![Page 1: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/1.jpg)
Electronic Bids for the contracts listed herein will be publicly opened. All bid totals will be printed and postedon the SCDOT web site, Bid Express, and the Construction Extranet. Visitors are welcome and should signin at the Park Street entrance. Please contact the Contract Administration Office at (803)737-1750 with allLetting related questions.
The following items will be made available on September 11, 2018 unless otherwise noted:• EBS (Electronic Bidding System) files via Bid Express website• Hardcopy plans & proposals will be printed upon request only via Engineering Publications
o Located in room G23 SCDOT Headquarterso Phone (803)737-4533/ Fax (803)737-4530 Call ahead for pickup orderso Cash, check, money order, VISA/MC accepted (Payable to SCDOT. No refunds)
Access the Construction Extranet for the following items:• Plans• Announcements• Bids as Received• CPM Schedule Templates
Contractors are encouraged to utilize the Extranet Discussion Board to make contact with other Prime andSubcontractors to request/offer quotes. There is no charge to access this site, but you must register for auser name and password. See link for details http://www.scdot.org/doing/constructionletting_extranet.aspx.
Certain projects will require bidders to have a minimum quarterly CPS (Contractor Performance Score)issued by SCDOT. These projects will be noted accordingly to include the minimum score and quarterissued. Contractors wishing to verify their CPS may call SCDOT Construction Data Support at(803)737-1656.
The SCDOT Standard Drawings are available for download at http://www.scdot.org/doing/road.aspx
Quantities shown herein are approximate for information only and should not be used for bidding purposes.The Department reserves the right to change these quantities without notice.
SOUTH CAROLINADEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORSFOR
REGULAR HIGHWAY LETTINGOctober 09, 2018
Letting Location: SCDOT Headquarters Building
Conference Room 331 955 Park Street Columbia, SC
![Page 2: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/2.jpg)
Call No.: 010 1Page:
South Carolina Department of Transportation 8/30/2018
0115050SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Abbeville DBE Goal Percent: 8.00%
Completion Date:
Description: S-32 BRIDGE REPLACEMENT OVER LITTLERIVER
6/30/2020
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$28.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $34.00
Letting Time:
0.4220
BR010120031134XPCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
MOBILIZATION - SUBCONTRACTOR 1.000 LS
BRIDGE CONSTRUCTION ACCESS 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 2.000 EA
TRAFFIC CONTROL 1.000 LS
CPM PROGRESS SCHEDULE 1.000 LS
CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS
REMOVAL OF STRUCTURES & OBSTRUCTIONS 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 001 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 002 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 003 1.000 LS
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 1,420.000 SY
REMOVAL OF EXIST. GUARDRAIL 512.000 LF
REMOVAL & DISPOSAL OF EXISTING BRIDGE 1.000 LS
UNCLASSIFIED EXCAVATION 2,928.000 CY
BORROW EXCAVATION 11,817.000 CY
MUCK EXCAVATION 100.000 CY
GEOTEXTILE, SEPARATION 100.000 SY
GEOGRID REINFORCEMENT (UNIAXIAL) 650.000 SY
STRUCTURE EXCAVATION FOR CULVERTS 430.000 CY
NO. 57 STONE FOR BACKFILL 100.000 TON
FINE GRADING 6,064.000 SY
MAINTENANCE STONE 700.000 TON
HOT MIX ASPHALT BASE COURSE - TYPE B 1,601.000 TON
LIQUID ASPHALT BINDER PG64-22 167.000 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 750.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 60.000 SY
MILLED-IN RUMBLE STRIP 0.690 MI
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE C 1,430.000 TON
![Page 3: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/3.jpg)
Call No.: 010 2Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
HOT MIX ASPHALT SURFACE COURSE TYPE D 406.000 TON
HOT MIX ASPH. CONC. SURF. CR. FOR DITCH PAVING 12.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 312.000 SF
PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 70.000 SF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 4,410.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 4,410.000 LF
BARRICADE - TYPE 3 84.000 LF
TYPE B - FLASHING LIGHT 16.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 55.000 EA
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1,684.000 LF
CONC. FOR STRUCTURES - CLASS 4000 665.500 CY
CONC. FOR STRUCTURES - CLASS 4000(CULVERT) 150.800 CY
COMPRESSION SEAL JOINT 75.600 LF
GROOVED SURFACE FINISH 1,540.000 SY
REINF. STEEL FOR STRUCTURES (ROADWAY) 23,970.000 LB
REINF. STEEL FOR STRUCTURES (BRIDGE) 201,233.000 LB
HOOP REINFORCING STEEL FOR STRUCTURES (BRIDGE) 10,408.000 LB
PRESTRESSED CONC. BEAM (TYPE III) 1,880.000 LF
CONCRETE BRIDGE BARRIER PARAPET 776.000 LF
CONCRETE BRIDGE BARRIER PARAPET TRANSITION 4.000 EA
PILE DRIVING SET-UP 10.000 EA
REINF. PILE TIPS (HP14 X 73) 10.000 EA
STEEL H BEARING PILING (HP14 X 73) 460.000 LF
DRILLED SHAFT SET-UP 6.000 EA
DRILLED SHAFT WITH ROCK EXCAVATION - 42" DIAMETER 150.000 LF
DRILLED SHAFT WITH WET & DRY EXCAVATION - 48" DIAMETER 144.000 LF
CONSTRUCTION CASING - 48" DIAMETER 144.000 LF
18" SMOOTH WALL PIPE 160.000 LF
BRIDGE APPROACH CONCRETE CURB AND GUTTER(1'-10") 40.000 LF
ELASTOMERIC BEARING 40.000 EA
CROSSHOLE SONIC LOGGING SETUP 6.000 EA
AGGREGATE UNDERDRAIN(AGG#789)WITH 4"PERF.PIPE FOR STRUC 100.000 TON
6" PERFORATED PIPE UNDERDRAIN 500.000 LF
6" UNDERDRAIN END PROTECTOR 2.000 EA
RIP-RAP (CLASS A) 60.000 TON
RIP-RAP (CLASS B) 972.000 TON
RIP-RAP (CLASS C) 219.000 TON
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE C 2,360.000 SY
MT3 LEADING END TREATMENT TL3 6.000 EA
GUARDRAIL THRIE-BEAM WITH BASE PLATE 6.25’ POST SPACING 25.000 LF
STEEL BEAM GUARDRAIL (THRIE) 75.000 LF
MGS3 GR STANDARD SHOULDER 1,175.000 LF
![Page 4: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/4.jpg)
Call No.: 010 3Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 4.000 EA
BARBED WIRE FENCE - 1 STRAND 370.000 LF
BARBED WIRE FENCE - 4 STRANDS 600.000 LF
RIGHT OF WAY MARKER(REBAR AND CAP) 40.000 EA
RIGHT OF WAY PLAT 1.000 LS
PERMANENT COVER 4.000 ACRE
TEMPORARY COVER 6.400 ACRE
COMPOST 1,133.000 CY
FERTILIZER (NITROGEN) 400.000 LB
FERTILIZER (PHOSPHORIC ACID) 400.000 LB
FERTILIZER (POTASH) 400.000 LB
AGRICULTURAL GRANULAR LIME 8,000.000 LB
SELECTIVE WATERING 54,300.000 GAL
MOWING 8.430 ACRE
WATERPROOFING (SUBSTRUCTURE-SECOND METHOD) 24.800 SY
TURF REINFORCEMENT MATTING (TRM) TYPE 1 0.321 MSY
TEMPORARY EROSION CONTROL BLANKET (ECB) 1.941 MSY
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 10.400 ACRE
SEDIMENT TUBES FOR DITCH CHECKS 268.000 LF
SILT FENCE 3,105.000 LF
REPLACE/REPAIR SILT FENCE 311.000 LF
SILT BASINS 300.000 CY
REMOVAL OF SILT RETAINED BY SILT FENCE 776.000 LF
DITCH CHECK 160.000 TON
AGGREGATE NO.5 OR 57 FOR EROSION CONTROL 100.000 TON
STABILIZED CONSTRUCTION ENTRANCE 550.000 SY
![Page 5: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/5.jpg)
Call No.: 020 4Page:
South Carolina Department of Transportation 8/30/2018
0391050SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Allendale DBE Goal Percent: 12.00%
Completion Date:
Description: ALLENDALE US 301 UNIVERSITY MILE -SHOULDER IMPROVEMENTS
7/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$67.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.8230
P028532P028532PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
TRAFFIC CONTROL 1.000 LS
CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,060.000 SY
SITE EXCAVATION 1.000 LS
FLOWABLE FILL 450.000 CY
LIQUID ASPHALT BINDER PG64-22 203.000 TON
MILLING EXISTING ASPHALT PAVEMENT 2.0" 33,895.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE B 3,770.000 TON
IMPRINTED ASPHALT WITH SURFACE COATING 1,230.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,800.000 SF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 3,936.000 LF
6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,010.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,436.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 9,250.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 2,760.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 562.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 26.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 13.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA
HANDICAP SYMBOL - THERMOPLASTIC - 125 MIL. 6.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,920.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 12,820.000 LF
BIKE LANE SYMBOL -PREFORMED THERMO - 60MIL 26.000 EA
BIKE LANE ARROW - PREFORMED THERMO - 60MIL 42.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 164.000 EA
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 425.000 SF
U-SECTION POST FOR SIGN SUPPORTS - 3P 1,000.000 LF
![Page 6: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/6.jpg)
Call No.: 020 5Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 259.000 LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 255.000 LF
FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 46.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 1,693.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 2,478.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 880.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,714.000 LF
SAWCUT FOR LOOP DETECTOR 596.000 LF
FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 1.000 EA
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 6.000 EA
F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 1.000 EA
F&I 13"X28' STEEL STRAIN POLE ON EXISTING FOUNDATION 4.000 EA
FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 422.000 LF
FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 6.000 EA
F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 001 1.000 EA
FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002 8.000 EA
F&I - 1-WAY-1SECT.HAND/MAN EMBLEM PEDESTRIAN SIGNAL HEAD 8.000 EA
F&I-PED PUSH BUTTON MICRO ASSEMBLY(9"X15")AND SIGN(R-10-3E or R10-4a) 8.000 EA
BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 8.000 EA
REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS
REMOVE FOUNDATION FOR STEEL STRAIN POLE - 18" BELOW GRADE 3.000 EA
FURNISH & INSTALL CONCRETE CABINET FOUNDATION 1.000 EA
