PROJECT SCOPE OF WORK
Project Title:
PERMANENT CONTRACTOR SHELTERS
Purchase Order No.:4800805149
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 2 of 24
PURCHASE ORDER 4800805149
TABLE OF CONTENTS
1.0 INTRODUCTION………………………………………………………………………………. 3
1.1 GENERAL…………………………………………………………………………… 3
1.2 PROJECT SUMMARY…………………………………………………………….. 3
1.3 ORDER OF PRECEDENCE FOR DOCUMENT………………………………… 3
1.4 DEFINITIONS………………………………………………………………………. 4
2.0 SCOPE OF WORK……………………………………………………………………………... 4
2.1 GENERAL…………………………………………………………………………… 4
2.2 CIVIL /STRUCTURAL/ARCHITECTURAL WORK…………………………... 6
2.3 ELECTRICAL WORK…………………………………………………………….. 10
2.4 COMMUNICATION & IT ( INFORMATION TECHNOLOGY) …………… 14
2.5 HVAC WORK……………………………………………………………………… 15
2.6 SITE WORKS……………………………………………………………………… 17
3.0 BASIC REQUIREMENTS AND GUIDELINES……………………………………………. 17
3.1 GENERAL………………………………………………………………………….. 17
3.2 PROJECT DRAWINGS…………………………………………………………… 18
3.3 SUBSTITUTIONS………………………………………………………………… 18
3.4 QUALITY CONTROL AND INSPECTION……………………………………… 18
3.5 PROTECTION OF EXISTING FACILITIES…………………………………… 20
3.6 SCHEDULE OF THE CRITICAL WORK……………………………………… 20
3.7 MODIFICATION OF EXISTING FACILITIES………………………………… 20
3.8 SAFETY AND FIRE PREVENTION…………………………………………….. 20
3.9 FIRST AID FACILITIES…………………………………………………………... 21
3.10 CONTRACT SCHEDULE………………………………………………………… 21
3.11 PROGRESS REPORT……………………………………………………………… 21
4.0 DELIVERABLE……………………………………………………………………………….. 22
4.1 DOCUMENTS TO BE SUBMITTED ALONG WITH BID DOCUMENTS…… 22
4.2 DOCUMENTS TO BE SUBMITTED DURING EXECUTION………………… 22
5.0 CODES AND STANDARD…………………………………………………………………… 22
5.1 SABIC ENGINEERING STANDARDS (SES) FOR CIVIL…………………… 22
5.2 SABIC ENGINEERING STANDARDS (SES) FOR HVAC…………………… 23
5.3 SABIC ENGINEERING STANDARDS ( SES) FOR ELECTRICAL………… 23
6.0 ATTACHMENT…………………………………………………………………………………
.
24
1.0 INTRODUCTION
1.1 General
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 3 of 24
PURCHASE ORDER 4800805149
Eastern Petrochemical Company (SHARQ) is in the Kingdom of Saudi Arabia.
EASTERN PETROCHEMICAL COMPANY (SHARQ) is planning to construct a permanent
Contractor Shelters for Contractor Workers to take rest during summer or hot weather. They can
utilize these shelters to pray, to take rest and to use toilet facilities during their stay.
The proposed location of Contractor Permanent Shelters is located in EG-1 plant, utility plant and
MSD TAM Equipment Laydown Yard Area.
This package provides construction scope of work required for the Construction of three Building
inside the SHARQ Plant.
This Construction Scope of Work must be read in conjunction with other engineering documents,
contract schedules and interfaces to obtain a complete understanding of the full requirements of the
project presented on the referenced documents/drawings.
1.2 Project Summary
This scope of work for Construction of three Office Building covers all the works including but not
limited to civil, structural, architectural, HVAC, piping, mechanical, fire protection system, electrical
& communication works.
The intent of this Scope of Work is to generally describe the major components of the WORK. It is
not the intent to describe each item or to detail every procedure for the construction of the entire
project. Contractor shall refer to the drawings, specification and referenced Standards for a more
comprehensive description of the WORK.
This Construction Scope of Work for three building includes to follow international and SABIC codes
to design the buildings, design data should be forwarded to SHARQ for reference and record, the
buildings should be explosion proof as per SHARQ recommendation and applicable SABIC/SHARQ
Engineering Standards constitute the basis for the construction of Office Building.
Contractor shall procure, fabricate, install, test, commission the facilities and provide documentation
as described in this Construction. All work shall be in accordance with the Project drawings, Data
Sheets, Construction Specifications, and all applicable SABIC/SHARQ Engineering Standards,
Industry Codes and Standards, and overall Good Construction Practice. Scope of Work and drawings
are coherent and are not to be used separately. Any item mentioned in Scope of Work and not shown
in drawings and vice versa shall be of like effect as if shown or mentioned in both.
1.3 Order of Precedence for Documentation
Should there be any discrepancy among the documents in this Scope of Work; the order of precedence
shall be described as below:
Order of Precedence Document
This Scope of Work
Drawings
Specifications/Standard
Note:
1 All the three buildings should follow international and SABIC codes to design the building, If
there is any discrepancy between documents in the same category, the CONTRACTOR shall
consult SABIC/SHARQ for clarification.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 4 of 24
PURCHASE ORDER 4800805149
2 In the event of discrepancy between local laws and regulations and the documents listed above,
the more stringent requirement shall prevail. The CONTRACTOR should be fully aware of
local laws and regulations related to the performance of the WORK.
3 Drawings should be in sequence wise like Architectural, structural, electrical and mechanical
means For site visit arrangement, Contractor shall approach the following person for
coordination:
Mr. Badal, Mohammed Mustafa. Tel.No. 03 357 5000 X 5714.
1.4 Definitions
“ Work” means all the activities and services to be performed by Contractor in accordance with this
Scope of Work.
“ Work Site “ means all locations at which the Contractor performs any portion of the work.
“ Facility” means the structure or item being constructed, installed or repaired by Contractor in
accordance with this Scope of Work.
“ Company Representative” means a party or parties duly authorized by SABIC/SHARQ with whom
Contractor may consult at all reasonable times, and whose instructions, requests and decisions issued
or made as provided in the Contract.
“Drawings” referred herein pertains to approved detailed engineering drawings prepared by Design
Contractor specifically for this Scope of Work.
“ Contractor” refers to any company under contract to supply services, tools, equipment, materials and
consumables for the construction work.
“ Client” refers to EASTERN PETROCHEMICAL COMPANY (SHARQ)
“Shall” expresses a provision that is binding between two or more parties; a mandatory requirements .
“Will” expresses a declaration of purpose or intent of one party.
For info:
1 SHARQ is the Project Management arm of SABIC and is the all-time focal point for the
contractor and will be responsible for the execution of the work and the administration of this
contract through its representative the Project Engineer.
2 The PROJECT ENGINEER is the only focal point for the project and all correspondence
related to the project, Technical or Contractual shall be addressed to the PROJECT
ENGINEER.
3 SHARQ is the affiliate of SABIC and is the owner of the project wherein the project is to be
constructed in the facility of SHARQ for their use.
