sr01et model no. lw1012fb - arrow sheds 715800111wfb.pdfarrow has the best base for your building in...

39
Model No. LW1012FB Owner's Manual & Assembly Instructions SR01et Exterior Dimensions Interior Dimensions Door *Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening Size Size Width Depth Height Width Depth Height Width Height 10' x 12' 121" x 143 1/4" 123 1/4" 145 3/4" 81 3/8" 118 1/4" 140 1/2" 80 1/8" 55 1/2" 60" 3,0 m x 3,6 m 307,3 cm x 363,9 cm 313,1 cm 370,2 cm 206,7 cm 300,4 cm 356,9 cm 203,5 cm 141,0 cm 152,4 cm 715800111 Storage Area: 115 Sq. Ft. 686 Cu. Ft. 10,7 m 2 19,4 m 3 BUILDING DIMENSIONS * Size rounded off to the nearest foot CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION. WEAR GLOVES WHEN HANDLING METAL PARTS. Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or [email protected] Do not return to dealer, they are not equipped to handle your requests.

Upload: lehanh

Post on 27-Mar-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Model No. LW1012FB

Owner's Manual & Assembly Instructions SR01et

Exterior Dimensions Interior Dimensions Door *Approx. Base (Roof Edge to Roof Edge) (Wall to Wall) Opening Size Size Width Depth Height Width Depth Height Width Height

10' x 12' 121" x 143 1/4" 123 1/4" 145 3/4" 81 3/8" 118 1/4" 140 1/2" 80 1/8" 55 1/2" 60"

3,0 m x 3,6 m 307,3 cm x 363,9 cm 313,1 cm 370,2 cm 206,7 cm 300,4 cm 356,9 cm 203,5 cm 141,0 cm 152,4 cm

715800111

Storage Area: 115 Sq. Ft. 686 Cu. Ft. 10,7 m2 19,4 m3

BUILDING DIMENSIONS * Size rounded off to the nearest foot

CAUTION: SOME PARTS HAVE SHARP EDGES. CAREMUST BE TAKEN WHEN HANDLING THE VARIOUS PIECESTO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READSAFETY INFORMATION PROVIDED IN THIS MANUALBEFORE BEGINNING CONSTRUCTION. WEAR GLOVESWHEN HANDLING METAL PARTS.

Missing Parts, Questions on Assembly?Call: 1-800-851-1085 or

[email protected] not return to dealer, they are notequipped to handle your requests.

Page 2: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Owner's ManualBefore beginning construction, check local building codes regarding footings, locationand other requirements. Study and understand this owner's manual.Important information and helpful tips will make your construction easier and moreenjoyable.

Assembly Instructions: Instructions are supplied in this manual and contain allappropriate information for your building model. Review all instructions before you begin,and during assembly, follow the step sequence carefully for successful results.

Flooring and Anchoring: Your storage building must be anchored to prevent winddamage. A base is necessary to construct a square and level building. Anchoring andbase materials are not included with your building. We recommend the combined use ofan Arrow Floor Frame Kit and an Arrow Anchoring Kit as an effective method ofsecuring your building to the ground (Available by mail order or at your local dealer) oryou may construct a base and anchoring system of your choice. Your assemblyinstructions provide information on a few methods commonly used to secure and levela storage building.

Parts and Parts List: Check to be sure that you have all the necessary parts for yourbuilding.

•All part numbers can be found on the parts. All of these numbers (before the -) must agree with thenumbers on the Parts List page.

•If you find that a part is missing, include the model number of your building and contact:

Arrow Shed, LLC Customer Service Department1101 North 4th Street Breese, Illinois 62230

•Separate contents of the carton by the part number while reviewing parts list. The first few stepsshow how to join related parts to make larger sub assemblies which will be used later.

•Familiarize yourself with the hardware and fasteners for easier use during construction. These arepackaged within the carton. Note that extra fasteners have been supplied for your convenience.

BEFORE YOU BEGIN.... A2

1-800-851-1085 or [email protected]

Page 3: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Selecting and Preparing Your Site: Before assembly, you will want to decide ona location for your building. The best location is a level area with good drainage.

•Allow enough working space for ease of moving parts into position during assembly. Be sure therewill be enough space at entrance for doors to open fully and enough space around the building tobe able to fasten the panel screws from the outside.

•Before you begin the first steps in assembling your parts, a base should be constructed andan anchoring system should be ready to use.

Watch the Weather: Be sure the day you select to install your building is dry and calm.Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground.

Teamwork: Whenever possible, two or more people should work together to assembleyour building. One person can position parts or panels while the other is able to handle thefasteners and the tools.

Tools and Materials: These are some basic tools and materials you will need for theconstruction of your building. Decide which method of anchoring and the type of base youwish to use in order to form a complete list of the materials you will need.

Base Preparation• Hammer and Nails• Spade or Shovel• Hand Saw / Power Saw• Lumber and/or Concrete

Optional Time-Savers• Wrench / Nut Driver• Electric / Cordless Drill• Square• String (for squaring frame)

Required• Work Gloves• Step Ladder• Utility Knife / Scissors• Pliers• Carpenter's Level• Tape Measure

Required• Eye Goggles• No. 2 Phillips Screwdriver(With Hardened Magnetic Tip)Note: A power screwdriver or vari-able speed drill with Phillips-tip at-tachment can speed assembly byas much as 40%.

PLAN AHEAD.... A3

Page 4: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Safety precautions are important to follow throughout the construction of your building.

•Care must be taken when handling variouspieces of your building since some containsharp edges. Please wear work gloves, eyeprotection and long sleeves when assemblingor performing any maintenance on your build-ing.

•Practice caution with the tools being used in theassembly of this building. Be familiar with theoperation of all power tools.

•Never concentrate your total weight on theroof of the building. When using a step laddermake sure that it is fully open and on evenground before climbing on it.

•Keep children and pets away from worksite toavoid distractions and any accidents whichmay occur.

•Do not attempt to assemble the building if partsare missing because any building left partiallyassembled may be seriously damaged by lightwinds. Call 1-800-851-1085 [email protected]

•Do not attempt to assemble the building on awindy day, because the large panels acting as a"sail", can be whipped about by the wind makingconstruction difficult and unsafe.

SAFETY FIRST.... A4

safety edge

safety edge

sharp edge

sharp edge

Page 5: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area witha wire brush; wash it and apply touch-up paint per manufacturer's recommendation.

Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavyamounts of snow on roof can damage building making it unsafe to enter. In snow country,Roof Strengthening Kits are available for most Arrow Buildings for added protectionagainst heavy snow accumulation.

Doors: Always keep the door tracks clear of dirt and other debris that prevent them fromsliding easily. Lubricate door track annually with furniture polish or silicone spray. Keepdoors closed and locked to prevent wind damage.

Fasteners: Use all washers supplied to protect against weather infiltration and to protectthe metal from being scratched by screws. Regularly check your building for loosescrews, bolts, nuts, etc. and retighten them as necessary.

Moisture: A plastic sheet (vapor barrier) placed under the entire floor area with goodventilation will reduce condensation.

Other Tips....• Wash off inked part numbers on coated panels with soap and water.• Silicone caulking may be used for watertight seals throughout the building.

Do not store swimming pool chemicals in your building. Combustibles andcorrosives must be stored in air tight approved containers.

Keep this Owner's Manual and Assembly Instructions for future reference.

