Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme, Property bearing CTS No. 1794 of Mahim Division, Mumbai 9.10 Crs. Establish RO(HQ) 1 to 17 2 Ahura Builders "The Latitude", Sr. no. 18 Salunkhe Vihar, Village - Kondhwa Khurd, Lane No. 21, NIBM Road, Dist - Pune 98 Crs. Establish RO(HQ) 18 - 33 3 Sukhawani Buildcon Pramoters and Builders, "Sukhawani Camus", Sr. No. 177 - H. No. 2, 187-H. No. 3, 188 H. No. - 2 CTS No. 4858, 4858/1, 4858/2, Pune-Mumbai Road, Near Kalasagar Hotel, Pimpri, Pune 30.26 Crs. Renewal (Expansion) RO(HQ) 34 - 45 4 Appasaheb Nalawade Gadhinglaj Taluka S.S.K. Ltd., Harali, Tal - Gadhinglaj, Dist - Kolhapur 56.18 Crs. Renewal JD(WPC) 46 - 63 --- Fresh Agenda 1 Ananta Landmark Pvt. Ltd., Sr. 113/7P, 113/8P, 113/9/2P, 113/14P, 113/17P, 114/2P, 114/3, 114/4, 114/5, 114/6, 114/7, 114/8.Village - Balkum, Dist - Thane 337.60 Crs. Establish RO(HQ) 64 - 84 2 Trunapushpa Co-op Hsg Soc. Ltd., CTS No. 315, TPS No. 1, Panchpakhadi, Thane 97.40 Crs. Establish RO(HQ) 85 - 94 3 Jagtap - Patil Promoters & Builders "Engracia", S. No. 24(P), CST No. 625(P), Plot No. 2, Pimple Gurav, Pune 300 Crs. Establish RO(HQ) 95 - 107 4 Stratford Reality LLP, "Stratford", S. No. 102/A/1B, F.P.No. 3, Part Kalyani Nagar, Village - Yerawada, T.P.S. No. 1, Dist - Pune. 200.33 Crs. Establish RO(HQ) 108 - 119 5 Samda (Saundadi) Larger Minor Project, Vill - Samda, Tal - Daryapur, Dist - Amravati. 49.72 Crs. Establish RO(HQ) 120 - 132 6 Rajura Larger Minor Project, Vill - Rajura, Tal - Chandur Bazar, Dist - Amravati 44.78 Crs. Establish RO(HQ) 133 - 145 7 Bhagadi Larger Minor Irrigation Project, Vill - Talni, Tal - Chandur Bazar, Dist - Amravati 19.54 Crs. Establish RO(HQ) 146 - 158 8 JWR Logistics Private Limited, Sr. No. 13, 15 to 17, 18, 20 & 21, Village - Padeghar, Post - Kundevahal, Off NH-4B, Tal - Panvel, Dist - Raigad 40.10 Crs. 1st Operate RO(HQ) 159 - 173 9 JWC Logistics Private Limited, Sr. No. 69/91, Village - Palaspe, Tal - Panvel, Dist- Raigad 45 Crs. 1st Operate RO(HQ) 174 - 188 10 Bharat Agri Fert & Realty Ltd., Sr. No. 112/1B, 2A, 3 to 12, 13A, 14, Majiwada, Thane 38.67 Crs. 1st Operate RO(HQ) 189 - 215 11 Runwal Construction, Gut No. 21/B1 and 21/B2, Vhitalsar, Manpada, Thane 80.74 Crs. 1st Operate RO(HQ) 216 - 236 12 Pimpri Chinchwad Municipal Corporation, Vetalnagar Project, S. No. 100, Vetalnagar, Pimpri. 4.01 Crs. 1st Operate RO(HQ) 237 - 248 13 Pimpri Chinchwad Municipal Corporation, Milindnagar Project, S. No. 12, 13, 14(P), Milind Nagar, Pimpri. 4.16 Crs. 1st Operate RO(HQ) 249 - 260 14 Rainbow Housing Company "Park Royale", S. No. 14/1/1, 14/1/2, Rahatni, Pimpri Chinchwad, Pune 37 Crs. Renewal RO(HQ) 261 - 273 15 St. Peters High School, Plot No. 504, A/p Panchgani, Tal - Mahabaleshwar, Dist - Satara 4.8 Crs. Renewal RO(HQ) 274 - 289 16 Artheon Battery Company Pvt. Ltd., E-11, MIDC Malegaon, Sinnar, Nashik 50.66 Crs. Renewal RO(HQ) 290 - 303 JD(WPC) 1 ` AS(T) 0 RO(HQ) 19 JD(APC) 0 PSO 0 Total 20 List of Cases to be submitted before th Consent Committee Meeting of 2014-15 scheduled on 17.05.2014 at 02:30 p.m. (Booklet No. 8)

Upload: others

Post on 07-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

Sr. No. Name & Address Capital

Investment Applied For Section Page No. Remarks

Resubmission1

Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme, Property bearing CTS No. 1794 of Mahim Division, Mumbai

9.10 Crs. Establish RO(HQ) 1 to 17

2

Ahura Builders "The Latitude", Sr. no. 18 Salunkhe Vihar, Village - Kondhwa Khurd, Lane No. 21, NIBM Road, Dist - Pune 98 Crs. Establish RO(HQ) 18 - 33

3

Sukhawani Buildcon Pramoters and Builders, "Sukhawani Camus", Sr. No. 177 - H. No. 2, 187-H. No. 3, 188 H. No. - 2 CTS No. 4858, 4858/1, 4858/2, Pune-Mumbai Road, Near Kalasagar Hotel, Pimpri, Pune

30.26 Crs. Renewal (Expansion) RO(HQ) 34 - 45

4Appasaheb Nalawade Gadhinglaj Taluka S.S.K. Ltd., Harali, Tal - Gadhinglaj, Dist - Kolhapur

56.18 Crs. Renewal JD(WPC) 46 - 63---

Fresh Agenda

1

Ananta Landmark Pvt. Ltd., Sr. 113/7P, 113/8P, 113/9/2P, 113/14P, 113/17P, 114/2P, 114/3, 114/4, 114/5, 114/6, 114/7, 114/8.Village - Balkum, Dist - Thane

