special economic zone 2018 - gov.ruadmin.ved.gov.ru/uploads/sez alabuga eng.pdf · 2018-08-31 ·...
TRANSCRIPT
![Page 1: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/1.jpg)
SPECIAL ECONOMIC ZONE 2018
![Page 2: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/2.jpg)
KAZAN YELABUGA
REPUBLIC OF TATARSTAN
THE REPUBLIC OF TATARSTAN IS ONE OF THE MOST ECONOMICALLY DEVELOPED REGIONS
The Special economic industrial zone“Alabuga“ was created on December21 st, 2005 in the Republic of Tatarstan
The center of the largestindustrial region 800 kmeast of Moscow
68 000 KM2
3.89 MLN
38.7
36.3
Territory
Population
GRP
Industrial output BLN USD
BLN USD
IN THE RUSSIAN FEDERATION
![Page 3: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/3.jpg)
АSI1 PLACE
AGENCYFOR STRATEGICINITIATIVES
Republic of Tatarstan - in Russian Federationinvestment climate national ranking
Agency for strategic Initiatives,2015, 2016, 2017
![Page 4: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/4.jpg)
SEZ “ALABUGA“provides an excellent set of conditions for investors who intendto establish new production in Russia
Located in one of the biggestindustrial center of Russia
Low cost land plots
Attractive tax andcustoms preferences
Developed industrialinfrastructure
Strong governmentalsupport
Decreased bureaucracy
Proven track record –many global companieshave already establishedproduction in the SEZ
![Page 5: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/5.jpg)
INVESTMENT INCENTIVESAND PREFERENCES(for 10 years since tax base introduction)
TAX RATE FORNON-RESIDENTS
TAX RATE FORSEZ RESIDENTS
Property tax
Land tax
Transport tax*
2.2%
1.5%
0.1-4$
0%
0%
0$*tax rate per 1 hp
![Page 6: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/6.jpg)
CORPORATE INCOME TAX(paid since the first profit)
TAX RATE FORNON-RESIDENTS
TAX RATE FORSEZ RESIDENTS
First 5 years
Second 5 years
Till 2055
20%
20%
20%
2%
7%
15.5%
PERIOD
![Page 7: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/7.jpg)
INSURANCE CONTRIBUTIONSFor residents, carrying out innovation activities
TAX RATE FORNON-RESIDENTS
TAX RATE FORSEZ RESIDENTS
2011-2017
2018
2019
30%
34%
34%
14%
21%
28%
YEAR
![Page 8: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/8.jpg)
SEZ “Alabuga“Import equipment
0%VATIMPORT DUTY
Russian FederationForeign countries
FREE CUSTOMSZONE
![Page 9: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/9.jpg)
$2.67bln USD
$910mln USD
2018 2023
Investments in infrastructure until2023 will rise up to $2.67 bln USDmore than $910 mln USDhas already been invested
CUSTOMSINFRASTRUCTURE
BUSINESSINFRASTRUCTURE
SOCIALINFRASTRUCTURE
INDUSTRIAL INFRASTRUCTURE
INFRASTRUCTURESEZ “ALABUGA”
![Page 10: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/10.jpg)
Railroads
Inner-site roads
Gas
Electricity
Heating
Water
Storm sewage
Drainage
Sewerage
IP Phone
High-speed Internet
INDUSTRIAL INFRASTRUCTURELand plots with an access to:
![Page 11: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/11.jpg)
FREE CONNECTIONTO UTILITY LINESconnection cost to electricity lines:
MOSCOW– $ 500 000 USD per 1 MW
TATARSTAN– $ 100 000 USD per 1 MW
SEZ «ALABUGA» – $ 0 USD per 1 MW
Cost of connection per 1MW
![Page 12: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/12.jpg)
RENT AND PURCHASE
10ha
10ha
$ 5 000 USD per year
$ 15 000 USD
land plot rent at average: $ 0.05 USD per 1 m2 /year
land plot purchase at average: $ 0.15 USD per 1 m 2
LAND PLOT
![Page 13: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/13.jpg)
NOT READYTO BUILD?
