SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
i
TABLE OF CONTENTS
1 INTRODUCTION .............................................................................................................................................. 2
2 INFORMATION DISSEMINATION AND STAKEHOLDER ATTENDANCE ........................................................... 4
3 ISSUES AND CONCERNS RASIED .................................................................................................................... 6
3.1 SEGREGATED ISSUES AND CONCERNS ............................................................................................................... 6
3.2 ISSUES AND CONCERNS BEYOND THE MANDATE OF EMB .................................................................................. 10
4 PHOTODOCUMENTATION ........................................................................................................................... 11
5 ANNEXES ...................................................................................................................................................... 16
LIST OF TABLES
Table 1: Project Information and Summary of Project Components .................................................... 3
Table 2: Summary of Attendees during the Public Hearing ................................................................. 4
Table 3: Issues and Concerns raised Kitaotao Public Hearing ............................................................ 6
Table 4: Issues and Concerns raised Dangcagan Public Hearing ....................................................... 7
Table 5: Issues and Concerns raised Kibawe Public Hearing ............................................................. 8
Table 6: Issues and Concerns raised Damulog Public Hearing......................................................... 10
LIST OF FIGURES
Figure 1: Project Location .................................................................................................................. 2
LIST OF ANNEXES
Annex 1: Newspaper Publication ..................................................................................................... 16
Annex 2: EMB Website Posting ....................................................................................................... 16
Annex 3: Received Invitation Letters ................................................................................................ 16
Annex 4: Attendance Sheets............................................................................................................ 16
Annex 5: Public Hearing Presentation .............................................................................................. 16
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
2
1 INTRODUCTION
The Public Hearing for the proposed Pulangi Hydroelectric Power Plant Project was conducted in
accordance with the guidelines set in DENR Department Administrative Order (DAO) 30 series of
2003 and DAO 15 series of 2017. The Project involves the construction of a concrete faced rockfill
dam to impound water primarily for power generation. The proposed hydroelectric power project has a
capacity of 250MW and covers the Municipalities of Damulog, Dangcagan, Kibawe and Kitaotao.
Figure 1 shows the location of the Project while Figure 2 provides a summary of the project
components.
Figure 1: Project Location
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
3
Table 1: Project Information and Summary of Project Components
Project Component Description/Specification
1 Dam
Dam type Concrete face rockfill dam
Maximum dam height 143.1 m
Length of dam crest (including spillway) 878.5 m
2 Reservoir
Area 2,924 ha
Storage capacity 1169.3 106 m
3
3 River Diversion and Outlet Facilities
Cofferdam Elevation 73 m
Design Flood 1.5 year return period
Diversion Tunnel-diameter 10 m
Number of units 3
Length 900 m
4 Spillway
Elevation of weir crest 149.0 m
Gate quantity 3 sets
5 Power Intake and Waterways
5.1 Intake structures
Name of Project:
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
Project Location: Municipalities of Dangcagan, Damulog, Kibawe, and Kitaotao, Province of Bukidnon
Project Proponent: PULANGI HYDRO POWER CORPORATION (PHPC)
Proponent’s Address 15
th Floor Ramon Magsaysay Center,
1680 Roxas Blvd., cor. Quintos St., Malate Manila
Contact Person: MR. JOSUE A. LAPITAN
Position/ Designation: President and Chief Executive Officer
Contact No: Tel Nos.: (02) 554-9963/ (02) 567-1654 Email add: [email protected]
Name of Consultant: LICHEL TECHNOLOGIES INC.