337.60 Crs. Establish RO(HQ) 64 - 84

2Trunapushpa Co-op Hsg Soc. Ltd., CTS No. 315, TPS No. 1, Panchpakhadi, Thane 97.40 Crs. Establish RO(HQ) 85 - 94

3Jagtap - Patil Promoters & Builders "Engracia", S. No. 24(P), CST No. 625(P), Plot No. 2, Pimple Gurav, Pune

300 Crs. Establish RO(HQ) 95 - 107

4

Stratford Reality LLP, "Stratford", S. No. 102/A/1B, F.P.No. 3, Part Kalyani Nagar, Village - Yerawada, T.P.S. No. 1, Dist - Pune. 200.33 Crs. Establish RO(HQ) 108 - 119

5Samda (Saundadi) Larger Minor Project, Vill - Samda, Tal - Daryapur, Dist - Amravati. 49.72 Crs. Establish RO(HQ) 120 - 132

6Rajura Larger Minor Project, Vill - Rajura, Tal - Chandur Bazar, Dist - Amravati 44.78 Crs. Establish RO(HQ) 133 - 145

7Bhagadi Larger Minor Irrigation Project, Vill - Talni, Tal - Chandur Bazar, Dist - Amravati 19.54 Crs. Establish RO(HQ) 146 - 158

8

JWR Logistics Private Limited, Sr. No. 13, 15 to 17, 18, 20 & 21, Village - Padeghar, Post - Kundevahal, Off NH-4B, Tal - Panvel, Dist - Raigad

40.10 Crs. 1st Operate RO(HQ) 159 - 173

9JWC Logistics Private Limited, Sr. No. 69/91, Village - Palaspe, Tal - Panvel, Dist- Raigad

45 Crs. 1st Operate RO(HQ) 174 - 188

10Bharat Agri Fert & Realty Ltd., Sr. No. 112/1B, 2A, 3 to 12, 13A, 14, Majiwada, Thane

38.67 Crs. 1st Operate RO(HQ) 189 - 215

11 Runwal Construction, Gut No. 21/B1 and 21/B2, Vhitalsar, Manpada, Thane 80.74 Crs. 1st Operate RO(HQ) 216 - 236

12Pimpri Chinchwad Municipal Corporation, Vetalnagar Project, S. No. 100, Vetalnagar, Pimpri.

4.01 Crs. 1st Operate RO(HQ) 237 - 248

13Pimpri Chinchwad Municipal Corporation, Milindnagar Project, S. No. 12, 13, 14(P), Milind Nagar, Pimpri.

4.16 Crs. 1st Operate RO(HQ) 249 - 260

14Rainbow Housing Company "Park Royale", S. No. 14/1/1, 14/1/2, Rahatni, Pimpri Chinchwad, Pune

37 Crs. Renewal RO(HQ) 261 - 273

15St. Peters High School, Plot No. 504, A/p Panchgani, Tal - Mahabaleshwar, Dist - Satara

4.8 Crs. Renewal RO(HQ) 274 - 289

16 Artheon Battery Company Pvt. Ltd., E-11, MIDC Malegaon, Sinnar, Nashik 50.66 Crs. Renewal RO(HQ) 290 - 303

JD(WPC) 1 `AS(T) 0RO(HQ) 19JD(APC) 0PSO 0Total 20

List of Cases to be submitted before th Consent Committee Meeting of 2014-15 scheduled on 17.05.2014 at 02:30 p.m. (Booklet No. 8)

Page 2: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    1 

 

CC-Resubmission Agenda no. 1 Region : SRO Mumbai I Section :RO(HQ) Date :

Name & Address M/s.Matoshree Infrastructure Pvt. LTD., ShivajiPark Scheme, Property bearing CTS No.1794 of Mahim Division,Mumbai

Consent For C to E

Capital Investment Rs.9.10

Previous Consent Validity

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water consumption - 9 CMD.

Sewage Generation - 7 CMD

Connected to Municipal sewer line.

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

Application for grant of Consent to Establish for construction of residential project for

Total Plot area -369.57 Sq. mtrs

Total Construction BUA -923.67 Sq. mtrs

Page 3: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    2 

 

Said project falls under CRZ Area and not obtained CRZ Clearance from competent authority.

SRO Mumbai-I reported that project proponent has completed G+7 Storey and now constriction activity is stopped.

The case was discussed in CC Meeting dated 24/12/2013 and it was decided to keep case in abeyance and refer matter to MCZMA for starting construction without obtaining CRZ Clearance.

Accordingly letter issued addressed to Member Secretary, MCZMA Dated 16/1/2014 regarding referring matter to MCZMA for starting construction without CRZ Clearance.

PP has communicated letter dated 30/4/2014 which is received in HQ Dated 5/5/2014 in which PP has submitted their explanation in brief (Copy attached)

Recommendation of SRO/RO

RO recommended the grant of C to E at higher level.

Page 4: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    3 

 

Agenda no. 2 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 22/01/2014

Ro (HQ) Date of receipt;- 14/02/2014d

Name & Address M/s. Ahura Builders “The Latitude”, S.No. 18, Salunkhe Vihar, Village : Kondhwa Khurd, Lane 21, NIBM Road, Dist : Pune.

Consent For C to E

Capital Investment 98.00 Crore

Previous Consent Validity

-

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- Water Consumption :- 174.0 CMD , Effluent Generated :- 139.0 CMD

Proposed STP Capacity :- 150.0 CMD

Water Cess Assessment Done :- Paid Upto :

Other Relevant Information

Applied for C to E Residential Commercial & School Bldg.

Plot Area 14,900.0 sq.mt Built up area 46,307.45 sq.mt

EC Status Applied Dated 07/07/2011

River Distance @ 1.0 Km Name of River Mutha (A-II)

Water Consumption 174.0 CMD Effluent Generated 139.0 CMD

STP Capacity 150.0 CMD Recycle water 64.5 CMD

Bio-degradable 276.49 Kg/D Treatment OWC

Non-Boi degradable 200.0 Kg/D Treatment Local Body

No of DG Sets 5 Capacity 320 x 2, 400, 40, 82.5 KVA

Construction status Started

& Stopped

Date of Visit 22/01/2014

PP has started construction of 3 nos of buildings, at the time of visit PP informed that they have stopped the construction activity from August 2013. PP also submitted

Page 5: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    4 

 

undertaking on 100 Rs stamp paper stated that construction activity has been stopped on site from August 2013.

