Development Area 6 Draft Vision Plan & Implementation Strategy 44 VILLAGE GREEN The Village Green will be a multi functional space providing a focus for community life and gathering. The Village Green will be of a size that can be utilised by the local community for exercise. Within the park existing mature trees will be retained where possible and the site will incorporate drainage. A Community facility is also proposed within the Park with the prospect for a cafe to be incorporated allowing alfresco opportunities to spill over and integrate with the space. Children will be able to play, while their parents share a coffee with friends in a safe, attractive and family friendly setting. Furthermore, the Community facility can be converted to markets or a meeting area on weekends, special occasions and/or evenings. STATION PLAZA The Station Plaza will be a multi functional space. The Airport West Train Station will be centrally located within the Plaza, covered by a sculpted shade structure. The Plaza will primarily be a paved area surrounded and lined with trees with a central sunny open interior. The abutting built form and land use shall provide opportunities for public/private and alfresco opportunities to spill over and integrate with the space. Children will be able to ‘fool around’, while their parents share a coffee with friends in a safe, attractive and family friendly setting. The Plaza will be an area with a focus for community life and gatherings, with the opportunity for the space to be converted to markets or meeting areas for weekends or social areas in the evenings. Village Green with retained trees and active spaces for children to play Planting, seating and feature landscaping in the plaza to encourage people to linger SPACES Creating a comfortable, flexible, appealing plaza

Upload: vuongdien

Post on 04-Feb-2018

218 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

Development Area 6 Draft Vision Plan & Implementation Strategy44

VILLAGE GREEN

The Village Green will be a multi functional space providing a

focus for community life and gathering. The Village Green will

be of a size that can be utilised by the local community for

exercise. Within the park existing mature trees will be

retained where possible and the site will incorporate

drainage.

A Community facility is also proposed within the Park with

the prospect for a cafe to be incorporated allowing alfresco

opportunities to spill over and integrate with the space.

Children will be able to play, while their parents share a

coffee with friends in a safe, attractive and family friendly

setting.

Furthermore, the Community facility can be converted to

markets or a meeting area on weekends, special occasions

and/or evenings.

STATION PLAZA

The Station Plaza will be a multi functional space. The Airport

West Train Station will be centrally located within the Plaza,

covered by a sculpted shade structure. The Plaza will

primarily be a paved area surrounded and lined with trees

with a central sunny open interior. The abutting built form and

land use shall provide opportunities for public/private and

alfresco opportunities to spill over and integrate with the

space.Childrenwillbeableto‘foolaround’,whiletheir

parents share a coffee with friends in a safe, attractive and

family friendly setting.

The Plaza will be an area with a focus for community life and

gatherings, with the opportunity for the space to be

converted to markets or meeting areas for weekends or

social areas in the evenings.

Village Green with retained trees and active spaces for children to play

Planting, seating and feature landscaping in the plaza to encourage people to linger

SPACES

Creating a comfortable, flexible, appealing plaza

Page 2: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

45 Development Area 6 Draft Vision Plan & Implementation Strategy

LINEAR PARK

The Linear Park consists of six parcels of public open space

(includingtheVillageGreen)ofvarioussizesandshapes,

located primarily along the existing Brearley Avenue

alignment. The network is proposed to extend through the

Residential Neighbourhood, from Great Eastern Highway to

Dunreath Drive. The key consideration within these networks

of open spaces is the retention of existing mature trees

where possible, and the provision for pedestrian and cycle

movement.

This network will be a mixture of tree retention, turf, paving

and swales envisaged to be utilised for more passive uses.

Each open space will have areas designated as a small

breakout space supplying unique intimate environments that

are multi functional for use by individuals, groups and families

alike. Possible features included within these areas will be

such elements as public art, play equipment and small

pockets of soft and hard landscaping.

The network will be linked with shared paths meandering

through the full length of the network, winding around the

existing mature trees and connecting seamlessly at key

positions to the wider pedestrian and cycle network.

Mix of soft and hard landscaping through open spaces

Linear park connecting open space areas, incorporating retained trees

Shared paths linking the open space network

Page 3: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

Development Area 6 Draft Vision Plan & Implementation Strategy46

The Airport Southern Main Drain

currently runs along Brearley Avenue

and provides a drainage route for much

of the catchment in the area.

The Water Corporation advises that

approvals will be required should

additional flow need to be discharged

into the Swan River. Any modifications

to the drainage discharging into the

river, including water quality, will need

to be approved by the Swan River Trust

and the Department of Water.

boundaries, the existing network of

150mm diameter water mains servicing

properties will need to be modified to

suit. The design of public open spaces

and landscaping will have regard to

DA6’s allocation of City’s irrigation water

supply.

STORMWATER/DRAINAGE

The developments shown in the Vision

Plan will increase the impermeable area

within DA6 significantly. Therefore, the

drainage systems will need to be

resized unless provisions are made for

on-site retention.

SERVICES

WATER

The Water Corporation have advised

that the overall existing major

infrastructure for water will be sufficient

to support the proposed developments.

This means that no upgrade will be

required for the 760mm diameter water

main on Great Eastern Highway despite

the density increase expected for this

development. Upgrades will be

required for the reticulation size mains

(under300mmindiameter)inorderto

meet demand. The extent of the

required upgrades will need to be

discussed with the Water Corporation

once specific details of the

developments are available. As the

Vision Plan shows reassigned lots and

possible changes to cadastral

Page 4: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

47

COMMUNICATIONS

There are no major communication

upgrades envisioned for the site

other than the rollout of the high

speed broadband network. The DA6

is at least three years away from the

national rollout of the high speed

broadband network.

