DESIGN OF SQUARE FOOTINGINPUT DATA TRIAL FOOTING THICKNESS
20.70 Mpa 300.0275.00 Mpa 16100.00 Kpa250.00 mm500.00 mm16.00
Min. ht. from NGL,(h) = 1.50 m
LOADS160.00 Kn70.00 Kn
246.00 Kn 68.803.581.89 m CHECK FOR BEAM SHEAR
d =Adopted Width, (B)= 1.90 m = 217.0 mm
Adopted Length, (L)= 1.90 mActual Supplied Area = 3.61
Asupplied> Req'd Area304.00 Kn84.21 Kpa
1.9084.21 Kpa m.
CHECK PUNCHING SHEAR209.00 mm459.00 mm x d709.00 mm 0.83
2,336.00 mmREINFORCEMENT DESIGN
276.6 Kn
Concrete strength, (Fc') = Footing thk., (t) =Yield strength, (Fy) = Deformed Bar, () =
Allow. Soil Pressure,(qa) =Column size, X-axis,(CX) =Column size, Y-axis,(CY) =
Soil unit weight,() = Kn/m3
Dead load, (PD)=Live load, (PL)=
PT = 1.10PD + PL=
qnet = qa - (h)-d) =AReq'd= PT/qa = m2
Let, B=L= AReq'd = dAVE + f/2
m2
Pu = 1.2PD + 1.6PL=qu = PU /Asupplied =
qnet =
Effective depth,(de)=(Cx +de)=(Cy +de)=
bo=
Vup = qu*[(B*L)-[(c1+de)*(c2+de)]} =
-
R = Mu = 629.36
3 0.85fc'Vu < Vc, Thickness Ok Fy
= 0.002708
= 10.05
USE 11
rebar spacing
Vcp = fc' bod bde2
=
As = *B*de
-
Footing Mark F-1Footing Date :
Checked by:
DESIGN OF SQUARE FOOTINGTRIAL FOOTING THICKNESS
mm Thickness Ok
Bending Moment along X-Axis
Mx=2
= 54.45 Kn.m GOVERNSBending Moment along Y-Axis
My=2
= 39.20 Kn.m
###m. To be safe, Vu Vc
Vu = 97.280
Vc = 6= 265.746
Vu < Vc,SAFE for Beam Shear
### 0.83
REINFORCEMENT DESIGN
mm
q u*L*[(B/2)-(C x/2)] 2
q u*B*[(L/2)-(C y/2)] 2
f f'c
-
=5.45E+07
= 0.728977.47E+07
0.85fc'
0.002708 1.4 = 0.00509P < Pmin, Use Pmin
= 2,021.60
pcs
16
= 172.4 mm.
1 - 1 - 2R
min Fy
m2
mmars both ways
-
Project : Location : Flr./Level : Designed by :