Resubmission 

• The  application  for  consent  to  establish  was  discussed  in  CC  meeting  held  on 29/04/2014, during discussion  it was decided  to  issue SCN  for  refusal of  consent  to establish  and  stop work  as  PP  has  started  construction work without  C  to  E  and environment clearance. Board has issued SCN on 09/05/2014. 

• After  hosting  minutes  of  meeting  on  website  applicant  has  submitted  reply  on 06/05/2014  in  reply applicant  stated  that “we have already  stopped  the work  from August 2013 and affidavit  for the same was submitted along with the application of consent  to establish. We assure you  that we will not  initiate any construction work before obtaining Environmental clearance and Consent to Establish”. 

• In view of above we may consider consent to establish with BG & BR with affidavit. 

Recommendation of SRO/RO

Decision of grant of consent to establish may be taken at higher level

Page 6: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    5 

 

Agenda no. 3 Region : RO PUNE Section :RO(HQ) Date :

Name & Address M/s . Sukhawani Buildcon Pramoters and Builders, “Sukhawani Campus” 

Sr.No. 177‐ H.No. 2, 187‐ H.No. 3, 188 H.No‐2 CTS No.4858,4858/1,4858/2, Pune‐Mumbai Road, Near Kalasagar Hotel, Pimpri, Pune. 

Consent For C to R + Expansion

Capital Investment 30.26 Crore

Previous Validity 30/04/2012

Industry Type O08 Building & Construction Projects more than 20,000 Sq. mtr.

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-Water Consumption: 235.0 CMD, Effluent generated 182.0 CMD. STP Proposed

of Capacity : 185.0 CMD

BG Details Amount : Validity :

BG Obtained against :

Other Relevant Information

1. PP has applied for renewal of consent. 2. Earlier consent was valid upto 31/03/2013 for residential project. 3. PP  has  obtained  consent  to  operate  for  total  plot  area  13603.33  sq.mtrs  and  BUA 

20145.91  sq.mtrs  on  dated  29/05/2010  for  same  area  PP  has  obtained  Environment clearance from MoEF on dated 22/07/2008. 

4.  PP has obtained amendment in environment clearance on dated 30th November 2012 in built up area from 20145.91 to 20894.78 sq.mtrs (additional 1 building) 

5. For  this  847.87  sq.mtrs  additional  builtup  area  applicant  has  not  obtained  consent  to establish. 

6. Now  applicant  has  applied  for  renewal  for  existing  20145.91  and  additional  847.87 sq.mtrs. 

7. Capital  investment  in  environment  clearance  299.0Cr  and  PP  submitted  CA  certificate showing CI 30.26 Cr. Accordingly fees paid. 

8. Capital  investment  in  consent  to  operate  22.0  Crore  now  30.26  increased  due  to expansion.. 

9. For pert project Total water consuming 235.0 m3/day & generating about 182.0 m3/day of sewage, which PP has provided STP of capacity 185.0 m3/day. 

10. PP has not provided own composting facility for disposal of biodegradable solid waste. at present the solid waste disposed through PCMC facility. 

11. 1 no. of DG sets each having capacity, 125 Kva.  12. PP has not submitted bank guarantee of Rs.10 lakh as per consent to operate condition. Resubmission:‐ 

Page 7: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    6 

 

• Application for consent to establish was discussed in CC meeting held on 31/01/2014. During discussion it was decided to issue SCN for non provision of MSW plant as per consent condition. Board has issued SCN on 11/02/2014. 

• Applicant has not submitted reply of the SCN issued but submitted reply of query letter issued by SRO as per reply PP has submitted additional consent fees from 30/03/2012, but not mentioned about MSW treatment. 

• In view of above we may refused consent to operate or we may give 3 month time with separate BG for installation of MSW plant. 

• Submitted for CC discussion.  

Recommendation of SRO/RO

RO Pune has recommended that the decision for grant of consent to operate may be taken at higher level after receipt of justified reply of the query letter. 

Page 8: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    7 

 

Agenda no. 4 Region : SRO Kolhapur Section : JD(WPC) Date :25.02.2014

Name & Address Appasaheb Nalawade Gadhinglaj Taluka S.S.K Ltd , Harali,Tal-Gadhinglaj,Dist-Kolhapur

Consent For CR

Capital Investment 5618 Lacs

Previous Consent Validity

31/12/2013

Industry Type R74 Sugar (excluding Khandsari)

Industry Category Red

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- Industrial effluent generation is 274 CMD.

ETP is provided with secondary treatment. The JVS analysis results dtd.21.01.2013, 21.02.25013 are submitted which are exceeding

Water Cess Assessment Done : April 2013 Paid Upto : Nov 2013

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period 2012-13

Other Relevant Information

• Industry has not submitted Bank Guarantees of Rs.5.0 Lakhs, Rs. 2.0 Lakhs and Rs.2.0 Lakhs imposed in the previous consent for O & M of ETP and APC system, to avoid ingress of bagasse and towards CREP compliance respectively.

• SRO, Kolhapur has issued letter to Industry on dt.30.12.2013 for Non compliances of consent conditions and Industry replied vide letter dt.04.01.2014.

Resubmitted:

Industry vide letter dtd.08.04.2014 replied to the SCN motioning following points;

Sr. No.

SCN Dtd.29.03.2014

Reply of Industry vide Letter dtd.08.04.2014

1. The JVS analysis reports are exceeding the consented limits,

Due to some Electrical supply cable work of ETP was idle for two Hours. That day it was our planned stoppage when the JVS was collected. Immediately after completion of cable work, ETP was

Page 9: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    8 

 

started. Till completion of crushing season 2013-14 it was working efficiently with proper results as per the norms.

2. You have not provided 15 days storage tank for treated effluent,

We already have started the work of 15 days storage tank of treated effluent. The excavation work is in hand. The storage tank will be ready in all respect before starting of crushing season 2014-15.