POWER

Western Power conducts its own

feasibility studies for new

developments for a fee. Further

consultation will be required with

Western Power once specific details of

the new developments are established.

SEWERAGE

DA6 encompasses areas currently

serviced by Perth Airport’s own internal

network. It is envisaged that this network

will become Water Corporation asset. An

assessment will need to be made on

whether the existing network outside the

PAPL land will meet Water Corporation

standards. Similarly to the water network,

the reassigned lots will mean a

modification of the existing sewer

network will be required.

The pump station which services the

residential dwellings is currently at

capacity. It is expected that this pump

station will require an upgrade in order to

meet demand generated by the increase

in dwellings. The Perth Airport pump

station on Fauntleroy Avenue will also

require an upgrade or potentially the

addition of second pump station. Gravity

reticulation mains servicing dwellings will

need to be upgraded in size based on

specific development details. This will

require further investigation, working with

the Water Corporation.

GAS

As the existing gas network currently

servicing the site is entirely an ATCO Gas

asset it is envisioned that the system will

meet standards. A major network of

medium pressure gas mains exists within

the site and is believed to have adequate

capacity to supply the new developments.

Approval to modify the network to suit

the updated cadastral boundaries will

need to be managed with ATCO Gas.

Opportunity to sensitively incorporate drainage into open spaces

Sustainable commercial buildings

Page 5: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

Development Area 6 Draft Vision Plan & Implementation Strategy48

medium to high density residential and mixed use product

near Great Eastern Highway which may be a model for

additional product near Airport West Train Station. This

approach has the benefit of allowing ideas to be tested,

being lower in cost and not involving major works or

changes.

The implementation framework groups the Vision Plan

initiatives as follows:

1. Statutory and Policy framework

2. Community and Economic Development

3. Transport-related projects.

4. Land Assembly and Physical Improvements to the Public

Domain

The Implementation Framework covers the strategic

initiatives contained within the Vision Plan, along with an

indication of the main agencies and organisations involved in

delivery and timeframes.

IMPLEMENTATION STRATEGYIn order to realise the potential of DA6 and achieve change, the Vision Plan will need to be implemented over time, by a number of stakeholders. Some initiatives, such as the development of medium density housing and mixed use concepts, will have immediate and significant impact on their own whilst other projects, such as the opening of Airport West Train Station, will be catalysts for others with considerable flow-on effects for many

generations.

A robust Implementation Strategy based upon the guiding

principles of the Vision Plan will lead to housing and

employment choice, innovation and sustainability in service

delivery and benefits for the local and neighbouring

communities.

Delivery of the Vision Plan will rely on the cooperation of a

range of stakeholders including Federal and State

Government, the City, the private sector and the community.

The implementation timeframe will commence in the

short-term, but will then roll out with medium and long-term

actions.

Some initiatives will be implemented more readily than

others. Planning-focused initiatives, such as developing the

Structure Plan and amending the Planning Scheme as well

as development of transport related strategies, can

commence and be delivered in the short-term. Delivery of

physical improvements will be more gradual over a longer

period of time. Some physical improvements are suited to

being trialled to gauge their effectiveness, for example, the

Page 6: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

49 Development Area 6 Draft Vision Plan & Implementation Strategy

GOVERNANCE

A governance structure is proposed with opportunities for

greater sharing of responsibility, ongoing community

engagement and enhanced private sector leadership which

would place DA6 high up on the list of innovative urban

renewal projects. The two key pillars of governance

recommended are:

1. Coordinating Committee

A voluntary or informal administrative group made up of City

Planning and Economic Development project officers, a

representative from PAPL, a representative from each of the

PTA and MRWA, meeting once a month over the next 12

months, with the objective to steer the redevelopment

project to optimise the Vision Plan and gain value add from

the significant infrastructure projects proposed for DA6. It is

also recommended that this group maintain the community

engagement process established through the Vision Plan

and report progress back to the Community Focus Group at

regular intervals.

2. Implementation Partnership

A formal partnership between the City and State

GovernmentDevelopmentAgency(e.g.Landcorp/

MetropolitanRedevelopmentAuthority)tofacilitatethe

development of Brearley Park and associated pilot high

density and mixed use development projects once Brearley

Avenue is decommissioned as a road. It is likely that this

work would include the realignment and upgrading of

significant utility services and stormwater drainage facilities,

public open space enhancement and the branding and

marketing of substantial mixed use, high density

development opportunities in proximity of Great Eastern

Highway and the Airport West Train Station. These catalyst

projects would set an example for other similar development

opportunities along Brearley Park which may attract private

sector developers in time. The City has experience of a

similar albeit larger development partnership with The

Springs project which has been delivered with positive

outcomes.

The following key initiatives will have significant short-term

benefits as well as being catalysts to stimulate wider change

in the City:

• RevitalisationofGreatEasternHighwaypromoting

opportunities for mixed use redevelopment and

connections to Swan River and Garvey Park.

• OpeningofAirportWestTrainStationpromotingahigher

mode shift to public transport, connections to the CBD,

place activation, attracting more residents and workers

into the City.

• ClosureofBrearleyAvenueandreshapingBrearleyPark

as a linear park and key recreational asset in the City.

• GatewayWAProjectpromotingenhancedconnections

across the Tonkin Highway to regional open space and

activity nodes and improved access to Perth Airport.