4 CONTRACTOR is the work establishment of company which is awarded the contract for the
construction of the facility based on the procedures of procurement by SABIC.
2.0 SCOPE OF WORK
2.1 General
CONTRACTOR Scope of Work for construction shall include, but not be limited to the following:
2.2.1 CONTRACTOR shall mobilize and demobilize at site as per the stipulated schedule. Obtain
necessary gate passes and work permits from the Plant.
2.1.2 This PROJECT covers the procurement, supply of all materials, fabrication, construction,
painting, inspection, testing and commissioning of newly structure.
2.1.3 The Contractor shall be responsible to do the interfacing work related to the existing facilities
by qualified and trained personnel. The CONTRACTOR shall make all necessary coordination
with other vendors who may be present at site undertaking different works for the same project.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 5 of 24
PURCHASE ORDER 4800805149
2.1.4 The job site will be handed over to CONTRACTOR “as it is “. After the award of
contract and kick – off meeting. Contractor shall start survey, investigation and
preparation to start the WORK. At least site preparation plan shall be prepared by
CONTRACTOR and approved by SABIC/SHARQ before starting the activities.
2.1.5 CONTRACTOR shall provide qualified labor, tools, construction equipment, facilities, indirect
materials, direct materials, consumables, supervision, management, technical and professional
services and each and every other item necessary for the completion of the work.
2.1.6 CONTRACTOR shall perform all the WORK required for FINAL ACCEPTANCE by SABIC
/SHARQ. SABI/SHARQ will not perform any part of the WORK except review, monitoring
and approval of CONTRACOTR’S performance of the WORK in accordance with
CONTRACT.
2.1.7 Prepare and submit list of material for construction with catalogues/ data sheets/test certificates
to SABIC/SHARQ for approval by way of a submittal at least fifteen ( 15) days in advance of
the requirement of such material notwithstanding the lead time require for the material.
2.1.8 All materials shall be in compliance with SES and approval shall be obtained from the
PROJECT Engineer prior to procurement.
2.1.9 Initiate engineering queries and concession request to resolve construction related problems.
2.1.10 Provide and verify progress measurement and reporting system as per the guidelines at the end
of this document.
2.1.11 Prepare a constructability program for use on the work site.
2.1.12 Provide all utilities at work site for use including arrangement of necessary facilities for the
workers.
2.1.13 Provide Shop/Fabrication drawings for all structural steel structures & architectural and sample
catalogue and brochures for architectural finishes.
2.1.14 Develop additional drawings and details as necessary to supplement issued for Construction (
IFC) drawings to facilitate ease of construction and fabrication.
2.1.15 Carry out fields check if indicated on drawings and make required field changes and submit for
review of SABIC/SHARQ, prior to start of construction.
2.1.16 Supply all required material to complete the project as stated in the project scope of this
document.
2.1.17Perform all work operation required to execute the required works.
2.1.18 Continuously check and inspect the work during the construction in accordance with approved
inspection Test Plan (ITP) to ensure it is completed in compliance with approved
drawings/specifications and quality requirements.
2.1.19 Maintain, coordinate and track all deviations from approved construction drawings and do the
necessary update to the Project Engineer from time to time.
2.1.20 Clean the site and dispose – off all debris to SABIC/SHARQ or Royal Commission designated
dumping yard as directed by the site Project Engineer at no additional cost to SABIC/SHARQ.
2.1.21 Carry –out safe disposal of material where ever encountered. Prevailing government regulation
shall be followed for its safe disposal at no additional cost of SABIC/SHARQ
2.1.22 Prepare and issue “As – Built “drawings/documents in hardcopy and soft copy as per the
Project Documents submittal requirements.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 6 of 24
PURCHASE ORDER 4800805149
2.2 Civil/Structural/Architectural Work
Below is a summary description of civil works only. It shall not be constructed as a limitation to
the contractor’s scope which is defined in more details in drawings and other contract
documents. In case of conflict between the details below and the drawings, the most stringent
requirement shall prevail.
2.2.1 General
a) CONSTRUCTION CONSTRACTOR shall verify and locate all underground
utilities and other obstructions in the path of construction and take precautions to
protect them. Extra care shall be taken to protect existing utilities, communication,
and electrical cables.
b) The Contractor shall perform all surveying functions necessary to accurately
establish levels and lines for the work, as shown in the drawings and as directed by
the SABIC/SHARQ Representative.
c) CONSTRUCTION CONTRACTOR shall perform all work necessary to level
existing surface to the lines and grades as shown on drawing.
d) CONSTRUCTION CONTRACTOR shall excavate trenches for utility lines.
e) CONSTRUCTION CONTRACTOR shall be responsible for preserving all
existing monuments and restoration of damaged pavements and other structures
affected on the Construction of new facilities.
f) Contractor shall field verify the underground utilities prior to excavation. Any
underground utilities encountered during the excavation shall be notified to
SABIC/SHARQ representative.
g) All electrical utilities affected by the construction shall first be de-energized and all
non – electrical utilities shall be isolated from nearest isolation valve before
commencing the work.
h) The Contractor shall clean the working area and dispose of all debris and excess
materials during and after the construction period to designated place approved by
SABIC/SHARQ, or as per the instruction of the Client’s Project Engineer – in
Charge.
i) Earth work shall include clearing and grubbing earthwork excavation in soil,
removal and disposal of all unsuitable material from work site, placement and
controlled compaction of fill material from work site excavation and/or from a
borrow pit and other site work.
j) All concrete works shall comply to SABIC Engineering Standards and with SES
B51 rev.3
k) Construction Contractor shall apply cement- sand plastering to all masonry interior
& exterior walls, and to concrete surfaces that in contact with all design
architectural finishes. The thickness of plastering will not be less than 20mm. The
final coat will have smooth finish to receive the print.
l) Structural concrete shall be M30 grade and plain cement concrete shall be M17
grade. Ordinary Portland cements ( Type – 1) and shall conform to ASTM C 150
and shall be used in all cases (above and below ground, pavements and slab – on-
grade). Silica fume shall be used as specified in table VII of SES B51 – SO1.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 7 of 24
PURCHASE ORDER 4800805149
Ready – mix concrete shall be used complying with the requirements of AC1211
and / or ASTM C94.
m) Steel reinforcement shall be deformed bars confirming to ASTM A615/A615M,
Grade 60, and SASO SSA 2, with specified yield strength of 414 MPa and shall be
epoxy coated in accordance with SES B51-S02 AND ASTM A775/A775M.
n) Structural Steel shall conform to ASTM A36 or equivalent.
o) The reinforced concrete work below the ground level shall be treated with
protective coating as per SES B51-S01
p) Polyethylene sheet of 25 micron (0.25mm) thickness shall be provided below the
grade slab, grade beams and foundations as per SES B51-S01
q) Non shrink cementations grout shall be Grade C Combination Volume – Adjusting
when tested in accordance with ASTM C 1107 as per SES B51 – S03.
r) Contractor shall prepare steel reinforcement fabrication/ cutting detail drawings
(Bar-ending Schedule) with dimensions field verified before start of fabrication.
