SSLLDDCC

MMOONNTTHHLLYY SSYYSSTTEEMM OOPPEERRAATTIIOONN RREEPPOORRTT

FFOORR TTHHEE MMOONNTTHH MMAAYY 22001166

1.1 Installed Capacity of SGS & Share from Central Sector :

Installed Capacity

(MW)

State Sector Gen.

Stations (MW)

Central Sector

Share (MW)Total

June/16 2924.7 1125.92 4050.62

June/15 2424.7 1190.92 3615.62

% Increase 20.62% -5.46% 12.03%

1.2 Energy Requirement (Mus) & Transmission Loss (%) :

Energy

Un-Restricted

Requirement

(In MU)

Total Supply

(upto 132 KV)

(In MU)

Transmission

Loss %

June/16 1873.01 1856.62 3.09%

June/15 1694.17 1688.73 2.46%

% Increase 10.56% 9.94% 25.47%

1.3 Peak Demand (MW) :

Demand

Max.Un-Restricted

Demand Met (In

MW)

Max Demand

Met

(In MW)

June/16 3498 3398

June/15 3525 3350

% Increase -0.77% 1.43%

1.4 Generation Capacity Outage :

Planned Outage MU

June/16 31.34

June/15 145.13

Forced Outage MU

June/16 80.42

June/15 140.58

1.5 Generation in Mus :

NOTE: The generation of MTPP # 2 is In-firm.

1. SALIENT FEATURES OF CHHATTISGARH GRID FOR THE

MONTH OF JUNE - 2016

Capacity Outage

KTPS HTPS DSPMTPS KWB Extn. MTPPTotal

Thermal

Total

Hydel Gen.

Jun-15 173 365 335 324 0 1196 14

Jun-16 207 449 346 449 59 1325 3

May-16 213 556 352 301 10 1432 7

173

365 335324

0

1196

14

207

449346 449

59

1325

3

213

556

352301

10

1432

70

200

400

600

800

1000

1200

1400

1600

MU

s

Monthly Report Jun16

1.6 Demand Met in MW :

Demand Met

Un Restricted Demand

1.7 Water Level of Major Reservoirs for last day of the month in Mtrs :

Demand Met Un Restricted Demand

Jun-15 3350 3525

Jun-16 3398 3498

May-16 3457 3510

3350

3525

3398

34983457

3510

3000

3100

3200

3300

3400

3500

3600M

W

Hasdeo Bango Gangrel

Jun-15 355.00 339.87

Jun-16 345.49 340.34

May-16 345.86 340.54

355.00

339.87

345.49

340.34

345.86

340.54

330.00

335.00

340.00

345.00

350.00

355.00

360.00

Mtr

Monthly Report Jun16

1

2

3

4

5

7

8

9

10

11 Total Interruption in following S/s occurred in JUNE-16.

S.No Date Name of the Sub StationTime of occurance

( hh:mm)

Restoration

Time (hh:mm)

1 01-Jun-16 132 KV BHATAPARA 14:48 15:34

2 03-Jun-16 132 KV S/S SARONA 02:07 02:40

3 03-Jun-16 132 KV S/S SARONA 02:50 03:00

4 03-Jun-16 132 KV S/S GUDHIYARI 02:07 02:44

5 03-Jun-16 132 KV S/S GUDHIYARI 02:50 02:55

6 03-Jun-16 132 KV S/S BIRGAON 02:07 02:42

7 03-Jun-16 132 KV S/S BIRGAON 03:05 03:40

8 03-Jun-16 132 KV S/S SECTOR 'C' 02:20 02:37

9 03-Jun-16 132 KV S/S SECTOR 'C' 03:05 03:36

10 03-Jun-16 132 KV S/S HIRAPOOLING 07:07 18:51

11 03-Jun-16 132 KV S/S BHILAI 02:50 03:05

12 03-Jun-16 132 KV S/S KURUD (BHILAI) 02:50 03:11

13 03-Jun-16 132 KV S/S RUABANDHA 02:50 03:08

14 07-Jun-16 132KV S/S BANGO 16:46 18:21

15 07-Jun-16 132KV S/S BHANUPRATAPPUR 21:00 21:11

16 13-Jun-16 220 KV S/S SILTARA 15:06 15:17

17 14-Jun-16 132 KV S/S BORJHARA 17:40 17:53

18 14-Jun-16 132 KV S/S HIRA POOLING 17:40 17:50

19 14-Jun-16 132 KV S/S SECTOR 'C' 17:40 17:45

20 17-Jun-16 132 KV SARANGARH S/S 16:15 16:36

21 26-Jun-16 132 KV S/S RAJNANDGAON 19:55 20:05

197 number of planned shutdowns of transmission lines & elements in CSPTCL grid

availed in the month of JUNE-16.