CATALYST PROJECTS AND COMMUNITY BENEFITS

Page 7: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

Development Area 6 Draft Vision Plan & Implementation Strategy50

PERTH AIRPORT MASTER PLAN Developed by PAPL in accordance with the Airports Act

1996. The Master Plan will be prepared in 2014 and will

describe the expected development at the Airport during the

next 20 years and will also present an indicative plan for the

airport once developed to full capacity. The Master Plan will

outline the sustainable growth of the Airport to meet West

Australia’s aviation needs.

COMMUNITY AND ECONOMIC DEVELOPMENTThe Vision Plan is in line with both the Regional Economic

DevelopmentStrategy2010–2015(REDS)preparedbythe

Eastern Regional Metropolitan Council and also with the

City’s Local Planning Scheme supporting document,

Business. The Vision should be supported by the application

of the City’s key strategies for home occupations,

continuance of local employment nodes along Great Eastern

Highway and integration of the Airport’s aeronautical and

non-aeronautical development strategies.

The Vision will benefit from specific marketing to creative

industries, knowledge and technology based business and

the health and education services sector. The high visibility

afforded by Great Eastern Highway, the future ambience of

Brearley Park and the access opportunities afforded by

Airport West Train Station make this location very desirable.

The mixed use location near Airport West Train Station will

also be attractive to the technical, architectural and

engineering based services as is demonstrated by an

emerging cluster Subiaco Station along Roberts Road and

Centro Avenue.

Community development will focus in and around the Airport

West Train Station and the proposed Community Centre on

the Village Green. The City could establish in this building an

enterprise hub for business advisory services, a high speed

broadband network technology base and various course and

classes for multi generational groups to service the local

community and wider neighbourhoods.

INTERIM LOCAL PLANNING POLICY (LPP)

Made under the provisions of the Local Planning Scheme No

15 this interim policy will identify the nexus between the

Vision Plan and the further planning of DA6 and identify

critical requirements for the redevelopment. The purpose of

the LPP will be to assist the decision makers in their

decisions until such time as the DA6 Structure Plan is

adopted. The LPP would ensure that the Vision Plan is given

due regard and acknowledgement and discourage planning

decision making contrary to the Vision.

LOCAL STRUCTURE PLAN FOR DA6 – (LSP)

Local Planning Scheme No. 15 requires that a LSP is

prepared for DA6. The LSP would follow the WAPC Structure

Plan Preparation Guidelines which requires the preparation

of a Statutory Part 1 containing provisions to control

development, variations to the R Codes and other

development requirements and a Part Two containing

Supporting Information which provides the rationale for the

provisions and key considerations in decision making. The

LSP will take effect under clause 6.2.12.1 of the Scheme.

AMENDMENT TO LOCAL PLANNING SCHEME NO 15 AND CONSIDERATION OF DEVELOPER CONTRIBUTION REQUIREMENTS

An amendment may be required to ensure alignment of the

Scheme and the LSP. It is also likely that there will need to

be a Developer Contribution Plan for DA6 to allow for the

equitable sharing of costs of improved infrastructure and

Public Open Space as a result of the increased densities

identified in the structure plan. The Scheme sets out the

requirements and steps to be taken in this event.

STATUTORY AND POLICY FRAMEWORK

A number of core documents will guide the implementation of the Vision Plan:

Page 8: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

51 Development Area 6 Draft Vision Plan & Implementation Strategy

Implementation framework

Page 9: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

Development Area 6 Draft Vision Plan & Implementation Strategy52

A key to the implementation of the Vision will be the delivery of major transport related projects. In particular in the short term, improvements to Great Eastern HighwayandTonkinHighway(GatewayWAproject)willallowforimprovedtrafficmovement and circulation around DA6 and less ’rat running’.

In the medium term, Airport West Train Station will be a catalyst project which will present a major opportunity for public transport use to and from work, the Airport and other activities which may take place within DA6.

The upgrade of Fauntleroy, connections between Dunreath Drive and Boud Avenue and the closure of Brearley Avenue will allow traffic circulation around DA6, slow, safe internal streets and the opportunity to reconnect the two halves of DA6 with a local movement network.

LAND ASSEMBLY

The present subdivision includes medium sized single residential lots. Whilst it may be possible to redevelop these lots, the outcome as battle axe strata lots would not present the best outcome for DA6 and may detract from the Vision. The Vision is to maximise street presence, passive surveillance and significant additional density near in the linear park interface and in close proximity to Airport West Train Station. To optimise the potential of the residential and mixed use land in DA6 some lot amalgamation will be required. For example, if 3 single lots are amalgamated, multiple town houses with street frontage can be provided. It is feasible that the private sector could accommodate this initiative through agreements. The development industry may expedite this process once the structure plan is adopted.

EXISTING LANDHOLDINGS

LANDHOLDINGS TO FACILITATE PRELIMINARY VISION PLAN BUILDINGS

PRELIMINARY VISION PLAN BUILDING FOOTPRINTS

PRELIMINARY VISION PLAN INDICATIVE BUILDINGS

TRANSPORT–RELATED PROJECTS

Indicative Land Assembly scenario

Page 10: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

53 Development Area 6 Draft Vision Plan & Implementation Strategy

The decommissioning of

Brearley Avenue and the

opportunity to implement a

linear park is another catalyst

project.

This project could be the focus of a

strategic partnership with the City and

State Agencies involved in the rollout of

major service upgrades, public realm

implementation and development

facilitation, such as Landcorp or similar.

The diagram opposite highlights the

complexity of the existing land title and

reserves along the Brearley Avenue

alignment. In order to translate this into

future roads, parks and development sites

it is recommended that all relevant lots

are amalgamated and then re-subdivided

intodiscreetparcelsfortheCity(roads

andparks)andfordevelopment.This

process assumes that the Water

Corporation reserve is amended as

services are realigned and upgraded after

Brearley Avenue is decommissioned.

