South Kingstown School DistrictJanuary 14, 2020
High School at Curtis Corner Middle School
High School at Curtis Corner Middle School
South Kingstown School District
2
Birds Eye View
High School at Curtis Corner Middle School
South Kingstown School District
3
Birds Eye View
High School at Curtis Corner Middle School
South Kingstown School District
4
Aerial
CURTIS CORNER MIDDLE SCHOOL
High School at Curtis Corner Middle School
South Kingstown School District
5
Existing Site
JCEJCE
301 CURTIS CORNER ROADWAKEFIELD, RHODE ISLAND
ZONING DISTRICT: GOVERNMENT AND INSTITUTIONAL (GI)
LOCUS MAP N
SITE
ABUTTING PROPERTY LINE
PROPOSED CONTOUREXISTING CONTOUR
EXISTING STONE WALL
EXISTING SEWER LINE
TEST HOLE
EXISTING UTILITY POLE
EXISTING SEWER MANHOLES
EXISTING PROPERTY LINE
NOW OR FORMERLYN/FTREELINEHAY BALES
LIMIT OF DISTURBANCE
100100
EXISTING WATER LINE
WATER GATE
PROPOSED DRAINAGE MANHOLED
EXISTING CATCH BASIN
BUILDING SETBACK LINE
EXISTING CURB
SILT FENCE
PROPOSED CURBEXISTING METAL FENCE
EXISTING DRAIN LINEPROPOSED DRAIN LINEEXISTING DRAINAGE MANHOLED
PROPOSED CATCH BASIN
PROPOSED UTILITY POLE
PROPOSED WATER LINE
WV
PROPOSED SEWER LINE
PROPOSED SEWER MANHOLES
EXISTING GAS LINEPROPOSED GAS LINE
EXISTING TREE
EXISTING SPOT ELEVATION
CHAIN LINK FENCE
BOLLARD
LAMP POLE
FIRE DEPTMENT CONTROL
EXISTING HANDICAP
PROPOSED HANDICAP
EMERGENCY PHONE BOX
PROPOSED WATER GATE
ZONING DISTRICTMINIMUM LOT AREA
MAXIMUM LOT BUILDING COVERAGEMAXIMUM BUILDING HEIGHTMINIMUM FRONT YARD SETBACKMINIMUM CORNER SIDE YARD SETBACKMINIMUM SIDE YARD SETBACK 40 FT
40 FT40 FT35 FT20%
GIZONING CRITERIA REQUIRED
MINIMUM LOT FRONTAGE & WIDTH 200 FT
MINIMUM REAR YARD SETBACK 40 FT
GENERAL NOTES:
1. CLASS I BOUNDARY AND CLASS III TOPOGRAPHIC SURVEY COMPLETED BY WATERMAN ENGINEERING CO., INC., 46SUTTON AVENUE, EAST PROVIDENCE, RI, IN AUGUST 2018 (SEE REFERENCE PLAN 1).
2. FRESHWATER WETLANDS WERE DELINEATED ON THE SITE BY NATURAL RESOURCE SERVICES, INC., 180 TINKHAMLANE, HARRISVILLE, RI, IN JUNE 2018.
3. THE AREA OF PROPOSED SITE IMPROVEMENTS LIES ENTIRELY WITHIN FEMA FLOOD ZONE X (AREAS DETERMINED TOBE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) AS SHOWN ON THE FEMA FIRM MAP FOR THE TOWN OF SOUTHKINGSTOWN, RI, COMMUNITY PANEL NO. 44009C0203J, EFFECTIVE DATE OCTOBER 16, 2013.
4. THE LOCATION AND DEPTH OF EXISTING UTILITIES ARE APPROXIMATE AND HAVE BEEN PLOTTED FROM THE LATESTAVAILABLE INFORMATION. THE UTILITY LOCATIONS ARE APPROXIMATE AND MAY NOT BE ALL INCLUSIVE. THECONTRACTOR SHALL CHECK AND VERIFY THE LOCATIONS OF ALL EXISTING UTILITIES, BOTH OVERHEAD ANDUNDERGROUND, AND "DIG-SAFE" MUST BE NOTIFIED PRIOR TO COMMENCING ANY CONSTRUCTION OPERATIONS.RESTORATION AND REPAIR OF DAMAGE TO EXISTING UTILITIES SHALL BE THE RESPONSIBILITY OF THE CONTRACTORWITH NO ADDITIONAL COST THE OWNER. NO EXCAVATION SHALL COMMENCE UNTIL ALL INVOLVED UTILITYCOMPANIES AND/OR CITY WHOSE FACILITIES MIGHT BE AFFECTED BY ANY WORK TO BE PERFORMED BY THECONTRACTOR ARE NOTIFIED AT LEAST 72 HOURS IN ADVANCE.
