    PREPARED

    BYNA

    PTT PUBLIC COMPANY LIMITED

    CHECKED

    BY ONSHORE COMPRESSOR STATION 4

    PROJECT

    APPROVED

    BY

    CERTIFIED

    (PTT)NA

    REV.

    NO.

    DATE REVISED

    BY

    APPROVED

    BY

    DESCRIPTION

    D1 18-Feb-08 NA ISSUED FOR ITB

    D2 19-May-08 NA REVISION ISSUED FOR ITB

    SPECIFICATION FOR

    DISTRIBUTED CONTROL SYSTEM SPECIFICATION

    SPC-0804.02-60.05 REV.D2

    TOTAL 31PAGES

    AREA CODE OF SITE LOCATION

    GENERAL AREA: 010

    .

    PTT PLC. CONTRACT NO. PTT PLC. PROJECT NO.

    0804.02

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    2/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 2 OF 31

    REV: D2

    CONTENTS

    SECTION

    1.0 SCOPE OF SERVICE .............................................................................. 3

    2.0 SYSTEM OVERVIEW ............................................................................. 3

    3.0 DEFINITIONS AND ABBREVIATIONS ....................................................... 4

    4.0 APPLICABLE SPECIFICATIONS, STANDARDS AND DRAWINGS ................. 5

    5.0 GENERAL REQUIREMENTS .................................................................... 6

    6.0 HARDWARE REQUIREMENTS................................................................10

    7.0 FUNCTIONAL REQUIREMENTS ..............................................................18

    8.0 ENGINEERING, DETAILED DESIGN AND IMPLEMENTATION ......................25

    9.0 INSPECTION AND TESTING ..................................................................26

    10.0 INSTALLATION AND COMMISSIONING ..................................................29

    11.0 DELETED. ...........................................................................................30

    12.0 DOCUMENTATION REQUIREMENT ........................................................30

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    3/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 3 OF 31

    REV: D2

    1.0 SCOPE OF SERVICE

    1.1 This Specification defines the minimum technical and functional requirementsfor the Distributed Control System (DCS) to be installed for the Onshore

    Compressor Station 4 (OCS# 4). It also covers the requirements for the

    supply, installation, testing, and commissioning of the DCS system for the

    OCS# 4 project.

    1.2 The Vendor shall furnish all labor, material, equipment, transportation, and

    facilities necessary to perform all work as defined in this specification and on

    the related drawings.

    1.3 The work required of the Vendor includes design, engineering, procurement,

    transportation, installation, commissioning, and start-up of DCS hardware andsoftware required for the monitoring and control of the OCS# 4 and FTPP

    facilities.

    1.4 The DCS vendor shall be the single source of supply, engineering, installation

    and testing for the Safety Instrumented System logic solver, Plant Information

    Management System and Plant Resource Management System

    2.0 SYSTEM OVERVIEW

    2.1 The functions of the DCS are to control and monitor the OCS#4 and FTPP

    facilities to continuously produce on-specification products.

    2.2 The OCS# 4 shall be controlled and monitored by the Yokogawa Centum CS

    3000 R3 DCS system or the latest Yokogawa Centum series.

    2.3 The system shall consist of a network of the Field Control Stations and

    Human Machine Interface work stations (HMI) which shall be located at the

    new Control Building. They shall provide the core DCS functions of:

    Acquiring data from field instrument devices via Field Control Units

    (FCU) located locally at the instrument rack room in the new control

    building.

    Acquiring data from the SIS logic solver, compressor control system,

    electrical system, FTPP SIS logic solver, DCS systems provided by the

    FTPP and LNG contractors, and other package equipments.

    Processing the field data to detect alarms and other significant

    process/data changes.

    Performing process and sequence control functions

    Presenting the data to the user via easy to understand graphical

    displays and reports

    Performing system monitoring and diagnostics to detect failure of

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    4/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 4 OF 31

    REV: D2

    hardware and/or software and take appropriate actions.

    2.4 The control and data acquisition equipments shall be housed at the instrument

    rack room in the new control building and/or other remote equipment rooms

    distributed throughout the facilities. A redundant fibre optic communication

    network shall link the various equipment rooms to the new control building.

    2.5 The DCS system shall utilize a dual redundant Fast Ethernet LAN as the core

    communications backbone of the system. Each FCS and HMI workstations

    shall be connected to both system LANs.

    2.6 Industrial type PC-based Operator workstations shall be used to access the

    process information in the FCSs. Each Operator workstation shall be

    connected to both DCS LANs and shall allow the user to interact with the

    information in the DCS system.

    2.7 The Operator workstations shall function as the main interface for the DCS

    and SIS provided by both OCS# 4 and FTPP contractors, the compressor

    control system, the fire & gas system, the machine monitoring system and

    other package equipments. The functions of these work station shall include

    at least;

    Graphical displays showing the process and equipment conditions of

    the FTP facilities

    Trends of selected process variables

    Alarm / Event management including alarm acknowledgment

    Commands and controls to change the operating state of the FTP

    facilities

    Summaries and reports

    2.8 The DCS system shall support open interfaces with other systems such as

    higher level management information systems and other business systems.

    The system shall support TCP/IP based links to these external systems. The

    DCS system shall support the use of standards commonly used in the

    Microsoft environment, including OPC and COM.

    3.0 DEFINITIONS AND ABBREVIATIONS

    AMS - Asset Management System

    PRM - Plant Resource Management

    CCR - Central Control Room FTP facilities

    DCS - Distributed Control System

    EMC - Electromagnetic Compatibility

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    5/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 5 OF 31

    REV: D2

    IS - Intrinsically Safe

    MTTR - Mean Time To Repair

    MTBF - Mean Time Between Failures

    RTD - Resistance Temperature Detector

    SER - Sequence Of Events Record

    UPS - Un-interruptible Power Supply

    VDU - Visual Display Unit (LCD TFT Type)

    HMI Human Machine Interface

    FTP Faculties The PTT facilities including the OCS# 4 and

    facilities provided by the FTPP contractor

    4.0 APPLICABLE SPECIFICATIONS, STANDARDS AND DRAWINGS

    4.1 Project Specification

    PHC-0804.02-60.01 Instrument and Control Philosophy

    SPC-0804.02-60.01 Instrumentation General Specification

    SPC-0804.02-60.02 Safety Instrumented System Logic Solver

    Specification

    4.2 International Standards

    IEC 79 - Electrical Apparatus in Explosive Atmosphere

    IEE - Guidelines for the documentation of software in

    industrial computer systems

    89/336/EEC - European Union EMC Directives

    EN 50081-2 - Emission, Industrial Environments

    EN 50082-2 - Immunity, Industrial Environment

    IEC 61000-4 - Electromagnetic Compatibility

    MIL-STD-217E - Military Handbook - Reliability Prediction of

    Electronic Equipment

    ISO 11064-3 - Ergonomic Design of Control Centres

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    6/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 6 OF 31

    REV: D2

    ISO 9241-3, -5 - Ergonomics requirements for office work with

    Visual Display Terminals (VDTs)

    4.3 Project Drawings60-3-0804.02-6000-001 OCS 4 Control System and Interface Block

    Diagram

    60-3-0804.02-6000-002 to 004 OCS 4 Control System and Interface

    Architecture

    5.0 GENERAL REQUIREMENTS

    5.1 System Environment

    The DCS equipments shall be installed in the control building, where the

    temperature and humidity are climate controlled, i.e. air-conditioned.