Fabrication items shall be appropriately piece marked & bill of material to be
provided.
s) Construction Contractor shall apply a solvent free, two component, polyurethane
coating, and minimum coating thickness shall be one (1) mm, to all exposed
surfaces of concrete below grade. It shall be applied in accordance with
manufacture’s recommendations as per SES B51 – S01.
t) All fabrication of structural columns/beams members, etc, shall be done as per
SABIC Standard B02-S08.
u) Doors & Windows shall be as per SES A05-S01, A05-S02, B02-S04 & A15 - S01
w) All steel structures shall be protected against atmospheric corrosion and the
industrial environment in accordance with SHARQ site conditions and engineering
standards & SES – PCS.
x) CONSTRUCTION CONTRACTOR shall provide necessary dewatering
equipments, if water table is reached during the required excavations in this project
and bring to the attention of SABIC/SHARQ Representative responsible in this
project for the proper de-watering disposal area.
y) Prior to excavating below water table, an approved dewatering system and shoring
shall be installed to lower the ground water table as noted on SABIC Engineering
Standard (C02-S02).
z) Hydro testing and disinfection of lines after installation work shall be performed
by the construction contractor.
aa) Testing and commissioning of new plumbing /utilities system shall be as per
SABIC standard.
bb) Construction contractor to comply all the plumbing system as per SES P01-E36
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 8 of 24
PURCHASE ORDER 4800805149
2.2.2 Civil/Structural/Architectural
2.2.2.1 Building Layout.
a) Grading shall include earthworks with machine excavation (limited to
areas free of u/g utilities) manual excavation (where u/g utilities are
anticipated) and controlled backfilling with approved backfill material
to the elevations and levels.
b) Construction contractor shall make manual trail pit at the location of
building foundation prior to excavation to ascertain u/g utilities and
obstruction.
2.2.2.2 Excavation, backfilling & compaction (Foundation)
a) Construction Contractor shall excavate backfill and compact to the
required elevations all foundations as shown on drawing. All
earthworks shall be carried out as per SABIC Standards.
2.2.2.3 Drainage System
a) Construction Contractor shall supply and install sanitary sewer system
complete.
b) Construction contractor shall connect the sanitary drainage line to the
existing Manhole outside the Building.
c) Hydro testing of lines after installation work shall be performed by the
construction contractor.
2.2.2.4 Water System
a) Construction Contractor shall provide hot and cold potable water
supply system complete with air gap, valve, and other required
accessories at the building and in accordance with SABIC/SHARQ
Standards
b) Construction contractor shall provide water line connection near the
HVAC equipment’s for maintenance
c) Hot water pipe lines shall be completely insulated as per
specifications.
d) Construction contractor to comply all the plumbing system
e) Hydro testing and disinfection of lines after installation work shall be
performed by the construction contractor.
f) Testing and commissioning of new plumbing/utilities system shall be
as per SABIC standard.
2.2.2.5 Structural Works
a) Construction Contractor shall construct reinforced concrete (RCC)
foundations. All concrete works shall be in accordance to SABIC
standards SES B51 – SO1.
b) Supply and construct the following structural reinforced concrete
(RCC) members & foundations, Concrete foundations, pedestals,
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 9 of 24
PURCHASE ORDER 4800805149
columns, wall columns, grade beams, grade slab with expansion joints
& isolation joints, concrete stairs and steps, concrete equipment pads,
ramp & steps.
c) Concrete framed structures like, column, floor and roof beam and
slabs.
d) Concrete canopy, parapet concrete molding, planter’s box, stair block,
concrete duct banks & masonry wall opening lintel beam and
columns.
2.2.2.6 Structural Works
a) Construction Contractor shall construct reinforced concrete (RCC)
foundations.
b) Concrete foundations, pedestals, columns, wall columns, grade beams,
grade slab with expansion joints & isolation joints, concrete stairs and
steps, ramp & steps.
2.2.2.7 Architectural Work.
a) Moisture resistant acoustic ceiling tiles on suspended metal frame,
including T-runners, hangers, supports and other related accessories in
kitchen and toilets in ground floor
b) Solid phenol core partitions, fixtures and accessories in toilets at
ground & first floor level or as shown on the drawings.
c) Complete kitchen sink, stainless steel counter top over floor mounted
cabinet and wall-hang cabinet with light fixture in kitchen
d) Provide precast splash block, scupper drain with down spout.
2.2.2.8 Thermal and Moisture Protection
a) EPDM waterproofing membrane on rigid insulation over 50
mm thick average cement screed sloped to drains in all exposed
roof decks of building roof.
b) Aluminum flashing & capping with sealant protection for water
tightness for all roof parapets
c) Supply and install polyethylene sheet (vapor barrier) below all
concrete slab on fill.
d) Termite protection to the building with termite shall be applied
on the compacted site under the footings, under grade beams,
under grade slab and around the building perimeter.
2.2.2.9 Doors and Windows (Service, Emergency & Roll –up Door) as per
SES A05-S01, A05-S02, B02-S04 & A15 – S01
a) Supply and install factory made insulated hollow metal door &
roll-up door including all hardware as per door schedule
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 10 of 24
PURCHASE ORDER 4800805149
b) Supply and install aluminum double glazed door including all
hardware as per door schedule
c) Supply and install fixed tempered glass window with aluminum
frame.
2.2.2.10 Flooring and Wall Finishing
a) Flooring and wall finishing to Building.
b) Fire retardant primer and paint finish on fair faced concrete
ceiling in all communication rooms.
2.2.2.11 Painting
a) Provide painting for all exterior & interior plastered CMU wall
and other underside roof exposed structure.
2.3 Electrical Work
Below is a summary description of Electrical works only. It shall not be construed as a
limitation to the contractor’s scope which is defined in more details in the drawings and
other contract documents. In case of conflict between the details below and the drawings,
the most stringent requirement shall prevail.
2.3.1 Cables
All power and control cables shall be rated 900 C, Copper; XLPE/PVC
insulated and shall comply with SES-E22-C01, SES-E22-S01 & SES-E22-
S02.
Cable entry into the building from below grade shall be in accordance with
SES-E22-C01. All cables shall be tested after installation, done and
performed as specified in the drawings. CONTRACTOR shall strictly
observe the minimum separation requirements as required by SES-E22-C01.
2.3.2 Conduit, Conduit fittings and supports
All conduit, conduit fittings and supports shall comply with the latest edition
of the National Electric Code (NFPA 70) and suitable for the intended
environment where to be installed.
2.3.3 Grounding
Grounding system shall install in accordance to NEC Article 250. All
equipment frames, instruments, devices, steel structures, and as required
within this Scope of Work shall be grounded as prescribed by SES-E11-S03.
Necessary protection against corrosion shall be taken into consideration for
all steps for assuring the continuity of the grounding system.
CONTRACTOR shall ensure that all local ground connections are
effectively connected to the main grounding grid.