A land assembly strategy for DA6 will

emerge as the Structure Plan is

developed.

IMPROVEMENTS TO PUBLIC DOMAIN AND DEVELOPMENT STAGING

Brearley Avenue Catalyst Project

Page 11: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

Development Area 6 Draft Vision Plan & Implementation Strategy54

2014-2015• Interim Planning

Policy/ Economic & Community Development

• Local Structure Plan/Scheme Amendment

• Airport Master Plan

2014- 2018• Airport West Rail &

Station implementation• Airport/Station car park

implementation• Utility upgrades

2014-2018 onward• Gateway WA project

implementation• Boud Avenue interchange

opens• Great Eastern Highway

upgrades/crossings

2018 onward• Dunreath Drive operational• Airport West Station opens• High speed broadband

rollout

By 2024• Brearley Avenue closure• Brearley Park

implemented• Precinct movement

network improvements

A further example of land assembly and title

rationalisation is shown for the Redcliffe

Primary School site. The school may need to

expand to accommodate additional students

attending as a result of the redevelopment. It

may be possible for the school to expand into

the underutilised Main Roads WA Reserve as it

is unlikely that any further exits from Tonkin

Highway will be required once Boud Avenue is

open.

The development staging in DA6 will be

closely linked to the key statutory planning and

major infrastructure projects. The Airport West

Train Station will be the key catalyst for

redevelopment. The closure of Brearley Avenue

subsequent to Qantas relocating to the

Consolidated Precinct will be the other

significant infrastructure project. The build out

of the Vision is likely to occur at an incremental

rate over the next 20-30 years.

Page 12: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

55 Development Area 6 Draft Vision Plan & Implementation Strategy

GAP ANALYSIS AND FURTHER STUDIES

The following additional work is recommended:

• ConsultwithMRWA,PAPLandrelevantoperatorsto

identify a revised RAV Network.

• Strategictransportmodellingtounderstandfuture

impacts of proposed land uses within DA6 and impacts

of altered access arrangements.

• Undertakebenchmarkingandleadingpracticeanalysisto

understand likely parking demands for commercial land

uses when Airport West Train Station becomes

operational.

• Furtherinvestigationworkingwitheachoftheservice

providers once more specific details of the developments

within DA6 are established.

• FurtherdiscussionswithPAPLregardingservicesthat

will be redundant once the terminals are consolidated.

• LiaisewithWMAWaterManagementregarding

consolidated urban water management strategy for

Airport and DA6.

• LiaisewithMRWAregardingimprovedpedestrianand

cycle crossings at Great Eastern Highway.

• LiaisewithPTAregardingincreasedbustransitfrequency

and location and timing of Airport West Train Station.

It is recommended that the following strategies and plans be

undertaken as development progresses:

• DrainageStrategy

• ParkingStrategy

• GroundTransportPlan

• StrategicTransportModel

In order to sustain the current momentum achieved through

the visioning process, and to build upon the strong

foundation of community and stakeholder engagement, the

following actions are recommended:

1. CoB to prepare Interim Local Planning Policy to support

the Vision Plan and provide for development to be in

accordance with the Local Structure Plan.

2. CoB shall liaise with WAPC in order to ascertain

involvementofstateplanningagencies(e.g.WAPC,

MetropolitanRedevelopmentAuthority,Landcorp)in

progression of structure planning and implementation.

3. CoB(orotherstateagency)tocommenceLocal

StructurePlan(orequivalent)andPAPLtocommence

Airport Master Plan and associated supporting studies as

soon as practical. CoB/PAPL to continue negotiations

with PTA on the rail alignment, station configuration and

development timing.

4. CoB/PAPL to continue negotiations with PTA regarding

additional bus services and bus station to service the

development.

5. CoB to continue negotiations with MRWA to achieve

appropriate outcomes from the Great Eastern Highway

improvements to support additional intensity of Mixed

Use/Commercial properties with frontage on the

Highway and to allow improved pedestrian and cycle

crossing points, shared access points and pathways.

6. CoB/PAPL to continue engagement with Government

Stakeholders DoP, EPA, DoT and DoW, Federal DOIT and

service providers WaterCorp, Gas and Power regarding

the Vision Plan and potential redevelopment yield to

enable forward planning

7. AirportWestTrainStationshouldbenamed‘Redcliffe

Station’ in recognition that the station will strategically

notbean‘AirportStation’.

RECOMMENDATIONS

Page 13: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

Development Area 6 Draft Vision Plan & Implementation Strategy56

Implementation Strategy and Action Plan

Generic Item Specific ItemPriority/ Timing I,S,M,L*

Implementation Mechanism Action Notes

Statutory Planning

DA6 Local Structure Plan (Redcliffe)

• Due Diligence/studies

• Urban Water Management Strategy

• Traffic Modelling

• Draft Local Structure Plan (LSP)

• Design Guidelines

• Developer Contributions/ Infrastructure funding strategy

• Land assembly/rationalisation

I, S

• Interim Local Planning Policy

• Scheme Amendment to adopt the LSP

• Developer Contribution Plan (DCP)

• Developer Contribution Schedule

• Land Assembly Strategy

• Subdivision Management order

CoB/DoP/ Lands

• Commence LSP immediately

• Augment/ finalise post decision on Rail and Brearley Ave.