POWDERCOATING OPTION FOR 10' ALUMINUM PEDESTAL POLE 6.000 EA
18" SMOOTH WALL PIPE 626.000 LF
BRICK SIDEWALK (MORTARLESS) 70.000 SY
CATCH BASIN -TYPE 1 CB - TYPE 1 12.000 EA
CATCH BASIN -TYPE 16 3.000 EA
MANHOLE 6.000 EA
CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 3,050.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 2,035.000 SY
DETECTABLE WARNING MATERIAL 670.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 265.000 SY
PEDESTRIAN RAMP CONSTRUCTION 1,325.000 SY
MOVING ITEM NO. 001 1.000 LS
MOVING ITEM NO. 002 1.000 LS
MOVING ITEM NO. 003 1.000 LS
RIGHT OF WAY MARKER(REINFORCED CONCRETE) 20.000 EA
RIGHT OF WAY PLAT 1.000 LS
SABAL PALMETTO 14' - 16' HEIGHT PALMETTO 14´- 16´ HT. 21.000 EA
TREE WATERING BAG SYSTEM 21.000 EA
SODDING - CENTIPEDE GRASS 1,660.000 SY
INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 400.000 LF
![Page 7: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/7.jpg)
Call No.: 020 6Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 400.000 LF
CLEANING INLET STRUCTURE FILTERS 21.000 EA
STABILIZED CONSTRUCTION ENTRANCE 550.000 SY
![Page 8: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/8.jpg)
Call No.: 030 7Page:
South Carolina Department of Transportation 8/30/2018
1083532SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Charleston DBE Goal Percent: 3.50%
Completion Date:
Description: S-28 @ S-53 ROUNDABOUT
10/31/2020
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$45.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $30.00
Letting Time:
0.1440
SA100100041072RD01PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BRIDGE CONSTRUCTION ACCESS 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
UTILITY RELOCATION NO. ____ 001 1.000 EA
TRAFFIC CONTROL 1.000 LS
LEVEL 3 - EARTH-BORNE VIBRATION MONITORING 1.000 LS
CPM PROGRESS SCHEDULE 1.000 LS
CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 1 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 2 1.000 LS
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 165.000 SY
REMOVAL & DISPOSAL OF DESIGNATED PORTIONS OF EXISTING BRIDGE 1.000 LS
UNCLASSIFIED EXCAVATION 387.000 CY
BORROW EXCAVATION 1,267.000 CY
MUCK EXCAVATION 474.000 CY
18" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 610.000 LF
FLOWABLE FILL 15.000 CY
MAINTENANCE STONE 10.000 TON
HOT MIX ASPHALT BASE COURSE - TYPE A 300.000 TON
LIQUID ASPHALT BINDER PG64-22 300.000 TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 410.000 SY
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 110.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE B 330.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 420.000 TON
STAINED CONCRETE PAVEMENT (8" UNIFORM) 397.000 SY
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 228.000 SF
PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE 4"WH.SOLID 200.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-2)TEMP.REMOVABLE4"YEL.SOLID 200.000 LF
PORTABLE TERMINAL IMPACT ATTENUATOR-TEST LEVEL 2 2.000 EA
![Page 9: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/9.jpg)
Call No.: 030 8Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
ANCHOR KIT - PORT. ATTENUATOR(TEST LEVEL 2) 2.000 EA
TEMPORARY CONCRETE BARRIER 220.000 LF
2.0" SCHEDULE 80 PVC CONDUIT 182.000 LF
CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 2.000 EA
PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 100.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 590.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 2,100.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES 530.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 108.000 LF
PAVEMENT MARKINGS (TEMPORARY PAINT) 12"X18" WHITE TRIANGLE YIELDBAR
88.000 LF
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 474.000 LF
8" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 50.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 295.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 265.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 44.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 54.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,050.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 75.000 EA
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 42.500 SF
FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 120.000 SF
U-SECTION POST FOR SIGN SUPPORTS - 3P 268.000 LF
REFLECTIVE SIGN POST PANELS 95.000 LF
4.0" SCHEDULE 40 PVC CONDUIT 130.000 LF
CONC. FOR STRUCTURES - CLASS 4000 117.400 CY
REINF. STEEL FOR STRUCTURES (BRIDGE) 27,657.000 LB
CONCRETE BRIDGE RAILING WALL (3'6"HT) 90.100 LF
DYNAMIC PILE ANALYZER TEST SET-UP DYNAMIC PILE ANALYZER TEST SETUP 11.000 EA
PREST. CONC. PILING (20"SQ.) 111.000 LF
PILE BUILD-UP PREPARATION (20"SQ) 2.000 EA
PRESTRESSED INDEX PILING (20" SQUARE) 37.000 LF
PRESTRESSED PILE POINT (HP10X57) 48.000 LF
STEEL H BEARING PILING (HP12 X 53) 95.000 LF
STEEL H BEARING INDEX PILING (HP12 X 53) 95.000 LF
10" CORRUGATED POLYETHYLENE (PE) PIPE CULVERT (TYPE S) 54.000 LF
18" SMOOTH WALL PIPE 610.000 LF
CLEANING EXISTING PIPE 46.000 LF
CATCH BASIN -TYPE 1 CB - TYPE 1 2.000 EA
CATCH BASIN -TYPE 16 7.000 EA
DROP INLET (24" X 36") 1.000 EA
36" X 36" JUNCTION BOX 1.000 EA
BEVELING OF PIPE END 3.000 EA
![Page 10: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/10.jpg)
Call No.: 030 9Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
CONCRETE CURB (9" X 15") 135.000 LF
CONCRETE CURB AND GUTTER(1'-6") OGEE 261.000 LF
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 877.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 440.000 SY
DETECTABLE WARNING MATERIAL 63.000 SF
CONCRETE MEDIAN 155.000 SY
PEDESTRIAN RAMP CONSTRUCTION 125.000 SY
SURFACE APPLIED DETECTABLE WARNING 150.000 SF
ELASTOMERIC BEARING ASSEMBLY (FLAT SLAB) 4.000 EA
6" PERFORATED PIPE UNDERDRAIN WITH GEOTEXTILE 120.000 LF
RIP-RAP (CLASS B) 60.000 TON
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 75.000 SY
MT3 LEADING END TREATMENT TL3 3.000 EA
MB TRAILING END TREATMENT 1.000 EA
MGS3 GR STANDARD SHOULDER 100.000 LF
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 4.000 EA
TEMPORARY BARRIER FENCE 485.000 LF
MOVING ITEM NO. 1 1.000 LS
RIGHT OF WAY MARKER(REBAR AND CAP) 8.000 EA
RIGHT OF WAY PLAT 1.000 LS
PERMANENT COVER 0.222 ACRE
TEMPORARY COVER 0.222 ACRE
STRAW OR HAY MULCH WITH TACKIFIER 0.798 ACRE
FERTILIZER (NITROGEN) 22.000 LB
FERTILIZER (PHOSPHORIC ACID) 22.000 LB
FERTILIZER (POTASH) 466.000 LB
MOWING 0.888 ACRE
ARBORIST 20.000 HR
DOUBLE-SHREDDED HARDWOOD MULCH 315.000 SF
MUHLENBERGIA CAPILLARIS (PINK MUHLY GRASS) #1 CONT. 37.000 EA
POROUS MATERIAL FOR ROOT PROTECTION 25.000 TON
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 0.090 ACRE
INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 150.000 LF
INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 150.000 LF
SEDIMENT TUBES FOR DITCH CHECKS 48.000 LF
SILT FENCE 1,141.000 LF
FLOATING TURBIDITY BARRIER-LIGHT DUTY 475.000 SF
CLEANING SILT BASINS 5.000 CY
INLET FILTER CLEANING 10.000 EA
STABILIZED CONSTRUCTION ENTRANCE 550.000 SY
WOOD FENCING 100.000 LF
![Page 11: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/11.jpg)
Call No.: 040 10Page:
South Carolina Department of Transportation 8/30/2018
1848180SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Dorchester DBE Goal Percent: 0.00%
Completion Date:
Description: S-55 OVER I-26 BRIDGE REPAIR
3/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $20.00
Letting Time:
7.5800
P037197P037197PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF DESIGNATED PORTIONS OF EXISTING BRIDGE 1.000 LS
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 128.000 SF
PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 166.000 SF
BARRICADE - TYPE 3 168.000 LF
CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 1.000 EA
TYPE B - FLASHING LIGHT 24.000 EA
CONC. FOR STRUCTURES - CLASS 4000 31.100 CY
REINF. STEEL FOR STRUCTURES (BRIDGE) 8,917.000 LB
PRESTRESSED CONC. BEAM (TYPE III) 113.500 LF
![Page 12: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/12.jpg)
Call No.: 050 11Page:
South Carolina Department of Transportation 8/30/2018
2125750SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Florence DBE Goal Percent: 0.00%
Completion Date:
Description: BENTREE LANE INTERSECTIONIMPROVEMENTS
6/30/2020
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$72.00
$21.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.8990
P034705P034705PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
UTILITY RELOCATION NO. ____ 001 1.000 EA
TRAFFIC CONTROL 1.000 LS
CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 001 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 002 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 003 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 004 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 005 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 006 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 007 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 008 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 009 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 010 1.000 LS
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 80.000 SY
UNCLASSIFIED EXCAVATION 1,285.000 CY
BORROW EXCAVATION 2,918.000 CY
MUCK EXCAVATION 1,279.000 CY
15" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 53.000 LF
18" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 459.000 LF
48" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 75.000 LF
54" DIAMETER PIPE ADDITIONAL FOUNDATION WORK 220.000 LF
GEOTEXTILE FOR SEPARATION OF SUBGRADE&SUBBASE/BASE CR 1,017.000 SY
GEOGRID REINFORCEMENT (BIAXIAL) 1,017.000 SY
STONE BRIDGE LIFT MATERIAL 915.000 TON
FINE GRADING 8,684.000 SY
FLOWABLE FILL 45.000 CY
MAINTENANCE STONE 150.000 TON
![Page 13: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/13.jpg)
Call No.: 050 12Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
HOT MIX ASPHALT BASE COURSE - TYPE A 1,827.000 TON
LIQUID ASPHALT BINDER PG64-22 470.000 TON
MILLING EXISTING ASPHALT PAVEMENT 2.0" 26,818.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 610.000 SY
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 3,208.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE B 4,220.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 892.000 SF
PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 70.000 SF
BARRICADE - TYPE 3 84.000 LF
CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 2.000 EA