21 number of force outages of CSPGCL units took place in the month of JUNE-16.

2. POWER SUPPLY POSITION & GRID PERFORMANCE DURING THE

MONTH OF JUNE-2016.

The maximum demand of Chhattisgarh met during JUNE-16 was 3398 MW on dated 30-

06-2016 , which is 1.43 % more than the JUNE-15 of 3350 MW.

The maximum unrestricted demand during the month was 3498 MW on 30-06-2016 and

minimum demand met was 2267 MW on 24-06-2016 .

The energy requirement for the JUNE-16 was 1873.01 MU which was 10.56 % more than

the requirement of 1694.17 MU in JUNE-15.

Backing down of generation for about 0.055 MU as per the requirement of the system.

Load Shedding was also excercised during the month of JUNE-16 for 16.39 MU.

Based upon the blockwise frequency recorded in SCADA,Grid Frequency remained in the

IEGC Band of 49.9 to 50.05 Hz for 76.35 % of time during the month. It was above 50.05

Hz for 19.06 % of time and below 49.90 Hz for 4.58 % of time.

During the month there was no instance of Under Frequency Relay operation reported in

CSPTCL grid as the frequency did not touch 49.2 Hz at all.

175 number of force outages of transmission lines & elements in CSPTCL grid took place

in the month of JUNE-16.

6

Monthly Report Jun16

3.1 Generating Units Commissioned during JUNE-2016.

S.No. Name of Project Unit No. Capacity (MW) Date of First Syn. C.O.D

3.2 Transmission Lines/Elements Commissioned during JUNE-2016.

S.No. Name of Project Voltage Level Length in Ckt KM No. of Ckt Date of Syn.

400 KV

220 KV

163 MVA Additional Transformer at 220

KV Girwani S/s.-- -- -- Charged on 28.6.2016

132 KV

1LILO of Raigarh-Gharghoda-Pathalgaon

at Girwani.132 KV 3.54 DCDS Charged on 28.6.2016

22nd Circuit of 132 KV Ambikapur-

Patthalgaon Line.132 KV 92 DCSS Charged on 29.6.2016

NIL

NIL

Monthly Report Jun16

S.No. PARTICULAR UNIT Jun-16

C.S.P.G.C.L GENERATION SCHEDULE & ACTUAL INJECTION (Ex-Bus)

KTPS, Korba East (sch.) MU 181.72

HTPS, Korba West (Sch.) MU 401.11

DSPM, Korba East (Sch.) MU 318.53

Korba West (Extn) (Sch.) MU 249.45

MTPP Tendubhata MU 0.06

C.S.P.G.C.L Gen. SCHEDULE MU 1,150.87

KSTPS, Korba East (inj) MU 182.72

HTPS, Korba West (Inj) MU 403.70

DSPM, Korba East (Inj) MU 319.11

Korba West (Extn) (Inj) MU 246.38

MTPP (FIRM+INFIRM) MU 43.31

HASDEO BANGO HYDEL (Inj) MU 3.19

C.S.P.G.C.L Gen. JMR data (132 KV &

above)U MU 1,198.41

SHP-Gangrel (Inj) MU 0.00

SHP-Sikasar (Inj) MU 0.00

SHP-HTPS Korba West (Mini-Micro) (Inj) MU 0.82

CO-GEN Kawardha plant (inj) MU 0.00

C.S.P.G.C.L Gen. JMR data (33 KV &

Below)MU 0.81

Schedule Energy, Actual Energy Injection & OD(+)/UD(-)

2 CPP/IPP/BIOMASS SCHEDULE & ACTUAL INJECTION

INTER REGIONAL POWER PURCHASE / IMPORT [EX-CG] (SCHEDULED)

Bilateral/Banking via STOA & MTOA (Sch) CSEB STOA MU 131.25

MTOA MU 13.72

PX (Sch)(Collective) CSEB+OAC MU 18.66

2(B)

INTRA REGIONAL POWER

PURCHASE/IMPORT [EX-CG] (SCHEDULED)

via PPA (upto 33 KV)

CSEB MU 0.58

ENERGY BALANCE STATEMENT OF JUNE 2016

1

2(A)

Monthly Report Jun16

ENERGY BALANCE STATEMENT OF JUNE 2016

INTER REGIONAL POWER SALE/EXPORT [EX-CG] (SCHEDULED)