3 Air pollution control system is not provided as per the CREP Norms,

The issue of providing wet scrubber / bag filters to all the boilers as per CREP norms is put up to Hon. Management for Approval. It is expected that the issue will be solved before starting of crushing season 2014-15.

4 Effluent generation is not achieving 100 ltrs of per ton cane crushing

Planning to provide various arrangement in the plant to reduce waste water generation. We have already installed various instruments like cooling tower single entry condenser, hot condensate for mill imbition, continuous sulphur burner cooling water is recirculated in the service tank to minimize water consumption. Maintaining house keeping properly we are trying to achieve effluent generation 100 Ltrs per ton of cane.

5 using kaccha laggons to store the untreated effluent

The existing kuccha lagoons will be scrapped during this season 2014-15 forever. Now our crushing season in over and distillery also is stopped so generation of waste water, spent wash is automatically stopped.

6 You have not submitted the Bank Guarantees as per the previous consent condition

Bank Guarantee as per the previous consent conditions will be made shortly.

Recommendation of SRO/RO

SRO has recommended  that the decision of the consent may be taken at higher level. 

Page 10: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    9 

 

CC-Fresh Agenda Agenda no. 1

Region : RO Thane Section : RO(HQ)- Section Fresh Case Date :

Name & Address M/s. Ananta Landmarks Pvt Ltd ,

Village Majiwade :Sr.113/7P,113/8P,113/9/2P,113/14P,113/17P,114/1P,114/2P,114/3,114/4,114/5,119P,114/10P,115/4/2,115/5,115/6,115/7/2,115/8/2,115/9,115/10/2,115/11,115/12,115/13,115/14,115/15

Village Balkum :Sr. No. 212/1, 212/1P, 212/3P, 212/4P, 213/1P, 229/1/2P, 229/2/2 Dist: Thane

Consent For CE

Capital Investment 33760 Lacs

Previous Consent Validity

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done :

BG Details Amount :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. Ananta Landmarks Pvt Ltd, “ Kalpataru Arena” Village : Balkum Thane has applied for consent to Esunder :

For Area Details of Project :-

Total Plot Area : 26,900 Sq. meters

Page 11: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    10 

 

Total Construction BUA Area : 92,303.44 Sq. meters Proposed project details :- Proposed project is residential and commercial development project. Capital investment of Project is Rs. – 337.60 Crs.

The project proponent has obtained Environment Clearance from Govt of Maharashtra for Residential c672/TC-II Dated: 25/03/2014 having area details as under : For Area Details of Project :-

Total Plot Area : 26,900 Sq. meters Total Construction BUA Area : 92,303.44 Sq. meters

Details of water consumption as under :-

Water consumption – 368.00 CMD

Sewage Generation –305.00 CMD

Proposed STP of the capacity- 330 CMD for treatment of sewage.

Non-hazardous Waste:

Bio degradable Waste : 518 Kg/day

Non- Bio Degradable : 555 Kg/day

STP Sludge : 31 kg/day

Proposed MSW Treatment facility (organic waste convertor) for treatment and disposal of MSW.

Proposed to provide DG sets – 750 KVA and 250 KVA

Project proponent has paid consent fees of Rs. 6,75,300.00/- towards fees for consent to establish.

Present Status of Construction :-

As per visit report dated: 24/04/2014

• No any development work is started.

Recommendation of SRO/RO

Consent to Establish May be granted.

Page 12: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    11 

 

Agenda no. 2 Region : RO Thane Section : RO(HQ) Section – Fresh Case Date : /05/2014

Name & Address M/s. Trunapushpa Co-Op Hsg Soc Ltd , CTS No. 315, TPS No. 1, Panchpakhadi, Thane

Consent For CE

Capital Investment 9740 Lacs

Previous Consent Validity

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. Trunapushpa Co-Op Hsg Soc Ltd , CTS No. 315, TPS No. 1, Panchpakhadi, Thane has applied for consent to Establish for proposed Residential project with Slum Re-Development Scheme construction project to MPC Board having area details as under :

For Area Details of Project :-

Total Plot Area : 10,621.90 Sq. meters Total Construction BUA Area : 48,928.68 Sq. meters Proposed project details :- Proposed Residential project with Slum Re-Development Scheme construction project comprising of 8 buildings covering

Page 13: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    12 

 

a. Sale buildings - 196 flats, 12 shops b. Rehab buildings- 448 flats, 9 shops Capital investment of Project is Rs. – 97.4 Crs (Land cost is not mentioned in the undertaking of capital investment).

The project proponent has applied for Environment Clearance from Govt of Maharashtra for Residential project with Slum Re-Development Scheme construction project and project proponent has submitted copy of minutes of meeting of the 18th meeting of the SEAC -2 ( MMR) held on 19th , 20th and 21st September 2013 having area details as under : For Area Details of Project :-

Total Plot Area : 10,621.90 Sq. meters Total Construction BUA Area : 48,928.68 Sq. meters

Details of water consumption as under :-

Water consumption – 450.00 CMD

Sewage Generation –425.00 CMD

Proposed STP of the capacity- 450 CMD for treatment of sewage.

Non-hazardous Waste:

Bio degradable Waste : 980 Kg/day

Non- Bio Degradable : 656 Kg/day

STP Sludge : 40 kg/day

Proposed MSW Treatment facility (organic waste convertor) for treatment and disposal of MSW.

Proposed to provide DG sets – 350 KVA and 200 KVA and 140 KVA

Project proponent has paid consent fees of Rs. 1,25,100/-- towards fees for consent to establish.

Present Status of Construction :-

• Construction yet not started. SRO Thane-I has issued query letter vide letter dated: 20/03/2014 and reminder letter dated: 21/04/2014, asking to submit details such as cost of land in the undertaking for capital investment and PAN , PIN code details. Project proponent not responded to these letters.

Recommendation of SRO/RO

SRO Thane-I submitted that, Land cost is not mentioned in the undertaking of capital investment hence, it is not possible to estimate requisite consent fee. Letter was issued to the pp accordingly on 20/03/2014 followed by reminder on 21/04/2014. Not responded to this office letter, hence consent may not be granted.