5. SOILS ON THE SITE CONSIST PRIMARILY OF RAINBOW VERY STONY SILT LOAM, 0 TO 8 PERCENT SLOPES (RbB). SOILEVALUATIONS WERE PERFORMED ON THE SITE BY JOE CASALI ENGINEERING, INC. IN AUGUST 2019. IN GENERAL,THE DEPTH TO THE SEASONAL HIGH GROUNDWATER TABLE IS APPROXIMATELY 32 TO 48 INCHES BELOW THEGROUND SURFACE. SUITABLE STORMWATER MANAGEMENT PRACTICES MAY INCLUDE INFILTRATION BASINS ANDINFILTRATION SWALES.
6. PROJECT IS OWNED BY THE TOWN OF SOUTH KINGSTOWN AND IS EXEMPT FROM REQUIREMENTS OF THE TOWN'SZONING ORDINANCE AND THE TOWN'S LAND DEVELOPMENT AND SUBDIVISION REGULATIONS.
NOTES:1. 200,000 SF + 40,000 PER 100 PUPILS
SEE NOTE 1
G
G
WW
SS
Drawn by
Checked by
Revised on
EXISTIN
E-mail: [email protected]
Project
Drawing Statu
Issued On
Sheet Conten
Project Numb
Phone: (401) 27Fax: (401) 27
Architecture ·
South
Broa35W
S
STAGE I
PARKING QUANTITIES6 Existing Spaces for Bus Parking67 Existing Spaces for School Department
71 Existing Spaces for Faculty/Staff and Visitor Parking0 Existing Spaces for Student Parking
6 Bus Spaces and 138 Vehicle Spaces
TOTAL
High School at Curtis Corner Middle School
South Kingstown School District
6
Existing Floor Plan & Photos
Existing Photos Existing First Floor Plan
High School at Curtis Corner Middle School
South Kingstown School District
7
Site Plan
1 HIGH SCHOOL2 EXISTING SCHOOL
4 PROPOSED TENNIS COURTS5 PROPOSED STORMWATER MITIGATION AREA
3 EXISTING CONCESSION STAND
BUILDING LEGEND
6 EXISTING SPORTS FIELD7 PROPSED BUS DROP-OFF + PICK-UP8 PROPOSED ADMINISTRATION AND STAFF PARKING + PARENT DROP OFF
25
5
5 4
6
8
5
3
7
1
9 EXISTING DISTRICT ADMINISTRATION
9
TOTAL BUILDING SF:15 BUS SPACESTOTAL PARKING:489 VEHICLE SPACES
163,561 SF
High School at Curtis Corner Middle School
South Kingstown School District
8
Concept Aerial
Learning Innovation Commons
Learning Studios
Learning Studios Addition
Art Studios
Learning Studio Addition
Auditorium
Science Wing
Community Room
Main Entrance
Gymnasium
Gymnasium Locker Rooms
PE Studios
School Administration & General Office
Entry Hall
Existing Addition - High School
Learning Innovation
Commons
Gymnasium
Tech Lab & Workshop
Auditorium
Science
Classroom
CTE Construction Tech Lab Existing Main Entrance
High School at Curtis Corner Middle School
South Kingstown School District
9
Floor Plan(RIDE)
(RIDE)
GROSS SF PER STUDENT
High School at Curtis Corner Middle School
South Kingstown School District
10
Green Design
PHOTOVOLTAIC
CELLS
SOLAR POWER
LIGHT POLES
RAIN WATER
HARVESTING
High School at Curtis Corner Middle School
South Kingstown School District
11
Concept Rendering A
High School at Curtis Corner Middle School
South Kingstown School District
12
Concept Rendering B
High School at Curtis Corner Middle School
South Kingstown School District
13
Concept Rendering C
High School at Curtis Corner Middle School
South Kingstown School District
14
Future ExpansionsPotential Stair location for Second Floor Addition
Potential Stair location for Second Floor Addition
Potential Elevator location for Second Floor Addition
Future Potential Second Floor Plan Future Potential District Administration Ground Floor Plan
Potential District Adminstration
24, 210 SF 171,580 SF
High School at Curtis Corner Middle School
South Kingstown School District
15
Broad Rock Middle School
Ground Floor Plan
Classroom
21st Century Multi-purpose
Special Education
Cafeteria, Media Center, Stage, Student Resource
Art & Music