    However, in the event of failure of the air-conditioner, the system is expected

    to continue normal operation. Therefore, the system shall be designed for

    continuous operation under the following conditions:

    20 to 50 Celsius operating temperature range

    10% to 95% relative humidity, non condensing

    5.2 System Architecture

    5.2.1 The system shall comprise of a distributed architecture with a microprocessor-

    based control system consisting of discrete types of functional hardware

    elements interconnected to provide overall system functionality, i.e.

    distributed architecture.

    5.2.2 The system shall also be geographically distributed with the control and data

    acquisition functions performed at a remote location within the OCS# 4 area

    and the control and monitoring of these functions from the new Control

    Building..

    5.2.3 The DCS shall be based on an open architecture where the system has

    inherent capabilities to integrate and exchange information with other systems

    and/or platforms via industry standard protocols.

    5.2.4 The DCS network system shall be based on fast dual redundant Ethernet LAN

    network. The failure of one network cable shall not have any impact to the

    operation of the DCS system.

    5.2.5 The arrangement for the Field Control Stations (FCS) shall prevent the

    common cause of inoperability for the equipment trains when the FCS/ its

    part fail or are under maintenance. All field process devices of differentcompressor trains shall not be connected to the same FCS and the same

    principal shall be applied to the inlet scrubber trains and communication

    between DCS and the compressor control systems.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    7/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 7 OF 31

    REV: D2

    5.3 System Spare Capacity, Loading and Expansion Requirements

    5.3.1 The DCS system shall be designed such that after the completion of

    commissioning the following evenly distributed spare capacity shall be

    available:

    I/O Modules - 30% installed, wired and fully functional

    I/O of all types used

    I/O Racks - 30% fully wired spare rack

    Terminal Blocks - 30% spare terminal blocks shall be

    provided in cabinets containing terminal

    blocks

    System Cabling - 30% spare pairs over and above the I/O

    module/rack spare requirements

    Fibre Optic Cables - 100% spare Fibres

    DCS Communication Port - 100% spare

    5.3.2 The system shall be designed such that, after the completion of

    commissioning, no more than 60% of processing capacity and/or memory is

    utilised (Spare capacity to be included).

    5.3.3 The system communication network shall also be design so as not to exceed

    60% loading after the completion of commissioning (Spare capacity to be

    included).

    5.3.4 The system power supply units shall include 30% spare capacity over the

    required loading (including the spare capacities).

    5.3.5 The system shall be designed such that 30% future expansion can beaccommodated without any modification or replacement of existing

    equipment, communication systems or software.

    5.4 System Availability and Redundancy

    5.4.1 The system shall be designed to achieve an availability of 99.99999% with

    an assumed Mean Time To Repair (MTTR) of eight hours or less and a Mean

    Time Between Failures (MTBF) of 5,000,000 hours or more. This shall be

    demonstrated by calculations as defined in US Military Handbook Standard

    217E.

    5.4.2 In order to meet the required system availability, redundant and/or fault

    tolerant technology shall be incorporated.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    8/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 8 OF 31

    REV: D2

    5.4.3 As a minimum the following equipment shall be redundant:

    - Communication Network including fibre optic cabling

    - Control Processors

    - Mass data storage devices

    - Power Supplies

    - I/O cards for control loops

    - Redundant network cards for the operator workstations

    - Network Hubs

    5.4.4 The system database shall be bi-weekly backed-up.

    5.4.5 The redundant system shall be designed such that, on failure, automatic

    bumpless changeover to the other unit shall take place. It shall also be

    possible to replace and test the failed unit without disrupting the control of

    the process.

    5.5 System Protection Requirements

    5.5.1 The system shall support at least three different levels of access control either

    via the use of a removable key and/or by entering a pre-configured password.

    It shall also be possible to configure user-specified functions to the following

    levels.

    Operator Level This level shall include typical operator functions

    and not require a key or password.

    Supervisor Level This level shall include all the operator functions

    as well as the pre-configured supervisory

    functions and shall require a key or password.

    Engineering Level This level shall include all functions and

    require a key or password.

    5.5.2 Different type of keys shall be used for the supervisory and engineering levels.

    Once removed, access will revert to the operator level.

    5.5.3 The system shall be provided with the firewall to protect the unauthorized

    access from outside. The firewall shall be Nokia or equivalent.

    5.5.4 The system shall be provided with Synmatec anti virus software. The anti

    virus server shall be provided to receive the update version of anti virus

    software via the internet and then distribute to the DCS and PIMS system.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    9/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 9 OF 31

    REV: D2

    The supplier shall configure the antivirus server to prevent unauthorized

    access from outside.

    5.5.5 The Plant Information Resource Management System shall be connected to

    the DCS network via firewall.

    5.6 System Electrical Requirements

    5.6.1 The DCS equipment shall be installed in the new control building and auxiliary

    equipment rooms, which shall be considered as safe areas. Equipments

    connected to the DCS, normally situated in areas classified as hazardous,

    shall be connected to the DCS via approved interfacing equipment.

    5.6.2 The preferred method of hazardous area protection is intrinsically safe. The

    use of IS certified I/O modules shall be preferred to discrete IS barriers. Insuch cases, the DCS VENDOR shall provide the certified I/O termination units

    for installation into the Clients marshalling cabinets.

    5.6.3 The DCS shall comply with all relevant European Union Electromagnetic

    compatibility (EMC) directives and, in particular, compliance with IEC 61000-

    4.

    5.6.4 The DCS shall be powered by two A.C. feeders connected to two

    independent 230 volts 50 Hz Uninterruptible Power Supplies (UPSs). The DCS

    power shall be derived from these including all necessary distribution and

    protection. Each cabinet/system shall be provided with redundant powersupply units, each sized and networked such that a system shutdown shall

    not be caused by the failure of one of these units. Any power supply unit

    failure shall generate both local and control room alarms.

