Bermondsey Station Peckam Rye Station Existing SPA School Proposed new SPA School SPA SCHOOL, CAMBERWELL DECEMBER 2017 LOCATION PLAN DESIGN BRIEF SITE CONTEXT The former Lewisham Southwark College Camberwell Campus is to be developed to provide much need pupil places within the London Borough of Southwark for a Spa School Camberwell. The existing main building is to be retained with some ancillary buildings being demolished. There will be a new build element that will present a new smart entrance on Southampton Way. A new vehicular exit is intended on Harris Street to enable safe access to the site.

Upload: others

Post on 25-Jun-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SPA SCHOOL, CAMBERWELL DECEMBER 2017

Bermondsey Station

Peckam Rye Station

Existing SPA School

Proposed new SPA School

SPA SCHOOL, CAMBERWELL DECEMBER 2017

LOCATION PLAN DESIGN BRIEF

SITE CONTEXT

The former Lewisham Southwark College Camberwell Campus is to be developed to provide much need pupil places within the London Borough of Southwark for a Spa School Camberwell.

The existing main building is to be retained with some ancillary buildings being demolished. There will be a new build element that will present a new smart entrance on Southampton Way. A new vehicular exit is intended on Harris Street to enable safe access to the site.

Page 2: SPA SCHOOL, CAMBERWELL DECEMBER 2017

UP

UP

UP

UP

UP

UP

UP

UP UP

UP

UP

UP

Architects 135 - 139 Curtain Rd,Shoreditch London EC2A 3BX

EllisWilliams

Copyright: All rights reserved.This drawing must not be reproduced without permission.This drawing must not be scaled. Dimensions are in millimetres unless specified.

Notes

Key Plan.

North Point.

Scale at A1

Revision

checked by

Job title

date

Drawing title

Status

Drawn by

Job No. Drawing number

Contractors Drawing No.

Rev. Date Rev. Note By Check

UP

UP

UP

UP

UP

UP

UP

BH 3.66

BH

2.21

BH 3.69

BH 3.67

BH

3.80

BH

3.80

BH

3.80

BH

3.80

BH

2.27 BH 3.93

BH

3.81

BH

3.81

BH

3.81

BH

3.75

BH

3.75

BH

3.75 BH 3.69

BH

3.67

BH

3.90

BH 3.71

BH 3.71

BH 3.71BH 3.71

BH 3.71

BH 3.71

BH

2.21

BH

2.21

BH

2.21

BH 3.84

BH 3.71

Architects 135 - 139 Curtain Rd,Shoreditch London EC2A 3BX

EllisWilliams

Copyright: All rights reserved.This drawing must not be reproduced without permission.This drawing must not be scaled. Dimensions are in millimetres unless specified.

Notes

Key Plan.

North Point.

Scale at A1

Revision

checked by

Job title

date

Drawing title

Status

Drawn by

Job No. Drawing number

Contractors Drawing No.

Rev. Date Rev. Note By Check

UP

UP

UP

UP

UP

UP

UP

BH 3.66

BH

2.21

BH 3.69

BH 3.67

BH

3.80

BH

3.80

BH

3.80

BH

3.80

BH

2.27 BH 3.93

BH

3.81

BH

3.81

BH

3.81

BH

3.75

BH

3.75

BH

3.75 BH 3.69

BH

3.67

BH

3.90

BH 3.71

BH 3.71

BH 3.71BH 3.71

BH 3.71

BH 3.71

BH

2.21

BH

2.21

BH

2.21

BH 3.84

BH 3.71

Architects 135 - 139 Curtain Rd,Shoreditch London EC2A 3BX

EllisWilliams

Copyright: All rights reserved.This drawing must not be reproduced without permission.This drawing must not be scaled. Dimensions are in millimetres unless specified.

Notes

Key Plan.

North Point.

Scale at A1

Revision

checked by

Job title

date

Drawing title

Status

Drawn by

Job No. Drawing number

Contractors Drawing No.

Rev. Date Rev. Note By Check

GROUND FLOOR PLAN

FIRST FLOOR PLAN SECOND FLOOR PLAN

DRAWING KEY:

Retained existing buildings

Proposed New build extent

Proposed areas of demolition

KEY BUILDING SPACES:

- Key Stage classrooms- Group Rooms- Sensory Rooms- Art - Music - Food Tech- Science- Library- Drama / Assembly- Main Hall- Therapy Rooms- Family / Meeting Room- Dining- Staff areas & admin

KEY OUTDOOR SPACES:

- Secure Play Space- Growing Area / Greenhouse- MUGA- Pick up / drop off

SPA SCHOOL, CAMBERWELL DECEMBER 2017

Site boundary line

Existing site context

Page 3: SPA SCHOOL, CAMBERWELL DECEMBER 2017

SPA SCHOOL, CAMBERWELL DECEMBER 2017

KEY DESIGN FACTORS; - Secure site access- Environment supportive of learning needs- All primary classrooms with easy playground acccess- Separate primary and secondary spaces- Classrooms paired with small group rooms and sensory spaces- Secure entrance lobby- Separate staff area- Large staff training space- Secure pick up and drop off- Separate dining hall- Mix of different landscape / play conditions

TRAFFIC:

The vast majority of pupils will arrive to school on minibuses and by public transport. A drop off area is proposed within Harris Street for pupils arriving in cars / taxis. By looking at current drop off arrangement proportion on the SPA School Monnow Road site, it is anticipated that a maximum of 16 vehicles (6 taxis and 10 private cars) could drop-off and pick-up pupils on a regular basis. This figure does not allow for any lift-sharing, which is likely to occur. The school will operate 2 time-periods for pupil arrival and departure at the start and end of every school day. These will operate for 2 periods of 15 minutes around 9am and 3.15pm.

TREES:

It is proposed to remove an existing tree within the Southeast corner of the site. The landscape strategy will be developed to provide replacement trees and planting along the Southampton Way boundary and elsewhere within the site.

KEY OUTDOOR SPACES:

- Secure Play Space- Growing Area / Greenhouse- MUGA- Pick up / drop off

INDICATIVE SCHEME PROPOSAL

PHASED PROJECT

Buildings demolished

SCHEME PHASING: - Initial works proposed to allow Charter School East Dulwich to increase its intake in September 2018- Existing buildings denoted red to be demolished- Temporary ‘haki’ stair to be installed at the Eastern end of the existing building- Existing school entrance retained- New vehicular access point off Harris Street to be created

New Harris St cross-over

temporary stair