South Eastern Power Networks plc
Use of System Charging Statement
FINAL NOTICEEffective from 1 Apr il 2014Version 2.1
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
2/36
Version Control Version Publication
DateDescription of version and any changes made
1.0 24/12/2013 Indicative Charges Effective 1 April 2014 (form to be approvedby Ofgem)
2.0 19/02/2014 Final Charges Effective 1 April 2014 (form still awaiting Ofgemapproval)
Please note changes have been made to the following charges:-
Annex 1:LV Medium Non-DomesticLV HH MeteredHV HH MeteredLV UMS (Pseudo HH Metered)LV Sub Generation Non-Intermittent
Annex 4: All charges beginning with:LDNO LVLDNO HV
2.1 20/02/2014 Form Approval received from Ofgem
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
3/36
Contents
1. Introduction ........................................................................................................................................... 2
2. Charge Application and Definitions ...................................................................................................... 3
Supercustomer Billing and Payment .................................................................................................... 3 Supercustomer Charges ...................................................................................................................... 3 Site-Specific Billing and Payment......................................................................................................... 4
Site-Specific Billed Charges ................................................................................................................. 4
Time Periods for Half-Hourly Metered Properties ................................................................................ 5
Time Periods for Half-Hourly Unmetered Properties............................................................................ 6 Application of Capacity Charges .......................................................................................................... 6 Chargeable Capacity ............................................................................................................................ 6 Exceeded Capacity .............................................................................................................................. 6 Demand Exceeded Capacity ................................................................................................................ 7 Generation Exceeded Capacity ............................................................................................................ 7 Standby Capacity for Additional Security on Site ................................................................................. 7
Minimum Capacity Levels .................................................................................................................... 7
Application of Charges for Excess Reactive Power ............................................................................. 8
Demand Chargeable Reactive Power .................................................................................................. 8 Generation Chargeable Reactive Power .............................................................................................. 8 Generation Charges for pre-2005 Designated EHV Properties ........................................................... 9 Provision of Billing Data ....................................................................................................................... 9 Out of Area Use of System Charges .................................................................................................. 10 Licensed Distribution Network Operator Charges .............................................................................. 10 Third Party Access from Exempt Distribution Networks .................................................................... 11
3 Schedule of Charges for Use of the Distribution System 12
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
4/36
1. Introduction
1.1. This statement has been prepared in order to discharge the obligation of South
Eastern Power Networks plc, hereafter referred to as “UK Power Networks”, under
standard licence condition 14 of its Electricity Distribution Licence. It contains
information about our charges 1 and charging principles for use of our distribution
system. It also contains information about our Line Loss Factors (LLFs).
1.2. The charges in this statement are calculated using the Common DistributionCharging Methodology (CDCM) for Low Voltage and High Voltage (LV and HV)
Designated Properties and the Extra-high Voltage Distribution Charging Methodology
(EDCM) for Designated Extra-high Voltage (EHV) properties. The application of
charges to premises can usually be referenced using the Line Loss Factor Class
(LLFC) contained in the charge tables.
1.3. All charges in this statement are shown exclusive of VAT. Invoices will include VAT at
the current applicable rate.
1.4. The annexes that form part of this statement are also provided for additional
convenience in spreadsheet format. This spreadsheet also contains supplementary
information used for charging purposes but which is not required to be provided in
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
5/36
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
6/36
permitted in the Electricity (Unmetered Supply) Regulations 2001 2 and where
operated in accordance with BSCP520 3 and traded as NHH.
2.8. Identification of the appropriate charge can be made by cross-reference to the LLFC.
2.9. Valid Settlement combinations 4 for these LLFCs are detailed in Market Domain Data
(MDD).
2.10. Where an MPAN has an invalid settlement combination, the ‘Domestic Unrestricted’
fixed and unit charge will be applied as default until the invalid combination is
corrected. Where there are multiple SSC/TPR combinations, the default ‘Domestic
Unrestricted’ fixed and unit charge will be applied for each invalid TPR combination.
2.11. The time periods for the charge rates are as specified by the SSC. To determine the
appropriate charge rate for each SSC/TPR a lookup table is provided in the spread
sheet that accompanies this statement.
2.12. The ‘Domestic Off-Peak’ and ‘Small Non-Domestic Off-Peak’ charges are
supplementary to either an Unrestricted or a Two Rate charge.
Site-Specific Billing and Payment
2.13. Site-specific billing and payment applies to metering points settled as Half Hourly
(HH) t d Th it ifi billi d t h k f HH
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
7/36
• a fixed charge, pence/MPAN/day or pence/MSID/day;
• a capacity charge, pence/kVA/day, for Maximum Import Capacity (MIC) and/or
Maximum Export Capacity (MEC);
• an excess capacity charge, pence/kVA/day, if a site exceeds its MIC and/or MEC;
• unit charges, pence/kWh; more than one unit charge may apply;
and
•
an excess reactive power charge, pence/kVArh, for each unit in excess of thereactive charge threshold.
2.18. Users who wish to supply electricity to Customers whose Metering System is
Measurement Class C, D, E within SVA or Users who trade their own electricity within
CVA will be allocated the relevant charge structure dependent upon the voltage and
location of the Metering Point.
2.19. Measurement Class C, E or CVA charges apply to Exit/Entry Points where HH
metering, or an equivalent meter, is used for Settlement purposes.
2.20. Measurement Class D charges apply to Exit Points deemed to be suitable as
Unmetered Supplies as permitted in the Electricity (Unmetered Supply) Regulations
2001 d h t d i d ith BSCP520
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
8/36
2.26. The time periods for the application of unit charges to Designated EHV Properties are
detailed in Annex 2.
UK Power Networks has not issued a notice to change the time bands.
Time Periods for Half-Hourly Unmetered Properties
2.27. The time periods for the application of unit charges to connections that are Pseudo
HH metered are detailed in Annex 1.
UK Power Networks has not issued a notice to change the time bands.
Appl ication of Capaci ty Charges
2.28. The following sections explain the application of Capacity Charges and Exceeded
Capacity charges.