2.3.4 Electrical Power Lighting and Grounding
Construction Contractor shall supply, install , and test new lights,
receptacle, lighting and grounding materials, equipment, and LV power
supply requirements including dry type transformer main distribution panel
board for the construction of contractor office building yard including tie-in
the LV power supply cable and signal /control cable to the existing sources.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 11 of 24
PURCHASE ORDER 4800805149
Construction contractor Electrical Scope for the following buildings
2.3.4.1 EG BUILDING
a. 112.5KVA 480-220/127V 3 PHASE 60, Hz pad mounted Step down
transformer inside electrical room via a electrical tie in point from the
existing 480volts Switchgear 4DP-11 spare feeder breaker at Substation
#4 as shown in the drawings
b. Construction contractor shall verify the tie in point at substation #4 from
the client supply, install , route and terminate the 120mm² XPLE
insulated armored power cable as shown in the drawings # SQ10-A9-
DW-002 and SQ10-A9-DW-003.the construction contractor shall provide
complete vendor details and installation procedures to SABIC/SHARQ
representative for approval before execution.
c. Construction contractor shall supply and install disconnect switch of
70Amps, 480volts 3 phase 60 HZ
d. Construction contractor shall supply and install test commission the new
400amps 220V 3Phase 4 wire 60HZ Main distribution panel board MDP
in NEMA -1 enclosure inside building/electrical room as shown on the
drawings, all supports, conduits, fittings and other related accessories
shall be provided as required on the site
e. Construction contractor shall supply and install test commission the new
200amps 220V 3Phase 4 wire 60HZ Power distribution panel board
PPAC in NEMA -1 enclosure inside building/electrical room as shown
on the drawings, all supports, conduits, fittings and other related
accessories shall be provided as required on the site
f. Construction contractor shall supply and install test commission the new
60amps 220V 3Phase 4 wire 60HZ Lighting distribution panel board
LPG in NEMA -1 enclosure inside building/electrical room as shown on
the drawings, all supports, conduits, fittings and other related accessories
shall be provided as required on the site
2.3.4.2 UTILITY BUILDING
a. Construction Contractor shall supply & install 45KVA 480-220/127V 3
PHASE 60, Hz pad mounted Step down transformer inside electrical
room via a electrical tie in point from the existing 480volts Switchgear
3DP-11 spare feeder breaker # 5G at Substation #3 as shown in the
drawings
b. Construction contractor shall verify the tie in point at substation #3 from
the client supply ,install , route and terminate the 50mm² XPLE insulated
armored power cable as shown in the drawings # --------------.the
construction contractor shall provide complete vendor details and
installation procedures to SABIC/SHARQ representative for approval
before execution.
c. Construction contractor shall supply and install disconnect switch
50Amps, 480volts 3 phase 60 HZ
d. Construction contractor shall supply and install test commission the new
400amps 220V 3Phase 4 wire 60HZ Main distribution panel board MDP
in NEMA -1 enclosure inside building/electrical room as shown on the
drawings, all supports, conduits, fittings and other related accessories
shall be provided as required on the site
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 12 of 24
PURCHASE ORDER 4800805149
e. Construction contractor shall supply and install test commission the new
70amps 220V 3Phase 4 wire 60HZ Power distribution panel board PPAC
in NEMA -1 enclosure inside building/electrical room as shown on the
drawings, all supports, conduits, fittings and other related accessories
shall be provided as required on the site
f. Construction contractor shall supply and install test commission the new
30amps 220V 3Phase 4 wire 60HZ Lighting distribution panel board LPG
in NEMA -1 enclosure inside building/electrical room as shown on the
drawings, all supports, conduits, fittings and other related accessories
shall be provided as required on the site
2.3.4.3 OLEFINS BUILDING
a. Construction Contractor shall supply & install 45KVA 480-220/127V 3
PHASE 60, Hz pad mounted Step down transformer inside electrical
room via a electrical tie in point from the existing 480volts Switchgear
36DP-60 spare feeder breaker # 10 at Olefins CCR as shown in the
drawings
b. Construction contractor shall verify the tie in point at Olefins CCR from
the client supply ,install , route and terminate the 50mm² XPLE insulated
armored power cable as shown in the drawings # --------------.the
construction contractor shall provide complete vendor details and
installation procedures to SABIC/SHARQ representative for approval
before execution.
c. Construction contractor shall supply and install disconnect switch
50Amps, 480volts 3 phase 60 HZ
d. Construction contractor shall supply and install test commission the new
150amps 220V 3Phase 4 wire 60HZ Main distribution panel board MDP
in NEMA -1 enclosure inside building/electrical room as shown on the
drawings, all supports, conduits, fittings and other related accessories
shall be provided as required on the site
e. Construction contractor shall supply and install test commission the new
70amps 220V 3Phase 4 wire 60HZ Power distribution panel board PPAC
in NEMA -1 enclosure inside building/electrical room as shown on the
drawings, all supports, conduits, fittings and other related accessories
shall be provided as required on the site
f. Construction contractor shall supply and install test commission the new
30amps 220V 3Phase 4 wire 60HZ Lighting distribution panel board
LPG in NEMA -1 enclosure inside building/electrical room as shown on
the drawings, all supports, conduits, fittings and other related accessories
shall be provided as required on the site.
2.3.4.4 Construction Contractor shall provide, install and test all interior and exterior
electrical works that include but not limited to routing the cables to the loads,
area lighting around Contractor Office Building and under this project.
Provide, install, test and commission grounding system/grid as shown in the
design drawings.
2.3.4.5 Construction Contractor shall provide SABIC/SHARQ with the manufactures
cable data for cable resistance and reactance.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 13 of 24
PURCHASE ORDER 4800805149
2.3.4.6 Construction Contractor shall provide lighting system for new Contractor
Office Buildings and tied it to the new ground grid. The new ground grid
shall be tied to the nearest existing plant grid as shown in the drawing no.
and other project documents.
2.3.4.7 Construction Contractor shall provide, install test and commission all
underground power, control/signal cables (all underground cables are SWA
armored) including the main cable under this project. The Construction
Contractor shall tag these underground cables wherever they are required per
SABIC/SHARQ standards especially at the equipment terminals, entering
and existing conduits/duct banks, in 900 bends, etc.
2.3.4.8 Construction Contractor shall provide, install, test and commission all
interior electrical building works that include power receptacles, lighting
fixtures, power & lighting distribution panels, lighting contactor panel,
distribution transformers, cable, wires, trays/conduits and supporting
accessories as defined in project drawings and bill of materials.
2.3.4.9 The location of panels, transformers, receptacles, lighting fixtures and
accessories as shown in project drawings is tentative. Construction
Contractor shall field verify and shall submit shop drawings with exact
dimensions for SABIC/SHARQ approval before execution.
2.3.4.10 The Construction Contractor shall read all drawings/documents in
conjunction with other disciplines drawings/documents for clear
understandings and to avoid conflicts.
2.3.4.11 The attached preliminary bulk material list is tentative. However,
Construction Contractor shall field verify for the quantities and types of the
all electrical materials / accessories and shall submit material specs for
SABIC/SHARQ approval prior the purchasing.
2.3.4.12 All building steel structures and electrical equipment shall be grounded with
the new ground grid. The ground grid shall be provided, installed and
connected to the nearest existing plant grounding grid.
