Page 1: SOUTH YARRA (EASTERN PORTAL) PRECINCT

SOUTH YARRA (EASTERN PORTAL) PRECINCT

COMMUNITY REFERENCE GROUP

1 DECEMBER 2020

Page 2: SOUTH YARRA (EASTERN PORTAL) PRECINCT

PROGRAM

Page 3: SOUTH YARRA (EASTERN PORTAL) PRECINCT

CONSTRUCTION PROGRESS

RIA

Page 4: SOUTH YARRA (EASTERN PORTAL) PRECINCT

PROGRESS UPDATE

CYP

Page 5: SOUTH YARRA (EASTERN PORTAL) PRECINCT

CONSTRUCTION LOOKAHEAD FOR 2020

Around the clock Monday to

Friday and from 7am to3pm on Saturday

24/7

Page 6: SOUTH YARRA (EASTERN PORTAL) PRECINCT

CONSTRUCTION UPDATE - CYP

Page 7: SOUTH YARRA (EASTERN PORTAL) PRECINCT

TUNNELLING UPDATE

– All oversized pieces of the TBMs have now been returned to site on St Kilda Road

– 24/7 works continue in the retrieval shaft to facilitate the retrieval of each of the TBM gantry pieces, which will be pulled back through the completed eastbound tunnel.

– All of TBM Millie’s gantry pieces have been returned to the station box, with XX of TBM Alice’s gantry pieces still to be retrieved

– The gantry crane will be used to pick up and turn the pieces around before they are pulled back through Millie’s completed tunnel.

– CYP team will breakthrough shaft wall into RIA site in December

[caption]

Picture to go here

Page 8: SOUTH YARRA (EASTERN PORTAL) PRECINCT

CROSS PASSAGE UPDATE

– Preparatory works for cross passage construction are underway from the Eastern Portal and will continue into next year

– This includes mobilising working platforms, grouting to improve ground conditions, and installing supporting structures for the excavation

– There are six cross passages located between Anzac Station and the Eastern Portal, with excavation on these set to commence in early 2021

– Works to facilitate the cross passage construction will operate out of Eastern Portal

[caption]

Picture to go here

Page 9: SOUTH YARRA (EASTERN PORTAL) PRECINCT

9

CYP EASTERN PORTAL LOOKAHEAD

*Subject to confirmation

• Cross passage construction ongoing until

mid 2021

• Tunnel fit out works will continue between

2021 and 2023

• William Street will be reopened late 2022

• Shaft build-out and Mechanical and

Electrical building construction from late

2021 until mid-2023

• Final fit-out, landscaping and roadworks

early-mid 2023

• Handover/completion mid-late 2023

Page 10: SOUTH YARRA (EASTERN PORTAL) PRECINCT

INTERIM DESIGN UPDATE- CYP

Page 11: SOUTH YARRA (EASTERN PORTAL) PRECINCT

OVERVIEW

11

• Draft development plans were available for public display and comment

from Friday 6 April to Friday 27 April 2018.