PAPL Perth Airport Master Plan

• Due Diligence/studies

• Draft Airport Master Plan

• Design Guidelines

I • Approved Airport Master Plan PAPL Required by end 2014

Roads, Cycleways, Shared Paths

Existing Local Road Upgrades

• Traffic calming S, M, L • CoB Forward Works CoB As redevelopment occurs

Upgrade Major Roads

• Great Eastern Highway• Tonkin Highway on/off ramps

I, S • MRWA Forward Works MRWA Linked to pedestrian access improvements

New Major Roads

• Boud Avenue• Boud Ave/Dunreath Drive

intersectionI, S

• MRWA(Gateway)• PAPL Forward Works MRWA/ PAPL Commence end 2014

New Minor Roads

• Linking across Brearley Avenue reserve – Residential

• Internal connections - AirportS, M, L • LSP, DCP, DA conditions/

agreements

• CoB/ Developers (Residential/mixeduse)

• PAPL/ Developers

• (Airportland)

• As redevelopment occurs

• Post decision on Rail and Brearley Ave.

• Post Airport Master Plan

Cycle ways/Shared paths

• Great Eastern Highway pedestrian /cycle crossings I, S • MRWA/DoT CoB/MRWA

Linked to Great Eastern Highway improvements

Public Transport

Train Line/Station

• Alignment /Station configuration

• Design/DevelopmentI, S

• PTA Business Case/cabinet decision

• Supported by LSP/Airport Master Plan

PTA Operational by 2020

Bus Routes/Station

• Alignment /Station configuration

• Design/DevelopmentI, S

• PTA Business Case, triggered by LSP/Airport Master Plan

PTAAdditional Bus Services could occur prior to rail

IMPLEMENTATION STRATEGY & ACTION PLAN

Page 14: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

57 Development Area 6 Draft Vision Plan & Implementation Strategy

• Lands(DepartmentofLands)

• DoT(DepartmentofTransport)

• LSP(LocalStructurePlan)

• DCP(DeveloperContributionPlan)

• DA(DevelopmentApplication)

• EOI(ExpressionofInterest)

Abbreviations:

• I – Immediately–1-2years(2013-2015)

• S–Shortterm–2-5years(2015–2018)

• M–Mediumterm–5-10years(2018-2023)

• L–Longterm–10yearsplus(2023+)

• CoB(CityofBelmont)

• PAPL(PerthAirportPtyLtd)

• MRWA(MainRoadsWA)

• PTA(PublicTransportAuthority)

Implementation Strategy and Action Plan

Generic Item Specific ItemPriority/ Timing I,S,M,L*

Implementation Mechanism Action Notes

Public Domain and Community Facilities

Existing POS upgrade/link

New POS/Public Realm

• Urban Water Management Strategy

• Draft Local Structure Plan • Design Guidelines• Developer Contributions/

Infrastructure funding strategy

• Land assembly/rationalisation

I, S

• CoB Forward Works• Developer Cash in Lieu/

Contributions CoB

• As redevelopment occurs

• Post decision on Rail and Brearley Ave.

Community Facilities

• Draft Local Structure Plan • Developer Contributions/

Infrastructure funding strategy

S, M, L• CoB Forward Works• EOI for lease/management

CoB As redevelopment occurs

Services

Utility upgrade:

Sewer

• Due Diligence/studies• Urban Water Management

Strategy• Draft Local Structure Plan • Airport Master Plan

S, M State Agency Forward Works

Department of Water/ Water Corp

Discuss yields with State Agencies/ service providers

Water Department of Water/ Water Corp

Power Western Power/ Renewables

Gas Alinta/ATCO Gas

High Speed Broadband Fderal Government

Drainage Department of Water/ Water Corp

Page 15: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

APPENDIX 1SUMMARY OF BACKGROUND AND CONTEXT

Page 16: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

59 Development Area 6 Draft Vision Plan & Implementation Strategy

DRAFT STATE PLANNING STRATEGY (WAPC, 2012)

• StrategicdocumentinformingallotherState,regionalandlocal planning strategies, policies and approvals.

• Coordinationofphysicalinfrastructurewilldriveefficiency,synergies, raise productivity and enhance global competitiveness.

• PerthAirportvitallyimportantroleineconomicandmovement network.

• Over12.6millionpassengerstravelledthroughPerthAirport in 2011-2012, an increase of 8.7% on the previous year – international passenger growth stood at 6.9% per year, while domestic passenger growth stood at 11.7%.

• Economicgrowthisdependentupontheavailabilityofhighquality movement infrastructure.

• Touristkeygrowthareas,reliantuponAirportasgatewaytoWestern Australia.

DIRECTIONS 2031 & BEYOND (WAPC, 2013)

• ConnectedCityModelofDevelopment.

• Target–328,000Dwellingsby2031.

• Target–47%ofNewDevelopmentasinfill.

• Goalsforcreatingaccessible,sustainableurbancommunities.

SPP 4.2 ACTIVITY CENTRES FOR PERTH & PEEL (WAPC,

2010)

• HierarchicalNetworkofActivityCentres.

• PerthAirportIdentifiedasSpecialisedCentrewithprimaryfunctions of aviation and logistic services.

• SpecialisedCentresshouldprovidearangeoflandusesthat complement the primary function of the centre.

• PerthAirportissubjecttoCommonwealthlegislation,outside the State and local government jurisdictions.

• BelmontForumidentifiedasSecondaryCentreandExistingIndustrial Centre.

• SurroundingcentresincludeMidlandStrategicMetropolitan Centre, Victoria Park Secondary Centre, Ashfield, Bassendean, and Burswood District Centres.

DRAFT CENTRAL METROPOLITAN PERTH SUB-REGIONAL

STRATEGY (WAPC, 2012)

• City’sHousingTargetover6,100NewDwellings.