Page 14: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    13 

 

Agenda no. 3 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 24/01/2014

Ro (HQ) Date of receipt;- 10/03/2014

Name & Address M/s. Jagtap – Patil Promoters & Builders “Engracia” S.No. 24 (P), C.S.T. No. 625 (P) Plot No. 2, Pimple Gurav, Pune 411061

Consent For C to E

Capital Investment 300.00 Crore

Previous Consent Validity

-

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- Water Consumption :- 469.42 CMD , Effluent Generated :- 343.51 CMD

Proposed STP Capacity :- 400 (260 + 140) CMD

Water Cess Assessment Done :- Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

--

Page 15: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    14 

 

Other Relevant Information

Applied for C to E Residential & Commercial Shops

Plot Area 31,800 sq.mt Built up area 52,676.56 sq.mt

EC Status Applied Dated 29/10/2013

River Distance @ 450 mtrs Name of River Pawana

Water Consumption 469.42 CMD Effluent Generated 343.51 CMD

STP Capacity 400.0 CMD Recycle water 193.1 CMD

Bio-degradable 691.24 Kg/D Treatment Manure

Non-Boi degradable 310.65 Kg/D Treatment Local Body

No of DG Sets 2 Capacity 75 + 600 KVA

Construction status Not Started Date of Visit 03/02/2014

Applicant has not started construction activity, we may consider consent to establish subject to submission of Architect plan showing STP & MSW location as site located 450mtrs from Pawana river.

Page 16: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    15 

 

Agenda no. 4 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 30/01/2014

Ro (HQ) Date of receipt;-

Name & Address M/s. Stratford Reality LLP, “Stratford”, S.No. 102A/1B, F.P.No. 3, Part Kalyani Nagar, Village-Yerawada, T.P.S.No.1, Dist. Pune, State Maharashtra.

Consent For C to E

Capital Investment 200.33 Cr.

Previous Consent Validity

-

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- Water Consumption :- 55.50 CMD , Effluent Generated :- 46.0 CMD

Proposed STP Capacity :- 50.0 CMD

Water Cess Assessment Done :- Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

--

Page 17: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    16 

 

Other Relevant Information

Applied for C to E Residential

Plot Area 18556 sq.mt Built up area 42129.22 sq.mt

EC Status Obtained Dated 21/03/2013

River Distance 600 mtrs Name of River Mula-Mutha

Water Consumption 55.50 CMD Effluent Generated 46.0 CMD

STP Capacity 50.0 CMD Recycle water 18.0 CMD

Bio-degradable 123.0 Kg/D Treatment OWC

Non-Boi degradable 53.0 Kg/D Treatment Local Body

No of DG Sets 2 Capacity 750.0 KVA

Construction status Not Started Date of Visit 03/02/2014

In view of above we may consider consent to establish with BG of Rs 10 lakh for compliance of consent condition.

Recommendation of SRO/RO

Page 18: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    17 

 

Agenda no. 5

Region : Amravati Section : RO(HQ) Date : /05/2014

Name & Address M/s. Samda(Saundadi) Larger Minor Project, Vill-Samda.Tal-Daryapur,Dist-Amravati .

Consent For CE

Capital Investment 49.72 Crs

Previous Consent Validity

Industry Type O08 Building and Construction projects more than 20,000 sq.mtr.

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s.Samda(Saundadi) Larger Minor Project has applied for consent to establish for Larger Medium Irrigation Project Near Vill Samda,Tal-Daryapur,Dist-Amravati. For Area Details of Project :- Command Area -1529 ha. Live Storage-9.701 mm3. Capital investment of part operate Project is Rs. – 49.72 Crs

The project requires Environmental Clearance from Govt. of Maharashtra as per EIA notification 2006.

Page 19: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    18 

 

There is no any land belongs to Forest Dept. The procedure of public hearing is under progress. They have started establishment of said project & approx.50 % work is completed.

Recommendation of SRO/RO

SRO Amravati-1 has recommented for grant of Consent to Establish upto commissioning of the unit or 5 years from the issue of consent whichever is earlier

Page 20: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    19 

 

Agenda no. 6

Region : Amravati Section : RO(HQ) Date : /05/2014

Name & Address M/s. Rajura Larger Minor Project, Vill-Rajura,Tal-Chandur Bazar,Dist-Amravati .

Consent For CE

Capital Investment 44.78 Crs

Previous Consent Validity

Industry Type O08 Building and Construction projects more than 20,000 sq.mtr.

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. Rajura Larger Minor Project has applied for consent to establish for Larger Medium Irrigation Project Near Vill-Rajura,Tal-Chandur Bazar,Dist-Amravati For Area Details of Project :- Command Area -1000 ha. Live Storage-5.334 mm3. Capital investment of part operate Project is Rs. – 19.54 Crs

The project requires Environmental Clearance from Govt. of Maharashtra as per EIA notification 2006. There is no any land belongs to Forest Dept. The procedure of public hearing is under progress. They have started establishment of said project & approx. 3 % work is completed.

Recommendation of SRO/RO

SRO Amravati-1 has recommended for grant of Consent to Establish upto commissioning of the unit or 5 years from the issue of consent whichever is earlier

Page 21: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    20 

 

Agenda no. 7

Region : Amravati Section : RO(HQ) Date : /05/2014

Name & Address M/s. Bhagadi Larger Minor Irrigation Project, Vill-Talni,Tal-Chandur Bazar,Dist-Amravati .

Consent For CE

Capital Investment 19.54 Crs

Previous Consent Validity

Industry Type O08 Building and Construction projects more than 20,000 sq.mtr.

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. Bhagadi Larger Minor Irrigation Project has applied for consent to establish for Larger Medium Irrigation Project Near Vill-Talni,Tal-Chandur Bazar,Dist-Amravati For Area Details of Project :- Command Area -985 ha. Live Storage-5.366 mm3. Capital investment of part operate Project is Rs. – 19.54 Crs

The project requires Environmental Clearance from Govt. of Maharashtra as per EIA notification 2006. There is no any land belongs to Forest Dept. The procedure of public hearing is under progress. They have started establishment of said project & approx.80 % work is completed.