    5.6.5 Where possible, field devices, connected to the DCS and operating at 24 volts

    DC, shall be powered by the DCS with all necessary protection of the field

    circuits such as surge protection etc.

    5.7 Standard Hardware and Software

    5.7.1 The system shall comprise standard hardware and software configured to

    meet the stated requirements.

    5.7.2 The systems standard operating software shall not be modified to meet the

    project requirements.

    5.7.3 The system software shall be the latest commercially released version at the

    time of order placement.

    5.7.4 All necessary software licences shall be provided, enabling the right to

    exercise the use of all relevant and applicable software.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    10/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 10 OF 31

    REV: D2

    6.0 HARDWARE REQUIREMENTS

    6.1 Operator Console

    6.1.1 The DCS Operator Workstations shall be housed in a purpose made console

    designed specifically to be used as a control console for the DCS and control

    systems, such as Evans Consoles or equivalent.

    6.1.2 The consoles shall provide five operating positions, each with space for 2

    display units, vertically arranged, of at least 21 viewable area in size. Three

    spaces shall be used for the DCS display units. The fourth space shall be used

    for the remote compressor control display units. The last one shall be for the

    Fire & Gas and CCTV display units, Fire & Gas on the bottom and CCTV on

    the top.

    6.1.3 The space between operating position shall be wide enough to prevent the

    congestion of the operator position.

    6.1.4 Console shall be modular in design and construction, capable of being

    expanded in the future to add additional modules and positions.

    6.1.5 Each module shall be approximately 36 inch in width and shall accommodate

    two vertically arranged 21-inch display units. An enclosed type design shall

    be used where the display units and all components of the PCs are enclosed

    under removable panels. The panels shall be easily removable without tools.

    6.1.5 For the modules that house auxiliary equipments, the width for each model

    shall be suitable for its application.

    6.1.6 The overall DCS console shall consist of at least 10 modules to be used as

    follows:

    5 display units, each for vertical arranged dual display units (Five operator

    positions) and be equipped with telephone mount.

    1 communication units of communications equipment such as the UHF

    radio based station and PAGA controller

    2 auxiliary units for the key switches, the push buttons, annunciators and

    the indication lamps.

    2 storage units/work surface at each end to provide additional space for

    operating manual storage and office space.

    6.1.7 The arrangement for the module shall allow the easy access to the push

    buttons and the indicator lamps are clearly visible for each operating position.

    6.1.8 The console shall be specifically designed to work with flat panel displays.

    The display modules shall be equipped with a non-glare glass protective cover

    for the LCD display panels.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    11/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 11 OF 31

    REV: D2

    6.1.9 Non-glare area task lighting shall be provided for the console by a hidden

    lighting strip at the top edge of the console. Intensity of the lighting shall be

    user controllable.

    6.1.10 The console system shall be designed to provide adequate ventilation to

    equipment inside through the use of ventilation grills (and fans, if necessary).

    6.1.11 Hardware, such as CPUs and networking equipment, mounted inside the

    console shall utilize pull out drawers or shelves to allow easy access for

    maintenance and service of the equipment.

    6.2 Operator and Engineering Workstations

    6.2.1 The total of 6 operator workstations shall be provided as follow.

    Three DCS operator workstations, each equipped with dual screens.

    These workstations shall be used for the monitoring and control of the

    FTP facilities.

    Two operator workstations, each equipped with one screen. One

    workstation shall be used as the remote compressor unit control panel

    HMI. The other shall be for the remote HMI of the compressor master

    performance, anti surge and load sharing controllers. The screens of

    these workstations shall vertically mount in the DCS console.

    One operator workstations, equipped with one screen. Thisworkstation shall be for the remote HMI of the Fire & Gas systems

    The contractor shall ensure that the DCS vendor hands over one dual screen

    DCS operator workstation to the FTPP contractor and the other single screen

    workstations to the related system vendors during the engineering phase.

    From the pre commissioning phase, these workstation shall be housed in the

    same DCS consoles.

    6.2.2 The DCS operator workstations shall be the latest industrial grade PC from

    the reliable and proven manufacturer. The performance and specification for

    these workstations shall meet the intended purposes.

    6.2.3 Where dual screens (stacked) are specified, only one keyboard and pointing

    facility are required to access both screens.

    6.2.4 Each operator workstation shall be powered from a redundant power supply

    arrangement and also have dual redundant network connections to each of

    the networks to which it is connected.

    6.2.5 The screen display units shall be as a minimum 21" diagonal screens with

    high resolution graphics (minimum 1600 x 1200 pixels), with minimum 8

    control (increment / decrement) key built-in with optical mouse. The LCD shall

    be flicker-free and glare-free. Standard screen controls such as brightness,etc., shall be accessible to the operator.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    12/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 12 OF 31

    REV: D2

    6.2.6 The typical computer keyboard shall be provided for each operator

    workstation which is not for the DCS system.

    The following requirements are for the operator workstations dedicated to the DCS

    system.

    6.2.6 Each workstation shall be capable of storing all particular graphics assigned to

    that workstation and any other workstation graphic once transferred from the

    data storage medium without the need for cartridges, disks, etc.

    6.2.7 Upon failure of a workstation, all its functions, that are not otherwise

    accessible, shall be assigned automatically to another workstation in that

    particular console.

    6.2.8 Operator keyboards shall be spill proof membrane type keyboards with aminimum of 64 dedicated and/or variable function keys (configurable).

    6.2.9 A separate engineering workstation shall be provided. It shall be a desktop

    style industrial type PC and include all the functionality as specified for the

    DCS operator workstation. In addition it shall provide all of the engineering

    tools necessary to configure the system database, include a cartridge drive for

    loading or storing software, an alpha/numeric keyboard and any other

    enhanced hardware features as required by the system VENDOR.

    6.2.10 A detachable engineering keyboard shall be provided, and shall be used for

    connection to any of the operator consoles.

    6.2.11A Plant Resource Management System (PRM) shall be provided. This system

    shall be installed in the control room.

    6.3 Printers6.3.1 Two A3 colour laser printers shall be provided. One printer shall be connected

    to the main DCS hub to allow each operator or engineering workstation to

    print out the selected logging of alarm, events, reports, system configuration

    and any other information in colour. Another printer shall be connected to the

    auxiliary hub to allow the PIMS, PRM, Bently Navada System 1 and APC

    server (provided by the FTPP contractor) to print out the reports and other

    information as required by the users.

    6.3.2 The operator shall be able to print out any graphical display in colour from any

    operator workstation.

    6.3.3 The printer shall be equipped with the hot-stand by redundant network cards

    and be connected to both LAN of the redundant DCS network.

