south nodaway long term planning bond issue presentation

17
South Nodaway Long South Nodaway Long Term Planning Bond Term Planning Bond Issue Presentation Issue Presentation

Upload: alexandrina-mccormick

Post on 11-Jan-2016

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: South Nodaway Long Term Planning Bond Issue Presentation

South Nodaway Long South Nodaway Long Term Planning Bond Term Planning Bond Issue PresentationIssue Presentation

South Nodaway Long South Nodaway Long Term Planning Bond Term Planning Bond Issue PresentationIssue Presentation

Page 2: South Nodaway Long Term Planning Bond Issue Presentation

Issues Impacting Long Term Planning

1. Educational Concerns• South Nodaway currently has limited and slow internet connectivity at the

elementary school, five teachers travel between the two buildings daily costing time and money, and high school A+ students must travel to the elementary to do their required A+ tutoring

2. Financial Concerns• State revenues are down and will directly affect the amount of state aid

we receive• Reduction to state formula payment, transportation, Career Ladder and

other state funded programs are all very real possibilities. This will put more of the financial burden on local effort.

3. Facility Concerns• Operating two older facilities in two separate sites increases maintenance,

energy and repair costs. These costs will only increase over time.

Page 3: South Nodaway Long Term Planning Bond Issue Presentation

Moody’s Budget Forecast for the State of Missouri

• Missouri cannot grow enough to cover the stimulus dollars plus normal program growth when the stimulus dollars go away

• One of two bad scenarios will occur in the next few years:

• 1) Federal government will continue to simply print money to bail out fiscally irresponsible states, and Missouri will ride the wave; or

• 2) Stimulus payments go away and the General Fund budget falls off the cliff in FY 2011 or FY 2012

-http://www.jamesrmoody.com/fileshare/Civic_Council_February_13,_2009.pdf

Page 4: South Nodaway Long Term Planning Bond Issue Presentation

What officials are saying about the state

budget• “I’ve never seen anything like it” “There will be a

day of reckoning”- Jim Moody, former State Budget Director

• There aren’t too many ways out of this one”- Allen Icet, House Budget Chairman

• “We’re talking about complete elimination of programs”- Senator Brad Lager

http://www.stltoday.com/stltoday/news/stories.nsf/politics/story/B2

(October 28, 2009)

Page 5: South Nodaway Long Term Planning Bond Issue Presentation

State Budget Shortfall Impact on South

Nodaway• If we did not have the federal

stabilization money this year we would be looking at a deficit in excess of $200,000 for 09-10

• This could result in 3-4 personnel and/ or programs lost, i.e. athletics and activities

Page 6: South Nodaway Long Term Planning Bond Issue Presentation

Long Term Planning Bond Proposal

• South Nodaway R-IV BOE is asking the voters of the district for a $1.3 Million 20 year bond issue for the purpose of building a new elementary school addition adjacent to the high school site in Barnard.

• This could be done with a .6136 debt service levy which is a continuation of the current debt service.

• This would keep our overall levee at 6.0536 (5.44 operating and .6136 debt service)

• By comparison, Last year, 08-09, was 5.55 and .89 for a total of 6.44

Page 7: South Nodaway Long Term Planning Bond Issue Presentation

The South Nodaway Long Term Plan Addresses Educational

Concerns• The educational expectations are

• 1) better access to technology for elementary students

• 2) approximately 375 minutes per week on the road from our swing teachers will be eliminated,

• 3) A+ tutoring can be accomplished without putting students on the road every other day and will give them more time and flexibility to work with the elementary students,

• 4) high school and elementary teachers will have more time to collaborate and make sure curriculum is aligned and objectives are being met

Page 8: South Nodaway Long Term Planning Bond Issue Presentation

Financial Concerns• The Financial Expectations are savings realized

through elimination of redundant positions, lower utility and energy costs, less travel between buildings, lower technology costs, no need for extra summer custodial help, less building and grounds costs (roof, parking lot, etc.), lower custodial costs (overall building size to maintain would be less)

• Take advantage of low interest rates, competitive bidding environment, and possibility for stimulus bonds at 0% interest

Page 9: South Nodaway Long Term Planning Bond Issue Presentation

…And Facility Concerns• The Facility Expectations are

modern classrooms with room for district growth, less money spent on maintenance and repair of aging buildings

• meals prepared and served in the same facility

Page 10: South Nodaway Long Term Planning Bond Issue Presentation

The following graphs illustrate what yearly budget balances and carryover balances are projected to be with the bond issue (yellow) and with no bond issue (green)

($40,000)($20,000)

$0$20,000$40,000$60,000$80,000

$100,000

2010-11

2011-12

Budget Balance Projections 2010-11 and 2011-12

Bond

Status Quo

$700,000

$750,000

$800,000

$850,000

$900,000

2010-11

2011-12

Carryover Projections 2010-11 and 2011-12

Bond

Status Quo

Page 11: South Nodaway Long Term Planning Bond Issue Presentation

Alternative Budget Reduction Measures are not

Pleasant to Consider:• Elimination of Activities and

Athletic Programs• Elimination of Benefits Like Health

Insurance for Employees• Combination of Classrooms• Elimination of Non-core Classes

and Programs

Page 12: South Nodaway Long Term Planning Bond Issue Presentation

Alternatives to Save the Additional $49-$55 Thousand saved yearly with

the bond

• Eliminating all JH and SH athletics would save app. $44-$54 thousand/year

• Reducing Music, PE and Art to ½ time would save app. $58 thousand/year

• Eliminating A+ and all JH sports would save app. $51 thousand/year

All of these options take opportunities away fromStudents and do nothing to address facility concerns

Page 13: South Nodaway Long Term Planning Bond Issue Presentation

The School’s Long Term Plan is to be

Proactive • The school will place a $1.3 Million dollar bond

issue on the April 2010 ballot for the purpose of constructing a new elementary school adjacent to the high school in Barnard

• It is a proactive way to address budget shortfalls which will impact us in the future

• This will help offset the reduction in state revenue

Page 14: South Nodaway Long Term Planning Bond Issue Presentation

Proactive cont.• It will address technology, facility, A+ tutoring,

and teacher travel concerns for the elementary students and teachers

• It will not raise taxes from their current level• Economic conditions are difficult but it is a good

time for a capital project because of low interest rates, competitive contracting, possibility of stimulus money, etc. It is not a good time to dip into carryover savings because of uncertainty of the funding from the state

Page 15: South Nodaway Long Term Planning Bond Issue Presentation

A Look at the Proposed Elementary Addition

Page 16: South Nodaway Long Term Planning Bond Issue Presentation

Upcoming Bond Meeting Information Dates

“Donuts and Discussion”• February 20th 7-10 a.m. Guilford

Community Center• March 10th 7-10 a.m. Barnard

Legion• March 27th 7-10 a.m. High School

Cafeteria

Page 17: South Nodaway Long Term Planning Bond Issue Presentation

PLEASE VOTE

April 6, 2010