Recommendation of SRO/RO

SRO Amravati-1 has recommended for grant of Consent to Establish upto commissioning of the unit or 5 years from the issue of consent whichever is earlier

Page 22: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    21 

 

Agenda no. 8 Region : Raigad Section : RO(HQ) Date: /05/2014

Name & Address M/s. JWR Logistics Private Limited., Sr. No. 13,15 to 17,18,20 & 21, Village Padeghar, Post Kundevahal, Off NH-4B, Tal. Panvel, Dist:- Raigad.

Consent For CO

Page 23: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    22 

 

Capital Investment 41.10 Crs.

Previous Consent Validity

Industry Type R 38 storage of Hazardous chemicals

Industry Category Red

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions

Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. JWR Logistics Private Limited has applied for consent to first operate with amendment  in  consent  at  Sr. No.  13,15  to  17,18,20 &  21,  Village Padeghar, Post Kundevahal, Off NH-4B, Tal. Panvel, Dist:- Raigad.  Earlier Consent granted for C to E vide no.: MPCB/ROR/CE1204000851/2012/C-201 For: Container Freight Station cum Warehouse (Custom Bonded) (without storage of Hazardous Waste & Hazardous chemicals) Now applied for: Amendment in Consent to Operate for storage handling and transportation of hazardous cargos. Capital investment of part operate Project is Rs. – 41.10 Crs   SRO Raigad  I has  commented  that  the Environment Clearance  is not  required  for storage of hazardous chemical listed in Annexure I as the quantities are lesser than those mentioned in Sch II of MSIHC Rules 989.    Details of water consumption as under :‐  Water consumption – 16.50 CMD  

Page 24: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    23 

 

Sewage Generation – 13.00 CMD  DG sets ‐ 250 KVA x 1 No.   Project proponent has paid consent fees of Rs. 3,00,000/‐‐ towards fees for consent to operate. 

Recommendation of SRO/RO

SRO Raigad I has recommended the case for grant of operate for shorter period

Agenda no. 9 Region : Raigad Section : RO(HQ) Date: /05/2014

Name & Address M/s. JWC Logistics Private Limited., Sr. No. 69/91, Village Palaspe, Tal. Panvel, Dist:- Raigad.

Consent For CO with amendment

Page 25: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    24 

 

Capital Investment 45.00

Previous Consent Validity

Industry Type R 38 storage of Hazardous chemicals

Industry Category Red

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. JWC Logistics Private Limited has applied for consent to first operate with amendment in consent at Sr. No. 69/91, Village Palaspe, Tal. Panvel, Dist:- Raigad. 

Earlier Consent granted for C to O under orange category vide no.: MPCB/ROR/E-17/2007/Raigad/50 dated 11/09/2008 valid upto 30/04/2018 For: Container Freight Station cum Warehouse (Custom Bonded) (without storage of Hazardous Waste & Hazardous chemicals) Now applied for: Amendment in Consent to Operate for storage handling and transportation of hazardous cargos. Capital investment of part operate Project is Rs. – 45.00 Crs SRO Raigad  I has  commented  that  the Environment Clearance  is not  required  for storage of hazardous chemical listed in Annexure I as the quantities are lesser than those mentioned in Sch II of MSIHC Rules 989.   

Details of water consumption as under :‐  

Page 26: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    25 

 

Water consumption – 17.00 CMD  

Sewage Generation – 15.00 CMD 

DG sets ‐ 250 KVA x 1 No.  

Project proponent has paid consent fees of Rs. 3,00,000/‐‐ towards fees for consent to operate. 

Recommendation of SRO/RO

 

SRO Raigad I has recommended the case for grant of operate for shorter period

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Agenda no. 10 Region : RO Thane Section : RO(HQ) – Fresh Case Date : / 05/2014

Name & Address M/s. Bharat Agri Fert & Realty Ltd , Sr.No. 112/1B, 2A, 3 to 12, 13A,14, Majiwada, Thane

Page 27: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    26 

 

Consent For CO

Capital Investment 3867.5 Lacs

Previous Consent Validity

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. Bharat Agri Fert & Realty Ltd , Sr.No. 112/1B, 2A, 3 to 12, 13A,14, Majiwada, Thane has submitted application for 1st Consent to Operate for their phase-I residential cum commercial project ( Shiv Sai Paradise).

Capital Investment for Part of Project is Rs. 38.67 Crs and Capital investment of complete project as per Environmental Clearance is Rs. 103.21 Crs.

• Earlier project proponent has obtained consent to establish from MPC Board vide no: BO/RO(p&p)/272 dated: 04/12/2006 for construction of Residential cum commercial housing construction project having Total Land Area for 22774.4 sq,meters.

• Again Project proponent has obtained consent to establish from MPC Board vide no: BO/RO(p&p)/626 dated: 12/09/2006 for construction of Residential cum commercial housing construction project having Total

Page 28: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    27 

 

Land Area for 26,089 sq,meters ( 438 nos of residential flats).

The project proponent has obtained Environment Clearance from  MoEF  New Delhi  vide no: 21‐427/2006‐1A‐III         dated: 17/05/2007        construction of  Proposed residential cum commercial project having  area details as under:  Total Plot area : 26,089.00 sq.meters and Total built up area : 26,526.00 sq.meters.

The project proponent has obtained Environment Clearance from SEAC Environment Department vide no: SEAC 2012/CR-288/TC-2 dated: 17/05/2013 construction of Proposed residential cum commercial project having area details as under:-

Total Plot area :- 26,089.00 sq.meters and Total built up area :- 57,342.27 sq.meters.

Now project proponent has applied for Part Consent to Operate phase-I residential complex having details as under :

• Total Plot Area 26,089.00 sq.meters • Total Construction Built up Area: 35,654.57 sq.meters out of 57,342.27

sq.meters.

Provided STP of 370 CMD capacities for treatment of sewage. details of water consumption as under :-

Domestic Water consumption -270 CMD

Sewage Generation –170 CMD

Non-hazardous Waste generation details Bio- Degradable : - 560.0 kg/day

Non- Bio Degradable :- 537.00 Kg/day

STP Sludge :- 10.00 Kg/day

Project proponent has provided Vermi composting facility for treatment of MSW.

