30.09.2014
To,PM/CM/Planning/StoreLARSEN & TOUBRO LIMITEDAdani-M2K Projects LLP- Oyster GrandeDate of Work Done-30.09.2014Concrete Production ReportsConcrete Production ReportS.NoName of SiteGrade of ConcreteRemarkM 7.5 GRADE ConcreteM 25 Grade ConcreteM 30 Grade ConcreteM 40 Grade ConcreteOther Qty for the dayCumulative Qty for the september MonthCumulative Qty Qty for the dayCumulative Qty for the september MonthCumulative Qty Qty for the dayCumulative Qty for the september MonthCumulative Qty Qty for the dayCumulative Qty for the september MonthCumulative Qty Qty for the dayCumulative Qty for the september MonthCumulative Qty
Tower-A154.5421435.5527.584721Tower-B345.51539.52352538.5Tower-C210841865.5279.51606.51045.5Tower-D13072161.51831181.51087.51099Tower-E13015117631961230861.8Tower-F188.541101146370644.280193.5707Tower-G307581659631.5227893Tower-H29717.51769.561.536223.5501Tower-J1281866310.5455295.5Non-Tower (B1A)3600.532209239.53795.55.5388.5Non-Tower (B1B)12.515374265126.56944155.51038Non Tower (B2A)905.51626.563.53299.5250.5384Non Tower (B2B)8493.52508.54652764105396L&T Works179.557.57015.55962113650.525741.50148523554.7848498735.3007Total Concrete Qty for the day197Total Concrete Qty for the Month september3000Total Concrete Qty up to till date64000.5Last Month qty produce from B.P3878Qty produce for this Month2856Qty From RMC for this month144cumulative from batching plant till this month47626.5cumulative from RMC till this month16374Material stock in Batching Plant(approx)MaterialStock at siteConcrete production can be done(cum)20mm ( cum)155.233610mm (cum)219.2673sand (cum)985.32190cement (mt)382.91094Fly Ash (mt)11110 Admixture( kg)76951282.5Other if any
QA/QC ENGINEER0