We build for you
Stock steel production
![Page 14: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/14.jpg)
SEZ“ALABUGA“
READY INDUSTRIALPREMISES ON THE TERRITORYOF THE
![Page 15: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/15.jpg)
А PLUS PARK ALABUGAIndustrial park
36 Hа 186 000 sq.m
200 000 sq.m
land plot area production-warehousefacilities
total areaof the complex
14 000 sq.mAdministrativebuildings
4buildings
![Page 16: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/16.jpg)
Readiness16 000 m2 — 3rd Q. 2015 38 640 m2 — 2nd Q. 201938 640 m2 — 2nd Q. 2020
Current statusunder construction
Readiness2019
Readiness2020
116 000 m2
238 640 m2
338 640 m2
4100 000 m2
А PLUS PARK ALABUGADevelopment stages
![Page 17: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/17.jpg)
![Page 18: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/18.jpg)
SYNERGYIndustrial park
24 500 sq.mRental space
![Page 19: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/19.jpg)
![Page 20: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/20.jpg)
Customs post operates only for the SEZ “Аlabuga“residents
99% E-declaration
Customs clearancewithin 3 hours
СUSTOMS INFRASTRUCTURE
![Page 21: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/21.jpg)
BUSINESS INFRASTRUCTURE
![Page 22: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/22.jpg)
BUSINESS INFRASTRUCTUREВ+ CLASS OFFICE CENTRE WITH ALL THE NECESSARY SERVICES NEEDEDFOR EVERYDAY WORK:
Office premises
Conference halls
Meeting rooms
Exhibition hall
Canteen-restaurant
Insurance companies
Customs brokers
Gym
![Page 23: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/23.jpg)
a day to Moscow and back
FLIGHTS
Flight time Drivefrom airport
40minutes1 h 30minutes
![Page 24: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/24.jpg)
Mamadysh
Kazan200km 286km
Ufa
NaberezhnyeChelny
Yelabuga
Mendeleevsk
Аlabuga
170kmChistopol
Nizhnekamsk
“Begishevo”airport
Аlabuga-2
M7
M7
KAMAINDUSTRIALCENTRE
1 000 000PEOPLE
![Page 25: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/25.jpg)
THE WORKFORCE(Naberezhnye Chelny, Nizhnekamsk,Yelabuga, Mendeleevsk)
29 UNIVERSITIES AND INSTITUTES
28 COLLEGES
20 200 NEW SPECIALISTS
BLUE COLLARS
WHITE COLLARS
$ 500USD$ 700USD
![Page 26: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/26.jpg)
EVERY YEAR IN KAMACLUSTER GRADUATE
TECHNICALEMPLOYEES
FOR SEZ "ALABUGA"
![Page 27: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/27.jpg)
9out of15Russian largest citiesare located within1000 km area
Moscow
Ekaterinburg
Nizhny Novgorod
UfaVoronezh Samara
KazanPerm
ChelyabinskAlabuga
1000 km
![Page 28: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/28.jpg)
SALESMARKET
Moscow
Belarus
Ukraine
Turkey
Iran
Uzbekistan
Kazakhstan
China
Yekaterinburg
Perm
1 073 km
460 km
794 km
1 809 km
3 005 km
6 500 km
3 500 km
3 400 km
2 041 km
1 844 km
SEZ“Аlabuga”
EU
![Page 29: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/29.jpg)
CARGO TRANSPORTATION SCHEMETIKHONOVOstation
SEZ “ALABUGA”
NABEREZHNYE CHELNY
Nizhnekamsk
KazanAMURBAY
VladivostokMoscow
Baltic Sea
Ust-luga
Saint-Petersburg
Petrozavodsk
Novorossiysk
1763 km
1861 km 7746 km
2219 km
Novorossiysk - st. TikhonovoSt. Petersburg - Art. TikhonovoUst-Luga - Art. TikhonovoVladivostok - Art. Tikhonovo
1 345 USD1 155 USD1 224 USD3 000 USD
Prices include cost platformand container rent
BLACK SEA
Novorossiysk – Naberezhnye ChelnySt. Petersburg - Naberezhnye ChelnyUst-Luga - Naberezhnye Chelny
2 707 USD2 155 USD2 276 USD
Prices don’t include costof container rent
![Page 30: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/30.jpg)