2.3.4.13 Construction contractor shall coordinate deeply with other disciplines for the
best routing/placement for the electrical cables/equipment in order to avoid
any conflict with other equipment such as HVAC ducts, pipes, etc.
2.3.4.14 Construction contractor shall ensure systems integrity during installation,
testing and commissioning ie.all systems of different disciplines are
compatible to each other and has no conflict to all or part of the systems.
2.3.4.15 Construction Contractor to provide , install, test, commission and terminate
all new cabling, wiring, boxes, power outlet, lighting fixtures and other
electrical equipment with all necessary supports and fittings complying with
the latest edition of the SABIC Material System Specification, SABIC
Engineering Standards and the National Electrical Code (NEC)
2.3.4.16 Construction Contractor shall coordinate with the equipment vendor/supplier
for the location, type & supply of electrical outlets and submit the required
sample/shop drawings for SABIC/SHARQ approval
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 14 of 24
PURCHASE ORDER 4800805149
2.3.4.17 Supply complete firestop system on all conduit and raceway penetration on the
concrete walls as required on site.
2.3.5 Fire Detection and Alarm System
2.3.5.1 Outside Works ( Not in Scope of Contract)
2.3.5.2 Contractor Office Building
The installation of all Fire Alarm System wiring needs to take into account the Fire
Alarm System Manufacture’s published installation instruction and the limitations of the
applicable product listings or approvals.
Construction Contractor shall coordinate and facilitate Honeywell (Vendor) for new
system tie in to the nearest existing FACP .coordinate with SHARQ Fire & Safety
Department
2.3.5.2.1 Construction contractor to provide , assemble, install and commission the
new Fire Alarm Control Panel, equipped with all associated components as
listed in the (Technical Specification – Fire Alarm System) and datasheet.
2.3.5.2.2 Construction Contractor shall provide all fire alarm and detection system
devices including but not limited to smoke and heat detectors, manual pull
stations, horns and flashing lights, interface modules, end-of line resistors,
etc. and al accessories required by the system as shown in the drawings .
2.3.5.2.3 Construction Contractor to Route , install and terminate controls cables and
conduits, for the initiating, Signaling and Notification Devices to /from new
Fire Alarm Control Panel as shown in the drawings no.
2.3.5.2.4 Construction contractor shall interface the new HVAC and fire protection
systems to the new fire alarm system via proper cables/devices.
2.3.5.2.5 Construction Contractor to provide supports for mounting the Fire Alarm
Control Panel and all Fire Alarm devices, complete with all other related
installation as required on site.
2.3.5.2.6 Construction Contractor to supply complete fire stop system on all conduit
and raceway penetration on the concrete walls as required on site.
2.3.5.2.7 Construction Contractor to provide control cables for the initiating, signaling
and notification devices.
2.3.5.2.8 Perform functional test and provide assistance for commissioning of the Fire
alarm Control Panel.
2.4 Communication & IT ( Information Technology) Work
Construction Contractor shall ensure that all Communication works, equipment, and materials shall
be in accordance with applicable SABIC/SHARQ Engineering standards and approved Industry
Codes and Standards ( ie.SSITS-NSD-S03 & BICSI)
2.4.1 Structured Cabling System
This section of the design engineering package scope of work describes the design requirements for
the Structured Cabling System to provide Voice over IP and Data services at the New Contractor’s
Office Building. Construction Contractor shall supply and install the Structured Cabling System
which consists of the following:
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 15 of 24
PURCHASE ORDER 4800805149
UTP non-plenum rated CAT6 cables
UTP patch panels
Fiber Optic Patch Panels and its accessories
Single Mode Fiber Optic Cable
Copper and Fiber patch cords
Telecommunication Grounding System
The following site-specific of work to complete the communication service requirements that
includes but not limited to the following work components and activities.
2.4.1.1 Cableway and Cable Distribution System
a) Construction Contractor to home run UTP wirings from the station terminal
outlets/faceplates back to the Modular Patch Panel of voice and data. Construction
Contractor to observe that the station terminal outlets configuration and termination are
the same and based now to EIA/TIA – 568A due to Voice over IP requirement.
b) Construction Contractor to supply and install all necessary telecommunication
equipment, Rittal cabinets, cable termination and cross-connect wirings network of the
New Contractor Building.
c) Construction Contractor shall supply and install 4-PAIR UTP Plenum rated Category 6 (
ref. SSITS-NSD-S03) distribution cables required to transport the data and voice service
between ( the GF Communication Room # 013 & FF Communication Room # 014) and
the served offices or usable work areas.
d) Construction Contractor shall home run the 4-pair UTP CAT6 wiring inside a 1” Ǿ EMT
conduits from the information outlets/Duplex faceplates for data/voice connectivity.
e) Construction Contractor shall supply and install a minimum of 4 sets of Data/IP
Telephone, Two(2) Voice outlets & Two (2) Data outlets at all Contractors Offices
area/rooms in a separate outlet boxes and (2) Voice outlets with wall mounted.
2.5 HVAC Work
2.5.1 HVAC scope of work shall be carried out as described below, however it shall not
be constructed as a limitation to the contractor’s scope.
The contractor must read/undersigned the scope of work along with project detail
drawings and SABIC HVAC standards and specification. In case of conflict, the
most stringent requirement shall prevail.
Following is the scope of work for the facility in general.
2.5.1.1 Construction Contractor shall provide and install split air-
conditioning unit wall mounted
fan coil unit with air cooled condensing unit including
accessories and controls suitable for closed control system.
2.5.1.2 Construction Contractor shall provide Seven (7) wall mounted
exhaust fans for toilet, tea room, washing room and food
handling as shown on drawings.
2.5.1.2.1 As per technical specification and drawings, supply,
installation testing and commissioning of the complete
HVAC system.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 16 of 24
PURCHASE ORDER 4800805149
2.5.1.2.1 Split Type AC Unit.
Fan Coil Unit
2.5.1.3 Supply, installation, testing and commissioning of Fan Coil Unit (FCU) with
constant temperature.
2.5.1.4 24,500 Btu/hr Cooling Capacity, 8.5 kW Heating Capacity supporting 220V,
1Ph, 60Hz
Air Cooled Condensing Unit.
2.5.1.4.1 Supply, installation, testing and commissioning of Air Cooled condensing
Unit (FCU) with constant temperature.
2.5.1.4.2 Exhaust Fan
Complete with controls, back draft dampers, isolation kit, wall cap and
accessories, as per drawings and specification. Exhaust fan In-Line
according to drawings 75Pa Power supply 220V/3ph/60Hz.
(EG, OLEFIN & UTILITY ) Building as shown in the drawings.
. .
2.5.2 Piping ( Fire Water )/ Mechanical
Below is summary description of piping works only. It shall not be construed as a
limitation to the contractor’s scope which is defined in more details in the drawings and
other contract documents. In case of conflict between the details below and the drawings,
the most stringent requirement shall prevail.
2.5.3 Drainage System
2.5.3.1 Supply and install soil, waste and vent system items compete as specified
and in accordance with detailed drawings.
2.5.3.2 The work consists of laying the pipeline network within the building
including the vertical stacks to the floor above and vents and connections to
the individual fixtures as required to complete the system in a workmanship
manner and testing the system for proper function.