Consultant’s Address: Unit 1403 Prestige Tower Condominium, F. Ortigas Jr. Road, Ortigas Center, Pasig City
Contact Person: RACHEL A. VASQUEZ
Position/ Designation: Managing Director
Contact No: 02-633-00-94
E-mail Address [email protected]
Estimated Project Cost Php 20,778,980,000.00
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
4
2 INFORMATION DISSEMINATION AND STAKEHOLDER ATTENDANCE
Information about the public hearing for the proposed project including follow-up visit and coordination
was conducted from August 24, 2019 to September 10, 2019. Newspaper notice was published on
August 24, 2019 and August 31 2019 (Annex 1). The Notice of Public Hearing was also posted in the
EMB website last August 22, 2019 (Annex 2). At the ground level, written invitations were distributed
to the Local Government Units, Barangay Officials, Tribal elders/council and other stakeholders. For
the some members of the Indigenous Cultural Communities, information about the schedule and
venue of the Public Hearing was transmitted verbally following the usual practice in the area.
Received invitation letters are attached as Annex 3. Table 2 shows the summary of stakeholders
attendance during the Public Hearing held in each municipality. Attendance sheets are included as
Annex 4.
Table 2: Summary of Attendees during the Public Hearing
Public Hearing Attendees Stakeholders
September 11
9:00 AM
Tourism Hall, Municipality of Kitaotao
52 Brgy Balocbocan Brgy Kitaihon Brgy San Lorenzo Brgy Tandong Brgy Metebagao IPMR Brgy Tandong IPMR Brgy Kitobo IPMR Brgy San Lorenzo IP Representative Metebagao Municipal Planning and Development Office Sangguniang Bayan Kitaotao
September 11
2:00 PM
Function Hall, Lucky 9 Resort Municipality of Dangcagan
65 IPMR Miaray Brgy San Vicente Brgy Dolorosa Brgy Miaray Municipal IPMR San Vicente Tribal Elders IP Council Brgy Dolorosa Sangguniang Bayan Dangcagan Local Youth Development Office Municipal Agriculture Office
September 12
9:00 AM
West Kibawe Gymnasium Municipality of Kibawe
58 Sangguniang Panlalawigan Representative Office of the Mayor Sangguniang Bayan Brgy Balintawak Brgy Balintawak Tribal Leader Brgy Bukang Liwayway IPMR Brgy Bukang Liwayway Tribal Chieftain Brgy Cagawasan Tribal Council Brgy Mascarinas IPMR Brgy Mascarinas Tribal Chieftain Brgy Natulongan (Parish Social Action Group) Brgy Natulongan Tribal Chieftain Brgy Osmena Brgy Panimula Tribal Chieftain Brgy Talahiron Brgy Talahiron IPMR Brgy Talahiron Tribal Chieftain
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
5
Public Hearing Attendees Stakeholders
Brgy Tumaras IP Representative Municipal Tribal Chieftain
September 12
2:00 PM
Municipal Function Hall, Municipality of Damulog
105 Office of the Mayor Brgy Tankulan Brgy Tankulan IPMR Brgy Tankulan Tribal Council Municipal IPMR Brgy Poblacion
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
6
3 ISSUES AND CONCERNS RASIED
3.1 Segregated Issues and Concerns
Table 3 to Table 6 shows the summary of the issues and concerns raised during the four public
hearings conducted.
Table 3: Issues and Concerns raised Kitaotao Public Hearing
Module Issue/Concern Raised Response
Project Description a) Is the Project really cost 37B? It can still go up or down?
b) Suggestion to include in the MMT one LGU representative, one Sangguniang Bayan Representative, and the president of the Association of Barangay Captains
c) Concern about the (technical) capacity of the MMT to conduct monitoring. Suggests capacity building for MMT be prioritized. Local MMT members should be capacitated.
a) Yes. Based on initial study the estimated project cost is 37B. But this is still subject to changes as more studies are concluded/ conducted for the project.
b) DENR DAO 2017-15 has a prescribed membership for the MMT. Additional members of the MMT should be discussed internally.
c) The suggestion is noted. Orientation of MMT members is usually
a) How much is the EGF? b) Can the EGF be used for livelihood
purposes (as indicated in the EIS document)?
c) What are the sample livelihoods qualified for SDP?
d) Cost of SDP program? Can this be increased?
a) Initial allocation for EGF is Php1,000,000.00. The final amount will be discussed during the formation of the MMT.
b) It can be used for emergency livelihood assistance for those affected.
c) The SDP contained is the framework only; hence, general approaches were indicated such as provision of gender-sensitive livelihood for men, women, youth and elders.
d) Initial allocation for SDP is Php500,000.00. This can be increased annually based on the specific programs that the community and PHPC will identify through a MOA.
