southwest southwest calgary ring road calgary ring road ......jul 18, 2018 · calgary ring road...
TRANSCRIPT
000_INDEX_DP044.1
Approved for Construction by KGL07/18/2018 3:15:33 PM
Questions? Contact us:24/7 phone: 403-212-0565 [email protected] SWCRRproject.com
Southwest Calgary Ring Road Segment 1: Highway 8 to 69th St SWSouthwest Calgary Ring Road Protecting the Beaver Pond (Wetland 6)
Building the Green Wall
For discussion purposes only – subject to change
000_INDEX_DP044.1
Approved for Construction by KGL07/18/2018 3:15:33 PM
Water Monitoring Program• The SWCRR design avoids impacts on the Beaver Pond
• A green wall with local vegetation will create a natural barrier between the SWCRR and pond
• Effective sediment control measures in place to protect the pond throughout the construction period
• Natural drainage has been maintained to provide flows to the pond
• Monitoring program developed to ensure the quantity and quality of water to the Beaver Pond
• Monitoring data and an annual report is posted on the project website at www.SWCRRproject.com
• The monitoring program will continue throughout the construction period and for five years after construction
To 90 Avenue To Sarcee Trail
Northbound SWCRR
Beaver Pond
Green Wall
54 metres
50 metres
Max height of wall is 8.5 metres
34 metres