Chargeable Capacity
2.29. The chargeable capacity is, for each billing period, the MIC/MEC, as detailed below.
2.30. The MIC/MEC will be agreed with UK Power Networks at the time of connection or
pursuant to a later change in requirements. Following such an agreement (be it at
the time of connection or later) no reduction in MIC/MEC will be allowed for a period
of 12 months. In the absence of an agreement the chargeable capacity, save for
i i ill b b d th l t MIC d/ MEC i l d b th
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
9/36
Demand Exceeded Capacity
)0,),max(max(2capacityexceededDemand22
MICRERI AI −+×=
Where:
AI = Active Import (kWh)
RI = Reactive Import (kVArh)
RE = Reactive Export (kVArh)
MIC = Maximum Import Capacity (kVA)
2.33. Only reactive import and reactive export values occurring at times of active import are
used in the calculation. Where data for two or more MPANs is aggregated for billing
purposes the HH consumption values are summated prior to the calculation above.
2.34. This calculation is completed for every half hour and the maximum value from the
billing period is applied.
Generation Exceeded Capacity
)0,),max(max(2capacityexceededGeneration 22 MECRERI AE −+×=
Where:
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
10/36
Appl ication of Charges for Excess Reacti ve Power
2.39. When an individual HH metered MPAN’s reactive power (measured in kVArh) at LV
and HV Designated Properties exceeds 33% of total active power (measured in
kWh), excess reactive power charges will apply. This threshold is equivalent to an
average power factor of 0.95 during the period. Any reactive units in excess of the
33% threshold are charged at the rate appropriate to the particular charge.
2.40. Power Factor is calculated as follows:
Cos θ = Power Factor
2.41. The chargeable reactive power is calculated as follows:
Demand Chargeable Reactive Power
( )
011
AIRI REkVA hh blD d
kWh
kVArh
θ
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
11/36
Where:
AE = Active Export (kWh)
RI = Reactive Import (kVArh)
RE = Reactive Export (kVArh)
2.45. Only reactive import and reactive export values occurring at times of active export are
used in the calculation. Where data for two or more MPANs is aggregated for billing
purposes the HH consumption values are summated prior to the calculation above.
2.46. The square root calculation will be to two decimal places.
2.47. This calculation is completed for every half hour and the values summated over the
billing period.
Generation Charges for pre-2005 Designated EHV Properties
2.48. Designated EHV Properties that were connected to the distribution system under a
pre-2005 connection charging policy are eligible for exemption from Generation Use
of System charges unless one of the following criteria has been met:
• 25 years have passed since their first energisation/connection date, i.e.
Designated EHV Properties with energisation/connection agreements dated prior
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
12/36
amount consumed and/or produced in each half hour of each day and shall
separately identify active and reactive import and export. Metering data provided to
UK Power Networks shall be consistent with that received through the metering
equipment installed. Metering data shall be provided in an electronic format specified
by UK Power Networks from time to time and, in the absence of such specification,
metering data shall be provided in a comma-separated text file in the format of D0036
MRA data flow (as agreed with UK Power Networks). The data shall be emailed
2.51. UK Power Networks requires details of reactive power consumed or produced to be
provided for all Measurement Class C (mandatory HH metered) sites and for
Measurement Class E (elective HH metered) sites. It is also required for CVA sites
and Exempt Distribution Network boundaries with Difference Metering. UK Power
Networks reserves the right to levy a charge on Users who fail to provide suchreactive data. In order to estimate missing reactive data, a power factor of 0.9 lag will
be applied to the active consumption in any half hour.
Out of Area Use of System Charges
2.52. UK Power Networks does not operate networks outside its distribution service area.
Li d Di ib i N k O Ch
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
13/36
2.57. For nested networks the relevant charging principles set out in DCUSA Schedule 21
will apply.
Third Party Access from Exempt Distr ibution Networks
2.58. Where one of our MPANs is embedded within an Exempt Distribution Network
connected to one of UK Power Networks’ distribution systems, and a Difference
Metering scheme is in place for settlement purposes, we will continue to charge the
Supplier of the boundary MPAN of the connection, based on gross measurement for
distribution use of system. No charges will be levied directly to the Customer or
Supplier of the embedded MPAN(s) connected within the Exempt Distribution
Network.
2.59. UK Power Networks requires that gross metered data for the boundary of the
connection is provided to them. Until a new flow is introduced for the sending of such
gross data, gross metered data shall:
• be sent using the D0036 MRA data flow; and
• the D0036 shall contain the metering reference specified by UK Power Networks
in place of the boundary settlements MPAN.
2.60. For the avoidance of doubt the reduced Difference Metered measurement data for
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
14/36
3. Schedule of Charges for Use of the Distr ibut ion System
3.1. Tables listing the distribution use of system charges are published in the annexes tothis document.
3.2. These charges are also listed in a spreadsheet which is published with this statement
and can be downloaded from www.ukpowernetworks.co.uk.
3.3. Annex 1 contains charges to LV and HV Designated Properties.
3.4. Annex 2 contains the charges to Designated EHV Properties and charges applied to
LDNOs with Designated EHV Properties embedded in networks within UK Power
Networks’ area.
3.5. Annex 3 contains details of any preserved and additional charges that are valid at this
time. Preserved charges are mapped to an appropriate charge and are closed to
new customers.
3.6. Annex 4 contains the charges applied to LDNOs in respect of LV and HV Designated
Properties embedded in networks within UK Power Networks’ distribution services
area.
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
15/36
4. Schedule of Line Loss Factors
Role of Line Loss Factors in the Supply of Electricity4.1. Electricity entering or exiting the DNOs’ networks is adjusted to take account of
energy that is lost5 as it is distributed through the network.
4.2. This adjustment is made to ensure that energy bought or sold by a User, from/to a
Customer, accounts for energy lost as part of distributing energy to and from the
Customer’s premises.
4.3. DNOs are responsible for calculating the LLFs and providing these factors to Elexon.
Elexon manage the Balancing and Settlement Code (BSC). The code covers the
governance and rules for the balancing and settlement arrangements.
4.4. Annex 5 provides the LLFs which must be used to adjust the metering system
volumes to take account of losses on the distribution network.
Calculation of Line Loss Factors
4.5. LLFs are calculated in accordance with BSC Procedure (BSCP) 128, which
determines the principles that DNOs must comply with when calculating LLFs.
4.6. LLFs are calculated using either a generic method or a site-specific method. The
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
16/36
4.10. The Elexon portal website, www.elexonportal.co.uk, contains the LLFs in standard
industry data format (D0265). A user guide with details on registering and using the
portal can be downloaded from www.elexonportal.co.uk/userguide .
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
17/36
5. Notes for Designated EHV Properties
EDCM Nodal/Network Group Costs5.1. A table is provided in the accompanying spreadsheet which shows the unscaled LRIC
nodal costs used to calculate the current EDCM charges. These charges are
published on our website www.ukpowernetworks.co.uk.
