south carolina furniture inc
TRANSCRIPT
-
8/3/2019 South Carolina Furniture Inc
1/11
A
B
C D E
G
F
H
South Carolina Furniture Inc. produces all types of office furniture. The executive
secretary is a chair that has been designed using ergonomics to provide comfort during
long work hours. The chair sells for $ 130. There are 480 minutes available during the
day, and the average daily demand has been 50 chairs. There are eight tasks:
TaskPerformance time
(min)
Task must follow
task listed below
A 4 -
B 7 -
C 6 A,B
D 5 C
E 6 DF 7 E
G 8 E
H 6 F,G
a) Draw a precedence diagram of this operation
b) What is the cycle time for this operation
c) What is theoretical minimum number of workstationsd) Assign tasks to workstations
e) How much total idle time is present each day
f) What is the overall efficiency of the assembly line
Solution
a) Precedence diagram
-
8/3/2019 South Carolina Furniture Inc
2/11
b) Cycle time = Production time available per day
Unit required per day
= 480 minutes
50 chairs
= 9.6 ~ 10 min/chair
c) Total task time = 4 + 7 + 6 + 5 + 6 + 7 + 8 + 6
= 49 min
Minimum number of workstations = Total task time = 49 min
Cycle time 10 min
= 4.9 ~ 5 workstations
d) Tasks to workstation
Since the tasks time in workstation must be not exceeding the cycle time. Then,
total workstation is 7.
A
B
C
D E
F
G
Station 1
4 min 6 min Station 3
5 min
Station 4
6 min
Station 5
7 minH
Station 7
6 min
Station 2
7 min
Station 6
8 min
-
8/3/2019 South Carolina Furniture Inc
3/11
e) Idle time
Idle times are in workstation 2 = 3 min, workstation 3 = 5 min, workstation 4 =
4min, workstation 5 = 3min, workstation 6 = 2 min, workstation 7 = 4 min and
total idle time is 21 minutes
f) Efficiency
Efficiency = (4 + 7 + 6 + 5 + 6 + 7 + 8 + 6) min = 49
(7 workstations) x (10min) 16
= 70%
-
8/3/2019 South Carolina Furniture Inc
4/11
Mach 10 is a one person sailboat designed to be used in ocean. Manufactured by
Creative Leisure, Mach 10 can handle 40 mph winds seas over 10 feet. The final
assembly plant is in Cupertino, California. At this time, 200 minutes are available each
day to manufacture Mach 10. The daily demand is 60 boats. Given the following
information,
a) Draw the precedence diagram and assign tasks to the fewest workstations
possible.
b) What is the efficiency of the assembly line
c) What is the theoretical minimum number of workstations
d) What is the idle time
Solution
a) Precedence diagram and fewest workstation
Cycle time = Production time available per day
Unit required per day
= 200 minutes
60 chairs
= 3.33 ~ 4 min/chair
Task Performance TimeTask must follow Task
listed below
A 1 -
B 1 A
C 2 A
D 1 C
E 3 C
F 1 CG 1 D,E,F
H 2 B
I 1 G,H
-
8/3/2019 South Carolina Furniture Inc
5/11
b) Efficiency of assembly line
Efficiency = (1 + 1 + 2 + 1 + 3 + 1 + 1 + 2 + 1) min = 13
(4 workstations) x (4 min) 16
= 81.25%
c) Theoretical minimum number of workstation
No of workstation = total task time = 13
Cycle time 4
= 3.25 or 4 workstations
A
C
B
D
EF
G
I
H
Station 2
Station 1
Station 3 Station 4
-
8/3/2019 South Carolina Furniture Inc
6/11
-
8/3/2019 South Carolina Furniture Inc
7/11
Dr. Lori Baker, operation manager at Nesa Electronics, prides herself on excellent
assembly line balancing. She has been told that the firm needs to complete 96
instruments per 24 hour day. The assembly line activities are:
Task Time (min) Predecessors
A 3 -
B 6 -
C 7 A
D 5 A,B
E 2 B
F 4 C
G 5 FH 7 D,E
I 1 H
J 6 E
K 4 G,I,J
a) Draw precedence diagram
b) If the daily (24- hour) production rate is 96 units, what is the highest allowablecycle time
c) If the cycle time after allowances is given as 10 minutes, what is the daily (24
hour) production rate
d) What a 10 minute cycle time, what is the theoretical minimum number of station
with which the line can be balanced
e) What a 10 minutes cycle time and six workstations, what is the efficiency
f) What is the total idle time per cycle with a 10 minute cycle time and six
workstations
g) What is the best workstation assignment you can make without exceeding a 10
minute cycle time and what is its efficiency
-
8/3/2019 South Carolina Furniture Inc
8/11
Solution:
a)
b) Cycle time
Cycle time = (24 hours) (60 minutes/ hours)
96 units
= 15 minutes/unit
c) Production rates
Production rates = cycle time x production units
= (10 min/unit) (96 units)
= 960 minutes
A
D
C
B
F
H
J
G
E
KI
-
8/3/2019 South Carolina Furniture Inc
9/11
d) Minimum workstations
No of workstation = Total time
Cycle time
= (3 + 6 + 7 + 5 + 2 + 4 + 5 + 7 + 1 + 6 + 4) min
10 min
= 5 workstations
e) Efficiency
Efficiency = 50 min
(6 workstations) (10 min/units)
= 83.33%
-
8/3/2019 South Carolina Furniture Inc
10/11
f) Workstations
Idle times are in workstation1 = 1 min, workstation 2 = 3 min, workstation 3 = 1
min, workstation 4 = 1 min, workstation 5 = 3 min, workstation 6 = 1 min and total
idle time is 10 minutes
A
B
C
D
F
K
H
G
I
E J
Station 1
3 min
6 min
Station 2
7 min
Station 3
4 min
5 min
Station 4
7 min
2 min
Station 5
1 min
6 min
Station 6
5 min
4 min
-
8/3/2019 South Carolina Furniture Inc
11/11
g) the best workstation assignment you can make without exceeding a 10 minute
cycle time and its efficiency
Efficiency = 50 min
(6 workstations) (9 min/units)
= 92.6%
A
B
C
D
F
KH
G
I
E J
Station 1
3 min
6 min
Station 2
7 min
Station 3
4 min
5 min
Station 4
7 min 1 min
Station 5
2 min 6 min
Station 6
5 min
4 min