    6.3.4 Both printers shall be equipped with 512 MB RAM as minimum.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    13/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 13 OF 31

    REV: D2

    6.4 System Control Processor Requirements

    6.4.1 Control and data acquisition functions shall be performed by fully redundant

    microprocessor-based controllers, capable of supporting multiple loops via a

    flexible array of I/O options.

    6.4.2 These control processors shall be able to support multiple I/O processors.

    6.4.3 Deleted.

    6.4.4 The overall system performance shall, as a minimum, provide the following

    response times based on the actual system I/O loadings:

    Analogue and digital control loops execution frequency of 50 mS

    configurable up to 1 second

    Operator workstation command execution within 1 second

    Operator workstation command to the field equipment within 1 second

    Operator workstations refresh rate of 1 second or less for the update

    information from the field equipment

    6.4.5 The control processors together with the I/O processors shall provide

    independent control and monitoring of the OCS# 4.

    6.4.6 In the event of total communication system failure, the controllers shall

    continue to operate with the last valid information received. In addition, each

    output shall be configurable to either maintain its current value or be driven to

    a predefined state on input or processor failure.

    6.5 System I/O Requirements

    6.5.1 The Field Control Station (FCS) shall be allocated such that independent

    process units/trains can be operated and maintained without affecting the

    other units upon the failure of the FCS. As minimum, three FCSs are foreseen

    for the OCS# 4.

    6.5.2 The critical I/O within a particular FCS shall be separated to minimise the

    effect of common mode failures. The required segregation shall be confirmed

    during detailed engineering.

    6.5.3 System I/O shall be selected such that the requirement for separate signal

    conversion and/or protection shall be kept to a minimum. The use of I/O with

    signal processing and/or protection facilities built-in shall be preferred.

    6.5.4 If discrete signal converters and/or IS barriers are essential, they shall be

    supplied and installed in the marshalling cabinets.

    6.5.5 All field measurements shall utilise Foundation fieldbus transmitters. This

    will enable full digital communication with the DCS, and transmitter access

    directly from the Plant Resource Management System. (PRM)

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    14/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 14 OF 31

    REV: D2

    6.5.6 Maximum 8 number of Foundation Fieldbus transmitters per one segment

    shall be utilised.

    6.5.7 All analogue inputs and outputs shall be short circuit proof and individually

    fused or isolated to provide electrical input isolation.

    6.5.8 All digital inputs and outputs shall be individually fused or isolated to provide

    electrical input isolation. Digital outputs shall also be short circuit proof.

    6.5.9 All system I/O shall be local to the controller equipment (within 50 metres).

    The use of remote I/O shall only be employed when specifically called for.

    6.5.10 In addition to Foundation Fieldbus signals, the system shall support the

    following analogue input signal types:

    4 - 20 mA (Self powered)

    4 - 20 mA (Externally powered, floating or grounded)

    1 - 5 volts

    Thermocouple

    Resistance Temperature Detector (RTD)

    The overall accuracy of the analogue signals shall be better than 0.1% of

    span and 0.5% of the maximum range for the selected type of

    thermocouple.

    6.5.11 Input isolation shall be provided for all I/O devices with external AC supplies

    or with grounded 4 - 20 mA signals.

    6.5.12 All analogue outputs shall be 4 - 20 mA, fully isolated from ground and be

    capable to drive resistive loads of 750 ohms. The overall accuracy shall be

    0.25% of full scale and a resolution of 0.1%.

    6.5.13 The analogue input and output systems shall provide a means of stripping

    the HART data signal from the analogue signal to make the data available tothe PRM. Preferably this functionality shall be included in the DCS analogue

    input/output module.

    6.5.14 Digital inputs. The system shall support both normally open and normally

    closed contacts with circuitry to ensure that chatter or bounce,

    encountered during contact closure, does not initiate an erroneous signal.

    6.5.15 External contacts shall be voltage and ground free and shall normally be

    powered from the system.

    6.5.16 Digital outputs. The system shall support both solid state and relay contacttype outputs.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    15/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 15 OF 31

    REV: D2

    6.5.17 Solid state outputs shall be capable of supplying a 1 amp non-inductive load

    at 24 volts DC and be isolated from ground.

    6.5.18 Relay contact type outputs shall be voltage free, isolated from ground, and

    fully independent from each other, with a minimum contact rating of 2

    amps.

    6.5.19 The system shall support pulse type inputs of rectangular and/or sine waves

    with pulse frequencies up to 10 KHz and levels of between 12 and 24 volts

    dc.

    6.5.20 The system shall support hardwired sequence of events record (SER) digital

    inputs which shall, generally, conform to the same requirements as normal

    digital inputs although the maximum event resolution shall be 10

    milliseconds (time from event to the time stamping thereof).

    6.6 Foundation Fieldbus

    6.6.1 For the Fieldbus field devices, the system shall be Foundation Fieldbus

    compatible devices. Communication with intelligent transmitters shall be bi-

    directional allowing read / write procedures.

    6.6.2 Vendor shall supply the software tools in the Engineering Workstation to

    create Fieldbus-based database and device parameters reference / setting,

    trend / message display and basic data acquisition for diagnostics and

    analysis.

    6.6.3 The tools shall provide schedule generation for communication of each

    fieldbus segment.

    6.6.4 Each Fieldbus I/O Module shall be able to support more than one segment and

    each segment should support no more than 32 blocks.

    6.6.5 Each Fieldbus I/O module shall be able to support 1:1 redundancy I/O module.

    6.6.6 Redundant I/O module shall be used for all Foundation Fieldbus I/O.

    6.6.7 Database documentation function shall support the Fieldbus configuration.

    6.6.8 DCS shall support PID algorithm implanted in the DCS control module as well

    as PID algorithms embedded in Fieldbus devices.

    6.6.9 DCS shall provide standard faceplate for PID algorithm embedded in

    Fieldbus devices. The faceplate shall have same look and feel of standard

    DCS based PID block.

    6.6.10 Virtual test function for the Fieldbus loops shall be available to check the

    integrity of the configured Fieldbus function blocks without the presence of

    actual field devices.

    6.6.11 DCS shall also support Plant Asset Management software that can

    integrate with the DCS system.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    16/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 16 OF 31

    REV: D2

    6.6.12 Diagnostic software packages for Foundation Fieldbus devices should be

    able to plug-in to the Plant asset management software for maintenance

    diagnostic functions.

    6.7 System Communication Requirements6.7.1 The DCS system communication network shall be fully redundant with

    automatic changeover upon failure of the active path. Manual changeover

    facilities shall also be provided.

    6.7.2 The redundant/secondary communication path shall either be used

    continuously or checked at least once per minute to ensure correct operation.

    Status changes shall be alarmed at the operator workstations.