• Across the two portals (Eastern and Western) there were 22 submissions

received. Seven of these provided comments on the Eastern Portal

Development Plan

• Feedback was also received from the Design Review Panel, including the

Office of the Victorian Government Architect

Page 12: SOUTH YARRA (EASTERN PORTAL) PRECINCT

DEVELOPMENT PLAN REFRESHER

12

Page 13: SOUTH YARRA (EASTERN PORTAL) PRECINCT

LANDSCAPE AND PUBLIC REALM

13

Page 14: SOUTH YARRA (EASTERN PORTAL) PRECINCT

LANDSCAPE AND PUBLIC REALM

14

Page 15: SOUTH YARRA (EASTERN PORTAL) PRECINCT

ACCESS BUILDING DESIGN

15

****

Page 16: SOUTH YARRA (EASTERN PORTAL) PRECINCT

INTERIM DESIGN - CYP

16

Page 17: SOUTH YARRA (EASTERN PORTAL) PRECINCT

FOOTPRINT REDUCTION EVOLUTION

17

Page 18: SOUTH YARRA (EASTERN PORTAL) PRECINCT

FOOTPRINT REDUCTION EVOLUTION

18

Page 19: SOUTH YARRA (EASTERN PORTAL) PRECINCT

BUILDING AT DEVELOPMENT PLAN

19

Page 20: SOUTH YARRA (EASTERN PORTAL) PRECINCT

NEW LAYOUT

20

Page 21: SOUTH YARRA (EASTERN PORTAL) PRECINCT

COMPARISON

21

Page 22: SOUTH YARRA (EASTERN PORTAL) PRECINCT

22

Page 23: SOUTH YARRA (EASTERN PORTAL) PRECINCT

VIEW TOWARDS TOORAK ROAD

23

Page 24: SOUTH YARRA (EASTERN PORTAL) PRECINCT

VIEW FROM TOORAK ROAD

24

Page 25: SOUTH YARRA (EASTERN PORTAL) PRECINCT

25

Page 26: SOUTH YARRA (EASTERN PORTAL) PRECINCT

OSBORNE STREET RESERVE RIA/ CYP COMBINED DESIGN

PLAN SHOWING COMBINDED CYP & RIA PUBLIC REALM DESIGNS

LEGEND

TBM

RETRIEVAL

SHAFT

OSBORNE

STREET

BRIDGE

OSBORNE STREET

SANDRINGHAM LINE

AREA SUBJECT TO CHANGES

AS PART OF POSSIBLE FUTURE

SUBSTATION AMENDMENT

CYP/ RIA

BOUNDARY

Page 27: SOUTH YARRA (EASTERN PORTAL) PRECINCT

OSBORNE STREET RESERVE RIA/ CYP COMBINED DESIGN

LEGEND

AREA SUBJECT TO CHANGES

AS PART OF POSSIBLE FUTURE

SUBSTATION AMENDMENT

TBM

RETRIEVAL

SHAFT

OSBORNE STREET

SANDRINGHAM LINE

LAG - Lagerstroemia indica

x L. Fauriei, Crepe Myrtel

(4m x 4m)

BAS – Banksia Serrata,

Old Man Banksia

(5m x 4m)

CFFF – Corymbia Ficifolia

‘FairyFloss’

(6m x 4m)

EUM – Eucalyptus Melliodora,

Eucalyptus ‘Beardsell Pink’

(8m x 7m)

ACI – Acacia implexa,

Lightw ood

(8m x 7m)

EMLS – Eucalyptus Mannifera

‘Little Spotty’

(8m x 7m)

SELECTED TREE PLANTING IMAGES

Page 28: SOUTH YARRA (EASTERN PORTAL) PRECINCT

OSBORNE STREET RESERVE RIA/ CYP COMBINED DESIGN

AREA SUBJECT TO CHANGES

AS PART OF POSSIBLE FUTURE

SUBSTATION AMENDMENT

OSBORNE STREET

SANDRINGHAM LINE

SELECTED TREE PLANTING IMAGESLEGEND

CFFF – Corymbia Ficifolia

‘Fairy Floss’

(6m x 4m)

EMLS – Eucalyptus

Mannifera ‘Little Spotty’

(8m x 7m)

PCC – Pyrus calleryana

‘Cleveland Select’

(11m x 6m)

Page 29: SOUTH YARRA (EASTERN PORTAL) PRECINCT

OSBORNE STREET RESERVE RIA/ CYP COMBINED DESIGN

OSBORNE STREET

SANDRINGHAM LINE

SELECTED TREE PLANTING IMAGES

LEGEND

CFFF – Corymbia Ficifolia

‘Fairy Floss’

(6m x 4m)

EMLS – Eucalyptus

Mannifera ‘Little Spotty’

(8m x 7m)

PCC – Pyrus calleryana

‘Cleveland Select’

(11m x 6m)

Page 30: SOUTH YARRA (EASTERN PORTAL) PRECINCT

COMMUNITY & COMMUNICATIONS UPDATE

Page 31: SOUTH YARRA (EASTERN PORTAL) PRECINCT

COMMUNICATIONS

– The December construction update has been delivered to residents and businesses and is also available online

– Update also includes information about a short 24/7 rail occupation involving works around South Yarra station and along the corridor to Chapel Street

Recent and upcoming communications

Page 32: SOUTH YARRA (EASTERN PORTAL) PRECINCT

ENVIRONMENTAL MANAGEMENT

Page 33: SOUTH YARRA (EASTERN PORTAL) PRECINCT

AIR QUALITY MONITORING

William Street

October 2020

PM10

Page 34: SOUTH YARRA (EASTERN PORTAL) PRECINCT

AIR QUALITY MONITORING

William Street

October 2020

PM2.5

Page 35: SOUTH YARRA (EASTERN PORTAL) PRECINCT

NOISE MONITORING

William Street

October 2020

Page 36: SOUTH YARRA (EASTERN PORTAL) PRECINCT

VIBRATION MONITORING

Eastern Portal

October 2020

Page 37: SOUTH YARRA (EASTERN PORTAL) PRECINCT

Questions?