CARE & MAINTENANCE.... A5 Web

Page 6: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

ACCESSORIES.... A6 WEB

* Some drilling required to fit buildings without mid-wall bracing.

Model No. SS404• Makes 8" to 12" (20,3-30,5 cm) wide shelves in any length.• Brackets, braces, hardware included. Lumber is not included.

Model No. SS900-A• Grey color• 3 shelves• Holds up to 85 lbs. (38 kg) (even weight distribution)

Heavy-duty, galvanized steel shelf units help organize storagespace. They easily mount on the wall or sit on the floor. Fits allArrow buildings.*

SHELF UNITS

ATTIC KIT / WORKBENCH KITModel No. AT101Heavy-duty galvanized steel bars thatfit all 10' (3,0 m) wide Arrow buildings.They install quickly and easily tohelp organize space and createmore useable space as an attic orworkbench. Will hold up to 250 lbs.(113 kg) evenly distributed.

Some drilling required to fit buildings without mid-wall bracing.

Model No. AK100New concrete anchor system permitsanchoring any size Arrow buildingdirectly to a concrete slab. Each kitcontains heavy-duty, hot-dippedgalvanized steel corner gussets andperimeter clips which fit over the floorframe and lag bolt into a concrete slab.Full assembly instructions and a 1/4"masonary drill bit are included.

TOOL HANGING RACKModel No. TH100The perfect tool organizer. Twin25 1/2" (64,8 cm) steel channelsplus five heavy-duty snap-inhangers and a small tool holder forscrewdrivers, pliers, etc. Holdersslide along channel for fullyadjustable spacing. Great forgarage, basement, or the backof any door. Fits all Arrowstorage buildings.

ROOF STRENGTHENING(heavy snow load) KITSExtra roof beams and gable bracesdesigned for added protection againstheavy snow accumulation. Increasesthe strength of your roof by 50%.

ANCHOR KITSModel No. AK4Anchor Kit contains heavy-duty steelaugers, 60' (18 m) of steel cable and4 cable clamps. No digging or concretepouring, just insert cable under roof,over roof beams, into augers and twistaugers into the ground. For buildingslarger than 10'x9' (3,0 m x 2,6 m), use 2 kits.

FLOOR FRAME KITS

MODELS FB47410, FB5465, FB106-AFB109-A and FB1014-A

A simple new floor frame system made of heavy-duty, hot-dippedgalvanized steel. Use as base for plywood, sand or stone.

Model No. AK600Earth Anchor Kit anchors any sizeArrow building to the ground.Each kit contains heavy duty,hot-dipped galvanized steelcorner gussets and 4 earth anchors.

Page 7: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

THIS

PAGE

WAS

LEFT

BLANK

INTENTIONALLY

7

Page 8: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

THIS

PAGE

WAS

LEFT

BLANK

INTENTIONALLY

8

Page 9: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

16"/24"

40,6 cm/61,0 cm

The Base For Your Building

9

FRONT(DOOR)

FRONT(DOOR)

Base AQ09

Note: Finished Slab dimensions, with lumber removed.

OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB1014-A or 68387-A)

Arrow has the best base for your building in this simple kit. It keeps stored items above the ground.This kit should be used with one of the following:A. To support a plywood deck B. To be filled with sand. We recommend the combined use of1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground.Allow 1 - 2 hours for construction.

OPTION 2: Wood Platform

If you decide to build your own base, be sure to select the appropriate materials.These are the recommended materials for your base:● 2 x 4's (38 mm x 89 mm) Pressure Treated Lumber● 5/8" (15,5 mm) 4 x 8 (1220 mm x 2440 mm) Plywood-exterior grade NOTE: Pressure Treated Lumber must not be used where it will make contact with your storage building. The properties of Pressure Treated Lumber will cause accelerated corrosion.

If Pressure Treated Lumber comes in contact with your storage building your warranty will be voided.● 10 & 4 penny Galvanized Nails ● Concrete Blocks (optional)

The platform should be level and flat (free of bumps, ridges etc.)to provide good support for the building. The necessary materialsmay be obtained from your local lumber yard.

To construct the base follow instructions and diagram.Construct frame (using 10 penny galvanized nails)Measure 16"/24" (40,6 cm/61,0 cm) sections to constructinside frame (see diagram)Secure plywood to frame (using 4 penny galvanized nails)

Allow 6 - 7 hours for construction.

OPTION 3: Concrete Slab

The slab should be at least 4" (10,2 cm) thick. It must be level and flat to provide good support for the frame.The following are the recommended materials for your base.● 1 x 4's (19 mm x 89 mm) (will be removed once the concrete cures)● Concrete ● Sheet of 6 mil plastic● We recommend for a proper strength concrete to use a mix of: 1 part cement ● 3 parts pea sized gravel ● 2 1/2 parts clean sand

Prepare the Site/Construct a Base1. Dig a square, 6" (15,2 cm) deep into the ground (remove grass).2. Fill up to 4" (10,2 cm) in the square with gravel and tamp firm.3. Cover gravel with a sheet of 6 mil plastic.4. Construct a wood frame using four planks of 1x4 (19 mm x 89 mm) lumber.5. Pour in concrete to fill in the hole and the frame giving a total of 4" (10,2 cm) thick concrete. Be sure surface is level.

Allow 3 - 5 hours for construction and a week for concrete curing time.

Note: Platform/Slab will extend 9/16" (1,4 cm) beyond floor frame on all four sides. Seal this 9/16" (1,4 cm) of wood with a roofing cement (not included), or bevel this 9/16" (1,4 cm) of

concrete when pouring, for good water drainage.

121"307,3 cm 143 1/4"

363,9 cm

121"307,3 cm143 1/4"

363,9 cm

Page 10: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

It is important that the entire floor frame be anchored after the building is erected.Below are recommended ways of anchoring.

Anchoring Down The Building

AnchoringA10

Arrow Anchoring Kit: (Model No. AK100 or 68383)Recommended for use with the concrete base.Contains: Corner gussets, perimeter clips, hardware,1/4" masonary drill bit and installation instruction.

Anchoring into Concrete:1. For poured concrete slab or footing or patio blocks:Use 1/4" x 2" (6 mm x 51 mm) Lag Screws.2. For Anchor Post of Concrete poured after building iserected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws.

Arrow Anchoring Kit: (Model No. AK4 or 60298)Recommended for use with any suggested base.Contains: 4 Anchors with Cable, Clamps andinstallation instruction.

Anchoring into Wood/Post:Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm)dia. holes provided in the frames for proper anchoring.

10

OVER THE BEAMSAND INTO THE GROUND

1. 2.

1. 2.