TYPE B - FLASHING LIGHT 16.000 EA
PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 124,000.000 LF
PAVEMENT MARKINGS(TEMP-PAINT) 4" YELLOW BROKEN LINES 1,400.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 19,000.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 61,700.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES 8,000.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 11,070.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE SINGLE ARROW 115.000 EA
PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE COMBINATION ARROWS 12.000 EA
PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE WORD 'ONLY 106.000 EA
TEMPORARY CLEAR PAVEMENT MARKERS MONO-DIR.- 4"X4" 100.000 EA
TEMPORARY YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X4" 50.000 EA
TEMPORARY YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 50.000 EA
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 5,200.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 7,900.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 4,000.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 5,375.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 54.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 52.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 3.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 700.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 26,200.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 140.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 40.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 180.000 EA
Flat Sheet, Type XI, Size Determined by MSG, Overhead 90.000 SF
F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM 12.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 356.000 LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 1,846.000 LF
FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 80.000 LF
FURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE 1,638.000 LF
FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (DIRECTIONAL BORED) 855.000 LF
![Page 14: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/14.jpg)
Call No.: 050 13Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 2,128.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 4,874.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 1,951.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 7,636.000 LF
FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER 1.000 EA
SAWCUT FOR LOOP DETECTOR 2,831.000 LF
FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 4.000 EA
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 13.000 EA
F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 8.000 EA
FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 5.000 EA
F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 001 2.000 EA
FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD 3.000 EA
FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 6.000 EA
FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 002 20.000 EA
F&I-PED PUSH BUTTON MICRO ASSEMBLY(9"X15")AND SIGN(R-10-3E or R10-4a) 16.000 EA
BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 29.000 EA
REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS
REMOVE FOUNDATION FOR STEEL STRAIN POLE - 18" BELOW GRADE 5.000 EA
FURNISH & INSTALL CONCRETE CABINET FOUNDATION 2.000 EA
FURNISH & INSTALL SINGLE LUMINAIRE INCLDNG ARMS AND HARDWARE 8.000 EA
POWDERCOATING PER MAST ARM OVER GALVANIZED 8.000 EA
DECORATIVE OPTION PER MAST ARM 8.000 EA
DESIGN,FURNISH,INSTALL STEEL POLE W/ MAST ARM W/O FOUNDATION 8.000 EA
INSTALL FOUNDATION FOR MAST ARM INCLUDING CONCRETE AND REBAR 48.000 CY
POWDERCOATING OPTION FOR 10' ALUMINUM PEDESTAL POLE 5.000 EA
INSTALL LOOP DETECTOR AMPLIFIER 1.000 EA
18" RC PIPE CUL.-CLASS III 180.000 LF
54" RC PIPE CUL.-CLASS III 124.000 LF
15" SMOOTH WALL PIPE 212.000 LF
18" SMOOTH WALL PIPE 1,666.000 LF
48" SMOOTH WALL PIPE 300.000 LF
54" SMOOTH WALL PIPE 756.000 LF
12" CORRUGATED WALL PIPE 6.000 LF
CATCH BASIN -TYPE 1 CB - TYPE 1 3.000 EA
CATCH BASIN -TYPE 9 5.000 EA
CATCH BASIN -TYPE 16 23.000 EA
CATCH BASIN -TYPE 17 1.000 EA
CATCH BASIN -TYPE 18 2.000 EA
DROP INLET (24" X 36") 4.000 EA
DROP INLET TYPE 112 1.000 EA
TRENCH DRAIN-4" INTERIOR DIMENSION WITH 1.5' CURB & GUTTER 150.000 LF
MANHOLE 2.000 EA
![Page 15: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/15.jpg)
Call No.: 050 14Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
48" X 48" JUNCTION BOX 1.000 EA
72" X 72" JUNCTION BOX 3.000 EA
EXTRA DEPTH OF BOX 32.000 LF
JUNCTION BOX - CONVERT DROP INLET 24" X 24" 2.000 EA
JUNCTION BOX - CONVERT CB T-9 2.000 EA
JUNCTION BOX - CONVERT CB T-17 1.000 EA
CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 4,486.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 1,722.000 SY
DETECTABLE WARNING MATERIAL 160.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 240.000 SY
CONCRETE MEDIAN 134.000 SY
PEDESTRIAN RAMP CONSTRUCTION 400.000 SY
HAND PLACED RIPRAP 395.000 TON
MOVING ITEM NO. 001 1.000 LS
MOVING ITEM NO. 002 1.000 LS
MOVING ITEM NO. 003 1.000 LS
MOVING ITEM NO. 004 1.000 LS
RIGHT OF WAY MARKER(REBAR AND CAP) 50.000 EA
RIGHT OF WAY PLAT 1.000 LS
PERMANENT COVER 1.816 ACRE
TEMPORARY COVER 0.908 ACRE
COMPOST 49.000 CY
FERTILIZER (NITROGEN) 181.600 LB
FERTILIZER (PHOSPHORIC ACID) 181.600 LB
FERTILIZER (POTASH) 181.600 LB
AGRICULTURAL GRANULAR LIME 3,632.000 LB
SELECTIVE WATERING 54,300.000 GAL
MOWING 5.448 ACRE
TEMPORARY EROSION CONTROL BLANKET (ECB) 1.807 MSY
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 1.274 ACRE
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 2.358 ACRE
INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 419.000 LF
SEDIMENT TUBES FOR DITCH CHECKS 150.000 LF
SILT FENCE 4,166.000 LF
REPLACE/REPAIR SILT FENCE 834.000 LF
CLEANING SILT BASINS 20.000 CY
REMOVAL OF SILT RETAINED BY SILT FENCE 2,083.000 LF
CLEANING INLET STRUCTURE FILTERS 82.000 EA
INLET STRUCTURE FILTER - TYPE B 1.000 EA
INLET STRUCTURE FILTER - TYPE D2 6.000 EA
FILTER MATERIAL FOR INLET STRUCTURE FILTER - TYPE D2 12.000 EA
INLET STRUCTURE FILTER - TYPE A 76.000 LF
![Page 16: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/16.jpg)
Call No.: 050 15Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
STABILIZED CONSTRUCTION ENTRANCE 550.000 SY
![Page 17: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/17.jpg)
Call No.: 060 16Page:
South Carolina Department of Transportation 8/30/2018
2348050SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Greenville DBE Goal Percent: 0.00%
Completion Date:
Description: SAFETY IMPROVEMENTS FROM S-98 TO SC 11
11/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$13.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
7.1000
P037226P037226PCN: Project No.:
Description Quantity Units
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 6,437.200 TON
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,100.000 SY
UNCLASSIFIED EXCAVATION 420.000 CY
BORROW EXCAVATION 9,826.000 CY
EXCAVATION FOR SHOULDER PAVING 105.600 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 105.600 STA
GRADED AGGREGATE BASE COURSE (6" UNIFORM) 4,693.000 SY
CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B 131,413.300 SY
MAINTENANCE STONE 200.000 TON
LIQUID ASPHALT BINDER PG64-22 1,277.000 TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 533.330 SY
MILLED-IN RUMBLE STRIP 21.300 MI
HOT MIX ASPHALT SURFACE COURSE TYPE C 19,712.000 TON
DRIVEWAY PAVING-SURFACE TYPE D 560.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,120.000 SF
PAVEMENT MARKINGS(TEMP-PAINT) 6" WHITE BROKEN LINES 2,200.000 LF
PAVEMENT MARKINGS(TEMP-PAINT) 6" YELLOW BROKEN LINES 6,000.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-6" WHITE SOLID LINES 164,000.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-6" YELLOW SOLID LINES 130,000.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 1,800.000 LF
6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,100.000 LF
6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 82,000.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 900.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 7.000 EA
6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 3,000.000 LF
6" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 65,000.000 LF
![Page 18: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/18.jpg)
Call No.: 060 17Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 650.000 EA
EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS
FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 640.000 SF
REFLECTIVE SIGN POST PANELS 480.000 LF
GUARDRAIL DELINEATOR - WHITE 450.000 EA
18" SMOOTH WALL PIPE 300.000 LF
24" SMOOTH WALL PIPE 300.000 LF
30" SMOOTH WALL PIPE 300.000 LF
CLEANING EXISTING PIPE 200.000 LF
BEVELING OF PIPE END 280.000 EA
MT3 LEADING END TREATMENT TL3 46.000 EA
MGS3 GR STANDARD SHOULDER 6,400.000 LF
ADDITIONAL LENGTH GUARDRAIL POST 600.000 LF
MTBBC3 MASH THRIE-BEAM BARRIER CONNECTOR TL3 4.000 EA
GUARDRAIL W-BEAM CURVED SYSTEM 50.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 250.000 LF
PERMANENT GRASSING FOR SMALL PROJECTS 7.200 ACRE
SEDIMENT TUBES FOR DITCH CHECKS 280.000 LF
SILT FENCE 5,000.000 LF
REPLACE/REPAIR SILT FENCE 500.000 LF
![Page 19: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/19.jpg)
Call No.: 070 18Page:
South Carolina Department of Transportation 8/30/2018
2349030SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Greenville DBE Goal Percent: 0.00%
Completion Date:
Description: FULL DEPTH PATCH / CRACK SEAL
8/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
19.7200
P037459P037459PCN: Project No.:
P037461P037461PCN: Project No.:
P037473P037473PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 134.230 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 4,300.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 9,123.000 SY
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 56.000 LaMi
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,130.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 102,603.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 250.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 126,595.000 LF
SURFACE APPLIED DETECTABLE WARNING 120.000 SF
![Page 20: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/20.jpg)
Call No.: 080 19Page:
South Carolina Department of Transportation 8/30/2018
