Client: BHP Billiton Location: Olympic Dam, South Australia Value: $295 million Start date: January 2004 End date: Ongoing Scope of work: Development works Shotcreting Cablebolting The project Macmahon was awarded the contract to carry out underground mine development works for BHP Billiton at the Olympic Dam site. The Olympic Dam project is located at Roxby Downs, 560km north of Adelaide in South Australia, and is a large poly-metallic mine predominately mining copper, uranium and gold. It has a proven and probable ore reserve of 717 million tonnes grading 1.7 per cent copper and 0.5kg/tonne uranium oxide. Olympic Dam is the sixth largest known copper ore body, fifth largest gold ore body and largest uranium ore body in the world. It also contains significant quantities of silver and stands as the largest underground mine in Australia. The Olympic Dam operations comprise a fully integrated underground mine and above ground metallurgical complex. Macmahon's initial contract involved 10,091m of underground development and associated works. An extension of this initial contract was awarded and Macmahon has now carried out 33km of underground lateral development including ground support. In July 2009, Macmahon was awarded a two-year contract extension by BHP Billiton at the Olympic Dam site and a further one-year extension was granted in July 2011. In October 2011, Macmahon was awarded a three year contract with a potential to extend for a further one year. This contract involved underground mine development works, including shotcreting, cablebolting and other associated works with an estimated value of more than $200 million. The contract includes 35,000 metres of lateral development and associated cablebolting and shotcreting. Olympic Dam South Australia

Upload: vungoc

Post on 18-Mar-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: South Australia - Macmahon Holdings · PDF fileCablebolting The project Macmahon was awarded the contract to carry out underground mine development works for BHP Billiton at the Olympic

Client: BHP Billiton

Location: Olympic Dam, SouthAustralia

Value: $295 million

Start date: January 2004

End date: Ongoing

Scope of work:Development works

Shotcreting

Cablebolting

The project

Macmahon was awarded the contract to carry out underground minedevelopment works for BHP Billiton at the Olympic Dam site.

The Olympic Dam project is located at Roxby Downs, 560km north ofAdelaide in South Australia, and is a large poly-metallic minepredominately mining copper, uranium and gold. It has a proven andprobable ore reserve of 717 million tonnes grading 1.7 per cent copperand 0.5kg/tonne uranium oxide.

Olympic Dam is the sixth largest known copper ore body, fifth largestgold ore body and largest uranium ore body in the world. It alsocontains significant quantities of silver and stands as the largestunderground mine in Australia. The Olympic Dam operations comprisea fully integrated underground mine and above ground metallurgicalcomplex.

Macmahon's initial contract involved 10,091m of undergrounddevelopment and associated works. An extension of this initial contractwas awarded and Macmahon has now carried out 33km ofunderground lateral development including ground support.

In July 2009, Macmahon was awarded a two-year contract extension byBHP Billiton at the Olympic Dam site and a further one-year extensionwas granted in July 2011.

In October 2011, Macmahon was awarded a three year contract with apotential to extend for a further one year. This contract involvedunderground mine development works, including shotcreting,cablebolting and other associated works with an estimated value ofmore than $200 million. The contract includes 35,000 metres of lateraldevelopment and associated cablebolting and shotcreting.

Olympic DamSouth Australia