5.2. These are illustrative of the modelled costs at the time that this statement was
published. A new connection will result in changes to current network utilisations,
which will then form the basis of future prices: the charge determined in this
statement will not necessarily be the charge in subsequent years because of the
interaction between new and existing network connections and any other changes
made to UK Power Networks’ distribution system which may affect charges.
Charges for New Designated EHV Properties
5.3. Charges for any new Designated EHV Properties calculated after publication of the
current statement will be published in an addendum to that statement as and when
necessary.
5.4. The form of the addendum is detailed in Annex 6 to this statement.
5.5. The addendum will be sent to relevant DCUSA parties and published as a revised
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
18/36
5.9. Several options exist in which UK Power Networks may agree for some or the entire
MIC to be interruptible. Under the EDCM the applicable demand capacity costs would
be based on the MIC minus the capacity subject to interruption.
5.10. An EDCM customer interested in making part or all of its MIC interruptible as an
integral irrevocable feature of a new connection or modification to their existing
connection should in the first instance contact UK Power Networks’ connections
function;
• By emailing [email protected]
• By telephone to 08701 964 599
• By writing to UK Power Networks, Projects Gateway, Metropolitan House, Darkes
Lane, Potters Bar, EN6 1AG
The customer must make an express statement in their application that they have an
interest in some or all of the import capacity being interruptible for active network
management purposes.
5.11. An EDCM customer who is proactively interested in voluntarily but revocably offering
to make some or all of their existing connection’s MIC interruptible should in the first
instance contact UK Power Networks’ Agreement Manager at the address in
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
19/36
6. Electrici ty Distribution Rebates
6.1. UK Power Networks has neither given nor formally announced any Use of System
rebates to Users in the 12 months preceding the date of publication of this revision of
the statement.
7. Accounting and Administ ration Services
7.1. UK Power Networks reserves the right to impose payment default remedies. The
remedies are as set out in DCUSA where applicable or else as detailed in the
following paragraph.
7.2. If any invoices that are not subject to a valid dispute remain unpaid on the due date,
late payment interest (calculated at base rate plus 8%) and administration charges
will be imposed.
7.3. Our administration charges will be set at a level which is in line with the Late Payment
of Commercial Debts Regulations 2002;
Size of Unpaid Debt Late Payment Fee
Up to £999.99 £40.00
£1,000 to £9,999.99 £70.00
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
20/36
9. Glossary of Terms
9.1. The following definitions, which can extend to grammatical variations and cognateexpressions, are included to aid understanding:
Term Definition
All-the-way Charge A tariff applicable to an end User rather than an LDNO.
Balancing and Settlement Code(BSC)
The BSC contains the governance arrangements forelectricity balancing and settlement in Great Britain. Anoverview document is available at:
www.elexon.co.uk/ELEXONDocuments/trading_arrangements.pdf .
CDCM
The common distribution charging methodology used forcalculating charges to Designated Properties as required bystandard licence condition 13A of the Electricity Distribution
Licence.
Central Volume Allocation (CVA) As defined in the BSC.
A person to whom a User proposers to supply, or for thetime being supplies, electricity through an exit point, or fromwho, a User or any relevant exempt supplier, is entitled torecover charges, compensation or an account of profits inrespect of electricity supplied though an Exit Point.
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
21/36
Term Definition
Distribution Connection and Useof System Agreement (DCUSA)
The DCUSA is a multi-party contract between the licensedelectricity distributors, suppliers, generators and OffshoreTransmission Owners (OFTOs) of Great Britain.
It is a requirement that all licensed electricity distributorsand suppliers become parties to the DCUSA.
Distribution Network Operator(DNO)
An electricity distributor who operates one of the 14distribution services areas and in whose ElectricityDistribution Licence the requirements of Section B of the
standard conditions of that licence have effect.
Distribution Services AreaThe area specified by the authority within which each DNOmust provide specified distribution services.
Distribution System
The system consisting (wholly or mainly) of:
• electric lines owned or operated by an authoriseddistributor that is used for the distribution ofelectricity from grid supply points or generation sets
or other entry points to the points of delivery tocustomers or users; or
• any transmission licensee in its capacity asoperator of that licensee’s transmission system orthe Great Britain (GB) transmission system
and includes any remote transmission assets (owned by atransmission licensee within England and Wales) that areoperated by that authorised distributor and any electricalplant, electricity meters, and metering equipment owned or
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
22/36
Term Definition
Entry Point
A boundary point at which electricity is exported onto adistribution system from a connected installation or fromanother distribution system, not forming part of the totalsystem (boundary point and total system having themeaning given to those terms in the BSC).
Exempt Distributor
A person who is an operator of an electricity distributionsystem intended for the conveyance of electricity to or fromusers connected to that electricity distribution system for
which a specific exemption to hold a distribution licencepursuant to the Electricity Act has been granted to thatoperator or the operator is entitled to not hold a distributionlicence consequent to a class exemption from the holding ofa distribution licence also issued pursuant to section 5 ofthe Electricity Act as amended.
Exempt Distribution Network
Any structures, equipment, lines, appliances or devicesused, or to be used, at a Premises, that constitutes an
electricity distribution system under the control if not theownership of the Exempt Distributor.
Exit Point
A Point of Connection at which a supply of electricity mayflow from the Distribution System to the Customer’sinstallation or User’s installation or the Distribution Systemof another person.
Extra-High Voltage (EHV) Nominal voltages of 22kV and above.
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
23/36
Term Definition
Invalid Settlement Combination A Settlement Combination that is not recognised as a validcombination in Market Domain Data –see: https://www.elexonportal.co.uk/MDDVIEWER
kVA Kilovolt Amperes.
kVArh Kilovolt Ampere reactive hour.
kW Kilowatt.
kWh Kilowatt hour (equivalent to one “unit” of electricity).
Licensed Distribution NetworkOperator (LDNO)
The holder of a licence in respect of distribution activities inGreat Britain.
Line Loss Factor (LLF)The factor used in Settlement to adjust the metering systemvolumes to take account of losses on the DistributionSystem.
Line Loss Factor Class (LLFC) An identifier assigned to an SVA metering system which isused to assign the LLF and Use of System charges.
Low Voltage (LV) Nominal voltages below 1kV.
Market Domain Data (MDD)Market domain data is a central repository of reference dataused by all users involved in settlement. It is essential tothe operation of SVA trading arrangements.