    6.7.3 The system shall support Fast Ethernet and/or fibre optic communicationcables. However, all outdoor communication cables shall be fibre optic via

    diverse routes.

    6.7.4 Differences between the primary and secondary communication cable lengths

    shall be minimised so as not to affect the DCS communication system

    operation. The vendor shall advise maximum allowable length discrepancy.

    6.7.5 The system shall support redundant Modbus serial and TCP/IP based links.

    6.8 Data Storage, Backup and Restoral Requirements

    6.8.1 The data storage system shall be fully redundant and sized sufficiently to

    cope with all historical data collection requirements. The storage system shall

    be RAID 5 configuration.

    6.8.2 Data on the RAID storage array that has aged sufficiently, shall be

    automatically archived onto optical disk media. Upon the successful data

    archive, the system shall clean up the data in the storage disk.

    6.8.3 Data archiving and clean up shall be completely automated with no need for

    user interaction except for media replacement.

    6.8.4 The system shall perform an incremental backup monthly for entire disk

    system, including program files and system files for all operator workstations,engineering workstation, and Long time trend and log server to Optical media.

    6.9 System Cabinet Requirements

    The system cabinets shall be used Rital or equivalent and comply with the

    following requirements:

    - Cabinets to be free standing and constructed taking into account

    delivery and installation requirements (multi-pin plug and sockets shall

    be used between shipping breaks e.g. Elco plugs)

    - Cabinets to be mounted on sub-floor mountings suitably designed to

    withstand normal plant vibrations

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    17/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 17 OF 31

    REV: D2

    - Overall cabinet dimensions to be 2100mm high x 800mm wide and

    800mm deep with double front and rear removable and lockable hinged

    doors

    - Cabinet protection class IP 30 minimum

    - Cabinet finish to be smooth and follow the colour table below;

    Description Muncell code RAL colour Finish

    Exterior 7.5GY 7/2 7032 Semi gloss

    Panel Interior 7.5GY 7/2 7032 Semi gloss

    Channel base 7.5GY 7/2 7032 Semi gloss

    - Separate and isolated cabinets earthing connections shall be provided

    as follows:

    Safety earth (cabinets and steelwork)

    Signal earth (cable screens and signal common)

    - The cabinet layouts are to allow full and easy access for installation and

    maintenance requirements

    - Cable access shall be bottom entry via suitable cable clamping

    mechanisms

    - Utility power supplies shall be provided separated from UPS such as

    conventional type receptacles, fluorescent Lighting.

    6.10 System Wiring Requirements

    6.10.1 All wiring inside cabinets shall run in dedicated plastic ducts or wireways, or

    neatly loomed and secured with plastic spiral wrapping or tie-wraps and

    anchors.

    6.10.2 All discrete wiring shall be single core with sufficient current carrying

    capacity. A minimum core size of 0.5 mm shall be used unless otherwise

    stated.

    6.10.3 Wireways/ducting shall be routed to provide sufficient segregation between

    AC and DC wiring and will be able to accommodate 30% more wiring.

    6.10.4 System card bins shall be interconnected with plug and socket type system

    cables or ribbon type cables and edge connectors. The sockets and both

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    18/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 18 OF 31

    REV: D2

    ends of the cables shall be labelled with the Origin and Destination

    tags.

    6.11 Other System Requirements

    6.11.1 Marshalling cabinets shall be provided with an identical outward

    appearance to the system cabinets.

    6.11.2 Within the marshalling cabinets the incoming field multi-pair cables shall

    terminate either sequentially onto terminals or directly onto the IS barrier

    terminals. The output side shall be connected to the system I/O termination

    units or to Elco sockets where no I/O termination units are available.

    6.11.3 The DCS VENDORs system cabling or pre-made and tested system cables

    with Elco plugs shall be used to connect to the DCS system cabinets.

    6.11.4 The Plant Information Management System (PIMS) shall be configured to

    record all Operation Logs, reports, process/system alarms and shall have

    the facility to print any of the logs, reports or alarms on demand using a

    Network Laser printer also supplied with the System. The PIMS shall be

    equipped with Alarm and event analysis software. This software shall

    provide the tools and be configured to allow PTT to analyze the alarm and

    event in the system in all aspects. The detail requirements for the PIMS are

    specified in the related specification

    6.11.5 Long Term Historical Data Recording Package and server.

    The DCS vendor shall provide the server connected directly to the DCS

    network to store the historical long term trend and alarm/event log for 14

    days

    The System as a minimum shall be able to keep data such as PV, MV, SV,

    Operator actions, System alarms, Process Alarms etc in the Long term

    historical data recording package. The System shall have the facility to

    select the data required to be put in the Long term historical package and

    to display their trending in any selective time span. Any Operator station

    can access this database via System data highway and intuitive graphical

    interface displays.

    7.0 FUNCTIONAL REQUIREMENTS

    7.1 Process Control and Data Acquisition Requirements

    7.1.1 The system process control functions shall be performed by predefined

    algorithms with configurable parameters and shall, as a minimum, include the

    following:

    - Control algorithms such as PID, ratio control, gap control, etc.

    - Computational algorithms such as addition, subtraction, etc.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    19/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 19 OF 31

    REV: D2

    - Logic algorithms such as AND, OR, Set/Reset, etc.

    7.1.2 Sequential, timed and computational control programmes shall be supported

    via a high level programming language. The following typical functions shall

    be supported:

    - Expressions such as Equal To, Not Equal To, etc.

    - Mathematical functions

    - Timer related functions

    - Counter/Pulse related functions

    - Logic type functions

    7.1.3 The system shall also support logic control programmes where the

    grouping/linking of various logic functions shall provide the required

    functionality. The programming shall be done via function block. The

    following typical functions shall be supported:

    - Logic functions such as AND, OR, etc.

    - Timer related functions

    - Counter/Pulse related function

    7.2 Graphic Display Requirements

    7.2.1 Graphic displays can be divided into standard and custom types. The

    custom graphic display details a schematic presentation of the station at

    different levels, from overview level right through to equipment detail level.

    The standard graphic displays provide the operator with a standard format for

    displaying information and are configurable and normally accessible from

    dedicated function keys.

    7.2.2 The graphic displays, together with the keyboards shall provide a complete

    window to the station for all control and monitoring requirements.

    7.2.3 The real time data within these displays shall be automatically updated

    without the need for operator action with a configurable refresh rate of four

    seconds or less.

    7.2.4 The following standard type of graphic displays shall be provided and

    accessible from dedicated function keys:

    - Loop (Faceplate) Displays. The loop display shall contain, in engineering

    units and bargraph format, the process variable, set point and loop

    output values. In addition, all control and configuration parametersincluding tuning constants shall be displayed. All adjustable parameters

    shall be changeable from within the display.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    20/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 20 OF 31

    REV: D2

    - Group Displays. Predefined and operator configurable group displays

    shall consist of approximately eight loops displayed in similar format as

    in Loop Displays. Configuration parameters shall not normally bechangeable from within this display.

