south florida east coast corridor transit analysis study

15
1 SOUTH FLORIDA EAST COAST CORRIDOR SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY TRANSIT ANALYSIS STUDY Municipal Meetings Municipal Meetings September 2006 September 2006

Upload: lavina

Post on 13-Jan-2016

32 views

Category:

Documents


7 download

DESCRIPTION

SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY. Municipal Meetings September 2006. N. Jasmine Yacinthe, Ph.D. Gannett Fleming, Inc. SFECC Transit Analysis Study. Tiered Alternatives Analysis/EIS Study Area Centered on FEC Two Miles Wide Approximately 85 Miles Long - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

1

SOUTH FLORIDA EAST COAST CORRIDORSOUTH FLORIDA EAST COAST CORRIDORTRANSIT ANALYSIS STUDYTRANSIT ANALYSIS STUDY

Municipal MeetingsMunicipal MeetingsSeptember 2006September 2006

Page 2: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

2

N. Jasmine Yacinthe, Ph.D.N. Jasmine Yacinthe, Ph.D.

Gannett Fleming, Inc.Gannett Fleming, Inc.

Page 3: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

3

SFECC Transit Analysis SFECC Transit Analysis StudyStudy

• Tiered Alternatives Analysis/EISTiered Alternatives Analysis/EIS

• Study Area Centered on FECStudy Area Centered on FEC– Two Miles WideTwo Miles Wide– Approximately 85 Miles LongApproximately 85 Miles Long

• Focus on North-South MobilityFocus on North-South Mobility– Multiple, Parallel N-S AlignmentsMultiple, Parallel N-S Alignments

• FEC, SFRC, US1, I-95FEC, SFRC, US1, I-95

– Consolidates Multiple Past StudiesConsolidates Multiple Past Studies• Tri-Rail Jupiter ExtensionTri-Rail Jupiter Extension• Miami-Dade Northeast CorridorMiami-Dade Northeast Corridor• Broward County Transit ImprovementsBroward County Transit Improvements

Page 4: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

4

Tiered Tiered Alternatives Analysis/EIS ProcessAlternatives Analysis/EIS Process

SectionalSectionalRecords of Records of

DecisionDecision

SectionalSectionalRecords of Records of

DecisionDecision

Tier 2 Tier 2 Sectional AnalysisSectional Analysis

Tier 2 Tier 2 Sectional AnalysisSectional Analysis

September 2005 September 2005 to April 2007to April 2007

April 2007April 2007

2007 to 2009+2007 to 2009+

RegionalRegionalRecord of Record of DecisionDecision

RegionalRegionalRecord of Record of DecisionDecision

Tier 1 Tier 1 Regional AnalysisRegional Analysis

Tier 1 Tier 1 Regional AnalysisRegional Analysis

Many AlternativesMany AlternativesQualitative ScreeningQualitative ScreeningDefine Tier 2 Study SegmentsDefine Tier 2 Study Segments

Few AlternativesFew AlternativesQuantitative ScreeningQuantitative ScreeningSystems to Implement Systems to Implement

Page 5: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

5

Florida East Coast RailwayFlorida East Coast Railway• 100-Foot Corridor through Three Counties100-Foot Corridor through Three Counties

– Presently One or Two Main Line TracksPresently One or Two Main Line Tracks– 203 At-Grade Highway Grade Crossings203 At-Grade Highway Grade Crossings

• Infrastructure Matched to Current OperationsInfrastructure Matched to Current Operations– Presently 26 Freight Trains per DayPresently 26 Freight Trains per Day– Capacity for Passenger Trains Capacity for Passenger Trains Very LimitedVery Limited

• Strategies to Increase Capacity Strategies to Increase Capacity – Add Main Line TracksAdd Main Line Tracks– Reduce Marine ConflictsReduce Marine Conflicts

• Elevate Key Water CrossingsElevate Key Water Crossings

– Ameliorate Grade CrossingsAmeliorate Grade Crossings• ““Quiet” Crossings through Whistle BansQuiet” Crossings through Whistle Bans• Consider Crossing ConsolidationsConsider Crossing Consolidations• Grade Separate Key Highway CrossingsGrade Separate Key Highway Crossings

Page 6: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

6

SFECC AlignmentsSFECC Alignments

PROSPECTIVE ALIGNMENTSPROSPECTIVE ALIGNMENTS

Railroad AlignmentsRailroad Alignments• Florida East Coast RailwayFlorida East Coast Railway• South Florida Railroad CorridorSouth Florida Railroad Corridor

(CSXT, Tri-Rail, Amtrak)(CSXT, Tri-Rail, Amtrak)Highway AlignmentsHighway Alignments• US-1US-1• Interstate 95Interstate 95OthersOthers• Intra-Coastal WaterwayIntra-Coastal Waterway• Power Utility Rights of WayPower Utility Rights of Way• CanalsCanals

95

1

®

Page 7: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

7

TRANSIT TECHNOLOGIESTRANSIT TECHNOLOGIES

SFECC Modal TechnologiesSFECC Modal Technologies

Regional BusRegional Bus

Light Rail TransitLight Rail Transit

Bus Rapid TransitBus Rapid Transit

Rail Rapid TransitRail Rapid Transit

Page 8: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

8

RAILROAD TECHNOLOGIESRAILROAD TECHNOLOGIES

SFECC Modal TechnologiesSFECC Modal Technologies

Type 2 DMUType 2 DMUType 1 DMUType 1 DMUType 1 DMUType 1 DMU

Regional (Commuter) RailRegional (Commuter) Rail502 502502 502

Page 9: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

Service SegmentService Segment AlignmentAlignment RGBRGB BRTBRT LRTLRT RRTRRT Tri-RailTri-Rail Other RGROther RGR