Page 11: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

11

Remove from bag of screwsand save for the last step

67545Weather Stripping (1)

66382Lower Door Guide (4)

66183Roof Trim Cap(2 right & 2 left)

66045Handle (2)

66646Washer (445)

(12 sheets of 40)

65109#8-32 Acorn Nut (4)

(Packed with Screws)

67468Peak Cap (2)(Arrow Logo)

65004#8Ax5/16" (8 mm)

Screw (416)

65923#8-32x3/8" (10 mm)

Bolt (186)

65900A#10Bx1/2" (13 mm)

Black Screw (8)(Packed with Screws)

65103#8-32 Hex Nut (186)

Hardware SR11

6228Track Support (2)

66769Door Slide (4)

Page 12: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Parts List SR12et

12

Assembly Part Part Quantity CheckKey No. Number Description in Carton List

1 8576 Right Gable 2 2 8577 Left Gable 2 3 10497 Horizontal Door Brace 4 4 7743 Roof Panel 6 5 9086 Right Roof Panel 2 6 9087 Left Roof Panel 2 7 10475 Right and Left Doors 2 8 9369 Door Jamb 2 9 9373 Front Wall Panel 210 6515 Wall Panel 1011 6514 Corner Panel 412 3719 Door Handle Brace 213 6278 Vertical Door Brace 214 6403 Door Track Splice 115 6014 Side Roof Trim 216 6015 Side Roof Trim 417 6868 Ridge Cap 118 6869 Ridge Cap 219 9366 Door Track 220 5986 Rear Wall Angle 221 10389 Rear Wall Channel 222 9365 Front Wall Channel 223 6635 Roof Beam Bracket 424 10397 Roof Beam 825 10390 Side Wall Channel 426 10394 Side Wall Angle 427 10392 Side Floor Frame 428 8936 Rear Floor Frame 229 9367 Front Floor Frame 230 9009 Gable Brace 231 9204 Roof Beam Brace 232 8934 Ramp 133 69835 Edge Trim (Green) 4

Page 13: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

13

Assembly by Key No. SR13et

5

2

1

23

23

3

4

3

4

4

5

6

4

4

4

186

17

16

1816

16

15

16

15

23

231

2

3

3

30

78

7

30

98

109

10

10

1010

11

10

11

11

1110

10

10

12

10

13

12

1914

13

20

1921

20

22

21

24

22

24

24

24

2424

24

25

24

25

25

26

2526

26

27

26

27

29

27

28

32

28

29

33

33

33

31

31

27

Page 14: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

The front floor frame is made up ofthree pieces. The side floor framesand the rear floor frame are made upof two pieces. The holes in thesepieces will align when the pieces arepositioned with correct amount ofoverlap. The illustrations below showthe proper overall length for the sides,rear and front. Proceed as follows:

1 Place the front floor frames asshown. Center the ramp, with drainholes facing outside, on top of the twofront floor frames. Join the frames byinserting eight screws.

2 Overlap the side floor frames andthe rear floor frames as shown. Theholes in these pieces will align whenthe pieces are positioned with cor-rect amount of overlap. See the illus-trations below for the proper overalllength of the side and rear floor frames.Join the frames by inserting four/fivebolts into each frame set as shown.

3 Double check the length of eachand set these pieces aside for lateruse.

Step 1SV14hw

● Parts Needed For ●Floor Frame Assemblies

●●●●● 8934 Ramp (1)●●●●● 9367 Front Floor Frame (2)●●●●● 8936 Rear Floor Frame (2)●●●●● 10392 Side Floor Frame (4)

14

9367

STEP

18934

9367

DRAIN HOLES FACEOUTSIDE

Front FloorFrame Assembly

119 3/8" 303,2 cm

893610392

9367

8934

9367

10392

10392

Side Floor Frame 141 5/8" 359,7cm

8936 8936

Rear Floor Frame 119 3/8"303,2 cm

STEP

2

STEP

3

141 5/8" 359,7 cm

141 5/8" 359,7 cm

119 3/8" 303,2 cm

Front & Rear

119 3/8" 303,2 cm

Sides

(8) (13)

Page 15: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Step 2SR15hw

15

● Parts Needed For ●Frame Assemblies

The main frame pieces reinforce thewalls. These pieces will later be in-stalled in the center and at the topedge of the side walls and the rearwall. Proceed as follows:

1 Overlap the rear wall channelpieces as shown in the figure andfasten the two pieces together witheight bolts as shown.

2 Make two side wall channels byoverlapping the side wall channelpieces as shown. Fasten each settogether with eight bolts as shown.

3 Overlap the rear wall anglepieces as shown in the figure andfasten them together with one bolt inthe center hole.

4 Make two side wall angles byoverlapping the side wall anglepieces as shown. Fasten each settogether with one bolt thru the sec-ond large hole from the end of eachpart.

5 Double check the length of eachand set these pieces aside for lateruse.

●●●●● 5986 Rear Wall Angle (2)●●●●● 10389 Rear Wall Channel (2)●●●●● 10390 Side Wall Channel (4)● ● ● ● ● 10394 Side Wall Angle (4)

STEP

1STEP

2

10389

10390 Side Wall Channels140 3/8" 356,6 cm

Rear Wall Angle118 1/8" 300,0 cm

5986

5986

10394Side Wall Angles

140 3/8" 356,6 cm

STEP

3 4

Rear Wall Angle 118 1/8" 300,0 cmSide Wall Angles 140 3/8" 356,6 cm (2 Assemblies)

STEP

5STEP

Rear Wall Channel118 1/8" 300,0 cm

10390

10389

10394

Rear Wall Channel 118 1/8" 300,0 cmSide Wall Channels 140 3/8" 356,6 cm (2 Assemblies)

(27)

Page 16: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

16

The roof beams join the two gablesand support the roof panels. The mainroof beam is made up of four piecesoverlapped back to back at the cen-ter. The left and right roof beam as-semblies are made up of two pieces.Hint: These pieces are force-fitted,so you may have to press hard to jointhem together.

1 Place one end of a roof beaminside another roof beam so that thesix holes in each piece align. Makefour sets of roof beams by repeatingthis procedure. Do not insert boltsyet.

2 Take two of the pressed-togetherroof beams and join them as shownto form the main roof beam assembly.Hold the assembly together and fas-ten with 14 bolts. Build only oneDoubled Beam Assembly.

3 Fasten the other two pressed-together roof beams with eight boltsto make the left and right roof beamassemblies.

4 Double check the length of eachand set these pieces aside for lateruse.

Step 3SV16hw

● Parts Needed For ●Roof Beam Assemblies

●●●●● 10397 Roof Beam (8)

10397

STEP

1

10397

Assembled

142 3/8" 361,6 cm

Build one Doubled Main RoofBeam Assembly for Peak in Roof

EndView

142 3/8" 361,6 cm

Build two Single BeamAssemblies

STEP

2

STEP

3

142 3/8" 361,6 cm

(30)

Page 17: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

17

NOTE:Door Track Splice (painted part)

Step 4A17hw

● Parts Needed For ●Door Track Assembly

●●●●● 6403 Door Track Splice (1)●●●●● 9366 Door Track (2)

66769

STEP

3STEP

4

END VIEW

STEP

1

9366

STEP

2

6403

9366

Long Legon Top

Short Legon Bottom

93669366

6403

66769

118 1/8" 300,0 cm

The door track assembly supportsthe sliding doors and reinforces thefront wall. It is made up of three pieces.

1 Using the door track splice,(painted), join the door track(galvanized) pieces end-to-end asshown.

2 Insert four screws from the under-side only.

Hint: The holes in the top side of thedoor track assembly are for fasteningthe gable to the top of the front wall ina later step.

3 Position door slides onto thelegs, from the end of door trackassembly, as shown in the end view.

4 Set this piece aside for later use.118 1/8" 300,0 cm

118 1/8" 300,0 cm

(4)

Page 18: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

●●●●● Front Floor Assembly (1)●●●●● Side Floor Assembly (2)●●●●● Rear Floor Assembly (1)

● Parts Needed For ●

Floor FrameStep 5SW18hw

The floor frame must be squareand level or holes will not align.