Student Support
Administration/ Faculty
Storage & Support
REQUIREMENTS681 STUDENTS166 SF/ PER STUDENT113, 046 TOTAL SF
PROPOSED AREAFIRST FLOOR
EXISTING 52,668 SFADDITION +25,273 SF
TOTAL BUILDING 121,261 SF
121,261 TOTAL SF681 STUDENTS178 SF/ PER STUDENT
Key Plan
SECOND FLOOREXISTING 27,719 SF
TOTAL FIRST FLOOR 77,941 SF
GROSS SF PER STUDENT
(RIDE)(RIDE)
ADDITION + 15,601 SFTOTAL SECOND FLOOR 43,320 SF
High School at Curtis Corner Middle School
South Kingstown School District
16
Broad Rock Middle School
Second Floor Plan
Classroom
21st Century Multi-purpose
Special Education
Cafeteria, Media Center, Stage, Student Resource
Art & Music
Student Support
Administration/ Faculty
Storage & Support
Key Plan
REQUIREMENTS681 STUDENTS166 SF/ PER STUDENT113, 046 TOTAL SF
PROPOSED AREAFIRST FLOOR
EXISTING 52,668 SFADDITION +25,273 SF
TOTAL BUILDING 121,261 SF
121,261 TOTAL SF681 STUDENTS178 SF/ PER STUDENT
SECOND FLOOREXISTING 27,719 SF
TOTAL FIRST FLOOR 77,941 SF
GROSS SF PER STUDENT
(RIDE)(RIDE)
ADDITION + 15,601 SFTOTAL SECOND FLOOR 43,320 SF
High School at Curtis Corner Middle School
South Kingstown School District
17
Matunuck & West Kingston Elementary
West Kingston Elementary School Matunuck Elementary School
Classroom
21st Century Multi-purpose
Special Education
Cafeteria, Media Center, Stage, Student Resource
Art & MusicStudent Support
Administration/ Faculty
Storage & Support
High School at Curtis Corner Middle School
South Kingstown School District
18
Wakefield Elementary
Ground Floor Plan
Classroom
21st Century Multi-purpose
Special Education
Cafeteria, Media Center, Stage, Student Resource
Art & MusicStudent Support
Administration/ Faculty
Storage & Support
High School at Curtis Corner Middle School
South Kingstown School District
19
Peace Dale Elementary
Lower Level Floor Plan Upper Level Floor Plan
Classroom
21st Century Multi-purpose
Special Education
Cafeteria, Media Center, Stage, Student Resource
Art & MusicStudent Support
Administration/ Faculty
Storage & Support
High School at Curtis Corner Middle School
South Kingstown School District
20
Order of Magnitude Project Budget
BUDGET COMM
I. CURTIS CORNER HS
TOTAL 62,000,000$
II. BROAD ROCK MS
TOTAL 17,000,000$
III. ELEMENTARY SCHOOLS
TOTAL 6,000,000$
TOTAL PROJECT BUDGET 85,000,000$
IV. DISTRICT ADMIN OFFICENew Construction with HS Addition Option (not incl. above) 3,400,000$
NOTE: Project budget and cost information is preliminary and is based on concept plans provided by A/E and eprojects of this nature. Costs include Hard, Soft and Furniture, Fixtures & Equipment Allowances.
DRAFT - ORDER OF MAGNITUDE PROJECT BUDSouth Kingstown Schools - SUMMARY
South Kingstown, RIrev. 1.13.20
DESCRIPTION
BUDGET COMMENT
I. CURTIS CORNER HS
TOTAL 62,000,000$
II. BROAD ROCK MS
TOTAL 17,000,000$
III. ELEMENTARY SCHOOLS
TOTAL 6,000,000$
TOTAL PROJECT BUDGET 85,000,000$
IV. DISTRICT ADMIN OFFICENew Construction with HS Addition Option (not incl. above) 3,400,000$
NOTE: Project budget and cost information is preliminary and is based on concept plans provided by A/E and experience with similar projects of this nature. Costs include Hard, Soft and Furniture, Fixtures & Equipment Allowances.
DRAFT - ORDER OF MAGNITUDE PROJECT BUDGETSouth Kingstown Schools - SUMMARY
South Kingstown, RIrev. 1.13.20
DESCRIPTION
THANK YOU
South Kingstown School District New High School at Curtis Corner Middle School
RGB Architects www.rgb.net