2449440SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Greenwood DBE Goal Percent: 0.00%
Completion Date:
Description: 2019 PRESERVATION (CRACK SEAL)
6/15/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
52.6600
P037727P037727PCN: Project No.:
P037728P037728PCN: Project No.:
P037730P037730PCN: Project No.:
P037731P037731PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 107.010 LaMi
4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZEDPOLYMER– 20 MILS
1,500.000 LF
4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS 001
91,150.000 LF
4" YELLOW BROKEN LINES (GAPS EXCLUDED) - SINGLE COMPONENTHYBRIDIZED POLYMER - 20 MILS
13,500.000 LF
4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS
119,300.000 LF
![Page 21: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/21.jpg)
Call No.: 090 20Page:
South Carolina Department of Transportation 8/30/2018
2602910SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date:
PCN: P028361 CO(S).: Horry DBE Goal Percent: 1.50%
Completion Date:
Description: US-501 BUSINESS BRIDGE REHAB OVERWACCAMAW RIVER AND RR L-12
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $44.00
Letting Time:
0.2400
P028361Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 192.000 SF
PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 195.000 SF
DETOUR SIGNS 800.000 SF
BARRICADE - TYPE 3 246.000 LF
CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 4.000 EA
TYPE B - FLASHING LIGHT 24.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 20.000 EA
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 2,650.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 2,650.000 LF
SPALL REPAIR 40.000 SF
EPOXY CRACK INJECTION 2,880.000 LF
GROOVED SURFACE FINISH 3,104.000 SY
RAIL SURFACE FINISH (CONCRETE) 2,446.000 SY
ENVIRONMENTAL AND WORKER PROTECTION 1.000 LS
CLEANING AND PAINTING EXISTING STEEL BEARINGS 1.000 LS
CLEANING AND PAINTING EXISTING STRUCTURAL STEEL 1.000 LS
MACHINE PREPARATION OF EXISTING SURFACE 3,387.000 SY
HYDRO-DEMOLITION OF EXISTING SURFACE 3,387.000 SY
BLAST CLEANING 4,774.000 SY
CONCRETE OVERLAY (LATEX) 155.200 CY
EPOXY-SAND SLURRY 15,028.000 SF
CONCRETE CLASS 4000 FOR FULL DEPTH DECK PATCHING 5.000 CY
CLEAN AND TEXTURE EXISTING BENTS 1,808.000 SY
REHABILITATE EXISTING EXPANSION JOINT 2.000 EA
RESEAL DECK EXPANSION JOINT 592.000 LF
60" CHAIN LINK FENCE 1,200.000 LF
12' WIDE - CHAIN LINK FENCE GATE (60"HT) 2.000 EA
![Page 22: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/22.jpg)
Call No.: 090 21Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
24' WIDE- CHAIN LINK FENCE GATE (60"HT) DOUBLE SWING GATES 2.000 EA
![Page 23: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/23.jpg)
Call No.: 100 22Page:
South Carolina Department of Transportation 8/30/2018
2649190SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Horry DBE Goal Percent: 0.00%
Completion Date:
Description: 2017 CTC RESURFACING
10/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
5.0000
P037031P037031PCN: Project No.:
P037100P037100PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
BORROW EXCAVATION 1,000.000 CY
EXCAVATION FOR SHOULDER PAVING 250.272 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 250.272 STA
CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B 50,000.000 SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,600.000 TON
MAINTENANCE STONE 4.000 TON
HMA SHOULDER WIDENING COURSE 1,251.360 TON
LIQUID ASPHALT BINDER PG64-22 575.685 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 400.000 SY
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,000.000 SY
MILLED-IN RUMBLE STRIP 10.000 MI
HOT MIX ASPHALT SURFACE COURSE TYPE B 5,000.214 TON
HOT MIX ASPHALT SURFACE COURSE TYPE C 2,562.720 TON
HOT MIX ASPHALT SURFACE COURSE TYPE D 1,100.000 TON
DRIVEWAY PAVING-SURFACE TYPE D 397.500 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 908.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 5,000.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 136,740.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,310.000 LF
WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 30.000 EA
WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 12.000 EA
WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 6.000 EA
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 5,000.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 145,540.000 LF
24" YELLOW DIAGONAL LINES - FAST DRY PAINT 2,730.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,700.000 LF
![Page 24: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/24.jpg)
Call No.: 100 23Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 54,080.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 450.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 10.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 4.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 2.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 2,500.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 55,780.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 910.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 35.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 365.000 EA
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 1,500.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 5,400.000 LF
SAWCUT FOR LOOP DETECTOR 4,500.000 LF
END TERMINAL - TYPE T 4.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 4.848 ACRE
![Page 25: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/25.jpg)
Call No.: 110 24Page:
South Carolina Department of Transportation 8/30/2018
2688711SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Horry DBE Goal Percent: 10.00%
Completion Date:
Description: US 17 BUSINESS ACCESS MANAGEMENTPROJECT - RESURFACING
5/15/2020
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$253.00
$67.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
3.0770
P028288P028288PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
UTILITY RELOCATION NO. ____ 001 1.000 EA
TRAFFIC CONTROL 1.000 LS
CPM PROGRESS SCHEDULE 1.000 LS
CLEARING & GRUBBING WITHIN ROADWAY 1.000 LS
REMOVAL & DISPOSAL OF HIGH LEVEL CONTAMINATED SOIL 250.000 TON
REMOVAL & DISPOSAL ITEM NO. 002 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 003 1.000 LS
REMOVAL & DISPOSAL OF EXISTING ASPHALT PAVEMENT 10,170.000 SY
REMOVAL & DISPOSAL OF EXISTING CONCRETE 20.000 CY
UNCLASSIFIED EXCAVATION 11,000.000 CY
BORROW EXCAVATION 19,200.000 CY
MUCK EXCAVATION 3,000.000 CY
SELECT MATERIAL FOR LANDSCAPING 500.000 CY
FLOWABLE FILL 65.000 CY
MAINTENANCE STONE 300.000 TON
HOT MIX ASPHALT BASE COURSE - TYPE A 4,585.000 TON
LIQUID ASPHALT BINDER PG64-22 1,085.000 TON
MILLING EXISTING ASPHALT PAVEMENT 2.0" 133,015.000 SY
HOT MIX ASPHALT INTERMEDIATE COURSE TYPE B 1,260.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE B 15,355.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,140.000 SF
BARRICADE - TYPE 3 204.000 LF
PAVEMENT MARKINGS(TEMP-PAINT) 4" WHITE BROKEN LINES 28,620.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" WHITE SOLID LINES 70,710.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-4" YELLOW SOLID LINES 70,890.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-8" WHITE SOLID LINES 6,520.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"WHITE SOLID LINES 11,750.000 LF
![Page 26: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/26.jpg)
Call No.: 110 25Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
PAVEMENT MARKINGS(TEMPORARY-PAINT)-24"YELLOW SOLID LINES 800.000 LF
PAVEMENT MARKINGS (TEMPORARY PAINT) 12"X18" WHITE TRIANGLE YIELDBAR
32.000 LF
PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE SINGLE ARROW 318.000 EA
PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE COMBINATION ARROWS 12.000 EA
PAVEMENT MARKINGS(TEMP.-PAINT)-WHITE LANE DROP ARROWS 22.000 EA
PAVEMENT MARKINGS(TEMPORARY-PAINT)-WHITE WORD 'ONLY 230.000 EA
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 1,985.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 14,310.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 35,355.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 3,260.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 16.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 5,875.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 159.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 115.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 6.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 11.000 EA
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 35,445.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 400.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 585.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 425.000 EA
REMOVAL OF PAVEMENT MARKINGS 4,350.000 LF
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 1,127.500 SF
Flat Sheet, Type XI, Size Determined by MSG, Overhead 396.000 SF
FLAT SHEET,TYPE-VIII,IX, OR XI, FLUOR FIXED SIZE & MSG. 36.000 SF
MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON SPAN WIRE 12.000 EA
F&I MOUNTING ASSEMBLY FOR F.S. SIGN ERCTD ON MAST ARM 54.000 EA
U-SECTION POST FOR SIGN SUPPORTS - 3P 1,920.000 LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 410.000 LF
FURNISH & INSTALL 2.0" SCHEDULE 80 PVC CONDUIT 5,081.000 LF
FURNISH & INSTALL 3.0" SCHEDULE 80 PVC CONDUIT 210.000 LF
FURNISH ADDITIONAL CONDUIT WITHIN DIRECTIONAL BORE 1,723.000 LF
FURNISH & INSTALL 2" SCHEDULE 80 HDPE CONDUIT (TRENCHLESS) 1,723.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 5,610.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 9,110.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (BLACK) 10,840.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 6,960.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 26,398.000 LF
FURNISH & INSTALL FIBER OPTIC INTERCONNECT CENTER 1.000 EA
FIBER OPTIC TRANSCEIVER (SMFO) 1.000 EA
SAWCUT FOR LOOP DETECTOR 9,461.000 LF
FURNISH & INSTALL ELECTRICAL SERVICE FOR TRAFFIC SIGNAL 3.000 EA
![Page 27: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/27.jpg)
Call No.: 110 26Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 48.000 EA
F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 27.000 EA
F&I-17"X30"X26"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 7.000 EA
FURNISH & INSTALL 13" X 32' STEEL STRAIN POLE AND FOUNDATION 2.000 EA
FURNISH & INSTALL 3/8" GALVANIZED STEEL CABLE 610.000 LF
FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 23.000 EA