18

1 Assemble the four corners of thefloor frame using two screws at eachcorner as shown. At the front cornersfasten bolts through fromthe bottom with nuts on top.

2 Measure the floor frame diago-nally. When the diagonal measure-ments are equal, the floor frame issquare.

NOTEIf using a wood platform or

concrete slab do not fasten thefloor frames to your base at this

time. You will anchor thebuilding after it is erected.

STEP

1

10392

RIGHTREAR

8936

Level

10392

RIGHTFRONT

9367

STEP

2

When Diagonal Measurementsare Equal the Floor Frameis Square.

FRONT

(8) (2)

Page 19: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

1 Position a corner panel at thecorner of the floor frame as shown.The widest part of each corner panelmust be placed along the side of thebuilding for all four corners. Fastenthe corner panel to the floor framewith four screws.

Support the corner panel with a stepladder until a wall panel is attached.

2 Attach the front wall panels to thefront corner panels, as shown. A smallgap will exist between front wall paneland ramp.

3 Attach the wall panels to the rearcorner panels, as shown.

NOTEBe careful to install the correct

panel in each position as shown

●●●●● 6515 Wall Panel (2)●●●●● 9373 Front Wall Panel (2)●●●●● 6514 Corner Panel (4)Step 6

SR19hw

● Parts Needed For ●Corners

NOTEThe remainder of the building assemblyrequires many hours and more than one

person. Do not continue beyond this pointif you do not have enough time to com-

plete the assembly today. A partiallyassembled building can be severely

damaged by light winds.

4 Double-check the part numbers ofthe wall panels, before proceeding.

The floor frame must be square and level or holes will not align.

19

STEP

1

6515

9373 9373

6514

6514

REAR

FRONT

9373

Panels rest onframe as shown

6514

SIDE TOP VIEW

NarrowSide

6514

6515

Wide Side

STEP

3STEP

2

STEP

4 65146514

9373

6515

6515

6514

Washer

Crimped RibUnderneath

6514

SIDE

Each screw and bolt in the wallrequires a washer.

(38) (4)

CORRECT INCORRECT

Page 20: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

●●●●● Rear Wall Channel Assembly (1)●●●●● Side Wall Channel Assembly (2)

● Parts Needed For ●Mid FramesStep 7

SR20hw

20

The mid frame pieces give rigidity tothe side and rear walls.

1 Fasten the rear wall channelacross the middle of the rear wallusing screws.

2 Fasten the side wall channelsacross the middle of the side panelsusing screws. Fasten overlaps inrear corners with bolts and nuts, attwo locations. See the figure.

NOTEThe wall channels behind the

front wall panels will be installedin a later step.

STEP

1

10390

10389

FRONT

2STEP

(24) (4)

Page 21: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

●●●●● Door Track Assembly (1)●●●●● Rear Wall Angle Assembly (1)●●●●● Side Wall Angle Assembly (2)

● Parts Needed For ●

Top FramesStep 8SR21hw

21

The top frame pieces give rigidity tothe walls and provide a surface forattaching the gables which supportthe roof.

1 Fasten the rear wall angle acrossthe inside top of the rear wall usingscrews.

2 Fasten the side wall angles acrossthe inside top of the side panels us-ing screws. Side wall angles mustoverlap rear wall angle in corners.

3 Fasten the door track assembly(holes on top) across the top of thefront wall panels using screws. Seethe figure.

STEP

1

3STEP

9366

5986

FRONT

2STEP

10394

Long Legon Top

Openingfacing in

Short Legon Bottom

Wall AnglesMust FaceInsideBuilding

DOOR TRACK ASSEMBLY

(30)

Page 22: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

●●●●● 6515 Wall Panel (8)● Parts Needed For ●Wall PanelsStep 9

SR22hw

22

Each wall panel has a crimped rib onone side. The crimped rib should gounder the rib of the panel that followsit.

1 Locate all of the wall panels andset each one alongside the building.

2 Fasten the wall panels at the topand bottom with screws.

3 Fasten the center of each panel tothe wall channel with screws.

4 Fasten overlapping ribs as before.

STEP

1

3STEP

4STEP

6515Bolt and nutdoes not gothru wallchannel atoverlap

Panels rest onframe as shown

6515

Crimped RibUnderneath 2

STEP

Detail ShowingCenter of PanelScrewed toWall Channel

Use bolts and nutsthru wall angleoverlap at the topof panel at rear.

(116) (13)

Page 23: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

●●●●● 9369 Door Jamb (2)●●●●● 9365 Front Wall Channel (2)

● Parts Needed For ●Front Channel/Door JambStep 10

SO23hw

The door jambs reinforce the dooropening and provide an attractivetrim. Follow these steps for bothdoor jambs.

1 Fasten the front wall channelsin their positions between the end ofthe side wall channel and the cor-ner panel using screws. Do not puta screw in the hole at the end be-hind the door opening at this time.

2 Fasten a door jamb to the frontpanel with two bolts, nuts and acornnuts, as shown.

3 Fasten the center of the doorjamb to the front wall panel and thefront wall channel with two screws.

4 Fasten the top of the door jamb tothe door track with two screws. Dothe same for the bottom into frame.

Repeat steps 2 through 4 for theopposite door jamb.

23

Acorn Nut

Hex Nut

9369

FRO

NT

ScrewScrew

TOP VIEW

TOP VIEW

Door Track

9369

Front Wall Channel

Front Wall ChannelCross-SectionTop View

(2) bolts

Bolt

INSIDE OFBUILDING

9365

FRONT

TOP VIEW

Screw Screw

Door Track

STEP

4

STEP

3

STEP

2

STEP

1

Acorn Nut

(18) (4)

Page 24: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

24

The gables go on top of the front andrear walls to support the roof beams.

NOTEThe gables are packed nestedtogether and might be mistakenas one piece. Carefully separate

them before continuing.

1 Apply edge trim to the top edge ofthe right gables and left gables.

2 Attach the four roof beambrackets to the gables using twobolts, washers and nuts.

NOTEMounting leg of bracket mustface toward center of gable.

● Parts Needed For ●Gable AssembliesStep 11

SR24et

●●●●● 8576 Right Gable (2)●●●●● 8577 Left Gable (2)●●●●● 6635 Roof Beam Bracket (4)

STEP

2

6635Roof Beam Brackets

Washer

8577

8576

FRONT

6635Roof Beam Brackets

(8)

Edge Trim(plastic piece)

STEP

1

To avoid mishap on the sharpedge the edge trim must remainin place on the top edge of thegable until right and left roof

panels are in place.

CAUTION:

8577

Page 25: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

● Parts Needed For ●Gables/BracesStep 12

SR25hw

●●●●● Left Gable Assemblies (2)●●●●● Right Gable Assemblies (2)●●●●● 9009 Gable Brace (2)

25

1 Lift and fasten a right and leftgable, under angle at corner, to thedoor track with screws.

Hint: On the rear gable, use a boltand nut at the overlapping rear wallangle. On the front gable, leave out 2screws closest to center gable leg.

2 Join the left and right gablestogether with a gable brace using abolt in the second hole from the bot-tom only.

Repeat Steps 1 & 2 for the oppositeside of building.