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
24/36
Term Definition
Metering Point
The point at which electricity that is exported to or importedfrom the Licensee’s Distribution System is measured, isdeemed to be measured, or is intended to be measuredand which is registered pursuant to the provisions of theMRA. For the purposes of this statement, GSPs are not‘metering points’.
Metering SystemParticular commissioned metering equipment installed forthe purposes of measuring the quantities of exports and/or
imports at the Exit or Entry point.
Metering Point AdministrationNumber (MPAN)
A number relating to a metering point under the MRA.
Meter Timeswitch Code (MTC)
MTCs are three digit codes allowing Suppliers to identifythe metering installed in Customers’ premises. Theyindicate whether the meter is single or multi-rate, pre-payment or credit, or whether it is ‘related’ to another meter.
MRA The Master Registration Agreement.
Nested LDNO A Distribution System Operator that is responsible for aNested Network.
Nested Networks
This refers to a situation where there is more than one levelof Embedded Network and therefore Nested DistributionSystems between LDNOs (e.g. host DNOintermediate
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
25/36
Term Definition
Supplier An organisation with a supply licence which can registeritself as being responsible for electricity supplied to and/orexported from a metering point.
Supplier Volume Allocation(SVA)
As defined in the BSC.
Time Pattern Regime (TPR)The pattern of switching behaviour through time that one ormore meter registers follow.
Use of System ChargesCharges applicable to Demand and Generation connectionswhich are connected to and utilise the Distribution Network.
UserSomeone that has a Use of System agreement with theDNO e.g. a Supplier, Generator or other DNO.
Unmetered SuppliesExit points deemed to be suitable as unmetered supplies aspermitted in the Electricity (Unmetered Supply) Regulations
2001 and where operated in accordance with BSCP520.
10. Annexes 1 to 6
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
26/36
Annex 1 - Schedule of Charges for use of the Distribution System by LV and HV Designated Properties
Time periods Red Time Band Green Time Band Black Time Band Yellow Time Band Green Time Band
Monday to Friday
(Including Bank Holidays)
All Year
16.00 - 19.00 16.00 - 19.0007:00 - 16.00
19.00 - 23.00
Monday to Friday
(Including Bank Holidays)
All Year
07.00 - 23.00
Monday to Friday
(Including Bank Holidays)
All Year
00.00 - 07.00
23.00 - 24.00
00.00 - 07.00
23.00 - 24.00
Saturday and Sunday
All Year 00.00 - 24.00 00.00 - 24.00
Notes
Open LLFCs PCs
Unit rate 1
p/kWh
(red/black)
Unit rate 2
p/kWh
(amber/yellow)
Unit rate 3
p/kWh
(green)
Fixed charge
p/MPAN/day
Capacity charge
p/kVA/day
Reactive power
charge
p/kVArh
Excess capacity
charge
p/kVA/day
Closed LLFCs
Domestic Unrestricted 300, 301 1 2.617 3.99
Domestic Two Rate 100, 101, 250 2 3.252 0.073 3.99
Domestic Off Peak (related MPAN) 251, 283, 296 2 0.372
Small Non Domestic Unrestricted 320, 324 3 1.531 4.29
Small Non Domestic Two Rate 120, 124, 270, 274 4 1.926 0.042 4.29
Small Non Domestic Off Peak (related MPAN) 10, 287, 297 4 0.344
LV Medium Non-Domestic 480, 484 5-8 1.908 0.038 30.86
LV Sub Medium Non-Domestic
HV Medium Non-Domestic
LV HH Metered 550 0 12.509 0.181 0.026 12.47 3.11 0.353 3.11
LV Sub HH Metered 11 774 0 114 0 021 8 55 5 41 0 298 5 41
South Eastern Power Networks - Effective from 1st April 2014 - Final LV and HV charges
Amber Tim e Band
07.00 - 16.00
19.00 - 23.00
Monday to Friday
(Including Bank Holidays)
November to February
Inclusive
Monday to Friday
(Including Bank Holidays)
March to October Inclusive
Monday to Friday
(Including Bank Holidays)
All Year
Notes
Time Bands for Half Hourly Unmetered PropertiesTime Bands for Half Hourly Metered Properties
All tim es are in UK Clock time
Saturday and Sunday
All Year
All tim es are in UK Clock time
Annex 2 - Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with Designated EHV Properties/end-users).
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
27/36
Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site. 1 of 2
ImportUnique Identifier
LLFC ImportMPANs/MSIDs
Export UniqueIdentifier
LLFC ExportMPANs/MSIDs
Name
Import
Super Redunit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceededcapacity rate
(p/kVA/day)
Export
Super Redunit rate
(p/kWh)
Export
fixed charge
(p/day)
Export
capacity rate
(p/kVA/day)
Export
exceededcapacity rate
(p/kVA/day)
ASHGEN 796 1900090978866 ASHGEN 797 1900090978875 BREHON PROPERTY UNIT TRUST (EUROPA NURSERIES) 0.564 46.54 1.64 1.64 -0.931 1,396.08 0.05 0.05
AYLESF 868 1900060216613 AYLESF 725 1900060436880 NPOWER COGEN LTD 1.032 198.67 1.08 1.08
B&RLTD 7711900035000482,
1900035425153BROWN AND ROOT LTD 0.691 138.50 4.09 4.09
BEDDIN 771
1900070745640,
1900070745650,
1900070745669,
1900070745678
MORGAN STANLEY & CO 1,922.22 1.24 1.24
BP_OIL 7711900017426438,
1900017426447BP OIL UK LIMITED 0.182 138.50 2.49 2.49
BRETSH 8711900090466576,
1900061003393BRETSH 726
1900060866064,
1900060866082NFPA 0.554 8.16 2.31 2.31
BRKHST 796 1900090834409 BRKHST 797 1900090834418 BIFFA WASTE SERVICES LTD 1.157 76.83 1.74 1.74 -1.737 3,937.63 0.05 0.05
CHESDC 7961999000002228,
1999000002237SOUTHERN ELECTRIC POWER DISTRIBUTION 198.67 1.25 1.25
CRYENG 872 1900060831692 CRYENG 730 1900060831708 ROLLS ROYCE-CROYDON ENERGY 0.099 70.97 1.38 1.38
DSCPRK 796 1900091057568 DSCPRK 797 1900091057559 DISCOVERY PARK, KENT 1.058 69.67 2.51 2.51 -1.065 1,072.90 0.05 0.05