F&I - CONTR 332/336 CABINET ASSEMBLY - BASE MOUNTED 002 7.000 EA
FURNISH & INSTALL - 12" 5 SECTION SIGNAL HEAD 1.000 EA
FURNISH & INSTALL -12" 4 SECTION SIGNAL HEAD 13.000 EA
FURNISH & INSTALL - 12" 3 SECTION SIGNAL HEAD 003 68.000 EA
F&I - 1-WAY-1SECT.(COUNTDOWN HAND/MAN EMBLEM)PED.SIG.HEAD 36.000 EA
F&I-PED PUSH BUT.SOLID STATE W/ LIGHT&TONE ASSEM 9"X15"&SIGN (R-10-3Eor R10-4a)
36.000 EA
F&I VEHICLE TRAFFIC SINGAL HEAD MOUNTING ASSEMBLY FOR MAST ARM 64.000 EA
BACKPLATE W/ RETROREFL.BORDERS FOR TRAFF. SIG. 82.000 EA
REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS
TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT 1.000 LS
F&I - VIDEO DETECTION SYSTEM W/ ONE CAMERA, HARDWARE & LEAD-IN 4.000 EA
FURNISH & INSTALL VIDEO DETECTION CAMERA W/ HARDWARE & LEAD-IN 18.000 EA
TRAFFIC ADAPTIVE SYSTEM 3.000 EA
FURNISH & INSTALL FACTORY TERMINATED PATCH PANEL 1.000 EA
POWDERCOATING PER MAST ARM OVER GALVANIZED 17.000 EA
DESIGN, FURNISH & INSTALL STEEL POLE WITH TWIN MAST ARMS INCLUDINGFOUNDATION 001
6.000 EA
DESIGN, FURNISH & INSTALL STEEL POLE WITH MAST ARM INCLUDINGFOUNDATION
11.000 EA
POWDERCOATING OPTION FOR 10' ALUMINUM PEDESTAL POLE 23.000 EA
PERMANENT CONCRETE BOLLARD 2.000 EA
15" SMOOTH WALL PIPE 344.000 LF
18" SMOOTH WALL PIPE 7,312.000 LF
24" SMOOTH WALL PIPE 2,828.000 LF
30" SMOOTH WALL PIPE 2,533.000 LF
CLEANING EXISTING PIPE 2,730.000 LF
BRICK SIDEWALK (MORTARLESS) 23.000 SY
CATCH BASIN -TYPE 16 15.000 EA
DROP INLET (24" X 36") 18.000 EA
DROP INLET TYPE 112 64.000 EA
DROP INLET TYPE 112 WITH 4X4 BOX 14.000 EA
DROP INLET TYPE 115 WITH STANDARD 6' X 6' BOX 11.000 EA
TRENCH DRAIN-4" INTERIOR DIMENSION WITH 2.0' CURB & GUTTER 1,585.000 LF
MANHOLE WITH STANDARD 5' X 5' BOX 2.000 EA
MANHOLE WITH STANDARD 6' X 6' BOX 2.000 EA
48" X 48" JUNCTION BOX 4.000 EA
![Page 28: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/28.jpg)
Call No.: 110 27Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
ADJUST MANHOLE 2.000 EA
ADJUST DROP INLET ADJUST D. I. 3.000 EA
ADJUST JUNCTION BOX 1.000 EA
JUNCTION BOX - CONVERT CB T-16 1.000 EA
BEVELING OF PIPE END 20.000 EA
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 560.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 300.000 SY
CONCRETE SIDEWALK(6" UNIFORM) 55.000 SY
DETECTABLE WARNING MATERIAL 300.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 105.000 SY
CONCRETE MEDIAN 855.000 SY
CONCRETE FLUME 1.000 EA
PEDESTRIAN RAMP CONSTRUCTION 200.000 SY
SURFACE APPLIED DETECTABLE WARNING 60.000 SF
RIP-RAP (CLASS B) 90.000 TON
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE B 110.000 SY
MOVING ITEM NO. 007 1.000 LS
MOVING ITEM NO. 008 1.000 LS
MOVING ITEM NO. 009 1.000 LS
MOVING ITEM NO. 010 1.000 LS
RIGHT OF WAY MARKER(REBAR AND CAP) 11.000 EA
RIGHT OF WAY PLAT 1.000 LS
PERMANENT COVER 9.850 ACRE
TEMPORARY COVER 13.900 ACRE
FERTILIZER (NITROGEN) 985.000 LB
FERTILIZER (PHOSPHORIC ACID) 985.000 LB
FERTILIZER (POTASH) 985.000 LB
AGRICULTURAL GRANULAR LIME 19,700.000 LB
SELECTIVE WATERING 135,750.000 GAL
MOWING 47.500 ACRE
LANDSCAPING ITEM NO. 001 40.000 EA
LANDSCAPING ITEM NO. 002 36.000 EA
LANDSCAPING ITEM NO. 003 604.000 EA
LANDSCAPING ITEM NO. 004 480.000 EA
LANDSCAPING ITEM NO. 005 373.000 EA
LANDSCAPING ITEM NO. 006 530.000 EA
LANDSCAPING ITEM NO. 007 28.000 EA
LANDSCAPING ITEM NO. 008 2,960.000 EA
LANDSCAPING ITEM NO. 009 495.000 EA
LANDSCAPING ITEM NO. 010 3,466.000 EA
LANDSCAPING ITEM NO. 011 232.000 EA
LANDSCAPING ITEM NO. 012 1,062.000 EA
![Page 29: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/29.jpg)
Call No.: 110 28Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
LANDSCAPING ITEM NO. 013 6,316.000 EA
DOUBLE-SHREDDED HARDWOOD MULCH 50,000.000 SF
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 1 47.000 ACRE
HYDRAULIC EROSION CONTROL PRODUCT (HECP) - TYPE 3 0.880 ACRE
INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 112.000 LF
INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 104.000 LF
SEDIMENT TUBES FOR DITCH CHECKS 1,956.000 LF
SILT FENCE 7,195.000 LF
REPLACE/REPAIR SILT FENCE 720.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 1,800.000 LF
CLEANING INLET STRUCTURE FILTERS 148.000 EA
INLET STRUCTURE FILTER - TYPE A 4,460.000 LF
STABILIZED CONSTRUCTION ENTRANCE 1,650.000 SY
![Page 30: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/30.jpg)
Call No.: 120 29Page:
South Carolina Department of Transportation 8/30/2018
2949570SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Lancaster DBE Goal Percent: 5.00%
Completion Date:
Description: CMRB AND HMA
10/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
2.2600
P037412P037412PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING CONCRETE 3.200 CY
REMOVAL OF EXIST. GUARDRAIL 406.000 LF
UNCLASSIFIED EXCAVATION 225.000 CY
BORROW EXCAVATION 225.000 CY
CEMENT MODIFIED RECYCLED BASE (8" UNIF)-CURING METHOD A 27,850.000 SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 877.275 TON
LIQUID ASPHALT BINDER PG64-22 215.886 TON
MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 1,350.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE C 2,399.017 TON
HOT MIX ASPHALT SURFACE COURSE TYPE E 850.000 TON
DRIVEWAY PAVING-SURFACE TYPE C 278.250 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 480.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 126.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 71,160.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 300.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 71,160.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 150.000 EA
4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZEDPOLYMER– 20 MILS
126.000 LF
4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS 001
23,720.000 LF
24" WHITE SOLID LINES-(STOP/DIAGONAL LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS
100.000 LF
4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS
21,361.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 175.000 LF
GUARDRAIL THRIE-BEAM WITH BASE PLATE 3.125’ POST SPACING 300.000 LF
STEEL BEAM GUARDRAIL (THRIE) 156.250 LF
![Page 31: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/31.jpg)
Call No.: 120 30Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
END ANCHOR-TYPE B 1.000 EA
END TERMINAL - TYPE T 7.000 EA
GUARDRAIL W-BEAM CURVED SYSTEM 32.000 LF
PERMANENT GRASSING FOR SMALL PROJECTS 2.190 ACRE
![Page 32: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/32.jpg)
Call No.: 130 31Page:
South Carolina Department of Transportation 8/30/2018
3049450SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Laurens DBE Goal Percent: 0.00%
Completion Date:
Description: 2019 CRACK SEAL
5/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
27.8300
P037743P037743PCN: Project No.:
P037744P037744PCN: Project No.:
P037746P037746PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 60.100 LaMi
4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS 001
11,000.000 LF
4" YELLOW BROKEN LINES (GAPS EXCLUDED) - SINGLE COMPONENTHYBRIDIZED POLYMER - 20 MILS
6,000.000 LF
4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS
27,200.000 LF
![Page 33: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/33.jpg)
Call No.: 140 32Page:
South Carolina Department of Transportation 8/30/2018
3247800SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Lexington DBE Goal Percent: 0.00%
Completion Date:
Description: US 21 OVER I-26 BRIDGE DECKREPLACEMENT
5/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $25.00
Letting Time:
0.1000
P032283P032283PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL & DISPOSAL OF EXISTING CURB 48.000 LF
REMOVAL OF EXIST. GUARDRAIL 1,825.000 LF
REMOVAL & DISPOSAL OF DESIGNATED PORTIONS OF EXISTING BRIDGE 1.000 LS
BORROW EXCAVATION 26.000 CY
EXCAVATION FOR SHOULDER PAVING 10.613 STA
HAULING OF EXCAVATED SHOULDER MATERIAL 10.613 STA
HMA SHOULDER WIDENING COURSE 91.520 TON
LIQUID ASPHALT BINDER PG64-22 12.000 TON
MILLING EXISTING ASPHALT PAVEMENT 2.0" 2,000.000 SY
HOT MIX ASPHALT SURFACE COURSE TYPE B 200.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE D 16.800 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 128.000 SF
PERMANENT CONSTRUCTION SIGNS (BARRICADE MOUNTED) 181.000 SF
BARRICADE - TYPE 3 120.000 LF
CONSTRUCTION ZONE ELECTRIC CHANGEABLE MESSAGE SIGN (TRAILER 2.000 EA
TYPE B - FLASHING LIGHT 16.000 EA
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 2,708.000 LF
8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 648.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 2,708.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT 546.000 LF
4"YELLOW SOLID LINES-PVT.EDGE&NO PASSING ZONE - EPOXY PAINT 546.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,354.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 444.000 LF
6'X15' INTERSTATE ID SHIELD - THERMOPLASTIC - 125 MIL. 1.000 EA
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 1,354.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 11.000 EA
2.0" SCHEDULE 40 PVC CONDUIT 1,092.000 LF
![Page 34: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/34.jpg)
Call No.: 140 33Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
CONC. FOR STRUCTURES - CLASS 4000 176.700 CY
GROOVED SURFACE FINISH 728.000 SY
REINF. STEEL FOR STRUCTURES (BRIDGE) 69,491.000 LB
CONCRETE BRIDGE BARRIER PARAPET 482.000 LF
CONCRETE BRIDGE BARRIER PARAPET TRANSITION 4.000 EA
CONCRETE CURB (TRANSITION) 48.000 LF
STEEL BEAM GUARDRAIL STEEL BEAM GR. 1,575.000 LF
END TERMINAL - TYPE T 4.000 EA
THRIE BEAM G.R.BRIDGE CONN. 4.000 EA
PERMANENT GRASSING FOR SMALL PROJECTS 0.126 ACRE
TEMPORARY EROSION CONTROL BLANKET (CLASS A) 0.050 MSY
SILT FENCE 400.000 LF
![Page 35: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/35.jpg)
Call No.: 150 34Page:
South Carolina Department of Transportation 8/30/2018
3284920SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Lexington DBE Goal Percent: 8.00%
Completion Date:
Description: JULIUS FELDER SIDEWALKS
11/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$37.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.5150
P026848P026848PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
TRAFFIC CONTROL 1.000 LS
CPM PROGRESS SCHEDULE 1.000 LS
CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS
REMOVAL & DISPOSAL OF EXISTING CATCH BASIN 3.000 EA