• City’sEmploymentTargetover2,100NewJobs,withupto400 along the Great Eastern Highway urban corridor.

• Proportionofhousingandemploymenttargetscouldbeachieved in DA6.

• OtherplannedurbangrowthareasidentifiedinthedraftCMPSRS include The Springs, the Causeway Precinct and Perth Waterfront.

• HousingIndustryAssociationestimatesaten-yearforecastfor dwellings in Belmont up to 2021 to be over 3,800.

• Forecastsforhousingproductsinclude:

– Empty nester market in the primary group seeking to downsize.

– Forecast trend away from detached dwellings to attached dwellings, townhouses and villas, apartments and over 7% devoted to retirement dwellings, 26% in medium and high density product as the market seeks an increased supply of smaller dwellings.

SPP 5.1 LAND USE PLANNING IN THE VICINITY OF PERTH

AIRPORT

• ProvidesguidancetoLocalGovernmentsinthevicinityofPerth Airport and the WAPC when considering development on land adjacent to the Airport.

• PerthAirport’sANEFcontoursforultimatedevelopmentplaced into the planning scheme for relevant Local Governments.

• Ensuresdevelopmentisappropriateforrelevantnoiseexposure.

• EnsuresdevelopmentoftheAirportisnotrestricted.

• NotificationonTitlerequiredforlotswithinthenoiseexposure zone.

STATE STRATEGIC PLANNING CONTEXT

Page 17: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

Development Area 6 Draft Vision Plan & Implementation Strategy60

LOCAL STRATEGIC PLANNING CONTEXT

PERTH AIRPORT

• PAPLhasa50-yearleasewitha49-yearextensionfromtheCommonwealth Government.

• MasterPlantobepreparedevery5yearsundertherequirements of the Airports Act 1996 and describes the expected developments at Perth Airport during the next 20 years.

• MostrecentMasterPlanpreparedin2009,duetobereviewed end 2013 and document final 2014.

• PerthAirport’sMasterPlan2009identifiesfourbroadlanduses for land – runways and taxiways; terminal development; commercial development; and conservation areas.

• DA6locatedwithinPrecincts1Aand1B/CommercialPrecinct 1.

• IntendedusesarebasedontheZoningtableintheCityofBelmont Town Planning Scheme No. 14.

• Developmentmustcomplywithbuildingheightlimitationsas indicated on the Obstacle Limitations Surfaces Ultimate Surfaces Map – maximum height of 61 metres for majority of DA6, equating to approximately 13-14 storey buildings.

• PerthAirportprovidesconnectivitywithpopulationandeconomics within WA, Australia and the world.

• LargeundevelopedparcelsoflandclosetotheCBDavailable for development.

• AirportcontributessignificanteconomicvaluetoWA’sGrossStateProduct(GSP)-$1,360millionin2008.

• In2008employedover8,500people(30%ofBelmont’semployment)andover10,000indirector‘spin-off’jobs.

• Inrecentyearsairportshavebeenamongstthemostimportant job growth hubs in Australian cities.

• Between2006-2011employmentgrowthwasparticularlypronounced at Perth Airport, which added about 6,000 jobs due to a combination of growth in RPT flight passengers, charter flight passengers and ongoing redevelopment of the Airport site.

• EmploymentgrowthatthePerthAirportisexpectedtogrow to 37,000 direct and indirect jobs by 2029, with a directandindirectGSPcontributionof$5billion.

• StagedplantoconsolidateterminalswithQantasmovingfrom current site post 2024 resulting in potential to close Brearley Avenue.

CITY OF BELMONT

LOCAL PLANNING STRATEGY (2011)

• PerthAirportoccupies32%oftheCity’sarea.

• StructurePlanandPlanningGuidelinesrequiredforallprecincts under the Perth Airport Master Plan.

• Flexibleapproachforpotentialredevelopmentscenarios.

• IncreasedretailproposalsatPerthAirporttobeconsideredin wider context of centres regionally and locally.

• Encouragesofficeandbusinessesofhighqualityappearance along Great Eastern Highway.

• Encouragesmorefrequentandsafepedestriancrossingsof the Highway.

• RequiresimprovedaccesstobusinessesontheHighway.

• Consideration of heritage, environmental and cultural

matters.

STRATEGIC COMMUNITY PLAN 2012 TO 2032

• Establishesobjectives,strategiestoachievethemandmeasurable performance indicators to enable Council and the Community to review progress.

• Promotesimprovedaccesstowellplannedfacilitiesandamenities which inspires confidence enables the community to thrive.

• Accesstoriversideparklands,naturalbushlandandwetlands as well as water based activities significantly enhances the quality of life for residents of the City.

• Planningmustensurethatallsectorsofthepopulationcanfind homes and facilities that meet their needs and can access needed services.

• Abroadrangeofareasofopportunityexistforbusinessand employment growth including:

– Growth of home-based businesses; – Regional co-development with other local governments;

and – The growth of aeronautical and non-aeronautical

business at the Airport.

LOCAL HOUSING STRATEGY REPORT (2011)

• LowdensityR20shouldcontinuewithinDA6untilaStructure Plan is adopted for the area.

• Changesindensityshouldawaitfurtherimplementationofthe Perth Airport Master Plan and the possible closure of Brearley Avenue.

• Expectedthatincreaseddensitieswilloccurinthemediumto longer term with the structure planning process.

Page 18: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

61 Development Area 6 Draft Vision Plan & Implementation Strategy

STATUTORY PLANNING CONTEXTMETROPOLITAN REGION SCHEME

• AirportLandZoned‘PublicPurposes’–CommonwealthGovernment.