11 West Palm West Palm Beach NorthBeach North

FECFEC

US1US1

I-95I-95

22 North Palm North Palm Beach CountyBeach County

FECFEC

US1US1

33 West Palm West Palm Beach SouthBeach South

FECFEC

US1US1

44 East Broward East Broward CountyCounty

FECFEC

US1US1

55 Ft Lauderdale – Ft Lauderdale – MiamiMiami

FECFEC

US1US1

66 Miami NortheastMiami NortheastFECFEC

US1US1

SFECC Preliminary AlternativesSFECC Preliminary Alternatives502 502

95

1

1

1

1

1

1

Page 10: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

10

Miami-Dade/South Broward County Station AreasMiami-Dade/South Broward County Station Areas

Page 11: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

11

Tier 1 ConclusionsTier 1 Conclusions

• Eliminate US1 AlternativesEliminate US1 Alternatives– More Costly & Less Ridership More Costly & Less Ridership

Than FEC AlternativesThan FEC Alternatives• Eliminate I-95 Rail AlternativesEliminate I-95 Rail Alternatives

– Expense Disproportional to Expense Disproportional to RidershipRidership

– Retain Regional Bus AlternativeRetain Regional Bus Alternative• Terminate Alternatives in JupiterTerminate Alternatives in Jupiter

– Tequesta Service Requires New Tequesta Service Requires New High-Level Crossing of the High-Level Crossing of the LoxahatcheeLoxahatchee

– Martin County Park-Ride Traffic Martin County Park-Ride Traffic Handled Better at PGA Blvd StationHandled Better at PGA Blvd Station

Page 12: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

12

DecDec JanJan FebFeb MarMar AprApr MayMay JunJun JulJul AugAug SepSep OctOct NovNov DecDec JanJan FebFeb MarMar AprApr MayMay

0505 20062006 20072007Advance Advance Notification ReviewNotification Review

Public

Hea

rings

(3)

Public

Hea

rings

(3)

Public

Wor

ksho

p #1

(5)

Public

Wor

ksho

p #1

(5)

Public

Wor

ksho

p #2

(5)

Public

Wor

ksho

p #2

(5)

Public

Kic

koff

/ Sco

ping

(3)

Public

Kic

koff

/ Sco

ping

(3)

Elect

ed/A

genc

y Kic

k-O

ff (3

)

Elect

ed/A

genc

y Kic

k-O

ff (3

)

Advan

ce N

otifi

catio

n

Advan

ce N

otifi

catio

n

SFECC (Phase 1) Project ScheduleSFECC (Phase 1) Project Schedule

Alternatives Development

Alternatives Development

Regional ROD

Regional ROD

Data Collection

Data Collection

Regional Travel Survey

Regional Travel Survey

MPO, SFRTA

MPO, SFRTA

Endorsement

Endorsement

Existing Freight Analysis

Existing Freight Analysis

Submit Draft PEIS

Submit Draft PEIS

Submit Final PEIS

Submit Final PEIS

Mun

icip

al W

orks

hop

Mun

icip

al W

orks

hop

M

unic

ipal

Mee

tings

Mun

icip

al M

eetin

gsFreight Integration Analysis

Freight Integration Analysis

Page 13: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

13

• Adopt Resolutions of Support in Favor of the Project.Adopt Resolutions of Support in Favor of the Project.• Identify Your General Issues and Concerns.Identify Your General Issues and Concerns.• Address Regional Transit System vs. Local Challenges.Address Regional Transit System vs. Local Challenges.• Help Identify Corridor Subsections (Help Identify Corridor Subsections (Logical Project LimitsLogical Project Limits).).• Help Prioritize Corridor Sections (Help Prioritize Corridor Sections (ImplementationImplementation).).• Provide Input on Tier 1 Alternatives (Provide Input on Tier 1 Alternatives (Screen Out Non-Viable Screen Out Non-Viable

OptionsOptions))• Encourage TODEncourage TOD** and TSLU and TSLU**** at Stations Sites ( at Stations Sites (ZoningZoning))• Identify Financing & Funding Partners (Identify Financing & Funding Partners (City, County, OthersCity, County, Others))

Transportation Decisions by MPOsTransportation Decisions by MPOs Land Use Decisions by Counties & CitiesLand Use Decisions by Counties & Cities

How Can Municipalities Help?How Can Municipalities Help?

** TOD – TOD – TTransit-ransit-OOriented riented DDevelopment evelopment ** ** TSLU – TSLU – TTransit ransit SSupportive upportive LLand and UUsesses

Page 14: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

14

PLEASE VISIT US ATPLEASE VISIT US ATWWW.SFECCSTUDY.COMWWW.SFECCSTUDY.COM

Page 15: SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY

15

Tier 1 RecommendationsTier 1 Recommendations--Village Issues----Village Issues--

• RR Grade Crossing SafetyRR Grade Crossing Safety

• Whistle-Free ZonesWhistle-Free Zones

• Additional Traffic at Proposed Station Additional Traffic at Proposed Station LocationsLocations

• Sound WallsSound Walls

• Replacing GatesReplacing Gates

• SecuritySecurity