Free zones of the year 2017
WINNER:EUROPE 2015, 2016, 2017
LARGE TENANTS
HIGHLY COMMENDED:GLOBAL 2016, 2017
LARGE TENANTS
![Page 31: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/31.jpg)
4 000HA3
2
1
MAP OF THE SEZ “ALABUGA”3rd stage
1st stage
2nd stage
![Page 32: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/32.jpg)
RESIDENTS
![Page 33: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/33.jpg)
FORD SOLLERS Production of LCV Ford Transit,SUV Ford Explorer, Ford Kuga,gasoline engines
Production capacity
85 000vehicles per year
185 000engines per year
773.3mln USD
Investment volume
![Page 34: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/34.jpg)
AIR LIQUIDEALABUGAProduction of technical gases(oxygen, nitrogen, hydrogen-oxygenmixture)
80mln m3 per year
54.4mln USD
Production capacity Investment volume
![Page 35: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/35.jpg)
ROCKWOOLProduction of firesafe insulationmaterials 110 000
tons per year174.1mln USD
Production capacity Investment volume
![Page 36: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/36.jpg)
PREISS-DAIMLERTATNEFTProduction of fiberglass andfiberglass-based goods
24 195tons per year
158.4mln USD
Production capacity Investment volume
![Page 37: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/37.jpg)
POLYMATIZProduction of nonwoven fabric andother polymer goods 17 000
tons per year52.7mln USD
Production capacity Investment volume
![Page 38: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/38.jpg)
SARIAProduction of meat-bone flourand technical fat 24 500
tons per year59.8mln USD
Production capacity Investment volume
![Page 39: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/39.jpg)
KASTAMONUProduction of medium densityfiberboard and MDF – based goods 837 200
m3 per year488.7mln USD
Production capacity Investment volume
![Page 40: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/40.jpg)
HAYATProduction of household andsanitary paper products 140 000
tons per year207.6mln USD
Production capacity Investment volume
![Page 41: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/41.jpg)
Production of float glass, mirrorsand coated glass
250 000tons per yearglass
210.2mln USD
4.5mln m2 per yearmirrors
4.5mln m2 per yearcoated glass
SISECAMSAINT-GOBAIN
Production capacity Investment volume
![Page 42: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/42.jpg)
SISECAMProduction of automotive glass
6.4mln sets per year
113.4mln USD
Production capacity Investment volume
![Page 43: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/43.jpg)
ALABUGA-FIBER Production of carbon fiber 1 500
tons per year91.6mln USD
Production capacity Investment volume
![Page 44: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/44.jpg)
INTERSKOLProduction of electrical tools
1.27mln units per year
63.4mln USD
Production capacity Investment volume
![Page 45: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/45.jpg)
RMAProduction of steel ball valvesfor oil and gas extraction industry 11 000
units of productper year
56mln USD
Production capacity Investment volume
![Page 46: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/46.jpg)
ARMSTRONGProduction of mineral fiber ceiling 22
mln m2 per year101.4mln USD
Production capacity Investment volume
![Page 47: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/47.jpg)
COSKUNOZ Production of car body parts 6
mln units per year74mln USD
Production capacity Investment volume
![Page 48: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/48.jpg)
