square update presentation
TRANSCRIPT
IH35E
Open Summer 2
013
KEV IN SLOAN STUD IO
Representative Projects:
The AT&T Center for the Performing Arts
SABRE World Headquarters
Sprint World Headquarters
Vitruvian Park
George W. Bush Presidential Library
Downtown Carrollton Parking Plan
IH35E
Belt Line Road
Vandergriff
5th St
Main St
4th St
Elm St B
roadway
Carroll St
Main
St
EX
ISTIN
G P
AR
KIN
G -
SEPT.
20
10
Carroll Street81 Spaces
“In” Square46 Spaces
On Street: 201Off Street: 191
Gravely62 Spaces
IH35E
Open Summer 2
013
PU
BLI
C P
AR
KIN
G T
OD
AY
Vandergriff43 Off Street 39 On Street
Spaces
Union At Carrollton Square 314 Apts.
Phase 2 Opens 2/2014
Public Garage125 Spaces
Main St20 Spaces
Gravely10 Frost +52 Spaces
On Street84 Spaces
“In” Square46 Spaces
NEW On Street84 Spaces
City Lease18 Spaces
NEW On Street
84 Spaces
75 On StreetSpaces
On Street: 335 Off Street: 296 Net Gain Over 3 Years = 239 Spaces
Reference:
IH-35E and Belt Line RoadLooking South
IH-3
5E a
nd
Belt
Lin
e R
oad
Square Vandergriff Drive
DARTStation
Retention Pond
Hike andBike Trail
Main StreetPioneer Park
GreenParkingLot
Crosby Rec.
Site
City of Carrollton’sInfrastructure Investment Costs 2008-2013:
Item Cost
Catalyst Development Infrastructure $8,229,296
Crosby Recreational Center Reconstruction $2,800,000
Green Parking Lot $477,807
South Main Street and Pioneer Park $1,200,000
Retention Pond $950,000
Hike and Bike Trail (Phase 1) $867,775
Vandergriff Drive (Funded by NCTCOG Grant) $1,840,800
Total $16,365,678