    - Trend Displays. Both historical and real time trend displays shall be

    available for any variable point. Trend displays shall be able to

    accommodate at least eight different points simultaneously in different

    colours.

    - Alarm Displays. Alarm displays shall contain the alarm summary in

    chronological order and alarm groups for the configurable plant

    area/group.

    - System Diagnostic Displays. Diagnostic displays shall be specially

    designed to facilitate system maintenance and shall, as a minimum, list

    all the system devices, including communication systems and their

    associated status. System maintenance functions such as module

    restarts/switchovers, accepting errors, etc. shall be actioned from this

    display.

    7.2.5 The system shall support a powerful and flexible custom graphic display

    capability which shall include, as a minimum, the following:

    - Hierarchical display relationship for ease of movement

    - Display capacity of at least 200 dynamic elements per graphic including

    calculated values

    - Symbolic presentation of data by means of change in colour/shape

    and/or flashing

    - Configurable data/numeric format including colour

    - Unique colour combination display capability for multi-state devices

    - Suppression of inactive status messages and/or alarms

    - At least two different text/data sizes

    - Movement of displays from one screen to another

    7.2.6 The system shall contain custom graphic pages to display the status of all

    inputs and outputs to / from the SIS system and package equipment control

    systems such as compressor train etc., in the ESD hierarchy format for the

    shutdown. These graphics shall include a first out alarm display such that the

    first in a series of trip initiators can be easily identified.

    7.2.7 The system shall contain custom graphic pages to display the status of allinputs and outputs to / from the package equipment control systems, such as

    compressor train in the sequential format for the compressor start up

    sequence or the other operation.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    21/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 21 OF 31

    REV: D2

    7.2.8 The system shall support X-windows technology which shall, as a minimum,

    provide the following added features:

    - Displaying data from other X-window devices connected to the

    DCS/workstation

    - Displaying multiple sets of data on a single screen

    - Display resizing, repositioning including reduction to icon size

    - Running other standard software packages such as Microsoft Office

    etc.

    7.2.9 The customized graphic displays shall include the displays and interface for all

    process, SIS, package equipments, Fire& gas, utilities, Fire suppression,electrical systems and any other systems interfacing to the DCS.

    7.3 Alarm and Event Management Requirements

    7.3.1 The alarm management system shall be a fully configurable system capable of

    processing all alarms in an appropriate manner to maximise the information

    provided, but to minimise the number of alarms displayed.

    7.3.2 In order to minimise the number of alarms, grouping, suppression and/or

    filtering techniques shall be available. Suppressing and/or filtering of alarms

    shall include:-

    - Automatic suppression of individual and/or groups of alarms based on

    the occurrence of a preselected alarm or event.

    - Automatic disabling of alarms based on the associated equipment

    running status.

    7.3.3 Each alarm point shall be capable of being configured to at least three

    different alarm priority levels in order to discriminate between critical and non-

    critical alarms.

    7.3.4 Each alarm shall activate an audible and visual alarm at the configuredoperator console. The alarm shall be displayed on the alarm summary and on

    the respective graphic displays. In addition, each workstation screen shall

    display a warning that a point is in an alarm state including the number of

    unacknowledged alarms.

    7.3.5 Once the alarm has been acknowledged :-

    - The alarm shall change from flashing to steady state.

    - The audible alarm signal shall be silenced at all the assigned consoles.

    7.3.6 Once the alarm returns to the normal state:-

    - The alarm shall be removed from the alarm summary (if acknowledged).

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    22/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 22 OF 31

    REV: D2

    - The displays shall return to normal.

    7.3.7 All alarms and first out alarms from other machinery packages, Safety

    instrumented System, electrical systems, machine monitoring system, and fire

    and gas systems shall be time stamped with a resolution of at least one

    second. Both the alarm occurrence and acceptance times shall be recorded.

    7.3.9 All alarms and associated information shall be stored on the mass data

    storage medium for historical purposes.

    7.3.10 Deleted

    7.3.11 The system shall support a sequence of event capability either as part of the

    alarm management system or in a similar format and/or presentation. The

    sequence of event shall acquire the event from the SIS, packageequipments, electrical systems, machine monitoring system and Fire & Gas

    system. The time stamping of the sequence of event signals shall be carried

    out in the DCS when hardwired directly to the system or when time

    stamping is carried in another system, the signals, with the time stamping

    information, shall be transmitted to the DCS and/or sequence of events

    recorder. In either way, the time stamping resolution shall be 1 milliseconds

    or less.

    The contractor shall purpose in his bid how the time stamp for the package

    equipment will be achieved.

    7.3.12 The system shall automatically record the following events information and

    store in the historical database in long term trend and historical server and

    PIMS.

    period of occurring

    tag name

    tag description

    event type

    system generating alarm/event

    Process Events : Points going in and out of alarm, Points changing state, ,

    Sequence of event records

    the action of the operator,

    command from the systems/logic

    configuration changes

    response from the filed devices whether commanded or uncommanded state

    change

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    23/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 23 OF 31

    REV: D2

    other events generated by the systems interfacing with the DCS system.

    The information for the event generated by other system shall contain the

    same information as generated by the DCS.

    7.3.13 The system shall provide the capability for the alarm and event filtering. The

    operator shall be able to filter the interested alarm and event list based on

    the following

    period of occurring

    tag name

    tag description

    event type

    system generating alarm/event

    The intuitive graphical displays shall be provided for the filtering operation.

    7.3.14 The sequence of event facility shall allow reports to be displayed or printed

    automatically and/or on demand.

    7.4 Data Collection and Trend Requirements

    7.4.1 All measured and calculated variables shall be stored as follows:

    - 1 second snapshots for 14 days

    - 1 minute average for 14 days

    7.4.2 The system shall perform the data aggregation for the data mention in 7.4.1

    and store in the per the following

    - 1 hour averages for 1 month

    - Daily averages for 1 year

    - Monthly averages for 2 year

    The vendor may purpose to PIMS to perform this functions.

    7.4.3 The system shall support both real time and historical trend facility at any

    workstation. Each trend shall consist of the plotted trend graph and a table

    containing the trend parameters. The points engineering units shall be

    displayed on the vertical axis and the time scale on the horizontal axis. If

    more than one point is displayed, the vertical axis shall be in percentage or

    displayed in the multiple vertical axis.