REMOVAL & DISPOSAL ITEM NO. 001 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 002 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 003 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 004 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 005 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 006 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 007 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 008 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 009 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 010 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 100.000 SY
UNCLASSIFIED EXCAVATION 533.000 CY
FLOWABLE FILL 50.000 CY
MAINTENANCE STONE 100.000 TON
LIQUID ASPHALT BINDER PG64-22 7.000 TON
HOT MIX ASPHALT SURFACE COURSE TYPE D 105.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 240.000 SF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 1,125.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 42.000 LF
18" SMOOTH WALL PIPE 20.000 LF
30" SMOOTH WALL PIPE 524.000 LF
36" SMOOTH WALL PIPE 8.000 LF
CATCH BASIN -TYPE 9 1.000 EA
![Page 36: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/36.jpg)
Call No.: 150 35Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
CATCH BASIN -TYPE 16 3.000 EA
CATCH BASIN -TYPE 17 1.000 EA
CATCH BASIN -TYPE 18 5.000 EA
DROP INLET (24" X 36") 2.000 EA
MANHOLE-CONVERT CATCH BASIN 1.000 EA
CONCRETE CURB AND GUTTER(2'-0") VERTICAL FACE 1,622.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 1,223.068 SY
DETECTABLE WARNING MATERIAL 215.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 216.667 SY
PEDESTRIAN RAMP CONSTRUCTION 425.000 SY
RIP-RAP (CLASS B) 20.000 TON
GEOTEXTILE FOR EROSION CONTROL UNDER RIPRAP(CLASS 2)TYPE A 26.000 SY
60" CHAIN LINK FENCE 144.000 LF
ORNAMENTAL STEEL PICKET FENCE - 42" 25.000 LF
RESET FENCE 60.000 LF
MOVING ITEM NO. 001 1.000 LS
RIGHT OF WAY MARKER(REBAR AND CAP) 27.000 EA
RIGHT OF WAY PLAT 1.000 LS
PERMANENT GRASSING FOR SMALL PROJECTS 0.330 ACRE
TEMPORARY COVER 0.170 ACRE
MOWING 1.000 ACRE
SODDING 0.100 MSY
INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 100.000 LF
INLET STRUCTURE FILTER- TYPE F (NON-WEIGHTED) 100.000 LF
SILT FENCE 1,172.000 LF
SILT BASINS 257.500 CY
STABILIZED CONSTRUCTION ENTRANCE 550.000 SY
![Page 37: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/37.jpg)
Call No.: 160 36Page:
South Carolina Department of Transportation 8/30/2018
3291060SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Lexington DBE Goal Percent: 5.00%
Completion Date:
Description: TOWN OF BATESBURG LEESVILLESIDEWALK
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$24.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
0.2780
P028143P028143PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
CONSTRUCTION STAKES, LINES & GRADES 1.000 EA
TRAFFIC CONTROL 1.000 LS
CLEARING & GRUBBING WITHIN RIGHT OF WAY 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 001 1.000 LS
REMOVAL & DISPOSAL ITEM NO. 002 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 90.000 SY
REMOVAL & DISPOSAL OF EXISTING CONCRETE 100.000 CY
SITE EXCAVATION 1.000 LS
BORROW EXCAVATION 35.000 CY
FLOWABLE FILL 4.000 CY
MAINTENANCE STONE 40.000 TON
LIQUID ASPHALT BINDER PG64-22 0.800 TON
HOT MIX ASPHALT SURFACE COURSE TYPE B 12.000 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 248.000 SF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 380.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 60.000 LF
REMOVAL OF PAVEMENT MARKINGS 60.000 LF
FLAT SHEET, TYPE III, FIXED SZ. & MSG. SIGN 11.000 SF
U-SECTION POST FOR SIGN SUPPORTS - 3P 24.000 LF
FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 280.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - BLACK 1,000.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 4 CONDUCTOR - GRAY 1,000.000 LF
FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 1,580.000 LF
FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 1,550.000 LF
F&I-12"X12"X12"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 8.000 EA
FURNISH & INSTALL 10' BREAK-AWAY ALUM PEDESTAL POLE AND BASE 2.000 EA
F&I - 1-WAY-1SECT.HAND/MAN EMBLEM PEDESTRIAN SIGNAL HEAD 6.000 EA
F&I-PED PUSH BUTTON MICRO ASSEMBLY(9"X15")AND SIGN(R-10-3E or R10-4a) 6.000 EA
![Page 38: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/38.jpg)
Call No.: 160 37Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
REMOVAL,SALVAGE,&DISP.OF EXISTING TRAF. SIGNAL EQUIPMENT 1.000 LS
DROP INLET (24" X 36") TOP ONLY 1.000 EA
CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 750.000 LF
CONCRETE SIDEWALK(4" UNIFORM) 537.000 SY
DETECTABLE WARNING MATERIAL 50.000 SF
CONCRETE DRIVEWAY(6" UNIFORM) 592.000 SY
PEDESTRIAN RAMP CONSTRUCTION 75.000 SY
RIGHT OF WAY MARKER(REBAR AND CAP) 6.000 EA
RIGHT OF WAY PLAT 1.000 LS
PERMANENT GRASSING FOR SMALL PROJECTS 0.250 ACRE
INLET STRUCTURE FILTER - TYPE F (WEIGHTED) 50.000 LF
SILT FENCE 150.000 LF
REPLACE/REPAIR SILT FENCE 78.000 LF
REMOVAL OF SILT RETAINED BY SILT FENCE 150.000 LF
CLEANING INLET STRUCTURE FILTERS 2.000 EA
STABILIZED CONSTRUCTION ENTRANCE 275.000 SY
![Page 39: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/39.jpg)
Call No.: 170 38Page:
South Carolina Department of Transportation 8/30/2018
4248880SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Spartanburg DBE Goal Percent: 0.00%
Completion Date:
Description: CRACK SEAL/FDP
9/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
31.9600
P037447P037447PCN: Project No.:
P037457P037457PCN: Project No.:
P037460P037460PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 161.000 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,300.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 10,600.000 SY
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 74.580 LaMi
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 1,260.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 119,913.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 135.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 1,050.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 114,340.000 LF
![Page 40: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/40.jpg)
Call No.: 180 39Page:
South Carolina Department of Transportation 8/30/2018
5149470SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT 1 DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 PAVEMENT MARKINGS - DISTRICT 1
7/15/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
34.0000
P037718P037718PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 32,000.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 300,000.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 8,550.000 LF
12" WHITE SOLID LINES - THERMO. - 125 MIL. 100.000 LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 90.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 6,000.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 80.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 30.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 10.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 2.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 3.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 28,000.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 250,000.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 125.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,600.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 950.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,900.000 EA
REMOVAL OF PAVEMENT MARKINGS 550.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 100.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.BROKEN 100.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 350.000 LF
![Page 41: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/41.jpg)
Call No.: 190 40Page:
South Carolina Department of Transportation 8/30/2018
5149540SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Lexington Richland DBE Goal Percent: 0.00%
Completion Date:
Description: CRACK SEAL,FDP,ADA RAMPS,PVMT MARK
8/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
24.1000
P037763P037763PCN: Project No.:
P037764P037764PCN: Project No.:
P037765P037765PCN: Project No.:
P037766P037766PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CSX RAILROAD INSURANCE AND FLAGGING 001 1.000 LS
REMOVAL & DISPOSAL OF EXISTING PAVEMENT 1,300.000 SY
MAINTENANCE STONE 37.250 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,825.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,900.000 SY
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 59.037 LaMi
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 340.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,155.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 180.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 3,775.000 LF
6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 5,000.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 7,800.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 500.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 7,720.000 LF
12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 35.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,810.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 20.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 12.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 6.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 4.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 850.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 33,700.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 460.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 85.000 EA
![Page 42: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/42.jpg)
Call No.: 190 41Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 465.000 EA
DETECTABLE WARNING MATERIAL 650.000 SF
PEDESTRIAN RAMP CONSTRUCTION 1,300.000 SY
SURFACE APPLIED DETECTABLE WARNING 87.500 SF
![Page 43: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/43.jpg)
Call No.: 200 42Page:
South Carolina Department of Transportation 8/30/2018
5249400SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Abbeville Anderson DBE Goal Percent: 0.00%
Completion Date:
Description: 2019 CRACK SEAL
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
46.0500
P037708P037708PCN: Project No.:
P037712P037712PCN: Project No.:
P037713P037713PCN: Project No.:
P037714P037714PCN: Project No.:
P037859P037859PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 118.030 LaMi
4" WHITE BROKEN LINES- (GAPS EXCLD) - SINGLE COMPONENT HYBRIDIZEDPOLYMER– 20 MILS