• RemainderZoned‘Urban’.

• TonkinHighwayandGreatEasterHighway–‘PrimaryRegional Roads’.

WAPC DC POLICY 1.6 TRANSIT ORIENTED DEVELOPMENT

• PromotesOptimalUse(Employment&ResidentialDensity)aroundTransitPrecincts.

• Promotesuseofpublictransportandwalkableneighbourhoods.

CITY OF BELMONT – LOCAL PLANNING SCHEME NO. 15

• SchemerequiresaStructurePlanbepreparedforallDevelopment Areas to coordinate development.

• ZoningandReservesinclude:

– PublicPurposes–CommonwealthGovernment(AirportLand).

– Residential. – Parks and Recreation. – Mixed Use. – Service Station. – Public Purposes – Primary School. – Industrial. – Service Station.

LOCAL PLANNING POLICY CONTEXT

• Furtherstructureplanningfortheareawillrequireconsideration of a wide range of City Planning Policies.

PREVIOUS STUDIESREDCLIFFE AREA DEVELOPMENT AND REJUVENATION

• RedcliffeAreaDevelopmentandRejuvenation(RADAR)working group formed by the City and Westralia Airports Corporation(nowPAPL).

• IdentifiedtheopportunityofclosingBrearleyAvenue,presenting two preliminary design concepts.

DIALOGUE CAFE

• ‘DialogueCafe’hostedbytheCityinOctober2007-Forumfor residents to discuss the future of DA6.

• Participantsidentifiedtheneedforalocalshoppingarea,

deli, cafe or grocery store, and the possibility to create an iconic‘drawcard’totheareatoattractmorepeople.

• ParkingattheAirportandtheimpactofBrearleyAvenueonthe suburb were issues identified as needing to be addressed, as well as the need for more communication between the Airport Authority, small business owners and residents to move the suburb forward.

• InlightoftheuncertaintysurroundingtheclosureofBrearley Avenue and a future rail link between Perth City and the Airport, the project had not progressed.

STAKEHOLDER CONSULTATIONSTAKEHOLDER VISIONING WORKSHOPS

• TwoVisioningWorkshopswereheldwithstakeholdersincluding local residents, landowners and government agencies at the City of Belmont on 17 and 18 May 2013.

• Theworkshopinvolvedparticipationbyallattendeesinafacilitated format, and consisted of three exercises relating to values, scenario preferences and vision and principles.

• Attendeeswerepresentedwiththreeconceptplanoptions, which they were asked to comment on and modify as they saw necessary.

COMMUNITY INFORMATION FORUM

• Stakeholderswhoregisteredtheirinteresttobeinvolvedina second round of engagement were invited to attend an Information Session at the City of Belmont.

• SessionwasusedtopresentthePreliminaryVisionPlan,which was prepared as an outcome of the Visioning Workshops.

• AttendeesattheCommunityInformationSessionweregenerally supportive of the Preliminary Vision Plan, suggesting some minor modifications.

OTHER STAKEHOLDER CONSULTATION

• DepartmentofPlanning

• EasternMetropolitanRegionalCouncil

• Road,RailandServiceProviders

• CityofBelmontExecutive

• PerthAirportPtyLtdExecutive

Page 19: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

Development Area 6 Draft Vision Plan & Implementation Strategy62

SOCIO-ECONOMIC RESEARCH AND ANALYSISACCESSIBILITY

• Over60%oftheworkforceusescarasmodeoftransportto work; less than 4% walking or cycling to work.

• Lowlevelsofpublictransportprovisionandlownumberofvehicles per dwelling.

POPULATION AND HOUSING

• Gradualshiftinagewithasignificantincreaseinresidentsaged 40-49, and decrease in the number of residents aged 25-29 over the period from 2001 to 2011.

• Gradualshiftinhouseholdtype,withthenumberofcouples with children increasing by 117 over the 10 year period, indicating that the suburb is gaining popularity with younger families.

• Manyoccupantsaretenantsofolderproperties.

• Increasingmulti-culturalmix,withthepercentageofAustralian born residents in Redcliffe dropping from 62.6% in 2001 to 55.8% in 2011.

• Experiencingalevelofmortgage/rentalstresswith11.3%of Redcliffe household rent repayments are 30% or greater of household income, and 9.9% for mortgage repayments in2011,althoughBelmontwas‘affordable’formanywithhouse and apartment prices 7% and 28%, respectively, below the median for Perth and Peel and over 30% lower than the Central Subregion.

EMPLOYMENT TRENDS

• 22%ofworkforceliveandworkinBelmont;otherattractors include Perth CBD, Canning and Victoria Park.

• Demandforparttimeemploymentpositionsfromlocalresidents.

• FewerlocalresidentsengagedinProfessional&Managerialjobs than rest of Belmont.

• LargepopulationofresidentsengagedinTechnical&Tradeoccupations.

• Directions2031AnnualReportCard2012reviewsandmeasures progress by State and local government and the private sector in implementing Directions 2031 and Beyond:

– Perth Airport provides high economic diversity in comparison to other specialised centres;

– Percentage of mixed use employment is below the average of other specialised activity centres;

– Lowestemploymentdiversityofallcentres(jobs/hectare);

– Belmontidentifiedassecondarycentre(theForum)andexisting industrial centre;

– Provides a low economic diversity in comparison to other secondary centres;

– Percentage of mixed use employment is below average of other secondary centres; and

– Belmont is top third of centres for employment density.

MARKET FORCES

• $5billionofinfrastructuregoingintotheCity,Stadium,RailLink, Gateway, Crown Hotel and The Springs, which will be a catalyst for DA6 redevelopment.