3 Fasten the track supports to thefront gable assembly, as shown.

STEP

3

Track Supports 6228

STEP

1Gable

STEP

2

9009 Gable Brace

(32) (5)

Page 26: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

● Parts Needed For ●Roof Beam//BracesStep 13

SR26hw

●●●●● Roof Beam Assemblies (3)●●●●● 9204 Roof Beam Brace (2)

26

1 Wrap the weather stripping tapearound the two joined edges of theleft and right gables. See diagram.Cut the weather stripping to length.

2 Spread the two halves of the mainroof beam and fasten the roof beamto the gable brace of the front gable.

3 Fasten the other end of the mainroof beam to the gable brace of therear gable.

STEP

6

STEP

2

Roof Beam Brace 9204

STEP

7

9204 Roof Beam Brace

4 Fasten the single roof beam,small holes on top, as shown usingbolts and nuts.

5 Fasten a roof beam brace to themain roof beam behind the front gableby placing the tab on the end of thebrace between the roof beams. Alignthe tab with the second hole andfasten the brace with a bolt and nut.

6 Fasten the lower end of the roofbeam brace to the track supportwith a bolt and nut.

7 Fasten a roof beam brace be-tween the rear gable and the roofbeam at the first hole, as shown.

STEP

5

STEP

4

STEP

3

Roof Beam (Single)

STEP

1

Weather Stripping

Spread Two HalvesOf Roof Beams

Roof Beam (Double)

(16)

Page 27: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Step 14SR27et

● Parts Needed For ●Right Roof Panel

●●●●● 9086 Right Roof Panel (1)

Installing the roof panels is best donewith a step ladder. Install the first roofpanel at the back right corner of thebuilding. Each screw and bolt in theroof requires a washer.

NOTEMeasure the building diagonallyagain and make adjustments to

make sure the building is squareand level. This will make the roof

panels fit better, and holes willalign. Don't anchor the floor frame.

NOTEIf a Roof Beef-Up Kit was

purchased, assemble prior toattaching the roof panels.

1 Locate the roof panels and find theright roof panel.

2 Position a right roof panel at theback right corner and fasten to the toproof beam using screws.

27

Bolt(6)

STEP

NutWasher

Gab

leRight Roof Panel9086

1 2 3 4

5

STEP

1

1

3

5

7

2

4

6

8

9086

90869087

9087

7743

7743

7743

7743

10 9

7743

7743

10

(8) (6)

Hint: Follow the fastener sequence shown for proper alignment.

11 thru 14

3 Remove edge trim from the left gableunder the roof panel.

4 Continue fastening the right roof panel tothe gable and lower roof beam using screws,bolts and nuts as shown. Do not fasten thelower end of the panels to the side wallangles at this time.

78

9

6

STEP

2STEP

3 4

Page 28: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

1 Install a left roof panel 9087 at theleft rear corner of the roof.

3 Install two roof panels 7743 work-ing side to side. Do not fasten thelower end of the panels to the sidewall angles at this time. Continueweather stripping the ridge opening.

NOTENarrow roof panel crimped rib is

overlapped by wide rib ofadjacent panel where possible

28

Step 15SR28hw

●●●●● 9087 Left Roof Panel (1)●●●●● 7743 Roof Panel (2)●●●●● 6869 Ridge Cap (1)

● Parts Needed For ●Ridge Cap & Panels

2 Cover the joint at the peak withweather stripping tape. Unroll thetape and press it down over the open-ing at the ridge as you install eachroof panel. Do not cut the tape at thistime.

4 Install the first ridge cap 6869 onthe completed roof section using boltsand nuts. Do not fasten the ends ofthe ridge cap at this time.

5 Fasten the roof panel ribs, peakcap and ridge cap together usingbolts and nuts.

Screws ToRoof Beam

Fasten AtOverlap With

Bolt

Fasten atOverlap With

Bolt

Screws ToRoof Beam

Do not fastenat this time

WeatherStripping

Tape

STEP

5

STEP

2

STEP

4

STEP

1

7743Roof Panel

STEP

3

7743

6869

9087 Left Roof Panel

(24) (12)

Page 29: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

29

Step 16SR29hw

1 Install the second ridge cap 6868overlapping the first ridge cap whileinstalling two roof panels 7743. Hint:The bolts on the ridge cap need to beleft loose to move the ridge cap to theside and overlap the ribs of the nextroof panel. Continue weather strip-ping the ridge.

NOTEIf roof beam holes do not line up

with the roof panel holes, shift thebuilding from left to right.

If this does not help, your buildingmay not be level. Shim thecorners until holes line up.

● Parts Needed For ●Ridge Cap & Panels

●●●●● 7743 Roof Panel (2)●●●●● 6868 Ridge Cap (1)

Weather Stripping Tape6868

7743 Roof Panel

7743 Roof Panel

(16) (4)

Page 30: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Step 17SR30hw

30

● Parts Needed For ●Ridge Cap & Panels

●●●●● 6869 Ridge Cap (1)●●●●● 7743 Roof Panel (2)● ● ● ● ● 9087 Left Roof Panel (1)● ● ● ● ● 9086 Right Roof Panel (1)

1 Install the third ridge cap 6869overlapping the second ridge capwhile installing the remaining tworoof panels 7743. Hint: The bolts onthe ridge cap need to be left loose tomove the ridge cap to the side andoverlap the ribs of the next roof panel.Continue weather stripping the ridge.

2 Install the left 9087 and right roofpanel 9086 as you unroll the weatherstripping tape, and press it down.Fasten the lower end of the panels tothe side wall angles using screwsand washers.

3 Fasten the roof panel ribs, peakcap and ridge cap together usingbolts and nuts.

Peak Cap

STEP

2

STEP

27743

STEP

3

STEP

1

CutWeather Strippingand Fold Under

9087

77439086

6869

(72) (22)

Page 31: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

31

1 Attach the side roof trim pieces tothe lower end of the roof panels oneach side of the building using screwsat each panel overlap.

NOTEA single screw fastens both trim

pieces at the overlap.

2 Using your thumb and index fin-ger, overbend the bottom flange ofthe side roof trim at the corner inwardenough so the right and left roof trimcaps fit onto right and left corners.

3 Fasten the roof trim caps to theside trim using a screw.

●●●●● 6015 Side Roof Trim (4)● ● ● ● ● 6014 Side Roof Trim (2)

● Parts Needed For ●Roof TrimStep 18

SQ31hw

Tuck FlangeInward to Fit

Inside ofRoof Trim Cap

STEP

2

Roof Trim Cap

STEP

3

STEP

1

6014

6015

6015

Roof Trim6014

6015

6015

(4) (8)

Page 32: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

32

●●●●● 3719 Door Handle Brace (2)●●●●● 10475 Right and Left Doors (2)●●●●● 10497 Horizontal Door Brace (4)●●●●● 6278 Vertical Door Brace (2)

● Parts Needed For ●Door AssemblyStep 19

SO32hw

The steps on this page tell how toassemble the right door. You willperform exactly the same proceduresfor the left door. Each bolt and screwin the door requires a washer. Pro-ceed as follows:

1 Attach the door handle brace andhandle to the door with 1 bolt asshown. Don't tighten the bolt yet.

2 Swing the door handle brace up tothe hole on the center of the door andinsert a screw.

3 Hold the vertical door braceagainst the center of the inside sur-face of the door and turn the screw tohold the vertical door brace and doorhandle brace in place. Fasten todoor above and below centerconnection using 2 screws.