E_SHOS-1 7104 MSID: 7104 E_SHOS-1 7104 MSID: 7104 SHOREHAM POWER STATION 0.018 146.50 1.30 1.30
EMR_RD 873 1900060413234 EUROPEAN METAL RECYCLING LTD 3,207.61 0.51 0.51
EUROTU 874 1900060219605 EUROTUNNEL 57,191.74 0.53 0.53
GAT_AF 869
1900017427938,
1900017427947,
1900060576620
GATWICK AIRPORT LTD 1.324 2,281.37 6.09 6.09
GAT_BF 8701900060690231,
1900060690240GATWICK AIRPORT LTD 1.107 397.33 4.86 4.86
GROVEH 875 1900060225185 GROVEH 727 1900060225194 ST REGIS PAPER COMPANY LIMITED 260.54 1.04 1.04
HANSTA 8761900031426056,
1900004383769HANSTA 728
1900060442174,
1900060512032NFPA 3.628 1.14 1.15 1.15
KENTIS 877 1900070122273 KENTIS 722 1900070122343 KENTISH FLATS WINDFARM PROJECT 0.589 8.64 0.86 0.86
KINGSTON DNET MSID: 1027 UKPN 972.50 1.19 1.19
LCHEYI 878 1900090194653 LCHEYI 721 1900090194644 LITTLE CHEYNE COURT WIND FARM LIMITED 2.199 1.52 1.22 1.22 197.15 0.05 0.05
NEWHVN 800 1900090585014 NEWHVN 700 1900090585005 VEOLIA ES SOUTH DOWNS LTD 2.104 31.61 1.54 1.54 -2.482 221.28 0.05 0.05
NP_LAB 771 1900047386380 SERCO LTD 2.388 277.00 4.80 4.80
NR_3BR 866 1900060219145 NETWORK RAIL INFRASTRUCTURE LTD 1.130 596.00 4.11 4.11
NR_AFD 851 1900060219377 NETWORK RAIL INFRASTRUCTURE LTD 2.822 397.33 2.69 2.69
NR_ASH 879 1900070068129 NETWORK RAIL INFRASTRUCTURE LTD 0.041 397.33 3.58 3.58
NR_BRI 852 1900060218675 NETWORK RAIL INFRASTRUCTURE LTD 397.33 2.34 2.34
NR_BYF 853 1900060218727 NETWORK RAIL INFRASTRUCTURE LTD 0.309 596.00 2.40 2.40
NR_CAN 854 1900060218790 NETWORK RAIL INFRASTRUCTURE LTD 397.33 2.36 2.36
NR_CRO 855 1900060218815 NETWORK RAIL INFRASTRUCTURE LTD 397.33 1.98 1.98
Time Periods for Designated EHV Properties
Super Red Time Band
South Eastern Power Networks - Effective from 1st April 2014 - Final EDCM charges
16:00 - 19:00
All t imes are in UK Cl ock ti me
Time periods
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
Notes
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
28/36
Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site. 2 of 2
ImportUnique Identifier
LLFC ImportMPANs/MSIDs
Export UniqueIdentifier
LLFC ExportMPANs/MSIDs
Name
Import
Super Redunit rate
(p/kWh)
Import
fixed charge
(p/day)
Import
capacity rate
(p/kVA/day)
Import
exceededcapacity rate
(p/kVA/day)
Export
Super Redunit rate
(p/kWh)
Export
fixed charge
(p/day)
Export
capacity rate
(p/kVA/day)
Export
exceededcapacity rate
(p/kVA/day)
Time Periods for Designated EHV Properties
Super Red Time Band
South Eastern Power Networks - Effective from 1st April 2014 - Final EDCM charges
16:00 - 19:00
All t imes are in UK Cl ock ti me
Time periods
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
Notes
NR_DOR 856 1900060219303 NETWORK RAIL INFRASTRUCTURE LTD 2.371 397.33 2.59 2.59
NR_EAS 857 1900060218912 NETWORK RAIL INFRASTRUCTURE LTD 0.274 397.33 3.62 3.62
NR_FOK 858 1900060218959 NETWORK RAIL INFRASTRUCTURE LTD 1.378 397.33 3.19 3.19
NR_HAS 859 1900060218986 NETWORK RAIL INFRASTRUCTURE LTD 0.340 2,667.35 2.45 2.45
NR_LEA 860 1900060219001 NETWORK RAIL INFRASTRUCTURE LTD 0.194 397.33 2.44 2.44
NR_MAI 861 1900060219535 NETWORK RAIL INFRASTRUCTURE LTD 2.433 397.33 2.37 2.37
NR_NOR 862 1900060219891 NETWORK RAIL INFRASTRUCTURE LTD 794.66 1.82 1.82
NR_QUE 863 1900060219084 NETWORK RAIL INFRASTRUCTURE LTD 198.67 2.73 2.73
NR_SIT 864
1900060219819,
1900060219855,
1900060492477
NETWORK RAIL INFRASTRUCTURE LTD 0.019 397.33 2.03 2.03
NR_THA 865
1900060219720,
1900060219794,1900060492430
NETWORK RAIL INFRASTRUCTURE LTD 3.319 397.33 3.78 3.78
NR_TUN 867 1900060219206 NETWORK RAIL INFRASTRUCTURE LTD 8.169 397.33 6.76 6.76
OLDRSF 796 1900091024517 OLDRSF 797 1900091024526 OLD RIDES SOLAR FARM 0.288 4.58 20.13 20.13 392.75 0.05 0.05
PFIZER 881 1900060219544 PFIZER 724 1900060858356 PFIZER LIMITED 1.058 2,166.58 2.51 2.51
SENTIV 888
1900090497281,
1900090497290,
1900090497306,
1900090497315
SENTRUM SERVICE LTD 43,456.94 1.07 1.07
SEVIND 7160 MSID: 7160 SEVIND 7160 MSID: 7160 UKPN RESERVE 10.479 0.85 1.91 1.91 -11.081 68.40 0.05 0.05
SMURFI 882 1900060219952 SMURFI 723 1900060554947 TOWNSEND HOOK LTD 3.431 70.49 1.16 1.16
STAREN 883 1900060830217 STAREN 729 1900060830226 STAR ENERGY 0.155 822.33 11.47 11.47
THAEAR 850
1900090417081,
1900090417090,
1900090417115,
1900090417124,
1900090417151
THAEAR 733
1900090417170,
1900090417198,
1900090417203,
1900090417230
THANET EARTH CUSTOMERS
(charge divided by number of customers)386.67
THAEARD 8501998000000015,
1998000000024THAEARD 733
1998000000033,
1998000000042THANET ENERGY LIMITED (Distributor) 2.434 64.83 1.16 1.16 1,998.18 0.05 0.05
THAMEM 7711900090872672,
1900090872681THAMEM 792
1900090876979,
1900090876988THAMES WATER LTD 2.724 2,430.17 1.80 1.80 1,822.63 0.05 0.05
THAMES 884 1900016424857 THAMES 732 1900060576611 THAMES WATER UTILITIES LTD (IMPORT) 2.598 4,651.68 7.28 7.28
THANET 7230 MSID: 7230 THANET 7230 MSID: 7230 VATTENFALL 0.042 9.15 1.62 1.62 963.35 0.05 0.05
TS__33 886 1900060216622 THAMESTEEL LTD 397.33 2.32 2.32
TS_132 885 1900060225282 THAMESTEEL 3,155.68 0.52 0.52
WRGALL 887 1900070394457 WRGALL 731 1900070394466 KEL LTD 3.512 491.45 0.81 0.81
Annex 3 Schedule of Charges for use of the Distribution System to Preserved/Additional LLFC Classes
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
29/36
Annex 3 - Schedule of Charges for use of the Distribution System to Preserved/Additional LLFC Classes
1 of 1
Closed
LLFCsPCs
Unit rate 1
p/kWh
Unit rate 2
p/kWh
Unit rate 3
p/kWh
Fixed charge
p/MPAN/day
290 2 0.622
Closed
LLFCs PCs
Unit rate 1
p/kWh(red/black)
Unit rate 2
p/kWh(amber /yellow)
Unit rate 3
p/kWh(green)
Fixed charge
p/MPAN/day
Capacity charge
p/kVA/day
Reactive power
chargep/kVArh
Excess Capacity
chargep/kVA
.