Land There is already existing landslide in our area towards the river (Brgy Magsaysay). Will the establishment of the project worsen the landslide?
The needs to be further assessed. The conduct of a probabilistic seismic sampling has been required as a post-ECC condition. The results of these may be provided to the communities.
People For the land rental, how will the payment be (process on payment)?
A Resettlement Action Plan will be prepared which will contain details of the compensations scheme.
If the land is not titled, will there still be compensation/payment?
All affected properties will be compensated, including improvements. If there is no title,
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
7
Module Issue/Concern Raised Response
proof of ownership should be presented such as Tax Declaration.
a) The 28 households affected indicated in the report is too few considering that there are 6 barangays in Kitaotao
b) Will there be landslides once the reservoir is established?
c) The affected household should be priority for employment.
a) A resurvey to revalidate the affected household will be conducted
b) This needs further study. Nonetheless, buffer zone from the reservoir will be established.
c) Affected families will be prioritized for employment and livelihood programs.
a) Who will pay for the relocation? b) Where is the relocation site?
a) The proponent will pay for the relocation
b) The relocation site will be consulted with the affected communities and will be included in the RAP document.
The 28 households are too few. There are many others not included in the ragging/survey. There should be coordination with the tribal elders before the conduct of tagging/survey.
A revalidation survey will be conducted and will be coordinated with the concerned LGUs and Tribal Councils.
Table 4: Issues and Concerns raised Dangcagan Public Hearing
Module Issue/Concern Raised Response
People Based on the meeting last August 27, there were only 4 affected households. This may not be accurate and a resurvey must be conducted.
There will be a revalidation survey of all affected areas.
Clarification on the payment of P25, 00/ha/year.
The P25,000/ha/year is for land rental only. The payment for other improvements on the land is separate and may depend on the assessor’s office valuation.
Directly affected persons by the project should be included so they can hear the explanations for themselves.
During the RAP preparation and the validation survey, dialogue will be with the directly affected persons.
Amount of rental (P25, 000/ha/year) is small/insufficient.
The rate provided (P25,000/ha/year) is the highest given by any private entity in the Province. This was also the rate agreed with the Office of the Governor. In addition to the rental and payment for the improvements, the qualified affected persons are also priority for the employment to be
a) There people whose existing income is above P25,000/ha/year. p
b) Infrastructure in Dolorosa hanging bridge is affected
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
8
Module Issue/Concern Raised Response
c) There should be a marker (muon) to identify the extent of the reservoir for people’s safety as well.
provided as well as the livelihood programs under the project.
The bridges and other infrastructure to be affected will be included in the validation
EMB: A position paper on the proposed compensation scheme can be submitted to EMB for consideration.
Houses of higher value (than the proposed relocation unit) should have higher value compensation. Please also consider that in other cases (i.e., plantations) they can still have their land after the project. In your case, the land will be inundated and will not be usable.
The existing income from the land is about P70,000/ha/year.
If there are 3 barangays against the project, what will happen?
There will be continuing dialogue with the affected barangays.
They should talk to the people directly affected to explain to them the compensation package so they will be informed.
During the validation and the RAP, there will meetings with the directly affected persons.
What will be the rental for those titled and those not titled (stewardship only). Will they be the same?
All affected properties will be compensated, including improvements. If there is no title, proof of ownership should be presented such as Tax Declaration.
Table 5: Issues and Concerns raised Kibawe Public Hearing
Issue/Concern Raised Response
Project Description Tribal Chieftain Natulongan
Way back in 2007, there was a “Save Pulangi Movement”. There was also a resolution passed opposing the project as well as in 2012. It was a surprise for us that in 2017, there was a resolution endorsing the project.