2.5.3.3 All pipes and fittings shall be Upvc Sch. 40.
2.5.4 Water System
2.5.4.1 Supply and install and cold water supply lines complete as
specified and in accordance with detail drawings and
connection with external supply general layout plan for each
lot.
2.5.4.2 The work consists of layout plan for each lot.
2.5.4.3 The work consists of laying the pipe line, new work and fittings
and connections to individual fixtures as required to complete
the system in workmanship manner and testing and testing the
entire system for proper functioning, cold water supply pipes
and shall be PVC SCH.80 and hot water supply pipes and
fittings shall be insulated CPVC SCH. 80 piping.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 17 of 24
PURCHASE ORDER 4800805149
2.5.4.4 Materials required to complete the work shall consist of pipes,
elbows, equal tees, reducing tees, reducers, etc as specified and
as shown.
2.6 SITE WORKS
2.6.1 The scope of work shall include complete procurement & construction of drainage,
water system, utilities such as potable water supply. This will also include erection,
inspection, testing & commissioning.
2.6.2 Hydro testing of lines after installation work shall be performed by the
construction contractor.
2.6.3 Testing and commissioning of new plumbing/utilities system shall be as per
SABIC standard.
2.6.4 The CONTRACTOR shall provide all services, tools, equipment, material, and
consumables required for the fabrication, installation, cleaning, flushing, testing
and commissioning of all new piping systems as shown on drawing numbers.
2.6.5 The CONTRACTOR shall conduct field verification of dimensions and elevations
prior to installation of all field fabricated pipe spools, pipe random lengths, valves,
pipe supports, vents and drain lines, bolts and gaskets, and root valves for
instrumentation connection.
3.0 BASIC REQUIREMENTS AND GUIDELINES
3.1 General
3.1.1 CONTRACTOR shall endeavor to protect the site construction facilities with
whatever ingress that is anticipated and shall not be limited to providing a
barricade, fence or access gate as required.
3.1.2 All components and accessories required for the satisfactory operation of the
WORK covered under the scope of this PROJECT, either specified in detail or not,
shall be procured, supplied and Constructed/installed by the CONTRACTOR as
necessary.
3.1.3 The specification of materials required for this PROJECT shall be in accordance
with this Scope of Work, Specifications and Standards also and should be the same
as the existing facilities of SABIC/SHARQ plant.
3.1.4 All WORK, including services for testing and inspections required by
SABIC/SHARQ, shall be furnished by CONTRACTOR.
3.1.5 The available as-built drawings for all existing facilities in the work area of
SABIC/SHARQ Plant will be provided. CONTRACTOR shall be responsible for
all field verification of as-built drawings.
3.1.6 Bill of Quantities (BOQ) as shown on this document specifies minimum
requirement for this Project and is for CONTRACTOR’s use. CONTRACTOR
shall review these BOQ sheets, if required add additional item(s) for the successful
completion of the PROJECT.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 18 of 24
PURCHASE ORDER 4800805149
3.1.7 CONTRACTOR to prepare his own bill of quantity with unit rate for the biding
and successful completion of the PROJECT. This unit rate shall be used for the
variations ( addition or deletion) if any
.
3.2 Project Drawings
3.2.1 The CONTRACTOR shall maintain one complete set of drawings at the WORK
SITE. As the WORK progress, the CONTRACTOR shall record the following
information relative to WORK included in this Contract.
I) Exact location and elevation of the facilities.
II) Changes due to unexpected finding of existing facilities.
3.2.2 Upon completion of the WORK, the CONTRACTOR shall Prepare and issue “ As-
Built” drawings/documents in hardcopy and soft copy as per the Project Documents
submittal requirements.
3.2.3 The CONTRACTOR is cautioned that the Contract will not be considered complete
until the marked-up drawings for as-built information of the Project is delivered to
SABIC/SHARQ.
3.2.4 CONTRACTOR can use drawings/paper size A4, A3, A2 & A1 as A0 is not
acceptable.
3.3 Substitutions
3.3.1 Substitutions which are equal in quality to those specified will be approved, subject to
the following provisions. Substitutions must be approved by SABIC/SHARQ in
writing.
3.3.2 Alternate items installed without SABIC’s approval shall be replaced with the
specified material at the CONTRACTOR’s expense. The CONTRACTOR assumes
full responsibility for alternate items or cost of redesign and of modifications to this
and other parts of the WORK caused by alternate items furnished. No more than one
proposed alternate will be considered for each item.
3.4 Quality Control and Inspection
3.4.1 SABIC/SHARQ will witness all inspection and Quality Control activities.
3.4.2 The CONTRACTOR shall be responsible for the quality of all his manufactured
and purchased items and also the construction work. These include the following.
3.4.2.1 Vendor Supplier Quality Control and Inspection which covers all
items at the CONTRACTOR’s and/or vendor//supplier’s plants.
3.4.2.2 On-Site Quality Control and Inspection which covers all aspects of
control, inspection and testing of field activities and construction
works.
3.4.3 CONTRACTOR shall designate one of his key personnel as Quality Control
Manager. It shall be the sole duty and responsibility of the Quality Control
Manager and his staff to organize, coordinate, conduct and implement the Quality
Control for all the work disciplines as required with the assistance of concerned
discipline Engineers for Quality control.
3.4.4 The QC manager shall report directly to the Project Manager.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 19 of 24
PURCHASE ORDER 4800805149
3.4.5 Within 15 days from the award the CONTRACTOR shall submit for review and
approval a detailed inspection and Testing Plan which would form the basis for all
QA/QC procedures.
3.4.6 Prior to requesting SABIC/SHARQ review of inspection, the CONTRACTOR’S
inspection personnel should have accepted the WORK and prepared all necessary
documentation for sign-off. SABIC/SHARQ. Representative or his designee should sign
for SABIC/SHARQ, and the Quality Control Supervisor or his designee should sign
for the CONTRACTOR.
3.4.7 Relevant codes and specifications setting forth the required standards for materials
and workmanship are given in the Contract Documents. The CONTRACTOR shall
take full account of the requirements of such codes and criteria, together with the
applicable Sections of Specification, Standards and Project Quality Procedures.
3.4.8 Neither the failure by SABIC/SHARQ to conduct inspection or testing nor the
failure to discover defective engineering, workmanship, materials or equipment,
shall prejudice the rights of SABIC/SHARQ to thereafter require and obtain from
Contractor the satisfactory performance of the Work hereunder. No acceptance of
any part of the Work or the Permanent Works shall be implied or construed to
result from such inspection by SABIC/SHARQ.
3.4.9 Inspection
3.4.9.1 The CONTRACTOR shall carry out all inspection testing and survey
both in supplier’s shops and at the Job Site necessary to ensure that
the WORK is executed in accordance with the Drawings and
Specifications. Inspectors shall be qualified and experienced for the
work they have to undertake.
3.4.9.2 Access shall be provided for inspection of the WORK by
SABIC/SHARQ at all times, but such inspections shall not relieve
the CONTRACTOR of his responsibilities for performing inspections
and tests. The CONTRACTOR shall cooperate with SABIC/SHARQ
if any test is performed simultaneously with SABIC/SHARQ
inspection team.
