Spine Progress. R. Bates. Status. MT, PA, HGM and I visited IHEP (29/03/203) Spine production explained NIIGraphite Produce raw TPG NIITAP Machine/polish and coat TPG Produce all ceramic parts IHEP Assemble Spines (including washer at CERN) Manage project in Russia - PowerPoint PPT PresentationTRANSCRIPT
Spine Progress
R. Bates
Status
• MT, PA, HGM and I visited IHEP (29/03/203)• Spine production explained
– NIIGraphite• Produce raw TPG
– NIITAP• Machine/polish and coat TPG• Produce all ceramic parts
– IHEP• Assemble Spines (including washer at CERN)• Manage project in Russia
• And production bottlenecks explained
Towards faster delivery
• Two new contracts for spine production to finish by 1st Jan 2005– NIIGraphite; cost = 19100USD
• Increased TPG production
– IHEP (subcontracts to NIITAP); cost = 31500USD• Increase Ceramic production, TPG polishing/machining• Increase spine assembly, including CERN based technician• Initial extra 7500USD then 3000USD for each month
production over 200 spines
Some action so far
• Regular phone meetings are held with IHEP• Better book keeping of spines at CERN• Greater understanding of bowed spines• Reduced spine damage in transport• More washer gluing jigs at CERN• Faster assembly at IHEP (double shifts)• New, fast, TPG production schedule produced by
NIIGraphite• Slight change in machined section of spine to increase
yield under investigation• Extra polishing equipment sourced at NIITAP
– Last two points will increase yield and rate at NIITAP
Present delivery rates
• Rates from database– Reason why NIKHEF is zero module production
• Spine rate just matching present module rate– Falls short of desired module rate
Spine and Module Rates(Spine numbers since 20/02/04)
0
10
20
30
40
50
60
outer middle inner outer middle outer outer inner inner middle
Manchester Valencia Geneva Melbourne NIKHEF Freiburg MPI
Spine rate Good spine rate Good Spines in last month
Predicted Module rate Module rate in last month