spca2013 - successful migration to sharepoint 2013

22
Successful Migration to SharePoint 2013 Planning Considerations & Migration Strategies

Upload: nccomms

Post on 09-May-2015

458 views

Category:

Technology


0 download

DESCRIPTION

Successful Migration to SharePoint 2013

TRANSCRIPT

Page 1: SPCA2013 - Successful Migration to SharePoint 2013

Successful Migration to SharePoint 2013

Planning Considerations & Migration Strategies

Page 2: SPCA2013 - Successful Migration to SharePoint 2013

Speaker

Abi Onifade

@abi_london

Director Systems Engineering

Page 3: SPCA2013 - Successful Migration to SharePoint 2013

AgendaDesign Goals for SP2013 Upgrades

Site Collection UpgradesDeferring Site Collection UpgradeSite Collection Health ChecksSelf-Service Site Collection UpgradesQueuing Site Collection upgradesDemos

Farm Upgrade OverviewPlanningPreparingExecutingFinishing

Upgrade Q&A

Page 4: SPCA2013 - Successful Migration to SharePoint 2013

Design Goals for 2013 Upgrades

Safer upgradesRemoval of in-place version to version upgrades Adding site collection health checks

Reduced outage duration(*saves ~2/3 upgrade time)

Power to the peopleLet site collection admins control their own destiny

Page 5: SPCA2013 - Successful Migration to SharePoint 2013

Deferred Site Collection Upgrade

Eliminate big bang upgradesUpgrade database now, upgrade site collections laterKeep existing customizations, updated ones can wait

Move forward at a manageable paceInitially let users stay with 2010 experience:• Stay with the familiar• Keep using existing customizations

Gradually move users over to 2013 experience:• As training occurs (e.g. incrementally for each team)• As users decide to adopt new experience/features• As new version compatible customizations are available

Page 6: SPCA2013 - Successful Migration to SharePoint 2013

Site Collection Health Checks

Rules can detect and in some cases repair issues

Rules can exist for use in 14 and/or 15 modesSame or different rules may apply

Can be run without doing upgradeGive advanced notice of potential future issues

Page 7: SPCA2013 - Successful Migration to SharePoint 2013

Queuing Site Collection Upgrades

Throttles limit the number of parallel upgradesIn web application worker process:• Maximum in process site collection upgrade limits• IIS Process parallel site collection upgrade limit In any process:

Upgrade requests are always queued

Status of all queued upgrades are tracked within the queueEventually every site collection will have a single queue entry once it gets upgraded

Page 8: SPCA2013 - Successful Migration to SharePoint 2013

Farm Upgrade

Page 9: SPCA2013 - Successful Migration to SharePoint 2013

Prepare

© 2011 AvePoint, Inc. All rights reserved. No part of this may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, without the prior written consent of AvePoint, Inc.

Page 10: SPCA2013 - Successful Migration to SharePoint 2013

Detach and Re-attach Databases

© 2011 AvePoint, Inc. All rights reserved. No part of this may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, without the prior written consent of AvePoint, Inc.

Page 11: SPCA2013 - Successful Migration to SharePoint 2013

Powershell Command

© 2011 AvePoint, Inc. All rights reserved. No part of this may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, without the prior written consent of AvePoint, Inc.

Page 12: SPCA2013 - Successful Migration to SharePoint 2013

Recap Upgrade Stages

© 2011 AvePoint, Inc. All rights reserved. No part of this may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, without the prior written consent of AvePoint, Inc.

Page 13: SPCA2013 - Successful Migration to SharePoint 2013

Migration DEMO

Page 14: SPCA2013 - Successful Migration to SharePoint 2013

Migration with Third Party Tools

ConsPros

• Any size environment, from single server farms to large, distributed farms

• Restructuring content• Preservation of any

metadata or security

• Direct migration from 2007 to 2013

• Pre-scan to determine customisations

• Granular migration

• Virtually no downtime

• Applicable to non-SharePoint repositories

• Options for 24 x 7 Support?

• Costs associated with purchasing of additional software

Best For

• SharePoint Administrator installs the new version on separate hardware or a separate farm, and migrates content and users using 3rd Party Tool

Page 15: SPCA2013 - Successful Migration to SharePoint 2013

DEMO DocAve Pre-Scan Tool

Page 16: SPCA2013 - Successful Migration to SharePoint 2013

1. Backup everything2. Upgrade services first

• Search Administration database• Profile, Social, and Sync databases• Managed Metadata/Taxonomy database• Secure Store database

i. Remember to have Secure Store passphrase or you will lose all existing passwords• Project Server databases

i. Remember to merge the four 2010 Project databases before attempting upgrade• Service Application upgrade

i. http://technet.microsoft.com/en-us/library/jj839719.aspx

3. Upgrade content databases• Site collection upgrade automatically deferred

4. Upgrade site collections at your leisure5. Re-index existing content

Summary of Farm Upgrade

Page 17: SPCA2013 - Successful Migration to SharePoint 2013

Wrap Up

Page 19: SPCA2013 - Successful Migration to SharePoint 2013

AvePoint Corporate OverviewGlobal Leader – SharePoint Governance & Management

© 2011 AvePoint, Inc. All rights reserved. No part of this may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, without the prior written consent of AvePoint, Inc.

Specialized

• Founded and Debuted in 2001• World's Largest SharePoint-Exclusive Research & Development Team

with 1,500 Employees (800+ in R&D)

Experienced

• World's Largest Provider of Enterprise-Class Governance and Infrastructure Management Solutions

• 25 Offices, 13 Countries in 5 Continents & 8000+ Customers

Invested

• Depth-Managed, Microsoft Certified Partner• Comprehensive SharePoint Governance & Management Platform• Offering True 24 x 7 Support - Microsoft Certified Technicians

Page 20: SPCA2013 - Successful Migration to SharePoint 2013

© 2011 AvePoint, Inc. All rights reserved. No part of this may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, without the prior written consent of AvePoint, Inc.

Page 21: SPCA2013 - Successful Migration to SharePoint 2013

Resources - www.AvePoint.com

21

Visit us: http://www.AvePoint.com

Email us: [email protected]

Follow us: @AvePoint_Inc / @sharepointukReferenceshttp://blogs.dotnet-france.com/laurentv/post/Installation-de-SharePoint-foundation-2013-RTM.aspxSean Livingston SPC2012 conferencehttp://technet.microsoft.com/en-us/sharepoint/fp142375.aspx

Page 22: SPCA2013 - Successful Migration to SharePoint 2013

@tweetraw

[email protected]@abi_london

Thank You

Questions?