3.4.9.3 The CONTRACTOR shall be required as a minimum to undertake
testing at the frequency and type as described on the Specification and
Project Quality Procedures.
3.4.9.4 Within two (2) weeks of the commencement of the Contract, the
CONTRACTOR shall furnish for approval by SABIC/SHARQ the
name(s) of the independent Material Testing Consultant/Laboratory to
be used in the Project. Test results from a non-approved testing
laboratory will not be accepted. All cost of this third party testing
shall be borne by the CONTRACTOR.
3.4.10 Non-Compliance
3.4.10.1 In the event of non-compliance with specified requirements, the Quality
Control Supervisor shall issue a Certificate of Non-Compliance to his
Construction Manager for immediate remedial action. The Certificate of
Non-Compliance shall indicate the following.
i) Date and Section of WORK affected.
ii) Description of Non-Compliance (with inspection report and test result
attached)
iii) Suggested Remedial Action
3.4.11 It shall be endorsed by the Quality Control Manager and made immediately
available to SABIC/SHARQ as required. The Certificate of Non-Compliance shall
further be used to record the date and nature of successful remedial action which
shall again be endorsed by the Quality Control Manager.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 20 of 24
PURCHASE ORDER 4800805149
3.5 Protection of Existing Facilities
3.5.1 Special precautions shall be taken as the WORK is within and adjacent to the existing
facilities. The CONTRACTOR shall carefully carry out the WORK not to cause any
damage to the existing facilities. If any damage is done to the existing facilities, the
CONTRACTOR shall at once report to SABIC/SHARQ and repair it to its original
condition at his own cost to the extent of SABIC/SHARQ’S satisfaction.
3.5.2 Any reimbursement/replacement to partly or completely damaged
facility/equipment/material shall be full and binding on CONTRACTOR.
3.6 Schedule of the Critical Work
3.6.1 The CONTRACTOR shall follow the restriction to the schedule for the critical
work items which might be put by SABIC/SHARQ for the sake of plant operation.
The said critical work items include, but not limited to:
i) Tie-ins work with the existing facilities under operation
ii) Hot work in the hazardous area
iii) Any work in the vicinity of the equipment under high voltage electrical
power.
3.7 Modification of Existing Facilities
3.7.1 CONTRACTOR shall be responsible for the executing all necessary modifications
of existing facilities for tie-ins to piping, etc., and to accommodate the new
facilities to meet the requirements of this PROJECT.
3.7.2 CONTRACTOR shall be responsible for restoring all the existing facilities,
equipment, etc. to its original conditions which will be affected during the
execution of the PROJECT.
3.7.3 All modifications shall be executed in such a manner that there will be minimum
disturbance to people working in the area and to existing facilities, especially the
tie- in works.
3.8 Safety and Fire Prevention
3.8.1 Contractor shall comply with all applicable safety laws, standard, regulation, codes
and best practice, including the safety program established by SABIC/SHARQ
Safety & Health (SHEM) Standard.
3.8.2 Contractor, shall within thirty (30) days after the commencement date specified in
the “ Notice to Proceed”, submit for SABIC/SHARQ approval, Contractor’s Safety
and health Plan.
3.8.3 SABIC/SHARQ approval of any plan or program shall not relieved Contractor of
its other obligation hereunder.
3.8.4 Contractor shall inform its employees of all safety, health, welfare and fire
prevention practices and the requirements of SABIC/SHARQ.
3.8.5 Contractor shall ensure that all of its personnel employed in the project are
competent and, where required, provide nominated names and details as proof of
competency to SABIC/SHARQ.
3.8.6 Contractor shall furnish suitable safety, health, welfare and fire prevention
equipment and enforce the use of such equipment by all employees in compliance
of its own Plan and Program as detailed above.
3.8.7 Contractor shall not permit unauthorized fires or the dumping of surplus materials
within or adjacent to the limits of the Site and shall be liable for all damage for fire
due directly or indirectly to its own activities of its employees or its subcontractors
of any tier or their employees.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 21 of 24
PURCHASE ORDER 4800805149
3.8.8 Contractor shall provide fire extinguisher commensurate with the hazard of each
work area and shall instruct its personnel in their location and use.
3.8.9 Where ever welding or burning is conducted, all flammable materials shall be
protected and Contractor shall ensure that protected fire prevention measures are
taken and that no fires result from such operations.
3.8.10 At all times, the project area and works shall be kept clean and tidy in accordance
with requirements of SABIC/SHARQ
3.8.11 At the request of SABIC/SHARQ Contractor shall immediately remove from the
Work Site any material or structures which is in SABIC/SHARQ’s judgment are
contrary to SABIC/SHARQ’s fire prevention or safety program.
3.9 First Aid Facilities
3.9.1 Contractor shall be responsible for the provision of adequate first-aid facilities at
the site for all personnel employed or retained by Contractor or any of its
subcontractors in the performance of the work.
3.9.2 However, other first-aid facilities may be present at or near the Site, which
SABIC/SHARQ may at its option, make available for the treatment of such
personnel who may be injured or become ill while engaged in the performance of
the work.
3.10 Contract Schedule
3.10.1 Within fifteen (15) days from Notice of Site Possession, the Contractor shall
submit to SABIC/SHARQ for review and approval, a detailed Contract Schedule
showing the activities and sequences of operations needed for the orderly
performance and completion of every separable part of the work in order to meet
the dates for the major contract events.
3.10.2 The detailed Contract schedule shall be computerized CPM and/or detailed bar
chart at the option of SABIC/SHARQ.
3.10.3 The detailed Contract Schedule shall be complete in all respects covering all
activities relating to the work both on- site and off-site including but not limited to,
procurement, fabrication and delivery of equipment, materials and construction
plant and equipment.
3.11 Progress Reports
3.11.1 Based on the rate of progress, reports shall be submitted in duplicate and separated
into the major contractual activities, in such form and manner as SABIC/SHARQ
may request but will not be required more often than twice monthly nor less often
than once monthly, and shall contain the following.
3.11.2 Such reports (which do not include reports on such items as manpower and
equipment which are reported daily) shall be furnished.
a The activities schedule to be in progress or actually in progress during the
reporting period, together with the Contractor’s estimate of progress made to the
cutoff date and actual or forecast start and completion dates for each of these
activities.
b The activities schedule to be started within the next two (2) reporting period with
forecast start dates.
c A brief narrative report presenting a general resume of Contract progress and a
description of any anticipated variations from the Contract Schedule, together with
an assessment of the impact of such variations and statement of the proposed
corrective action:
d A list of the equipment used at the site during the reporting period and any
equipment idle during the reporting period.
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 22 of 24
PURCHASE ORDER 4800805149
4.0 DELIVERABLE
4.1 Documents to be submitted along with Bid Documents:
4.1.1 Scope Compliance Documents – clause by clause of enquiry specification.
4.1.2 Technical catalogue of offered equipment with model number
4.1.3 Preliminary construction schedule.
4.1.4 Organization chart of company and for the project execution team.
4.1.5 List of Deviations/exclusions, if any. Otherwise submit “ No Deviation Statement “
4.1.6 The bid shall comprise of technical package and un-priced commercial package in
one envelope.