DESIGN OF SQUARE FOOTINGINPUT DATA TRIAL FOOTING THICKNESS
20.70 Mpa 300.0275.00 Mpa 16100.00 Kpa250.00 mm500.00 mm16.00
Min. ht. from NGL,(h) = 1.50 m
LOADS200.00 Kn115.00 Kn
335.00 Kn 68.804.872.21 m CHECK FOR BEAM SHEAR
d =Adopted Width, (B)= 2.30 m = 217.0 mm
Adopted Length, (L)= 2.30 mActual Supplied Area = 5.29
Asupplied> Req'd Area424.00 Kn80.15 Kpa
2.3080.15 Kpa m.
CHECK PUNCHING SHEAR209.00 mm459.00 mm x d709.00 mm 1.03
2,336.00 mmREINFORCEMENT DESIGN
397.9 Kn
Concrete strength, (Fc') = Footing thk., (t) =Yield strength, (Fy) = Deformed Bar, () =
Allow. Soil Pressure,(qa) =Column size, X-axis,(CX) =Column size, Y-axis,(CY) =
Soil unit weight,() = Kn/m3
Dead load, (PD)=Live load, (PL)=
PT = 1.10PD + PL=
qnet = qa - (h)-d) =AReq'd= PT/qa = m2
Let, B=L= AReq'd = dAVE + f/2
m2
Pu = 1.2PD + 1.6PL=qu = PU /Asupplied =
qnet =
Effective depth,(de)=(Cx +de)=(Cy +de)=
bo=
Vup = qu*[(B*L)-[(c1+de)*(c2+de)]} =
-
R = Mu = 629.36
3 0.85fc'Vu < Vc, Thickness Ok Fy
= 0.004021
= 12.17
USE 13
rebar spacing
Vcp = fc' bod bde2
=
As = *B*de
-
Footing Mark F-2Footing Date :
Checked by:
DESIGN OF SQUARE FOOTINGTRIAL FOOTING THICKNESS
mm Thickness Ok
Bending Moment along X-Axis
Mx=2
= 96.84 Kn.m GOVERNSBending Moment along Y-Axis
My=2
= 74.66 Kn.m
###m. To be safe, Vu Vc
Vu = 148.953
Vc = 6= 321.692
Vu < Vc,SAFE for Beam Shear
### 1.03
REINFORCEMENT DESIGN
mm
q u*L*[(B/2)-(C x/2)] 2
q u*B*[(L/2)-(C y/2)] 2
f f'c
-
=9.68E+07
= 1.071019.04E+07
0.85fc'
0.004021 1.4 = 0.00509P < Pmin, Use Pmin
= 2,447.20
pcs
16
= 174.33 mm.
1 - 1 - 2R
min Fy
m2
mmars both ways
-
Project : Location : Flr./Level : Designed by :
DESIGN OF SQUARE FOOTINGINPUT DATA TRIAL FOOTING THICKNESS
20.70 Mpa 300.0275.00 Mpa 16100.00 Kpa250.00 mm500.00 mm16.00
Min. ht. from NGL,(h) = 1.50 m
LOADS100.00 Kn70.00 Kn
180.00 Kn 68.802.621.62 m CHECK FOR BEAM SHEAR
d =Adopted Width, (B)= 1.70 m = 217.0 mm
Adopted Length, (L)= 1.70 mActual Supplied Area = 2.89
Asupplied> Req'd Area232.00 Kn80.28 Kpa
1.7080.28 Kpa m.
CHECK PUNCHING SHEAR209.00 mm459.00 mm x d709.00 mm 0.73
2,336.00 mmREINFORCEMENT DESIGN
205.9 Kn
Concrete strength, (Fc') = Footing thk., (t) =Yield strength, (Fy) = Deformed Bar, () =
Allow. Soil Pressure,(qa) =Column size, X-axis,(CX) =Column size, Y-axis,(CY) =
Soil unit weight,() = Kn/m3
Dead load, (PD)=Live load, (PL)=
PT = 1.10PD + PL=
qnet = qa - (h)-d) =AReq'd= PT/qa = m2
Let, B=L= AReq'd = dAVE + f/2
m2
Pu = 1.2PD + 1.6PL=qu = PU /Asupplied =
qnet =
Effective depth,(de)=(Cx +de)=(Cy +de)=
bo=
Vup = qu*[(B*L)-[(c1+de)*(c2+de)]} =
-
R = Mu = 629.36
3 0.85fc'Vu < Vc, Thickness Ok Fy
= 0.001982
= 9.00
USE 9
rebar spacing
Vcp = fc' bod bde2
=
As = *B*de
-
Footing Mark F-3Footing Date :
Checked by:
DESIGN OF SQUARE FOOTINGTRIAL FOOTING THICKNESS
mm Thickness Ok
Bending Moment along X-Axis
Mx=2
= 35.87 Kn.m GOVERNSBending Moment along Y-Axis
My=2
= 24.56 Kn.m
###m. To be safe, Vu Vc
Vu = 69.327
Vc = 6= 237.772
Vu < Vc,SAFE for Beam Shear
### 0.73
REINFORCEMENT DESIGN
mm
q u*L*[(B/2)-(C x/2)] 2
q u*B*[(L/2)-(C y/2)] 2
f f'c
-
=3.59E+07
= 0.536666.68E+07
0.85fc'
0.001982 1.4 = 0.00509P < Pmin, Use Pmin
= 1,808.80
pcs
16
= 194.5 mm.
1 - 1 - 2R
min Fy
m2
mmars both ways
F1F2F3