The Budgetwarmth Unit Rate is based on the Domestic Off Peak charge with 0.250p/kWh added for equipment rental
South Eastern Power Networks has no Preserved NHH Tariffs/Additional LLFC classes
South Eastern Power Networks - Effective from 1st April 2014 - Final LV and HV tariffs
NHH preserved charges/additional L LFCs
Notes:
HH preserved charges/additional L LFCs
Notes:
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
30/36
Annex 4 - Charges applied to LDNOs with HV/LV end users
Time periods Red Time Band Amber Time Ban d Green Time Band Black Time Band Yellow Time Band Green Time Band
Monday to Friday
(Including Bank Holidays)
All Year
16.00 - 19.00 16.00 - 19.0007:00 - 16.00
19.00 - 23.00
Monday to Friday(Including Bank Holidays)
All Year
07.00 - 16.0019.00 - 23.00
07.00 - 23.00
Monday to Friday
(Including Bank Holidays)
All Year
00.00 - 07.00
23.00 - 24.00
00.00 - 07.00
23.00 - 24.00
Saturday and Sunday
All Year 00.00 - 24.00 00.00 - 24.00
Notes
Unique billingidentifier
PCs
Unit rate 1
p/kWh
(red/black)
Unit rate 2
p/kWh
(amber/yellow)
Unit rate 3
p/kWh
(green)
Fixed chargep/MPAN/day
Capacity chargep/kVA/day
Reactive power
charge
p/kVArh
Excess capacity
charge
p/kVA
LDNO LV: Domestic Unrestricted 1 1.838 2.80
LDNO LV: Domestic Two Rate 2 2.284 0.051 2.80
LDNO LV: Domestic Off Peak (related MPAN) 2 0.261
LDNO LV: Small Non Domestic Unrestricted 3 1.075 3.01
LDNO LV: Small Non Domestic Two Rate 4 1.353 0.030 3.01
LDNO LV: Small Non Domes tic Off Peak (related MPAN) 4 0.242
LDNO LV: LV Medium Non-Domestic 5-8 1.340 0.027 21.68
LDNO LV: LV HH Metered 0 8.787 0.127 0.018 8.76 2.18 0.248 2.18
LDNO LV: NHH UMS category A 8 1.094
LDNO LV: NHH UMS category B 1 1.560
LDNO LV: NHH UMS category C 1 2.699
LDNO LV: NHH UMS category D 1 0.801
LDNO LV: LV UMS (Pseudo HH Metered) 0 24.338 0.456 0.331
LDNO LV: LV Generation NHH 8 -0.903
LDNO LV: LV Generation Intermittent 0 -0.903 0.257
LDNO LV: LV Generation Non-Intermittent 0 -9.109 -0.197 -0.024 0.257
LDNO HV: Domestic Unrestricted 1 1.186 1.81
LDNO HV: Domestic Two Rate 2 1.474 0.033 1.81
South Eastern Power Networks - Effective from 1st April 2014 - Final LDNO tariffs
Time Bands for Half Hourly Unmetered Properties
All tim es are i n UK Clo ck ti me
Time Bands for Half Hourly Metered Properties
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
Notes All times are in UK Clock time
Monday to Friday(Including Bank Holidays)
March to October Inclusive
Monday to Friday
(Including Bank Holidays)
All Year
Saturday and Sunday
All Year
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
31/36
Time periods Red Time Band Amber Time Ban d Green Time Band Black Time Band Yellow Time Band Green Time Band
Monday to Friday
(Including Bank Holidays)
All Year
16.00 - 19.00 16.00 - 19.0007:00 - 16.00
19.00 - 23.00
Monday to Friday(Including Bank Holidays)
All Year
07.00 - 16.0019.00 - 23.00
07.00 - 23.00
Monday to Friday
(Including Bank Holidays)
All Year
00.00 - 07.00
23.00 - 24.00
00.00 - 07.00
23.00 - 24.00
Saturday and Sunday
All Year 00.00 - 24.00 00.00 - 24.00
Notes
Unique billingidentifier
PCs
Unit rate 1
p/kWh
(red/black)
Unit rate 2
p/kWh
(amber/yellow)
Unit rate 3
p/kWh
(green)
Fixed chargep/MPAN/day
Capacity chargep/kVA/day
Reactive power
charge
p/kVArh
Excess capacity
charge
p/kVA
South Eastern Power Networks - Effective from 1st April 2014 - Final LDNO tariffs
Time Bands for Half Hourly Unmetered Properties
All tim es are i n UK Clo ck ti me
Time Bands for Half Hourly Metered Properties
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
Notes All times are in UK Clock time
Monday to Friday(Including Bank Holidays)
March to October Inclusive
Monday to Friday
(Including Bank Holidays)
All Year
Saturday and Sunday
All Year
LDNO HVplus: NHH UMS category C 1 1.506
LDNO HVplus: NHH UMS category D 1 0.447
LDNO HVplus: LV UMS (Pseudo HH Metered) 0 13.581 0.254 0.185
LDNO HVplus: LV Generation NHH 8 -0.515
LDNO HVplus: LV Sub Generation NHH
LDNO HVplus: LV Generation Intermittent 0 -0.515 0.146
LDNO HVplus: LV Generation Non-Intermittent 0 -5.191 -0.112 -0.014 0.146
LDNO HVplus: LV Sub Generation Intermittent 0 -0.513 0.151
LDNO HVplus: LV Sub Generation Non-Intermittent0 -5.212 -0.104 -0.013 0.151
LDNO HVplus: HV Generation Intermittent 0 -0.542 32.00 0.188
LDNO HVplus: HV Generation Non-Intermittent 0 -5.706 -0.067 -0.012 32.00 0.188