4.1.7 Priced commercial: The sealed priced commercial lump sum package with major
cost breakdown shall be submitted separately. Bill of Quantities (BOQ) with Unit
rates shall also be submitted as part of commercial bid and this will be used
for addition or deletion of works.
4.2 Documents to be submitted during execution:
4.2.1 Panel drawings (dimensional, circuit diagram and terminal diagram)
4.2.2 Test certificate for major items such as transformer, panels and lighting
fixtures for electrical works.
4.2.3 Test certificate for concrete design mix for civil works.
4.2.4 Shop & Fabrication drawings.
4.2.5 As-Built Drawings: CONTRACTOR shall maintain one set of drawing
prints specifically for marking up as –built information. All changes shall be
recorded on the drawings, and on completion of construction work,
CONTRACTOR shall update construction drawings and provide them to
SHARQ – SPM.
4.2.6 Detailed construction schedule
4.2.7 Method Statement for execution of work
4.2.8 All Materials Submittals ( discipline wise)
4.2.9 Inspection Test Plans (ITPs)
4.2.10 Safety & QA/QC Manuals, formats & Test procedures
5.0 CODES AND STANDARDS
Following are the applicable SHARQ and SABIC Engineering standards, but not limited to
Standard
No. Title
Rev
.No Rev.Date
5.1 SABIC Engineering Standards (SES) for Civil
A01-F01 Architectural Standard Drawings-Index 1 Jun-01
A01-F01-01 Architectural Standard Drawings-Metal
Building Details 0 Jun-01
A01-F01-03 Architectural Standard Drawings-Door and
Window Details 0 Jun-01
A01-F01-04 Architectural Standard Drawings- Floor
Intersection Details 0 Jun-01
A01-F01-05 Architectural Standard Drawings-Threshold
Details 0 Jun-01
A01-F01-09 Architectural Standard Drawings-Roof and Wall
Insulation Details 0 Oct-03
A01-S02 Painting for Plant Buildings 1 Mar-04
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 23 of 24
PURCHASE ORDER 4800805149
A05-S01 Steel Doors, Windows and Frames 2 Mar-04
A07-S01 Building Insulation 2 Mar-04
A12-S02 Insulated Steel Siding and Roofing 2 Mar-04
A12-S03 Sheet Metal Flashing and Trim 1 Mar-04
A13-S01 Joint Sealant 1 Apri-01
A15-S01 Finish Door Hardware and Weather Stripping 1 Mar-01
B01-E01 Design Criteria for Concrete and Steel
Structures 3 Mar-04
B01-F01-05 Constructability/Safety Details 1 Apr-01
B02-E03 Wind load on structures 1 Mar-04
B02-S01 Specification for Fabrication of Structural Steel 2 Jun-04
B02-S02 Specification for Erection of Structural Steel 2 Jun-04
B50-F01-01 Concrete Standard Drawings Index and Related
Specifications 1 Oct-03
B50-F01-02 Concrete General Notes 2 Oct-03
B50-F01-03 Concrete Abbreviation Index 0 Jan-01
B50-F01-04 Reinforcement Clearances, Splices, Embedment
and Tie Spacing 1 Oct-03
B50-F01-05 Column Tie Reinforcement 0 Jan-01
B50-F01-06 Reinforcement Placement at Beam Intersections 1 Jun-01
B50-F01-07 Beam Stirrup Reinforcement and Reinforcement
at Pipe Openings in Walls 0 Jan-01
B50-F01-08 Pier and Footing Reinforcement 0 Jan-01
B50-F01-09 Reinforcement Standard Hooks and Bends 1 Jun-01
B50-F01-10 Grout and Anchor Bolt Projection Details 0 Jan-01
B50-F01-13 Standard Anchor Bolts and Sleeves 1 Jun-01
B50-F01-14 Embedment Details 1 Jun-01
B50-F01-15 Reinforced Concrete Slabs on Grade 2 Mar-04
B50-F01-17 Building and Equipment Grounding Foundation
Details 0 Sep-02
B50-F01-18 Standard Details for Block Wall Reinforcement 0 Oct-03
B51-S01 Cast-in- Place Reinforced Concrete 3 Apr-01
B51-S03 Grouting for Equipment and Structural
Foundations 0 Jun-97
B52-E01 Design Criteria for Foundations of Structures
and Equipment 1 Apr-01
B52-S01 Installation of Foundations 0 Sep-99
B53-E01 Slabs on Grade 0 Apr-99
B53-E02 Thickness of Floor Slabs on Grade 0 May-99
B53-F01 Floor Slabs on Grade, Joints, and Details 1 Mar-01
B55-E01 Anchor Bolt Design 0 Nov-98
B55-S01 Fabrication, Installation of Anchor Bolts and
Embedded Steel 0 Jun-98
B56-F01 Curb Angles 0 Jul-98
C01-F01 Drawing Index and Related Specifications 1 Jun-01
5.2. SABIC Engineering Standards (SES) for HVAC
H01-E01 HVAC System Design Criteria 2 Mar-04
H02-S01 Specification for HVAC Equipment 1 Jun-01
H03-C01 Specification for HVAC Installation 1 Jun-01
5.3 SABIC Engineering Standards (SES) for Electrical
E01-D02 Electrical Definitions and Symbols
E02-G01 Electrical System Design Criteria (NEC) 1 Jun-01
E04-S02 Dry Type Distribution and Power
Transformers(NEC) 1 Mar-04
E05-E01 Plant Building-Electrical Design 1 Jul-05
E11-E02 Grounding and Lighting Protection for 0 Mar-04
SCOPE OF WORK
AFFILIATE SHARQ Date: 24.01.2012
PROJECT TITLE: PERMANENT CONTRACTOR SHELTERS Page 24 of 24
PURCHASE ORDER 4800805149
Substation, Buildings and Structures (new)
E11-S03 Bonding and Grounding 0 Feb-99
E20-E01 Lighting Design Requirements 0 Dec-00
E20-E02 Lamp and Lighting Fixtures Selection and
Applications 0 Nov-00
E20-E03 Lighting and Receptacle Circuit Wiring
Requirements 0 Nov-00
E21-G01 Wiring Systems Application for Various
Environmental Classifications 1 Jun-01
E22-C01 Wires and Cables Installation, Splicing, and
Termination Requirements 1 Jun-01
E22-S01 Cables Low Voltage ( NEC and IEC) 1 Jun-01
E23-C01 Conduit System Installation Requirements 1 Jun-01
E23-S01 Conduit: Metallic, PVC Coated and
Nonmetallic 1 Apr-01
E26-C01 Underground Excavation and Installation of
Conduits, Manholes and Cables 1 Jun-01
E26-E01 Engineering Standard for Underground Duct
Bank, Conduit, Manhole, and Cable
Installations
1 Jun-01
6.0 ATTACHMENT
6.1 Civil/Structural/Plumbing/HVAC, Electrical & Communications/fire protection Design
Drawings & Documents.