There should be an assembly of the affected and any resolution from the barangay should be done with consultation.
There was a mention of Dam height as 15 m only, now you are presenting a dam height of 147 m. Which is the real dam height?
Once the RAP and validation survey is on-going there will be more consultations with the directly affected persons.
For the dam height, to clarify the 15m height mentioned is the threshold to be classified as a large dam. For this project, the dam height is 143.1 m.
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
9
Issue/Concern Raised Response
Who is the President of PHPC? Will there be compensation for house owners but not lot owners?
The President of PHPC is Mr. Josue Lapitan.
All affected properties will be compensated, including improvements. If there is no title, proof of ownership should be presented such as Tax Declaration.
When will the Project start?
There is no definite timeline yet for the project start as the necessary permits are still being processed.
People Resident Brgy Natulongan
If the project is implemented, we will lose our land which is our source of income/livelihood. Once the dam is there, the land will not be usable/available.
To compensate for the lost income/land productivity, there will be a land rental for the affected person. In addition, the qualified affected residents will be priority for employment and livelihood programs.
Datu Indao
There should have been a Letter of Intent with project proposal before they started with their activities. There should also be a MOA. It should be noted that the decision making of IPs is through consensus building.
PHPC will adhere to the required processes of the NCIP.
Marcial Sayson-Brgy Talahiron
There was a survey and most people are against the project. There should also be an assembly in Brgy Talahiron with the affected people. And where is the proposed relocation?
As for the assembly, there will be consultations with the Barangay Officials and Tribal Council on this.
As for the relocation site, this will be consulted the affected persons during the preparation of the RAP.
How about those who do not want to rent but want to sell their land instead?
If this is in private lot, this will be based on the negotiations between the company and the affected.
Bukang Liwayway Resident
Proposal/request to pay for the entire 25 years of rent instead of annual/5 year lump sum. How about payment for crops?
This will be taken up with the Board/Top Management for consideration.
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
10
Issue/Concern Raised Response
Lydia Laras
Clarification on the number of affected households in Brgy Balintawak? It was not in the presentation
A validation survey will be conducted to determine the exact number of affected houses/lots. The presentation does not show the exact number of affected per barangay. Although there is initial information from the first survey, it needs to be processed and validated.
There should be an option for cash instead of relocation.
The will be considered during the preparation of the RAP.
Table 6: Issues and Concerns raised Damulog Public Hearing
Module Issue/Concern Raised Response
Land/Water There should be clarification on the water level/area that will be inundated? What will happen to people in the lowlands?
There will be a validation of the affected areas. The water level will be determined during this validation. Affected people will be provided relocation, employment and livelihood if qualified.
People Payment of the affected should be done before project start/ before construction.
This is noted and will be more in detail during the preparation of the RAP.
Where should we apply?
This will coordinated with the LGUs.
3.2 Issues and Concerns Beyond the Mandate of EMB
Among the issues raised during the Public Hearings conducted, the following are considered to be
beyond the mandate of EMB:
The FPIC process currently being undertaken by the Proponent as a prerequisite for any
activity.
The exact amount of compensation for the land rental that should be followed.
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
11
4 PHOTODOCUMENTATION
Posting of Notices
Municipality of Dangcagan Municipality of Kitaotao
Municipality of Kibawe
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
12
Public Hearing Municipality of Kitaotao September 11 2019 9:00 AM
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
13
Public Hearing Municipality of Dangcagan September 11 2019 2:00 PM
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
14
Public Hearing Municipality of Kibawe September 12 2019 9:00 AM
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
15
Public Hearing Municipality of Damulog September 12 2019 2:00 PM
SOUTH PULANGI HYDROELECTRIC POWER PLANT PROJECT
PULANGI HYDROPOWER CORPORATION
16
5 ANNEXES
Annex 1: Newspaper Publication
Annex 2: EMB Website Posting
Annex 3: Received Invitation Letters
Annex 4: Attendance Sheets
Annex 5: Public Hearing Presentation