4 Insert a second bolt in the doorhandle and tighten both bolts.

5 Put a horizontal door brace ontothe top edge and bottom edge andfasten with 1 bolt in the center.

6 Attach the lower door guides andbolts as shown.

7 Repeat steps 1 through 6 for theleft door.

STEP

STEP

5

4

STEP

3

10475 Right Door

66382

66382

1049766045

3719

10497

66382

END VIEWSHOWING:

HorizontalDoor Brace DOOR

WASHER

GUIDE

6278

6278

(4)(6) (12)

3719

10475Left Door

66045

660453719 10497

6278

66382

66382

STEP

1

STEP

2

STEP

6

10497

Page 33: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

33

Step 20SQ33hw

● Parts Needed For ●Door Installation & Adjustment

●●●●● Right Door Assembly (1)●●●●● Left Door Assembly (1)

1 From inside the building, put thebottom of the right door assembly (onyour left when you are inside thebuilding) behind door jamb into thefront frame track.

2 Position the top of the door so thatthe holes in the door line up with theholes in the door slides.

3 Fasten the door to the door slidesusing two #10Bx1/2" (13 mm) screwsper door slide.

NOTEThe holes in the door slides allowyou to adjust the doors. Place the

door in the middle holes.

4 Repeat steps 1 through 3 for theleft door.

STEP

2

Horizontal Door Brace

STEP

1

Gable

STEP

3

#10Bx1/2" (13 mm) Screw

Door Slide

Adjustment Holes

Adjustment Holes AllowDoors to Meet Evenly

Along Their Length

Right Door Left Door STEP

4

Front Floor Frame Assembly

Door Track

Door Slide

Doo

r

Keep this Owner's Manual and Assembly Instructions for future reference.

(8)

Page 34: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Anchoring

Anchor your building at this time.

Floor Frame

If you have purchased a Floor Frame Kit you need to install it at this time.

34

Anchoring and Floor Frame XA34hw

Page 35: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

711660109

Asse

mb

ly Ma

nual

FB1014-A

697.68387-AM

ontagehandbuch * Manual de ensam

blaje* G

uide d’assemblage

Sh

arp

Ed

ge

sCA

UTIO

N

ATTEN

TION

Arê

tes vive

s

Precaución: extremos

y esquinas filosas

10192

10192

1019210192

10194

1019410192

10192

10192

1019210192

10192

10192

10192

10192

10192

10192

10192

1019210192

Floor Frame K

itBodenrahm

en-Bausatz * Kit de cadre pour plancher * K

it de entramado de pisos

10192 16

10194 2

10 x 11 BuildingQ

tyPa

rt Na

me

Bau 3,05 x 3,35* Edificio de 3,05 x 3,35* Rem

ise 3,05 x 3,35

Menge

CantidadQ

uantité

TeilbezeichungN

ombre de la pieza

Désignation de la pièce

1019218

10194 2

Part Nam

e *Teilbezeichung* N

ombre de la pieza *D

ésignation de la pièce

*Bau 3,05 x 3,96 * Edificio de 3,05 x 3,96

* Remise 3,05 x 3,96

Qty *M

enge*C

antidad *Quantité

*Bau 3,05 x 4,27 * Edificio de 3,05 x 4,27

* Remise 3,05 x 4,27

*Bau 3,05 x 3,66 * Edificio de 3,05 x 3,66

* Remise 3,05 x 3,66

10x12, 10x13, 10x14 Buildings

Page 36: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Befo

re Yo

u Beg

in / Site Pre

pa

ratio

n

Antes de empezar/Preparación del sitio

Avant de comm

encer/Préparation du terrain

1. Befo

re b

eg

inn

ing

co

nstruc

tion

, ch

ec

k loc

al b

uildin

g c

od

es

reg

ard

ing

foo

ting

s, loc

atio

n a

nd

oth

er re

qu

irem

en

ts.Stu

dy a

nd

un

de

rstan

d th

is ow

ne

r’s ma

nu

al.

2. Follo

w a

ll dire

ctio

ns a

nd

dim

en

sion

s ca

refu

lly.3. Fo

llow

the

step

seq

ue

nc

e c

are

fully fo

r co

rrec

t resu

lts.4

. Be

sure

all th

e p

arts fit to

ge

the

r pro

pe

rly be

fore

pro

ce

ed

ing

.5. IM

PORTA

NT: Re

mo

ve O

wn

er’s M

an

ua

l from

ma

in c

arto

n

1. Antes de empezar la construcción, verifique los códigos de

construcción locales relativos a cimentación, localización

y otros requisitos. Escudriñe y entienda este manual del

propietario.2. Siga todas las instrucciones y dim

ensiones con cuidado.3. Siga la secuencia de pasos con cuidado para realizar

resultados correctos.4. Asegure que todas las piezas se junten apropiadam

ente antesde continuar.

5. IMPO

RTANTE: Saque el M

anual del Propietario de la cajade cartón principal de su edificio de alm

acenaje.6. LA SEG

URID

AD AN

TE TOD

O: H

ay que tener cuidado alm

anejar las varias piezas de su juego porque algunas tienenbordes afilados. Póngase guantes de trabajo, protecciónpara los ojos y m

angas largas cuando ensamble o cuando

dé cualquier mantenim

iento a su juego.7. H

ERRAMIEN

TAS BASICAS: Destornillador Phillips núm

.2, alicates, guantes de trabajo, cinta m

étrica, nivel y azadao pala.

8. EL SUELO

DEBE ESTAR N

IVELADO

: Asegure que losm

arcos del piso estén planos en el suelo. Para preparar labase de tierra, quite césped y otros escom

bros. Nivele los

sitios altos con una pala plana y apisone la base.9. ¡N

O PISE LO

S CANALES H

ASTA QU

E EL MATERIAL D

EPISO

ESTE EN SU

LUG

AR!10. D

isponga el contenido de la caja de cartón por el número

de la pieza mientras repasa la lista de piezas. C

ontrole paraasegurar que Vd. tenga todas las piezas necesarias de sujuego.

1. Avant de comm

encer la construction, réviser les normes locales

de sécurité de construction relatives aux empattem

ents, àl‘em

placement et aux autres exigences.

2. Suivre attentivement toutes les directives et les dim

ensions.3. Suivre attentivem

ent la séquence des étapes pour obtenir lesrésultats désirés.

4. Avant de poursuivre, s‘assurer que toutes les pièces sontcorrectem

ent ajustées.5. IM

PORTAN

T : Retirer le Guide du propriétaire qui se trouve

dans l‘emballage principal de la rem

ise.6. SÉCU

RITÉ D‘ABO

RD : M

anipuler soigneusement les diverses

pièces du prêt-à-monter puisque certaines d‘entre elles ont des

angles coupants. Porter des gants de travail, une protectionoculaire et des m

anches longues pour assembler le prêt-à-

monter ou pour effectuer des travaux d‘entretien.

7. OU

TILS ESSENTIELS : tournevis Phillips n

o 2, pinces, gantsde travail, m

ètre à ruban, niveau, bêche ou pelle.8. ÉG

ALISER LE TERRAIN : S‘assurer que les pièces de la

charpente du plancher reposent à plat sur le sol. Pour préparerle lit de terre, enlever le gazon et les autres débris. Égaliser lespoints plus élevés avec une pelle plate et taper le lit de terre.