    7.4.4 Real time trends shall be available for all measured and calculated variables in

    similar time scales with a 1 second sampling time. This is expected to cater

    for approximately 2000 points.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    24/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 24 OF 31

    REV: D2

    7.4.5 Historical trends shall be available for any of the recorded variables at the

    specific sampling time per 7.4.2.

    7.4.6 The system shall provide the intuitive graphical display for the operators to

    customize the required trend set. The operator shall be able to select the

    following the parameters to be display in the trend.

    Tag name/ID

    Type of data such as second, 1 minute average, hourly average, daily

    average,

    Period of data

    The operator shall be able to save the new configured trend set in the system.

    7.5 Deleted

    7.6 Deleted

    7.7 System Diagnostic Requirements

    7.7.1 The system shall include a full diagnostic facility which shall intelligently

    identify all system faults and failures to ensure a fully operable system is

    maintained.

    7.7.2 The system shall generate the alarm and log the event when detecting the

    faults.

    7.7.3 The system shall display the location of the fault components in the graphical

    displays.

    7.8 System Clock and Synchronization

    7.8.1 The clock source shall be a GPS based clock source. This shall be provided by

    a GPS receiver and all necessary software and interfaces to retrieve the GPS

    clock data into the DCS system.

    7.8.2 The DCS shall then distribute the clock information to the SIS, Fire & Gassystem, utility control systems, Electrical systems, Compressor Unit Control

    Panels, Master performance, Load sharing and Anti surge controllers and any

    other system controllers connected to the DCS.

    7.8.3 The DCS shall distribute the clock to the DCS and SIS systems provided by

    the FTPP contractor.

    7.8.4 Clock updates shall be performed a minimum of once per day and shall not be

    scheduled during or near end of day rollover times or other critical periods in

    the day.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    25/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 25 OF 31

    REV: D2

    8.0 Engineering, Detailed Design and Implementation

    8.1 General

    3.1.1 The contractor and vendor shall be responsible for the engineering, detailed

    design and configuration of the DCS system.

    3.1.2 The engineering, detail design and implementation shall be performed by the

    DCS vendor in Thailand.

    3.1.3 Work included shall be configuration and customization of all DCS databases

    (real-time and historical) and HMI displays and reports.

    3.1.4 Custom programming required to implement functional requirements that are

    not available in the core DCS system package shall be included. The result of

    all custom programming specific to the project shall belong to PTT and sourcecode shall be included.

    3.1.5 Detailed design shall be an interactive process involving working closely with

    PTT engineering and operations team. The contractor and vendor shall make

    allowances for performing the work in this manner and shall allow for multiple

    iterations of design submittal, review, comments for changes and redesign.

    The vendor shall provide the office space for three PTT personnels during the

    engineering, detail design and Factory Acceptance Test phases.

    8.2 Database Configuration and Population

    8.2.1 Detailed design shall include complete configuration of each of the DCS

    databases and populating them with data based on the information on the

    project P&ID and process / instrument datasheets.

    8.2.2 This work shall include configuration of alarm limits, alarm actions and data

    archiving rate for each DCS database point.

    8.2.3 The DCS database point shall also include the data of the other systems

    which interface with the DCS.

    8.3 Graphical Displays

    8.3.1 The contractor and vendor shall design and implement all DCS graphical

    display screens

    8.3.2 The displays shall be designed to allow simple and efficient maneuvering from

    one display to the next in a structured hierarchical flow.

    8.3.3 The DCS system is expected to be supplied with a number of vendor standard

    displays (such as database summaries, system status summaries, etc.) shall

    serve as the starting point for customization, as required based on PTT

    requirements.

    8.3.4 The contractor and vendor shall allow for creation of at least 500 displays.

    8.3.5 PTT shall be consulted regarding the conventions for the use of colors and

    other attributes for denoting the various states of a signal.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    26/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 26 OF 31

    REV: D2

    8.3.6 CONTRACTOR shall choose simple to understand icons and symbols that are

    sufficiently large to be clearly visible.

    8.3.7 Screens shall be kept as uncluttered as possible

    9.0 INSPECTION AND TESTING

    9.1 General

    3.1.6 PTT reserve the right to carry out inspections at any time during construction

    of the Contractor's or Sub Contractor's work.

    3.1.7 The Contractor shall supply all calibration, test, and simulation equipment that

    are required to demonstrate correct operation of the system. Certificates ofthe test equipment shall be traceable to National Standards.

    3.1.8 Calibration, test, and simulation equipment shall be used at pre-

    commissioning, commissioning, and site testing. During the commissioning

    and testing period the Contractor shall ensure that all equipment is maintained

    in calibration.

    3.1.9 All calibration, test, and simulation equipments, used during the Site Accept

    Test and commissioning, shall be handed over to PTT after the completion of

    the commissioning and testing period. Current test certificates for all

    calibration equipment shall be supplied and included as part of the official test

    results.

    3.1.10If, for any reason, PTT waives any part of the inspection, this does not relieve

    the Contractor and vendor of the responsibility to effect repairs at their own

    expense to any defects found later, including within the guarantee period.

    3.1.11The Contractor and vendor shall submit to PTT a complete test schedule and

    procedure for the Factory Acceptance Test and the Site Acceptance Test at

    least two months prior to each test being performed.

    3.1.12The Contractor and vendor shall provide two copies of hand-written test

    reports at time of inspection. Four copies of typewritten official certificatescomplete with all necessary details shall be supplied to PTT for approval

    within one week after test completion. The results of all tests and checks are

    to be recorded in the form of a Test Certificate, copies of which shall be

    supplied to PTT.

    9.2 Factory Acceptance Test (FAT)

    9.2.1 The FAT procedures shall be submitted to PTT for approval at least two

    months in advance of any testing. The FAT procedure must be agreed in full

    by PTT prior to commencement of any testing.

    9.2.2 The Contractor and vendor shall supply all test, simulation, and otherequipment necessary to perform the FAT. The simulation equipment shall be

    able simulate the AI, DI, and the status of the output from the DCS such as

    AO and DO.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    27/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 27 OF 31

    REV: D2

    9.2.3 The test and simulation equipments shall allow the test of all provided Field

    Control Stations simultaneously. This means that the FAT shall be able to

    demonstrate the functions and performance of the DCS system as the realoperating conditions.

    9.2.4 The Contractor shall perform the following tests as a minimum during FAT:

    Visual Inspection: All equipment shall be checked for conformity

    with the approved drawings and with the contract/vendor

    documents.

    Hardware Functional Tests: Sub-system tests shall be

    performed on any equipment provided by the vendor. The

    equipment shall be tested for correct configuration,

    functionality, and fault handling.