3МProduction of adhesive tapes,industrial adhesives, abrasivematerials, glass microspheres 256
corrosionprotection agentskl per year
62.3mln USD
Production capacity Investment volume
![Page 49: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/49.jpg)
9 600tons per year
32.6mln USD
Production capacity Investment volumeBELAYA DACHA Processing of vegetable products
![Page 50: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/50.jpg)
HAVI LOGISTICSStorage and processingof processed foods for McDonald’s 17.7
mln USD
Investment volume
![Page 51: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/51.jpg)
HUHTAMAKIProduction of disposabletableware 641
mln units per year 7.1mln USD
Production capacity Investment volume
![Page 52: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/52.jpg)
DIZAYN-RUS Production of polyethylene and polypropylene plastic pipes 23 300
tons per year26.2mln USD
Production capacity Investment volume
![Page 53: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/53.jpg)
KORIBProduction of car batteries 1.5
mln car batteries24.7mln USD
Production capacity Investment volume
![Page 54: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/54.jpg)
DRYLOCKTECHNOLOGIES Production of hygienic products
433mln pieces per year
32.6mln USD
Production capacity Investment volume
![Page 55: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/55.jpg)
22 250tons per year
56.5mln USD
Production capacity Investment volumeDANAFLEX-ALABUGAProduction of flexible packaging materials
![Page 56: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/56.jpg)
15.8 mln liters per year
55.4mln USD
Production capacity Investment volumeAVGUST-ALABUGAProduction of crop protection agents
![Page 57: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/57.jpg)
SEZ “ALABUGA” MEDIUM-TERM STRATEGY On April, 1st 2018: To-be in 2023:
56 120Resident-companies Resident-companies
$ 5.0 BLN USD $ 12 BLN USDTotal resident investments Investment volume
6 501 16 000Jobs Jobs
$ 846.3 MLN USD of governmental investments
![Page 58: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/58.jpg)
SOCIALINFRASTRUCTURE
![Page 59: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/59.jpg)
INTERNATIONALDIPLOMASCHOOL10 classes for 10 children
BOARDING SCHOOL20 rooms for 40 children
![Page 60: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/60.jpg)
![Page 61: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/61.jpg)
![Page 62: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/62.jpg)
![Page 63: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/63.jpg)
NEARBY CITY-NABEREZHNYE CHELNY20 KMaway from the SEZ “Alabuga”,population of
522 000 PEOPLE
![Page 64: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/64.jpg)
NEARBY TOWN -YELABUGA10 KMaway from the SEZ “Alabuga”, population of
84 000 PEOPLE
![Page 66: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/66.jpg)
THE SEZ “АLABUGA”in the structure of special economic zones (out of 24 zones)
60%32%42%
$ 8.2 BLN USDof the revenues
$ 0.35 BLN USDof tax payments (without VAT)
$ 3.2 BLN USDof residents’ investments
![Page 67: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/67.jpg)
RESIDENT TO - BE STEPS3 MONTHS
1. 2. 3. 4.Registrationof a legal entity,preparationof a business-planand foundationdocuments
Projectpresentationfor SupervisoryBoard of theSEZ «Alabugа»
ProjectPresentationfor Expert Council(Кazan)
(Kazan)
Agreementsigning andgettingthe residentcertificate
![Page 68: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/68.jpg)
SERVICESExploitation:
-heat supply
-electricity supply
-water supply
-drainage
