04.16

1:4 A6 7

Horizontal Panel Window Interface

Page 8: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree Bkt - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

9Breathable Membrane. By Others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

T Profile - 60/80Optional Colour Match Strip

15EPDM or similar. By Others.16

To S

uit U

Val

ueS

FS to

sui

t loa

ds

Cla

ddin

g Zo

ne

Top

Hat

Faca

de S

ubst

rate

& W

eath

er L

ine

35

1

121514 13

5 7 8

89

Indicative Window System

1

10 11 6

16

2

5

8

3

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCWindow Jamb Detail

IPC-06 08.04.16

1:3 A8

Horizontal Panel Window Jamb Detail

Page 9: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree NH2 Bkt system - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

9Breathable Membrane. By Others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

T Profile - 60/80Optional Colour Match Strip

15EPDM or similar. By Others.16

To S

uit U

Val

ueS

FS to

sui

t loa

ds

Cla

ddin

g Zo

ne

Top

Hat

Faca

de S

ubst

rate

& W

eath

er L

ine

1

121514 13

5 7 889

Panel Module Panel Module

6

10

11

1

8

35

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCVertical Panel Joint

IPC-07 08.04.16

1:3 A8 9

Page 10: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree NH2 Bkt System - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

9Breathable Membrane. By Others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

T Profile - 60/80Optional Colour Match Strip

15EPDM or similar. By Others.16

Cladding Zone

To Suit U Value

Facade Substrate & Weather Line

SFS to suit loads

Bkt

Mod

ule

Sub

ject

To C

alcs

3

578

6

8

10

12

15

11

14

13

Top Hat

9

35

1

2

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCHorizontal Laid Panel Joint

IPC-08 08.04.16

1:3 A10

Vertical Panel, Horizontal Joint

Page 11: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

Cladding Zone

To Suit U Value

Facade Substrate & Weather Line

SFS to suit loads

3

578

6

8

1012

15

1114

13

9

1

2

Indicative Window System

1

1

15x6 WeepHole

16

16

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree NH2 Bkt System - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

9Breathable Membrane. By Others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

T Profile - 60/80Optional Colour Match Strip

15EPDM or similar. By Others.16

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCVertical Window Interface

IPC-09 08.04.16

1:4 A10 11

Horizontal Panel, Alternative Head Detail

Page 12: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree NH2 Bkt System - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material.

Insulation - thickness & type to suit specification.

Top Hat - material to suit span.

Isolator.

9Breathable Membrane.10Cemetitious Board (or simiar) - with fully taped joints & thickness to suit specification.11SFS Substrate - profile size & centres to suit loadings.12V.C.L. - if required.13Internal Finish.14Insulation - If required.

T Profile - 60/80Optional Colour Match Strip

15EPDM or similar.16

Indicative Window System

To S

uit U

Val

ueS

FS to

sui

t loa

ds

Cla

ddin

g Zo

ne

Top

Hat

Faca

de S

ubst

rate

& W

eath

er L

ine

35

1

121514 13

5 7 889

1

10 11 6

16

2

5

20

3

8

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCVertical Laid Panels - Window Jamb

IPC-10 08.04.16

1:4 A

12

Page 13: SOTECH OPTIMA IPC...7 2 5 6 8 10 12 15 11 14 13 Top Hat 9 1 20 8 35 @A4 Sotech Ltd 2 Traynor Way Whitehouse Business Park Peterlee County Durham SR8 2RU Title: Drg No: Scale: Checked

12

Optima IPC Panel. Finish to suit project.Self Drill Fastener(Ejot JT4-ZT-4-4.8x19).

345678

Nvelope Handsfree Bkt - to suit zone & ctrs to suit loadings.

Tek Fixing - type to suit substrate material. By Others.

Insulation - thickness & type to suit specification. By Others.

Top Hat - material to suit span. By Others.

Isolator.

9Breathable Membrane. By Others.10Cemetitious Board (or simiar), thickness to suit specification. By Others.11SFS Substrate - profile size & centres to suit loadings. By Others.12V.C.L. - if required. By Others.13Internal Finish. By Others.14Insulation - If required. By Others.

L Profile - 60/40Optional Colour Match Strip

15Aluminium Pressing.16

Panel ModulePanel Module

12 1514 13 14

Breather membrane & VCLlooped to accommodatemovement.

20

To S

uit U

Val

ueS

FS to

sui

t loa

ds

Cla

ddin

g Zo

ne

Top

Hat

Faca

de S

ubst

rate

& W

eath

er L

ine

58 7 6 9 11 10

23

16

1

35

6

8

@A4

Sotech Ltd2 Traynor WayWhitehouse Business ParkPeterleeCounty DurhamSR8 2RU

Title:

Drg No:

Rev:Scale: Checked By:

Date:Drawn By:

DD

Sotech

Tel: 0191 587 2287Fax: 0191 518 0703

www.sotech-optima.co.uk

Optima IPCVertical Movement Joint

IPC-11 08.04.16

1:3 A12 13

Horizontal Panel, Vertical Movement Joint