LDNO EHV: Domestic Unrestricted 1 0.837 1.28
LDNO EHV: Domestic Two Rate 2 1.040 0.023 1.28
LDNO EHV: Domestic Off Peak (related MPAN) 2 0.119
LDNO EHV: Small Non Domestic Unrestricted 3 0.490 1.37
LDNO EHV: Small Non Domestic Two Rate 4 0.616 0.013 1.37
LDNO EHV: Small Non Domestic Off Peak (related MPAN) 4 0.110
LDNO EHV: LV Medium Non-Domestic 5-8 0.610 0.012 9.87
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
32/36
Time periods Red Time Band Amber Time Ban d Green Time Band Black Time Band Yellow Time Band Green Time Band
Monday to Friday
(Including Bank Holidays)
All Year
16.00 - 19.00 16.00 - 19.0007:00 - 16.00
19.00 - 23.00
Monday to Friday(Including Bank Holidays)
All Year
07.00 - 16.0019.00 - 23.00
07.00 - 23.00
Monday to Friday
(Including Bank Holidays)
All Year
00.00 - 07.00
23.00 - 24.00
00.00 - 07.00
23.00 - 24.00
Saturday and Sunday
All Year 00.00 - 24.00 00.00 - 24.00
Notes
Unique billingidentifier
PCs
Unit rate 1
p/kWh(red/black)
Unit rate 2
p/kWh(amber/yellow)
Unit rate 3
p/kWh(green)
Fixed chargep/MPAN/day
Capacity chargep/kVA/day
Reactive power
chargep/kVArh
Excess capacity
chargep/kVA
South Eastern Power Networks - Effective from 1st April 2014 - Final LDNO tariffs
Time Bands for Half Hourly Unmetered Properties
All tim es are i n UK Clo ck ti me
Time Bands for Half Hourly Metered Properties
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
Notes All times are in UK Clock time
Monday to Friday
(Including Bank Holidays)
March to October Inclusive
Monday to Friday
(Including Bank Holidays)
All Year
Saturday and Sunday
All Year
LDNO 132kV/EHV: LV Sub Generation NHH
LDNO 132kV/EHV: LV Generation Intermittent 0 -0.351 0.100
LDNO 132kV/EHV: LV Generation Non-Intermittent 0 -3.537 -0.076 -0.009 0.100
LDNO 132kV/EHV: LV Sub Generation Intermi ttent 0 -0.350 0.103
LDNO 132kV/EHV: LV Sub Generation Non -Intermittent 0 -3.551 -0.071 -0.009 0.103
LDNO 132kV/EHV: HV Generation Intermittent 0 -0.369 21.80 0.128
LDNO 132kV/EHV: HV Generation Non-Intermittent 0 -3.888 -0.046 -0.008 21.80 0.128
LDNO 132kV: Domestic Unrestricted 1 0.505 0.77
LDNO 132kV: Domestic Two Rate 2 0.628 0.014 0.77
LDNO 132kV: Domestic Off Peak (r elated MPAN) 2 0.072
LDNO 132kV: Small Non Domestic Unrestricted 3 0.295 0.83
LDNO 132kV: Small Non Domestic Two Rate 4 0.372 0.008 0.83
LDNO 132kV: Small Non Domestic Off Peak (related MPAN) 4 0.066
LDNO 132kV: LV Medium Non-Domestic 5-8 0.368 0.007 5.96
LDNO 132kV: LV Sub Medium Non-Domestic 5-8 0.359 0.007 2.40
LDNO 132kV: HV Medium Non-Domestic 5-8 0.275 0.004 20.88
LDNO 132kV: LV HH Metered 0 2.414 0.035 0.005 2.41 0.60 0.068 0.60
LDNO 132kV: LV Sub HH Metered 0 3.304 0.032 0.006 2.40 1.52 0.084 1.52
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
33/36
Time periods Red Time Band Amber Time Ban d Green Time Band Black Time Band Yellow Time Band Green Time Band
Monday to Friday
(Including Bank Holidays)
All Year
16.00 - 19.00 16.00 - 19.0007:00 - 16.00
19.00 - 23.00
Monday to Friday
(Including Bank Holidays)
All Year
07.00 - 16.0019.00 - 23.00
07.00 - 23.00
Monday to Friday
(Including Bank Holidays)
All Year
00.00 - 07.00
23.00 - 24.00
00.00 - 07.00
23.00 - 24.00
Saturday and Sunday
All Year 00.00 - 24.00 00.00 - 24.00
Notes
Unique billingidentifier PCs
Unit rate 1
p/kWh(red/black)
Unit rate 2
p/kWh(amber/yellow)
Unit rate 3
p/kWh(green)
Fixed chargep/MPAN/day Capacity chargep/kVA/day
Reactive power
chargep/kVArh
Excess capacity
chargep/kVA
South Eastern Power Networks - Effective from 1st April 2014 - Final LDNO tariffs
Time Bands for Half Hourly Unmetered Properties
All tim es are i n UK Clo ck ti me
Time Bands for Half Hourly Metered Properties
Monday to Friday
(Including Bank Holidays)
November to February Inclusive
Notes All times are in UK Clock time
Monday to Friday
(Including Bank Holidays)
March to October Inclusive
Monday to Friday
(Including Bank Holidays)
All Year
Saturday and Sunday
All Year
LDNO 0000: LV Sub Generation Non-Intermittent 0 -0.961 -0.019 -0.002 0.028
LDNO 0000: HV Generation Intermittent 0 -0.100 5.90 0.035
LDNO 0000: HV Generation Non-Intermittent 0 -1.052 -0.012 -0.002 5.90 0.035
Annex 5 – Schedule of Line Loss Factors
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
34/36
Period 1 Period 2 Period 3 Period 4 Period 5
Winter Peak Summer Peak Winter Shoulder Night Other