8,000.000 LF
4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS 001
9,000.000 LF
4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS
46,500.000 LF
![Page 44: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/44.jpg)
Call No.: 210 43Page:
South Carolina Department of Transportation 8/30/2018
5249430SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Abbeville EdgefieldGreenwood
DBE Goal Percent: 0.00%
Completion Date:
Description: 2019 FULL-DEPTH PATCHING
4/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
9.1900
P037715P037715PCN: Project No.:
P037729P037729PCN: Project No.:
P037732P037732PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 67.750 TON
FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 3,200.000 SY
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 3,575.000 SY
4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS 001
12,500.000 LF
4" YELLOW BROKEN LINES (GAPS EXCLUDED) - SINGLE COMPONENTHYBRIDIZED POLYMER - 20 MILS
4,000.000 LF
4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS
8,500.000 LF
![Page 45: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/45.jpg)
Call No.: 220 44Page:
South Carolina Department of Transportation 8/30/2018
5249480SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT2 DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 PAVEMENT MARKINGS - DISTRICT 2
7/15/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
42.0000
P037719P037719PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 30,450.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 310,000.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 3,500.000 LF
12" WHITE SOLID LINES - THERMO. - 125 MIL. 125.000 LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 75.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 4,800.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 50.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 10.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 5.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 1.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 5.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 30,000.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 400,000.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 500.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 740.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 800.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,200.000 EA
REMOVAL OF PAVEMENT MARKINGS 7,600.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 3,700.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.BROKEN 200.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 3,700.000 LF
![Page 46: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/46.jpg)
Call No.: 230 45Page:
South Carolina Department of Transportation 8/30/2018
5249560SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: EdgefieldMcCormick
DBE Goal Percent: 0.00%
Completion Date:
Description: 2019 PRESERVATION (CRACK SEAL)
5/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
49.3600
P037734P037734PCN: Project No.:
P037736P037736PCN: Project No.:
P037738P037738PCN: Project No.:
P037750P037750PCN: Project No.:
P037751P037751PCN: Project No.:
P037753P037753PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 99.020 LaMi
4" WHITE SOLID LINES-(PAVEMENT EDGE LINES)-SINGLE COMPONENTHYBRIDIZED POLYMER–20 MILS 001
51,400.000 LF
4" YELLOW BROKEN LINES (GAPS EXCLUDED) - SINGLE COMPONENTHYBRIDIZED POLYMER - 20 MILS
5,600.000 LF
4" YELLOW SOLID LINES (PAVEMENT EDGE & NO PASSING ZONE) - SINGLECOMPONENT HYBRIDIZED POLYMER - 20 MILS
154,245.000 LF
![Page 47: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/47.jpg)
Call No.: 240 46Page:
South Carolina Department of Transportation 8/30/2018
5349130SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Greenville OconeePickensSpartanburg
DBE Goal Percent: 0.00%
Completion Date:
Description: RUMBLE STRIPS - DISTRICT 3
8/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
101.6000
P036760P036760PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MILLED-IN RUMBLE STRIP 140.380 MI
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 6,741.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,051,521.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 39,566.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 878,319.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 6,741.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 730,978.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 39,566.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 871,874.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 30.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 65.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 6,706.000 EA
REMOVAL OF PAVEMENT MARKINGS 1,649,158.000 LF
EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO. PROFILE 320,544.000 LF
![Page 48: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/48.jpg)
Call No.: 250 47Page:
South Carolina Department of Transportation 8/30/2018
5349230SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Oconee Pickens DBE Goal Percent: 0.00%
Completion Date:
Description: FULL DEPTH PATCH/CRACK SEAL
6/30/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
13.5100
P037458P037458PCN: Project No.:
P037568P037568PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MAINTENANCE STONE 72.800 TON
FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 2,240.000 SY
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 5,040.000 SY
CLEAN AND SEAL CRACKS IN ASPHALT PAVEMENT 27.980 LaMi
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 200.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 9,940.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 200.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 19,880.000 LF
![Page 49: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/49.jpg)
Call No.: 260 48Page:
South Carolina Department of Transportation 8/30/2018
5349490SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT3 DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 PAVEMENT MARKINGS - DISTRICT 3
7/15/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
22.0000
P037720P037720PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 27,000.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 160,000.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 13,000.000 LF
12" WHITE SOLID LINES - THERMO. - 125 MIL. 600.000 LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 150.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 7,000.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 80.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 40.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 15.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 5.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 3.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 12,000.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 220,000.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 100.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,400.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 650.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,000.000 EA
REMOVAL OF PAVEMENT MARKINGS 9,800.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 300.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 900.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.BROKEN 30.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 750.000 LF
![Page 50: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/50.jpg)
Call No.: 270 49Page:
South Carolina Department of Transportation 8/30/2018
5449140SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Cherokee ChesterChesterfield FairfieldUnion York
DBE Goal Percent: 0.00%
Completion Date:
Description: RUMBLE STRIPS - DISTRICT 4
7/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
135.9100
P036761P036761PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MILLED-IN RUMBLE STRIP 274.920 MI
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 8,543.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,406,506.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 109,758.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 746,016.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 8,543.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 1,406,506.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 109,758.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 791,034.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 18.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 287.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 8,969.000 EA
REMOVAL OF PAVEMENT MARKINGS 2,315,840.000 LF
EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS
![Page 51: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/51.jpg)
Call No.: 280 50Page:
South Carolina Department of Transportation 8/30/2018
5449500SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: DISTRICT4 DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 PAVEMENT MARKINGS - DISTRICT 4
7/15/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
33.0000
P037721P037721PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 40,500.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 270,000.000 LF
8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 11,000.000 LF
24IN X 36IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 300.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 8,000.000 LF
WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 100.000 EA
WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 50.000 EA
WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 10.000 EA
WHITE LANE DROP ARROW(LT.OR RT.)THERMO-125MIL 5.000 EA
RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 5.000 EA
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 25,000.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 280,000.000 LF
24" YELLOW SOLID LINES - THERMOPLASTIC - 125 MIL. 125.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 1,500.000 EA
PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 600.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 2,700.000 EA
REMOVAL OF PAVEMENT MARKINGS 1,100.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.60MIL4"WH.BROKEN 100.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"WH.SOLID 1,000.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.BROKEN 300.000 LF