-waste management, dumping, payments on environmental impact
-maintenance of fire extinguishing systems and smoke exhaust systems
-maintenance of electrical systems, water supply, heating, sewage
-maintenance of air conditioning and ventilation
--maintenance of elevators
-carrying out maintenance of the building and the managing company
territory
-technical supervision
-maintenance of utilities and roads
-machinery services
-passenger transportation
-transport and logistics services
-electrotechnical laboratory
Housekeeping:
-maintenance and cleaning of the rented premises
and managing company territory, disinfection
-protection of the building
-office space rent
-snow and ice cleaning and removal
-conducting tenders
-legal services
-outside windows wash
-ensuring the proper state of the external
facade of the building
Constructional:
-geodesy services
-technical customer
-construction and commissioning
technical supervision
![Page 69: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/69.jpg)
PRICE CATEGORY TARIFF RATES MEASURE 1 GROUPMORE THAN 150 kWh
2 GROUPFROM 150 TO 670 kWh
3 GROUPFROM 670 kWh TO 10 MW
4 GROUPFROM 10 MW AND ABOVE
I PRICECATEGORY
HIGH VOLTAGE TARIFF RATES RUB per kWh 3,02 3,01 х х
III PRICECATEGORY
HIGH VOLTAGE TARIFF RATES RUB per kWh 1,91 1,90 1,89 1,87
POWEROn to unregulated price
RUB per kWhper mouth 642 464,51 640 456,11 632 239,95 625 098,98
IV PRICECATEGORY
HIGH VOLTAGE TARIFF RATES RUB per kWh 1,37 1,37 1,35 1,34
TARIFF RATEfor the capacity for transmission
of electricity
RUB per kWhper mouth 385 966,61 385 966,61 385 966,61 385 966,61
POWEROn to unregulated price
RUB per kWhper mouth 642 464,51 640 456,11 632 239,95 625 098,98
TARIFF RATESFOR ELECTRICITY (HIGH VOLTAGE) FOR SEZ “ALABUGA” RESIDENTS IN 2018
Power supply reliability category Measure Tariff ratesFirst category power supply reliability RUB per kWh 0,78Second category power supply reliability RUB per kWh 0,53
The cost of leasing Medium Voltage-II networks JSC "SEZ PPT" Alabuga"
![Page 70: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/70.jpg)
TARIFF RATESSECOND HALF-YEAR 2018 WITHOUT VAT
Tariff rates without VAT
№ Resource Measure Firsthalf-year 2018
Secondhalf-year 2018
1 Heating RUB per Gcal 1 703,76 1 774,98
2 Water RUB per m3 29,48 30,72
3 Sewerage RUB per m3 53,34 55,58
4 Storm sewerage RUB per m3 26,76 27,83
![Page 71: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/71.jpg)
№ Gas consumption Measure First half-year2018
1 More than 500 million m3 per year RUB per 1000 m3 4 669,35
2 From 100 to 500 inclusive RUB per 1000 m3 4 786,38
3 From 10 to 100 inclusive RUB per 1000 m3 5 054,33
4 From 1 to 10 inclusive RUB per 1000 m3 5 242,96
5 From 0.1 to 1 inclusive RUB per 1000 m3 5 249,89
6 From 0.01 to 0.1 inclusive RUB per 1000 m3 5 532,04
7 To 0.01 inclusive RUB per 1000 m3 5 554,00
TARIFF RATESFOR GAS ON 2018 Average tariff rates without VAT
![Page 72: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/72.jpg)
NECESSARY PERMISSIONSFOR BUILDING AND LAUNCHING FACTORY
Type of work The timeline
Design according to Russian standards 6-9 months
State examination 2-3 months
Construction permit 2 weeks
Building development 1-1.5 years
Installation and commissioning of the equipment 6-9 months(in parallel with construction)
Statement of conformıty of design documentation and technical rules 2 months
Permission to launch 2 weeks
Total: 2-3 years
![Page 73: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/73.jpg)
SUPPORT PROGRAMPROJECT FINANCING INVESTMENT
IMPORT SUBSTITUTION
INTEREST RATEup to 11,2%
INVESTMENT PROJECTS SIZE1 – 20 bln rub.