    Software Testing: Software tests shall be performed to

    demonstrate the satisfactory operation of the software. Testing

    shall include:

    i) Telemetry I/O processing, speed, and accuracy

    ii) Display operation and performance

    iii) Application software

    iv) Alarm handling

    v) Database configuration

    vi) Logging facilities

    viii) System utilities

    ix) Historical data collection

    x) Logic

    xi) Links to the other systems interfacing with the

    DCS

    xii) Any other test required to demonstrate that the

    provided DCS system complies with this

    specification.

    9.2.5 The vendor shall perform the system integration test with the OCS# 4 SIS,

    FTPP DCS& SIS, all operator workstations, PIMS and PRM online.

    9.2.6 The vendor and contractor shall use the emulator to simulate the interfacebetween the DCS and other package equipments and electrical system for the

    FAT.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    28/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 28 OF 31

    REV: D2

    9.3 Site Acceptance Test (SAT)

    9.3.1 The SAT procedures shall be submitted to PTT for approval at least two

    months in advance of any testing. The SAT procedure must be agreed in fullby PTT prior to commencement of any testing.

    9.3.2 The Contractor shall supply all test, simulation, and other equipment

    necessary to perform the SAT.

    9.3.3 In general the SAT shall follow the same procedure as the FAT except the I/O

    signals shall be live.

    9.3.4 The vendor shall perform total system integration test which includes the

    interface and function with the following systems online.

    FTPP DCS

    FTPP SIS

    Motor Driven Compressor UCP

    Compressor Master Performance, Load Sharing and Antisurge

    controllers

    Instrument Air Package

    Fire Water Pump Package

    Fire and Gas Control Panels

    Emergency Diesel Generator

    Deluge Skid

    Machine Monitoring System

    Electrical switchgear and MCC

    9.4 Performance Test

    9.4.1 The system shall undergo a thirty day performance test after completion and

    acceptance of all SATs and correction of any deficiencies noted. This thirty

    day performance test shall be in line with the 30 day continuous run of the

    OCS# 4 station,

    9.4.2 The performance test procedures shall be submitted to PTT for approval at

    least two months in advance of any testing. The procedure must be agreed in

    full by PTT and all punch list items must be satisfactorily completed prior to

    commencement of any testing.

    9.4.3 During the thirty day performance test the system shall operate without a

    major error. Should a major error occur, the test will be stopped, the error

    corrected, and the thirty day test restarted at day one.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    29/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 29 OF 31

    REV: D2

    9.4.4 The Contractor shall notify PTT in writing when the repairs have been

    completed, along with a detailed explanation identifying the problem and

    corrective action taken.

    9.4.5 PTT shall have full access to the system during the thirty day test, and all

    normal operations shall be performed. Normal operations include polling,

    calculations, display of data, trends, and reports, as well as the addition or

    modification to any of the above.

    9.4.6 Should any abnormal event occur during the thirty day test the contractor and

    vendor shall immediately investigate the event to determine a cause , correct

    the problem and submit a report to PTT. The report shall state whether in the

    opinion of the contractor the event is a major error or not, and the reasons for

    such a conclusion.

    9.4.7 During investigation of any abnormal event the Contractor shall continue to

    make all tests and measurements as required by the performance test

    procedure. The report shall be submitted to PTT within three calendar days of

    the event. Failure to submit a report within the allotted time shall result in the

    event being declared a major error.

    9.4.8 PTT will respond to an abnormal event report within three days; either

    accepting the report, requesting additional information, or rejecting it.

    Rejection of a report shall result in the event being declared a major error.

    10.0 INSTALLATION AND COMMISSIONING

    10.1 A minimum of thirty days prior to commencement of any installation work the

    Contractor shall provide a schedule detailing the dates work will be

    undertaken to PTT.

    10.2 The Contractor shall provide a written plan detailing the work to be performed

    for the installation of the system. The site installation plan shall be submitted

    for approval by PTT a minimum of thirty calendar days prior to the

    commencement of any work.

    10.3 No installation of commissioning work shall be started at any site until the

    Contractor has obtained PTT approval for the FAT results and PTT approvalfor the applicable issued for construction drawings.

    10.4 The Contractor shall be responsible for obtaining all necessary permits and

    permission to perform the required installation work.

    10.5 The Contractor shall check the system as soon as it is installed at site to

    confirm the system is still fully calibrated and functional after shipment and

    installation.

    10.6 The Contractor shall be required to maintain the commissioning team of the

    vendor on site to cover any failures during the commissioning period.

    10.7 The Contractor shall supply on site software and hardware support expertise

    during commissioning of the system and during the complete thirty day

    performance test period from the DCS system vendor.

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    30/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 30 OF 31

    REV: D2

    11.0 Deleted.

    12.0 Documentation Requirement

    The Contractor and vendor shall provide the following documents in both

    hardcopy form (five copies) and electronic form on Compact Disk (three

    copies). The format of the document files shall be complied with the related

    PTT specification. The table of contents for each document shall be submitted

    to PTT for approval.

    (a) Basic Data

    (b) Design formulae and calculations

    (c) Overall accuracy or uncertainty in measurement

    (d) Outline of calibration and verification methods

    (e) Network setup setup and troubleshooting

    (f) Reliability details of all equipment

    (g) Equipment details / drawings for all components

    (h) Full software documentation

    (i) Wiring diagrams, including loop drawings

    (j) Terminal schedule including tag identifier and point description

    (l) System or component installation drawings and details

    (m) Equipment lists and data sheets

    (n) Drawing index

    (o) Factory acceptance test procedure

  • 5/25/2018 SPC-0804.02-60.05 Rev D2 DCS Specification

    31/31

    DISTRIBUTED

    CONTROL SYSTEM

    SPECIFICATION

    PTT PUBLIC COMPANY LIMITED

    ENGINEERING SPECIFICATION

    SPC-0804.02-60.05

    PAGE: 31 OF 31

    REV: D2

    (p) Site commissioning plan

    (q) Site installation plan

    (r) Site acceptance test procedure

    (s) Thirty day performance test procedure

    (t) System technical manuals

    (u) Utility consumption data

    (v) Comprehensive operation and maintenance manual which will

    enable PTT personnel to operate and service the equipment

    without reference to the Contractor

    (w) Comprehensive spare parts list and priced quotation for three

    years operation

    (x) Functional design specification which shall describe the system

    hardware and software from the users point of view

    (y) Complete and revised version of the detailed design manual

    which provides details on the implementation and configuration

    of each software component

    The contractor and vendor shall submit the mentioned documents from item

    (a) to (n) and (x) to PTT for review and approve during the engineering phase.

    For the item (y), the vendor shall consult PTT for the document developing.

    The rest of document shall be submitted to PTT for review and approval

    according to the specification and the related system implementation phase.