PREF.FLEX.RETRO.PVMT.MARK(T-1)PERM.(60MIL)4"YEL.SOL. 700.000 LF
![Page 52: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/52.jpg)
Call No.: 290 51Page:
South Carolina Department of Transportation 8/30/2018
5549150SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: Darlington DillonFlorenceGeorgetown HorryMarion MarlboroWilliamsburg
DBE Goal Percent: 0.00%
Completion Date:
Description: RUMBLE STRIPS - DISTRICT 5
7/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
99.3200
P036762P036762PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
MILLED-IN RUMBLE STRIP 182.140 MI
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 6,178.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 1,027,854.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 90,916.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 501,500.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 6,178.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 961,725.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 90,916.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 498,195.000 LF
PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 10.000 EA
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 6,556.000 EA
REMOVAL OF PAVEMENT MARKINGS 1,623,142.000 LF
EVALUATION OF PAVEMENT MARKING RETROREFLECTIVITY 1.000 LS
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO. PROFILE 66,129.000 LF
![Page 53: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/53.jpg)
Call No.: 300 52Page:
South Carolina Department of Transportation 8/30/2018
5549750SC File NO(S).:
October 09, 2018
02:00 PM
Letting Date: CO(S).: FlorenceWilliamsburg
DBE Goal Percent: 0.00%
Completion Date:
Description: 2018 CTC RESURFACING
10/31/2019
Cost of Road Plans:
Cost of X-Sections:
Cost of Proposal:
$0.00
$0.00
$15.00
Approx. Length (miles):
ITEMS OF WORK INCLUDE THE FOLLOWING:
Cost of BridgePlans: $0.00
Letting Time:
8.6200
P037641P037641PCN: Project No.:
P037788P037788PCN: Project No.:
Description Quantity Units
MOBILIZATION 1.000 LS
BONDS AND INSURANCE 1.000 LS
TRAFFIC CONTROL 1.000 LS
REMOVAL OF EXIST. GUARDRAIL 200.000 LF
BORROW EXCAVATION 1,724.000 CY
CEMENT MODIFIED RECYCLED BASE (12" UNIF)-CURING METHOD B 76,900.000 SY
PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 2,670.000 TON
MAINTENANCE STONE 36.000 TON
LIQUID ASPHALT BINDER PG64-22 719.215 TON
FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,600.000 SY
MILLING EXISTING ASPHALT PAVEMENT 1.5" 400.000 SY
MILLED-IN RUMBLE STRIP 16.920 MI
HOT MIX ASPHALT SURFACE COURSE TYPE C 10,677.686 TON
HOT MIX ASPHALT SURFACE COURSE TYPE D 485.000 TON
DRIVEWAY PAVING-SURFACE TYPE D 761.875 TON
PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 1,548.000 SF
4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 3,450.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 268,500.000 LF
24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 195.000 LF
4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 23,700.000 LF
4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 191,700.000 LF
4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 1,150.000 LF
4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 89,500.000 LF
24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 65.000 LF
4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 7,900.000 LF
4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 63,900.000 LF
PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 591.000 EA
RESET GUARDRAIL 200.000 LF
GUARDRAIL LEADING TYPE T TL3 (50') 8.000 EA
![Page 54: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/54.jpg)
Call No.: 300 53Page:
South Carolina Department of Transportation 8/30/2018
Description Quantity Units
PERMANENT GRASSING FOR SMALL PROJECTS 8.359 ACRE
![Page 55: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/55.jpg)
BID BONDS FOR SCDOT WORK. Unless otherwise indicated in the advertisement, no proposal will beconsidered unless accompanied by a bid bond in the amount of 5% of the APPROXIMATE BID AMOUNT,written by a SURETY satisfactory to the Department, properly executed in South Carolina Department ofTransportation Form 674 (furnished by the Department in each proposal). If an electronic bond is utilized,the Bond ID number must be provided on the Surety 2000 or SurePath Network electronic bond form. NOOTHER FORM OF PROPOSAL GUARANTY WILL BE ACCEPTED.
IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.
SUBMISSION OF BID BONDS. Bid Bonds may be submitted electronically, by US mail, express deliveryservice or hand-delivered. Bid Bonds not submitted electronically must be submitted in advance of the bidopening.
1. BID BONDS SUBMITTED BY US MAIL OR EXPRESS DELIVERY SERVICE. Sealed bid bonds submitted by US mail or express delivery service shall be enclosed in sealed envelope or container with Contractor Name and "Bid Bond for SC File No._______", and enclosed in an outer, sealed envelope or container addressed to Contract Administrator, SCDOT, PO Box 365, Columbia, SC 29202-0365, or 955 Park Street, Columbia, South Carolina, 29201. Bid bonds submitted by US mail or express delivery service must be received by the Contract Administrator, or designee, prior to the time and date for opening of proposals indicated in the beginning of this Notice. The department will not be responsible for delays in the US mail or express delivery service.
2. BID BONDS HAND DELIVERED. Bid bonds that are hand delivered shall be enclosed in a sealed envelope marked with Contractor Name and "Bid Bond for SC File No._______", and must be delivered directly to the Contract Administrator or designee prior to the time and date for opening of proposals indicated in the beginning of this Notice.
PREQUALIFICATION. The Contractor's attention is called to the requirements of the SC Department ofTransportation for Prequalification. ONLY CONTRACTORS WHO HAVE BEEN ISSUED APREQUALIFICATION CERTIFICATE BY THE SC DEPARTMENT OF TRANSPORTATION WILL BEALLOWED TO SUBMIT BIDS. Information concerning prequalification can be obtained at the ContractsAdministration office, Room 334 in the Headquarters building, 955 Park Street, Columbia, SC, or by callingJeff Elliott at (803)737-1253.
STATUTES, CODES, AND REGULATIONS. The Federal-Aid Projects embraced in this advertisementcontemplates the expenditure of funds pursuant to Title 23, United States Code, "Highways.The Contractor's attention is called to the fact that the SC Department of Transportation, in accordance withthe provisions of Title VI of the Civil Rights Act of 1964 (78) Sta. 252 and the Regulations of the FederalHighway Administration (15 C.F.R., Part 8), issued pursuant to such act, hereby notifies all bidders that itwill affirmatively insure that in any contract entered into pursuant to this advertisement minority businessenterprises will be afforded full opportunity to submit bids in response to this invitation and will not bediscriminated against on the grounds of race, color, sex, religion or national origin in consideration foraward. All bidders on Federal Aid Projects must comply with the Instructions to Bidders and SpecialProvision covering Disadvantaged and Women Business Enterprise (DBE/WBE) included as a part of theproposal.Attention is directed to the Fair Labor Standards Act of 1938, as amended. Contractors will be responsiblefor carrying out all of the provisions of this Act, which may affect these contracts. Attention is also called tothe fact that any Federal Aid Project or Projects included in this notice will be subject to the Work Hours andSafety Act of 1962 as amended, PL 87-581, PL 91-54 and implementing regulations.
MINIMUM WAGE RATES FOR FAP CONTRACTS HAVE BEEN PREDETERMINED BY THE SECRETARYOF LABOR IN ACCORDANCE WITH THE TERMS OF THE DAVIS BACON ACT AS AMENDED AND THEFEDERAL HIGHWAY ACT OF 1956, AND LATER ACTS, AND THESE RATES WILL BE SET FORTH INTHE PROPOSAL FORM. THIS CONTRACT IS ALSO SUBJECT TO THE WORK HOURS AND SAFETYACT OF 1962 AS AMENDED, PL 87-581, PL 91-54, AND IMPLEMENTING REGULATIONS.CONTRACTORS ATTENTION IS ALSO CALLED TO THE FEDERAL REQUIREMENTS GOVERNINGSPECIFIC EQUAL EMPLOYMENT OPPORTUNITY RESPONSIBILITIES, WHICH WILL BE INCLUDED INTHIS CONTRACT.
In addition to the Standard Specifications for Highway Construction, Edition of 2007, the "SupplementalSpecifications", and the "Project Special Provisions", the following govern SCDOT Highway Lettings:
![Page 56: SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION NOTICE … · 2018-09-05 · • EBS (Electronic Bidding System) ... Certain projects will require bidders to have a minimum quarterly](https://reader033.vdocument.in/reader033/viewer/2022042102/5e7f08324e5c1a2c5874da74/html5/thumbnails/56.jpg)
TIME OF THE LETTING. The Contract Administrator, or designee, at the site of the letting shall be the solejudge of determining the local time and the arrival of the designated time for the opening and reading of thebids.
Information in this notice is the latest available at the time of its publication. The information contained inthe proposals, plans, and any addenda issued shall govern over this notice. Cost of plans may change, andthe bidder should check with the SCDOT Engineering Publications office for the cost of plans when theplans are indicated to be available.
THE SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION RESERVES THE RIGHT TO REJECTANY OR ALL PROPOSALS AND WAIVE ANY TECHNICALITIES.
IRREGULAR ELECTRONIC BIDS. Electronic bids may be declared irregular for any of the followingreasons: 1. In the schedule of Prices, (a) alteration of a part of bid item except for the unit price; or (b) failure to enter a bid item unit price; or (c) a bid item unit price is not in the proper form or is incomplete. 2. In the DBE Folder, when a project has a DBE goal, in the DBE's subcontractors information, work items, unit prices, or the other required information has not been entered in the proper form fields or is incomplete. 3. In the PROPOSAL FORM, (a) the box at the end of the form indicating acknowledgement and acceptance of the conditions set forth in the form is not checked. 4. In the Bid Bond section of the PROPOSAL FORM, the required information for appropriate form fields is not furnished. 5. A properly executed Bid Bond is not furnished in accordance with the selected manner of submission.
Prepared by L. Stuckey
Issued by:
J.Brian Parnell
Contract Administrator