Ministry of Economy of the Republic of Tatarstansupports enterprises and organizations while obtainingloan under this program
10 authorized banks areinvolved in the implementationof the program:
OJSC «Sberbank Russia»
OJSC «ROSSELKHOZBANK»
OJSC «ALFA-BАNK»
OJSC BANK VTB
PJSC «Promsvazbank»
ОJSC «Gazprombank»
ОJSC «The Bank of Moscow»
PJSC «Otkritie» Financial Corporation Bank
International investment bank
Eurasian Development Bank
![Page 74: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/74.jpg)
STATE SUPPORT OF THEIMPORT SUBSTITUTIONENTERPRISESPERCENT COMPENSATION SCHEME ON CREDITS IN RUBLES
Ministry of Industry and Tradeof the Russian Federationcompensate for
2/3of the key rate of the CB of the RFon credits, obtained in rubles
Enterprises:- Automobile industry
- Civil aircraft industry
- Cable and electrical industry
- Light industry
- Timber industry complex
- Machine-building for food and processing industries
- Oil-and-gas machine industry
- Conventional arms, ammunition, special chemistry
- Radioelectronic industry
- Agricultural machinery industry
- Machine-tool manufacture
- Road-building machinery
- Shipbuilding industry
- Transport machine building
- Heavy engineering industry
- Pharmaceutical and medical industry
- Chemical industry
- Non-ferrous metallurgy
- Ferrous metallurgy
- Power machine building
![Page 75: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/75.jpg)
Kazan
Nizhnekamsk
UfaSterlitamak
Salavat
NEFIS COSMETICS
NIZHNEKAMSKNEFTEKHIM
UFAKHIMPROM
KAUSTIK
SALAVATNEFTORGSINTEZ
NIZHNEKAMSKTECHUGLEROD
ELASTOKAM
AMMONIY
NEFTEHIMSJEVILEN
KAZANORGSINTEZ— LDPE/HDPE 771599 MT Univation Technology— PC 65000 MT Asahi Kasei Chemicals Technology— LLDPE 14,4000 MT Imhausen Germany Technology— EVA 12000 MT
— Oleic acid— Stearic acid
— PP 200000 MT Spheripol Technology— GPPS/HIPS 84000 MT Fina— LLDPE 160000 MT (2010) Sphereline (Basell)— ABS 104000 MT(2010) Polimery Europa— EPS 80000 MT LG Technology
— PC - 10 000 MT(from 2008)
— PVC - 120 000 MT
— LDPE 70000 MT Технология Chevron Phillips— GPPS/HIPS 70000 MT— EPS 50000 MT
— PU systems 20000 MTElastogran Technology
— Nitrogen fertilizers— Ammonium nitrate— Ammonia— Urea— Methanol— Technical gases— Melamine (projected)
— Carbon Black - 85 000 MTYokogawa Technology
— LDPE 14,4000 MT— EVA 12000 MT— Imhausen Germany Technology
SEZ ”Аlabuga”
400 km
Mendeleevsk
POLYMERS PRODUCEDWITHIN 400 KM FROM THE SEZ ”АLABUGА”
![Page 76: SPECIAL ECONOMIC ZONE 2018 - gov.ruadmin.ved.gov.ru/uploads/SEZ Alabuga eng.pdf · 2018-08-31 · The Special economic industrial zone “Alabuga“ was created on December 21 st,](https://reader033.vdocument.in/reader033/viewer/2022060305/5f09467f7e708231d4260b8a/html5/thumbnails/76.jpg)
SEZ ”Аlabuga”
Izhevsk
Yelabuga Nizhnekamsk
NaberezhnyeChelny
Togliatti
Ulyanovsk
Pavlovo
NizhniNovgorod
500 km
FORD SOLLERS
ISUZU
NEFAZ
CASE NEW HOLLAND
Miass
FORD SOLLERS
URALAZ
KAMAZGM-AVTOVAZ
AVTOVAZ
UAZ
PAZ
GAZ
VOLKSWAGEN
IZH AVTOVAZ
123 000trucks67 000cars40 000buses
100 000cars
14 000buses
120 000cars
776 000cars
50 000cars
70 000trucks
35 000cars
4 000cars
1 000buses
220 000trucks
75 000cars
88 000cars
220 000cars
11 000trucks
MOST MAJOR RUSSIAN CARMAKERSLOCATED WITHIN 500 KM FROM THE SEZ ”АLABUGA”