9. NE PAS M

ARCHER SU

R LES TRAVERSES AVANT D

‘AVOIR

POSÉ LE REVÊTEM

ENT D

U PLAN

CHER!

10. Déballer les pièces selon leur num

éro de pièce tout enconsultant la liste des pièces. S‘assurer que toutes les piècesnécessaires se trouvent dans l‘em

ballage.

Asse

mb

lyM

ontage * Ensamblaje * Assem

blage

or w

rite * O

der schreiben Sie an * o escriba * ou écrireA

rrow

Gro

up

Ind

ustrie

s 1101 N

orth

4th Stre

et, Bre

ese

, Illino

is 62230Inc

lude

Mo

de

l Num

be

r, Part N

umb

er a

nd Pa

rt Na

me

• Bitte geben Sie Ihre Modellnum

mer, Teilenum

mer und

Teilebezeichnung an.• Proporcione núm

ero del modelo, núm

ero de la pieza ynom

bre de la pieza.• Indiquer le num

éro de modèle, le num

éro de pièce et ladésignation de la pièce.

• Si encuentra que le hacen falta piezas, llame al 1-800-851-1085

If you find

a p

art m

issing c

all 1-800-851-1085

of yo

ur sto

rag

e b

uild

ing

.6. SA

FETY FIRST: C

are

mu

st be

take

n w

he

n h

an

dlin

g va

riou

s pie

ce

so

f you

r kit sinc

e so

me

co

nta

in sh

arp

ed

ge

s. We

ar w

ork g

love

s,e

ye p

rote

ctio

n a

nd

lon

g sle

eve

s wh

en

asse

mb

ling

or p

erfo

rmin

ga

ny m

ain

ten

an

ce

on

you

r kit.7. BA

SIC TO

OLS: N

o. 2 Ph

illips sc

rew

drive

r, plie

rs, wo

rk glo

ves, ta

pe

me

asu

re, le

vel a

nd

a sp

ad

e o

r sho

vel.

8. GRO

UN

D M

UST BE LEV

EL: Be su

re Flo

or Fra

me

s lie fla

t on

gro

un

d.

To p

rep

are

ea

rth b

ed

, rem

ove

sod

an

d o

the

r de

bris.

Leve

l the

hig

h sp

ots w

ith fla

t sho

vel a

nd

tam

p th

e b

ed

do

wn

.9.D

O N

OT STEP O

N C

HA

NN

ELS UN

TIL FLOO

RING

MA

TERIAL

IS IN PLA

CE!

10. Sep

ara

te c

on

ten

ts of th

e c

arto

n b

y the

pa

rt nu

mb

er

wh

ile re

view

ing

pa

rts list. Ch

ec

k to b

e su

re th

at yo

uh

ave

all th

e n

ec

essa

ry pa

rts for yo

ur kit.

Bevor Sie anfangen / Vorbereitung der Baustelle1.

Vor Baubeginn überprüfen Sie örtliche Bauvorschriften auf Erfordernissehinsichtlich Fußflächen, Bauplatz und w

eitere Erfordernisse. Lesen Sie diesesBesitzerhandbuch sorgfältig und verstehen Sie es.

2.Befolgen Sie alle Anw

eisungen und Abmessungen sorgfältig.

3.Zur Erzielung richtiger Ergebnisse halten Sie die Reihenfolge der Schrittegenau ein.

4.Bevor Sie w

eitermachen, vergew

issern Sie sich, daß alle Teile richtigzusam

menpassen.

5.W

ICH

TIG: N

ehmen Sie das Besitzerhandbuch aus dem

Hauptkarton Ihres

Lagerschuppens heraus.6.

SICHERH

EIT KOM

MT ZU

ERST: Verschiedene Teile Ihres Bausatzes müssen

vorsichtig gehandhabt werden, da sie scharfe K

anten haben. Tragen Sie beimZusam

menbau oder bei der D

urchführung von Wartungsarbeiten an Ihrem

Bausatz Arbeitshandschuhe, Augenschutz und lange Ärmel.

7.G

RU

ND

WE

RK

ZE

UG

E: N

r. 2 Kreuzschlitzschraubenzieher, Zange,

Arbeitshandschuhe, Maßband, W

asserwaage und ein Spaten oder eine

Schaufel.8.

DER BO

DEN

MU

SS EBEN SEIN

: Vergewissern Sie sich, daß die Bodenrahm

enflach am

Boden liegen. Zur Vorbereitung des Erdbetts entfernen Sie dieG

rasdecke und anderen Schutt. Ebnen Sie höhere Flächen mit einer flachen

Schaufel ein und stampfen Sie das Bett nieder.

9.STEIG

EN SIE ERST AU

F DIE KAN

ÄLE, WEN

N D

AS BOD

ENM

ATERIALPLAZIERT IST!

10.Sortieren Sie den K

artoninhalt nach der Teilenumm

er, während Sie die

Teileliste überprüfen. Vergewissern Sie sich, daß Sie alle für Ihren Bausatz

notwendigen Teile haben.

1. Befo

re a

ssem

bling

this kit, the flo

or

fram

es p

ac

ked

with the

build

ing m

ustb

e a

ssem

ble

d.

• Vor dem Zusam

menbau dieses Bausatzes

müssen die m

it dem G

erätehaus mitgelieferten

Bodenrahmen zusam

mengebaut w

erden.• Avant de m

onter ce kit, les cadres de planchersfournis avec le bâtim

ent doivent être montés.

• Antes de armar este kit, se deben ensam

blarlos entram

ados del piso comprim

idos con eledificio.

Page 37: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

3. Bend

Tab

s and

asse

mb

le re

ma

ining p

arts.

4. Fram

e m

ust be

squa

re a

nd le

vel.

• Montieren Sie überlappende Teile.

• Ensamble las piezas que solapan.

• Assembler les pièces en recouvrem

ent.

• Biegen Sie die Endstücke um und bauen

Sie die verbleibenden Teile zusamm

en.• D

oble las lengüetas y ensamble las piezas que quedan.

• Plier les languettes et assembler les autres pièces.

Bend

Tab

s

Asse

mb

le

IMPO

RTAN

T :Th

e h

ole

s mu

st fac

e to

the

ce

nte

r.W

ICHTIG

: Die Löcher m

üssen der Mitte

zugewendet sein.

IMPO

RTANTE: Los agujeros deben

mirar hacia el centro.

IMPO

RTANT : Les trous doivent être

orientés vers le centre.

• Der Rahm

en muß rechtw

inkelig und eben sein.• El m

arco del piso debe ser cuadrado y nivelado.• La charpente du plancher doit être d’équerre et de niveau.

The p

erim

ente

r is the flo

or

fram

e fro

m the

build

ing.

Der Bodenrahm

en des Gerätehauses ist

die Eingrenzung.Le périm

ètre est le cadre de plancher du bâtiment.

El perímetro es el m

arco del piso desde el edificio.

10194

10192

10192

10192

10194

10192

10192

10192

10192

10192

10192

10192

10192

10194

10192

10194

10192

10192 10192

10192

10192

10192

10192

10192

10192

10192

10192

10 x 11

2. Asse

mb

le p

arts tha

t ove

rlap

.