Project proponent to provided rain water harvesting system.

As reported by SRO Thane-I validity of consent to establish has been

already expired on 11/09/2011, additional consent fees of Rs. 75,000/- has been recovered from project proponent.

Project proponent has paid fees of Rs. 75,000/- towards grant of 1st

Consent to Operate ( Part)

Page 29: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    28 

 

Recommendation of SRO/RO

SRO Thane-I has recommended grant of 1st Consent to operate up to 31/03/2016.

Agenda no. 11 Region : Thane Section : RO (HQ) Section – fresh Case Date : / 05/2014

Page 30: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    29 

 

Name & Address M/s. Runwal Construction , Gut No.21/B1, and 21/B2, Chitalsar, Manpada, Thane

Consent For CO

Capital Investment 8074 Lacs

Previous Consent Validity

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. Runwal Construction, “ R-annex ( Runwal pearl]” gut no: 21 /B1 and 21 and 21 /B2, chitalsar , Manpada, Thane has submitted application for 1st consent to operate for residential complex with convenience shopping project.

Capital Investment for Part of Project is Rs. 80.74 Crs Earlier project proponent has obtained Consent to Establish from MPC Board vide no: BO/RO(P&P)/106 dated: 04/10/20006 for construction activity of residential cum commercial project of the project having area details as under: Total Plot Area: 22,316.73 sq.meters. Project proponent has obtained Environmental Clearance from MoEF New Delhi vide no: J 12011/51/2006-1A. dated: 24/07/2006 ( validity of Environmental clearance is already expired) having area details as under :

Page 31: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    30 

 

a) Total Plot Area :- 22,019 sq.meters b) Total Built up Area 31,280 sq.meters

Project proponent has applied for Environmental clearance for residential development of expansion project to Environment department GoM , in this concern project proponent has submitted copy of the minutes of meeting of the 18th meeting of the SEAC -2 ( MMR) held on 19th , 20th and 21st September 2013 having area details as under : Total Plot Area : 22,019.00 sq meters Total Built up Area : 67,246 sq.meters Now project proponent has applied for Consent to Operate residential complex having details as under :

• Total Plot Area 22,019.00 sq.meters • Total Built up Area : 28,081.83 sq.meters

Provided STP of 325 CMD capacity for treatment of sewage. details of

water consumption as under :- Domestic Water consumption -236 CMD

Sewage Generation –160 CMD

Non-hazardous Waste generation details Bio- Degradable : - 200 kg/day

Non- Bio Degradable :- 468 kg/day

STP Sludge : 10 Kg/day

Project proponent has provided Organic Waste Convertor for treatment of MSW

Project proponent to provided rain water harvesting system.

• Project proponent has submitted copy of Occupancy certificate obtained from Thane Municipal Corporation dated: 30/11/2012 and 19/11/2013

• Query letter was issued by SRO Thane-I MPC Board on 12/02/2014 for want of additional information and clarification In respect of month and year of commissioning and validity of consent to establish granted vide dated: 04/01/2006, which is expired on 03/01/2011, asking them to obtain fresh consent to establish

• Project proponent has not submitted their reply and not obtained fresh consent to establish from MPC Board .

Project proponent has paid fees of Rs. 1,25,100/- towards grant of 1st Consent to Operate.

Page 32: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    31 

 

Recommendation of SRO/RO

SRO Thane –I has submitted application to HQ stating that, Validity period of Earlier obtained consent to establish got expired on 03/01/2011 and project proponent has not obtained fresh consent to establish, hence consent to operate may not be granted

Agenda no. 12

Page 33: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    32 

 

Region : Pune Section :RO(HQ) RO Pune:- 15/01/2014

RO(HQ) :- 14/03/2014

Name & Address Pimpri Chinchwad Municipal Corporation

Vetalnagar Project, S.No. 100, Vetalnagar, Pimpri

Consent For 1st C to O (Part operate for one building)

Capital Investment 4.01 Cr

Previous Consent Validity

31/01/2015 (For 4 buildings)

Industry Type O08 Building and construction projects more than 20,000 Sq mtr.

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Total water consumption - 75.60 CMD

and sewage generation - 68.48 CMD.

PCMC has connected sewage generated from this project to their Sewage Treatment Plant located at Chinchwad Link Road (i.e. Phase-II).

Water Cess Assessment Done : Paid Upto :

BG Details Amount : 05.0 lakhs Validity : one yr.

BG Obtained against : compliance of consent condition.

Details of BG forfeited/encashed , if any :

Page 34: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    33 

 

Other Relevant Information

PCMC has proposed Slum Rehabilitation Project at Vetal Nagar having total 13 nos. of building for C to Operate for

Total Plot Area- 23417.14 Sq. mtr ,

Total built up area 55062.01 Sq. mtr

PCMC has obtained Consent to Establish dated 11/1/2012

Total Plot Area - 23417.14 Sq. mtr

Total Construction BUA - 55,062.01 Sq. mtr.

PCMC has obtained Environmental Clearance from GOM Dated 7/10/2011

Total Plot Area - 23417.14 Sq. mtr

Total Construction BUA - 55,062.01 Sq. mtr.

PCMC has obtained part consent to operate on 18/01/2014

BUA for operate 17000.474 sq.mtrs ( 4 Buildings)

Now PCMC has applied for one building (5th Building name Ag)

BUA for 5th building - 2641.49 sq.mtrs

PCMC has submitted copy of Tharav No 305 passed in PCMC General Body meeting No 18 (20/06/2013) in respect to lifetime responsibility of treatment of sewage generated from project and treatment of municipal solid waste.

We may consider with amalgamation with existing part. After conformation of BG submission as per C to O condition.

Recommendation of SRO/RO

Page 35: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    34 

 

Agenda no. 13 Region : Pune Section : RO Pune:- 15/01/2014

RO(HQ) :- 14/03/2014

Name & Address Pimpri Chinchwad Municipal Corporation,

Milindnagar Project , S.No. 12,13,14 (P) Milind Nagar at Pimpri

Consent For CO

Capital Investment 4.16Cr.

