sqft studios€¦ · and receives final inspection and certificate of occupancy by june 30, 2019...

2

Upload: others

Post on 23-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SQFT Studios€¦ · and receives final inspection and certificate of occupancy by June 30, 2019 (the "SDC ADU Waiver Program"). WHEREAS, ADUs are integral to the achievement of the
Page 2: SQFT Studios€¦ · and receives final inspection and certificate of occupancy by June 30, 2019 (the "SDC ADU Waiver Program"). WHEREAS, ADUs are integral to the achievement of the