• Increasingdevelopmentopportunitiesraisingmarketconfidence.

• Increasingdemandforapartmentproduct,units,duplexes,villas and town houses.

TRANSPORT INITIATIVESSPP 5.4 ROAD & RAIL TRANSPORT NOISE

• ProtectResidentAmenity&MajorCorridorsfromUrbanExpansion.

• TonkinHighwayandGreatEasternHighwayidentifiedasPrimary Freight Routes and Perth Airport as intermodal freight terminal.

• PotentialImpactsincludesetbacks,noiseattenuation,Memorials on Title.

DRAFT PUBLIC TRANSPORT FOR PERTH IN 2031

• Stage2WorksextendrailwayconnectiontoAirportWestStation and consolidated terminal.

• PrioritybuslanesproposedforGreatEasternHighway.

GATEWAY WA

• MajorroadinfrastructureprojectfundedbytheStateandFederal governments.

• Involvesmajorinvestmentintheprimaryroadtransportnetwork to facilitate airport consolidation and improve access for freight to surrounding industrial areas.

• ParticularlyrelatingtoDA6istheextensionofBoudAvenueto connect to Tonkin Highway, which will provide the key point of access to the existing domestic terminal once Brearley Avenue is decommissioned.

Page 20: SPACES VILLAGE GREEN - City of · PDF file44 Development Area 6 Draft Vision Plan & Implementation Strategy VILLAGE GREEN The Village Green will be a multi functional space providing

63 Development Area 6 Draft Vision Plan & Implementation Strategy

MARKET ANALYSISRESIDENTIAL MARKET

• Redcliffepopulation4,809(2011UsualResidents);medianage 34 years.

• PropertiesinRedcliffegenerallyfallintooneofthreecategories:

– Older undeveloped or partly renovated properties towardsthenorthernendofthesuburb(typically1950’s/1960’sstyleonlargeland);

– Newer strata-titled villas in the older northern end of thesuburb(createdfromprivatesubdivision);and

– Newer homes and villas through the southern part built in the 1990’s and 2000’s which are located in the developed estates.

• Propertyprices(2012values)rangefromlow$300,000’stoabove$550,000dependingonsize,ageandlocation.

• Rentsgenerallyfallbetween$400-$500perweek;

• Medianweeklyhouseholdincome$975.

• Percentageofrentals38%

• Growthrates:

– 1 year average: -0.6% – 5 year average: 6.1% – 10 year average: 10.9%

• 20%ofallPerth’spopulationgrowthiswithin10kmofthePerth CBD, presenting market potential for residential redevelopment.

• Newresidentialmarketrequires:

– Commitment to critical public infrastructure and upgrades;

– Solutions for noise, traffic, air quality issues; and – Flexibility to allow innovations in scale, intensity,

parking, height and open space.

GREAT EASTERN HIGHWAY BUSINESS & MIXED USE

• InterestinlandandredevelopmenthasincreasedsinceGreat Eastern Highway upgrading has been completed.

• Manynewlargescale,multi-storeyresidentialdevelopment occurring.

• InterestshowninredevelopmentofMaracoondaMotel.

• PossiblehoteldevelopmentnearBulongAvenuewithfrontage to Great Eastern Highway.

• AirportandCityinterestinmeetingdemandforFIFOdevelopments.

• Marketinterestfrommedical/healthsectorforsmallandboutique accommodation for practitioners and services.

• Citydemonstratedthefastestgrowthrateincreativeindustry employment in the period 2001-2006 in terms of creative art professionals – Belmont Enterprise Centre specialises in support for creative industries.

REDCLIFFE INDUSTRIAL AREA

• Consideredbysomeinvestorsanddevelopersasanalternative location for mining and industrial service companies.

• AccesstoAirport,Kewdale,WelshpoolandCBD.

• Lowerrentalrates,goodparkingratios.

• ImprovementstoGreatEasternHighwaymayimproveexposure and make access easier.

BUSINESS PARK MARKET

• BusinessParksemerginggloballydrivenbybusinessexpansion, employment growth and general recovery in demand for office space.

• Increasingnumberofdevelopersarewillingtospeculatively built preliminary phases of parks in a bid to meet future anticipated need.

• TenantsinterestedinlocatingtoanAirportBusinessParkseek advantages:

– Close to Airport, giving access to airside freight; – Curfew free logistics operations; – Direct access to freeways, CBD; – Availability of medium to large sites; and – Pre-approved Master Plan.

• Trendsinmajorbusinessparkdevelopmentinclude:

– Served by a superior rail system/public transport; – Multiple broadband systems; – Access to workforce education and training; – Limited traffic congestion; – Access to large, trained workforce; – Colleges and universities nearby; – Sustainable‘green’infrastructure; – New uses include knowledge based, advanced

information and communications, advanced manufacturing; and

– Safe environment with high amenity and facilities.

WAREHOUSE, STORAGE, DISTRIBUTION & LOGISTICS

• StorageanddisplayofgoodsgenerallybestlocatednearFreeways, rail freight routes and along transport corridors.

• Importantthattheseusesarelocatedinproximitytostrategic and regional centres.

• Transport,courierdepotandservices,anddistributioncentres generally located close to the Airport and interstate, interregional arterial roads and rail freight.

• Requireverylarge,flatsiteswithsignificantparkingareasand maintain links to warehousing sites.

• DA6offersaccesstoPerthAirport,Kewdale,Welshpoolareas as well as Freeway and freight.

• Smartertechnologiesrequirehighspeedbroadbandnetwork.