Five (5) She

ets 4’ x 8’ fo

r 10 x 14 & 10 x 13

Four (4) She

ets fo

r 10 x 12 & 10 x 11

• Fünf (5) Platten zu (1,22 mx2,44 m

) für 3,05mx4,27m

und 3,05mx3,96m

, Vier (4) Platten zu (1,22 m

x2,44 m) für 3,05m

x3,66m und 3,05x3,35

• Cinco (5) hojas de 4’ x 8’ (1,22 m

x 2,44 m) para 10 x 14 y 10 x 13

Cuatro (4) hojas de 4’ x 8’ (1,22 m

x 2,44 m) para 10 x 12 y 10 x 11

• Cinq (5) panneaux de 4’ x 8’ pour 10 x 14 et 10 x 13

Quatre (4) panneaux de 4’ x 8’ pour 10 x 12 et 10 x 11

Insta

lling

Plywo

od

1. Cut Plyw

oo

d to

dim

ensio

ns show

n.

• Einbau des Sperrholzes • Instalación de la madera m

ultilaminar

• Installation du contre-plaqué

• 1,6 cm M

indestdicke. Qualitätsgrad für Außenanw

endungen• U

n mínim

o de 5/8” (1,6 cm) de grueso.

Calidad apropiada para el exterior

• Épaisseur minim

ale : 5/8”. Qualité extérieure

• Erfordernisse für das Sperrholz • Madera m

ultilaminar requerida

• Exigences en matière de contre-plaqué

Plywo

od

Req

uire

me

nts

5/8” Minim

um Thic

kness. Exte

rior G

rad

e

• Schneiden Sie das Sperrholz auf die gezeigten Maße zu.

• Corte la madera m

ultilaminar según las dim

ensiones que sem

uestran.• Couper les panneaux de contre-plaqué selon les dim

ensionsindiquées.

2. Faste

n to fra

me

with d

ry wa

ll scre

ws.

• Befestigen Sie es mit Schnellbauschrauben am

Rahmen.

• Asegúrela al marco con tornillos para cartón-yeso.

• Fixer les pièces à la charpente avec des vis à placoplâtre.

10 x 12,10 x 13 & 10 x 14

10192

1019210192

10192

10192

10192

10192

10192

10192

10192

10192

• Biegen Sie dieEndstücke• D

oble las lengüetas• Plier les languettes

• Montieren

• Ensamble

• Assembler

Page 38: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

Installing

Plywo

od

10 x 1210 x 14 & 10 x 13

Finish co

nstructio

n of yo

ur Stora

ge

Building

follo

wing

the A

ssem

bly Instruc

tions.

Einbau des Sperrholzes * Instalación de la madera m

ultilaminar * Installation du contre-plaqué

• Beenden Sie den Bau Ihres Lagerschuppens und befolgen Sie die Montageanleitungen.

• Com

plete la construcción de su edificio de almacenaje siguiendo las instrucciones para

el ensamblaje.

• Finir la construction de la remise en suivant les directives d‘assem

blage.

Sheet #248“ x 68”

Sheet #448“ x 68”

Sheet #348“ x 70 1/4”

Sheet #148“ x 70 1/4”

Sheet #222 1/8“ x 36 5/8”

Sheet #122 1/8“ x 38 7/8”

Sheet #422 1/8“ x 31 3/8”

Sheet #322 1/8“ x 31 3/8”

Platte 1 * Hoja núm. 1 * Panneau no 1121.9 cm x 178.4 cm

Platte 3 * Hoja núm. 3 * Panneau no 3121.9 cm x 178.4 cm

Platte 3 * Hoja núm. 3Panneau no 3

56.2 cm x 79.7 cm

Platte 1 * Hoja núm. 1Panneau no 1

56.2 cm x 98.7 cm

Platte 2 * Hoja núm. 2 * Panneau no 2121.9 cm x 172.7 cm

Platte 4 * Hoja núm. 4 * Panneau no 4121.9 cm x 172.7 cm

Platte 4 * Hoja núm. 4Panneau no 4

56.2 cm x 79.7 cm

Sheet #148“ x 78 3/4”

Sheet #448“ x 76 1/2”

Sheet #522 1/8“ x 78 3/4”

Sheet #248“ x 76 1/2”

Platte 2 * Hoja núm. 2* Panneau no 2

121.9 cm x 194.3 cm

121.9 cm x 191.9 cm

ES1014 & 697.6874048” x 75 9/16”

ES1014& 697.68740

22 1/8” x 75 9/16”

121.9 cm x 191.9 cm

Platte 1 * Hoja núm. 1* Panneau no 1

121.9 cm x 200 cm

Platte 5 * Hoja núm. 5* Panneau no 5

56.2 cm x 200 cm

Sheet #348“ x 78 3/4”

Platte 3 * Hoja núm. 3 * Panneau no 3

121.9 cm x 200 cm

Platte 4 * Hoja núm. 4* Panneau no 4

121.9 cm x 194.3 cm

56.2 cm x 191.9 cm

Platte 2 *Hoja núm. 2Panneau no 2

56.2 cm x 93 cm

CO

RRECT

INC

ORREC

T

•Richtig •CorrectoCorrect

• Falsch • Incorrecto• Incorrect

10 x11Sh

ee

t #3 30 3/8“ x 48”

She

et #

3 30 3/8“ x 48”

Platte 3 * Hoja núm

. 3Panneau n

o 377.2 c

mx 56.2 c

m

ES1014 & 697.6874048” x 75 9/16”

Sheet #522 1/8“ x 76 1/2”

Platte 5 * Hoja núm. 5* Panneau no 5

56.2 cm x 194.3 cm

She

et #

330 3/8“ x 22 1/8”

Shee

t #148“ x 96”

Platte 1 * Hoja núm

. 1* Panneau n

o 1121.9 c

m x 243.8 c

m

Platte 2 * Hoja núm

. 2* Panneau n

o 2121.9 c

m x 243.8 c

m

Shee

t #248“ x 96”

Platte 3 * Hoja núm

. 3* Panneau n

o 377.2 c

m x 121.9 c

m

Platte 3 * Hoja núm

. 3* Panneau n

o 377.2c

m x 121.9 c

m

She

et #

496“

x 22 1/8”

Platte 4H

oja núm. 4

Panneau no 4

243.8 cm

x 56.2 cm

Page 39: SR01et Model No. LW1012FB - Arrow Sheds 715800111wFB.pdfArrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used

SOME FACTS ABOUT RUSTRusting is a natural oxidizing process that occurswhen bare metal is exposed to moisture. Problemareas include screw holes, unfinished edges, orwhere scrapes and nicks occur in the protectivecoating through normal assembly, handling anduse. Identifying these natural rusting problem areasand taking some simple rust protection precautionscan help to stop rust from developing, or stop itquickly as soon as it appears.

1. Avoid nicking or scraping the coating surface,inside and out.

2. Use all the washers supplied. In addition to pro-tecting against weather infiltration, the washers pro-tect the metal from being scraped by the screws.

3. Keep roof, base perimeter and door tracks free ofdebris and leaves which may accumulate and retainmoisture. These can do double damage since theygive off acid as they decay.

4. Touch up scrapes or nicks and any area of visiblerust as soon as possible. Make sure the surface isfree of moisture, oils, dirt or grime and then apply aneven film of high quality touch-up paint.

SOME FACTS ABOUT RUST XA35hw