Monday to Friday
November to February16:00 - 19:59 07:00 - 15:59
Monday to Friday
June to August07:00 - 19:59
Monday to Friday
March07:00 - 19:59
All Year 00:00 - 06:59 All Other Times
Notes
Metered voltage Period 1 Period 2 Period 3 Period 4 Period 5 Associated LLFC
Low-Voltage Network 1.099 1.076 1.085 1.063 1.077
10, 100 ,101, 120, 124, 250,
251, 270, 274, 283, 287,
290, 296, 297, 300, 301,
320, 324, 350, 351, 352,
353, 354, 355, 356, 357,
358, 359, 360, 361, 362,
363, 364, 365, 366, 480,
484, 550, 921, 922, 932,
933, 935
Low-Voltage Substation 1.080 1.062 1.069 1.052 1.063 756, 781, 782
High-Voltage Network 1.057 1.044 1.049 1.034 1.044 650, 926, 937
High-Voltage Substation 1.053 1.040 1.045 1.032 1.040 771, 791, 792
33kV Generic 1.017 1.014 1.015 1.011 1.014 796, 797
132kV Generic 1.004 1.003 1.004 1.003 1.003 798, 799
EHV Site Specific LLFs
Demand
South Eastern Power Networks - Effective from 1st April 2014 - Final LLF Time Periods
All t imes are in UK Clo ck t ime
Time periods
Generic Demand and Generation LLFs
Metered voltage, respective periods and associated LLFCs
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
35/36
Site Period 1 Period 2 Period 3 Period 4 Period 5 Associated LLFC/MSID
EHV Site Specific LLFs
Demand
NR_DOR 1.032 1.022 1.026 1.017 1.025 856
NR_EAS 1.018 1.014 1.015 1.008 1.015 857
NR_FOK 1.014 1.011 1.013 1.008 1.011 858
NR_HAS 1.013 1.012 1.013 1.010 1.012 859
NR_LEA 1.006 1.006 1.006 1.006 1.006 860
NR_MAI 1.019 1.013 1.015 1.011 1.013 861
NR_NOR 1.010 1.008 1.009 1.006 1.008 862
NR_QUE 1.185 1.172 1.173 1.172 1.164 863
NR_SIT 1.014 1.010 1.013 1.009 1.011 864
NR_THA 1.034 1.022 1.026 1.018 1.024 865
NR_TUN 1.045 1.085 1.035 1.021 1.032 867
OLDRSF 1.017 1.014 1.015 1.011 1.014 796
PFIZER 1.029 1.022 1.028 1.021 1.026 881
RINGSF 1.017 1.014 1.015 1.011 1.014 796
SENTIV 1.007 1.007 1.007 1.007 1.008 888
SEVIND 1.053 1.040 1.045 1.032 1.040 MSID: 7160
SMURFI 1.024 1.025 1.024 1.025 1.025 882
STAREN 1.045 1.033 1.042 1.032 1.040 883
THAEAR 1.016 1.011 1.014 1.011 1.010 850
THAMEM 1.053 1.040 1.045 1.032 1.040 771
THAMES 1.017 1.014 1.015 1.012 1.015 884
THANET 1.000 0.998 1.000 0.997 0.999 MSID: 7230
TS__33 1.017 1.014 1.015 1.011 1.014 886
TS_132 1.004 1.003 1.004 1.003 1.003 885
WRGALL 1.061 1.037 1.063 1.040 1.047 887
EHV Site Specific LLFs
Generation
Annex 6 - New Designated EHV Properties. Addendum to Schedule of Charges for use of the Distribution System by Designated EHV Properties (including LDNOs with
-
8/9/2019 South Eastern Power Networks - Effective From 1st April 2014 - Final LV and HV Charges
36/36
Designated EHV Properties/end-users).
Note: The list of MPANs / MSIDs provided may be incomplete; the DNO reserves the right to apply the listed charges to any other MPANs / MSIDs associated with the site. 1 of 1
Import
Unique Identifier
Import
MPANs/MSIDs
Import
LLFC
Export
Unique Identifier
Export
LLFC
Export
MPANs/MSIDsName
Import
super-red
unit rate
p/kWh
Import fixed
charge
p/day
Import
capacity rate
p/kVA/day
Import
exceeded
capacity rate
p/kVA/day
Export
super-red
unit rate
p/kWh
Export fixed
charge
p/day
Export
capacity rate
p/kVA/day
Export
exceeded
capacity rate
p/kVA/day
EDCM import 1 EDCM export 1
EDCM import 2 EDCM export 2
EDCM import 3 EDCM export 3
EDCM import 4 EDCM export 4
EDCM import 5 EDCM export 5
EDCM import 6 EDCM export 6
EDCM import 7 EDCM export 7
EDCM import 8 EDCM export 8
EDCM import 9 EDCM export 9
EDCM import 10 EDCM export 10
Import
Unique Identifier
Import
MPANs/MSIDs
Import
LLFC
Export
Unique Identifier
Export
LLFC
Export
MPANs/MSIDsName
Import LLF
period 1
Import LLF
period 2
Import LLF
period 3
Import LLF
period 4
Import LLF
period 5
Export LLF
period 1
Export LLF
period 2
Export LLF
period 3
Export LLF
period 4
Export LLF
period 5
EDCM Import 1 EDCM Export 1
EDCM Import 2 EDCM Export 2
EDCM Import 3 EDCM Export 3
EDCM Import 4 EDCM Export 4
EDCM Import 5 EDCM Export 5
EDCM Import 6 EDCM Export 6
EDCM Import 7 EDCM Export 7
EDCM Import 8 EDCM Export 8
EDCM Import 9 EDCM Export 9
EDCM Import 10 EDCM Export 10
South Eastern Power Networks - Eff ective from 1st April 2014 - Final new designated EHV charges
Annex 6 - Ad dendu m to Annex 2 EHV ch arges
South Eastern Power Networks - Effective from 1st April 2014 - Final new designated EHV line loss factors