Previous Consent Validity

31/01/2015

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions

Water Cess Assessment Done : Paid Upto :

BG Details Amount : 05.0 lakhs Validity :1 yr

BG Obtained against : compliance of consent comdition.

Details of BG forfeited/encashed , if any :

Other Relevant Information

PCMC has proposed Slum Rehabilitation Project at Milind Nagar Nagar having total 12 nos. of building for C to Operate for

Total Plot Area - 24054.65 Sq. mtr

Total built up area - 50,844.75 Sq. mtr

PCMC has obtained Consent to Establish dated 11/1/2012

Total Plot Area - 24054.65 Sq. mtr

Total Construction BUA - 50,844.75 Sq. mtr.

PCMC has obtained Environmental Clearance from GOM Dated 10/10/2011

Total Plot Area - 24054.65 Sq. mtr

Total Construction BUA - 50,844.75 Sq. mtr.

Page 36: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    35 

 

PCMC has obtained part consent to operate on 18/01/2014

BUA for operate 8329.725 sq.mtrs ( 2 Buildings)

Now PCMC has applied for one building (3rd Building name Ag)

BUA for 5th building - 2641.0 sq. mtrs

PCMC has submitted copy of Tharav No 305 passed in PCMC General Body meeting No 18 (20/06/2013) in respect to lifetime responsibility of treatment of sewage generated from project and treatment of municipal solid waste.

We may consider with amalgamation with existing part. After conformation of BG submission as per C to O condition.

Recommendation of SRO/RO

Page 37: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    36 

 

Agenda no. 14 Region : RO PUNE Section :RO(HQ) SRO Date : 07/03/2014

RO HQ date:-29/04/2014

Name & Address M/s. Rainbow Housing Company, “ Park Royale”, 

S.No. 14/1/1, 14/1/2, Rahatni, Pimpri Chinchwad, Pune. 

Consent For C to R

Capital Investment 37.0 Cr.

Previous Consent Validity

30/04/2012

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-Water Consumption: 320.0 CMD, Effluent generated 230.0 CMD. Provided

STP of Capacity : 250.0 CMD

BG Details Amount : Validity :

BG Obtained against :

1. PP has applied for plain renewal of residential project project. 

2. Applicant  has  obtained  consent  to  operate  having  total  plot  area  23300.0 m2  and 

BUA  67677.0 m2 consent valid upto 30/04/2012. 

3. PP has obtained environment clearance from SEIAA having total plot area 23300.0 m2 

BUA 67677.0 sq.mtrs on 04/07/2007. 

4. Capital investment of the project is 37.0 Cr.  

5. Total water consuming 320.0 m3/day & generating about 230.0 m3/day of sewage, PP 

has provided Sewage treatment plant of capacity 250.0 CMD. 

6. MSW is disposed through PCMC collection and disposal system.   

7. 1 no. of DG sets having capacity, 500KVA.  

8. In view of above we may  consider plain  renewal with  condition  installation of OWC 

within 3 month and BG for the same. Recommendation of SRO/RO

Page 38: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    37 

 

Agenda no. 15 Region : Pune Section : RO(HQ) Date : 05/2014

Name & Address M/s. St. Peters High school Plot No. 504, A/p. Panchgani, Tal. Mahabaleshwar Dist. Satara

Consent For CR

Capital Investment 4.8 Crs.

Previous Consent Validity

31/12/2006

Industry Type O39 Infrastructure development project

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. St. Peters High school has applied for grant of renewal of consent to operate for their Educational Institute and Residential School at Plot No. 504, A/p. Panchgani, Tal. Mahabaleshwar Dist. Satara Earlier Consent granted vide No.: BO/RO(P&P)/O/CC-189 dated 17/01/2006 valid upto 31/12/2006. The institute applied for renewal of consent upto 31/12/2012. The Institute not received consent copy. Now applied for renewal upto 31/12/2014 For Educational Institute and Residential School for 300 Students.

Page 39: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    38 

 

Capital investment of part operate Project is Rs. – 4.8 Crs The institute located in Mahabaleshwar – Panchagani Eco Sensitive Zone. Details of water consumption as under :- Water consumption Domestic – 20.00 CMD Sewage Generation – 16.00 CMD STP Provided – 25 CMD

Recommendation of SRO/RO

SRO has commented the renewal upto 31/12/2014

Page 40: Sr. No. Resubmission Fresh Agenda...Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 Matoshree Infrastructure Pvt. Ltd., Shivaji Park Scheme,

 

Web agenda of 4th CC meeting (Booklet No. 8) of 2014‐15 dtd. 17.05.2014    39 

 

Agenda no. 16 Region : SRO Nashik Section : Date :

Name & Address Artheon Battery Company Pvt Ltd/ , E-11, MIDC Malegaon, Sinnar, Nashik

Consent For CR

Capital Investment 5066 Lacs

Previous Consent Validity

31/01/2014

Industry Type R39 Lead acid battery manufacturing(excluding assembling & charg

Industry Category Red

YES ( Y ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- primary and tertiary treatment provided

Water Cess Assessment Done : September 2013 Paid Upto : December 2012

BG Details Amount : NA Validity :NA

BG Obtained against : NA

Details of BG forfeited/encashed , if any :NA

Other Relevant Information

i. Industry has applied for plain renewal. ii. Earlier consent was valid for period up to 31/01/2014 for manufacturing of 

SMF Batteries from Virgin Lead. iii. Capital investment of the industry increased from 49.64 cr to 50.66 Crore. iv. There is no change in water, fuel and production quantity.  v. Industry has paid additional DD of amount RS. 215000/‐ toward increases 

in capital investment. vi. Effluent treatment plant provided consisting of collection tank lime dosing 

tank poly dosing tank clarifier tank clear water tank etc. vii. Sewage  treatment plant provided  consisting of  Collection  tank bio  reactor 

equalization tank dosing tank carbon filter and sludge bed.  viii. SRO Nashik  has  recommended  for  grant  of  consent  to  operate  for  period 

upto 31/01/2015. ix. In view of above we may consider consent of renewal. 

Recommendation of SRO/RO

Recommended for grant of consent to operate for the period up to 31/01/2015