STOA MU -178.91

MTOA MU -145.82

Total -324.74STOA MU 0.00

MTOA MU 0.00

Total 0.00

PX (Sch) CSEB+OAC MU -58.98

2(D)TOTAL CPP/IPP/Biomass INJECTION 132

KV & ABOVEV MU 107.69

2(E)TOTAL CPP/IPP/Biomass/RENEWABLE

SOURCE INJECTION 33 KV & BelowMU 70.65

3 CENTRAL SECTOR GENERATION SCHEDULE & ACTUAL INJECTION

3(A) SAIL (BSP) NSPCL SCHEDULE (Ex-CG) MU 146.35

3(B)CEN. SECTOR SCHEDULED ENERGY (EX-

ISGS) MU 785.34

3'(C)CEN. SECTOR SCHEDULED ENERGY (EX-

CG) MU 744.70

3(D)Drawal/Injection from CTU Grid at CG

Periphery (EXCL. BSP)W MU 550.53

5

NET DRAWL FROM CENTRAL SECTOR INCL

BI-LATERALS as per WRPC Weekly UI

Account

C MU 729.91

6 OD/UD ( + / - ) D=C-B MU 59.4455

6(A) Total Overdrawal (+) E 85.03

6(B) Total Underdrawal (-) -25.59

6(C) DSM Rate for UD Rs/Kwh 0.88

6(D)DSM Rate for OD Rs/Kwh

3.15

6(E) NET DSM Rate Rs. 4.13

7CG SUPPLY (EXCL.AUX.CONS) At 132 KV &

ABOVE X=U+V+W MU 1,856.62

8CG CONSUMPTION AT 33KV XMER SIDE +

EHV SalesY MU 1,797.52

9 Z=X-Y MU 59.10

% 3.18%

10 LOAD SHEDDING (Calculated) MU 16.39

11 Requirement MU 1,873.01

2'(C) BILATERAL POWER SALE/EXPORT [EX-CG]

(SCHEDULED) via MTOA & STOA

CSEB

OAC

TRANSMISSION LOSS OF CG SYSTEM

Monthly Report Jun16

5. DEMAND PARTICULARS FOR THE MONTH OF JUNE-2016

Demand MW Date Time Frequency

Demand Met (MW) 3398 30-Jun-16 24:00:00 50.04

Un restricted Demand (MW) 3498 30-Jun-16 20:00 49.99

Minimum Demand 2267 24-Jun-16 8:00 50.05

Break-Up of Generation / Injection at the time of monthly Peak Demand

30/06/2016 (24:00 hrs)

MW %Total Import at the time

of Max Demand MetMW

Total Export at

the time of Max

Demand Met

MW

CSPGCL Thermal 1603 47% ACBIL 1 Hariyana 192

CSPGCL Hydel 2 0.06% ACBIL 12 Hariyana 122

CPP/IPP's (STOA+PPA) Injection 2 0.06% BALCO 33 DTL 16

Other Injection 105 3% DB POWER 57 DTL 84

CS Share including BSP share in

NSPCL 1064 31%

DB POWER

(Additional)103 KSEB 0

URS 492 14% KWBPL 31 413

Net Import / Export 12 0.35% JPL-II 29

OD(+) / UD(-) 118 3% LAMKPL 13

Demand Met (MW) 3398 Power Exchange 146

425

CSPGCL Thermal 47%

CSPGCL Hydel0.06%CPP/IPP's (STOA+PPA)

Injection0.06%

Other Injection3%

CS Share including BSP share in NSPCL

31%

URS14%

Net Import / Export 0.03% OD(+) / UD(-)

3%

Break-Up of Max. Demand met : 3398 MW on 30 June 2016 at 24:00 Hrs.

Monthly Report Jun16

ACBIL1%

ACBIL12% BALCO

33%

DB POWER57%

DB POWER (Additional)

103%KWBPL31%

JPL-II29%

LAMKPL13%

Power Exchange146%

Total Import (425 MW) at the time of Max. Demand Met.

Hariyana192%

Hariyana122%

DTL16%

DTL84%

KSEB0%

Total Export (413 MW) at the time of Max. Demand Met.

Monthly Report Jun16

Jun-16Prog. From

01.04.2016Jun-16

Prog. From

01.04.2016

1 50 44.00 26.48 83.63 73.56 76.59

2 50 43.00 3.47 35.39 9.63 32.41

3 50 44.00 25.16 69.49 69.89 63.63

4 50 46.00 19.87 79.36 55.20 72.67

5 120 105.00 66.82 202.72 77.34 77.35

6 120 42856.00 42583.00 42709.43 42948.00 99.96

STN. 440 367.00 207.48 662.71 65.49 68.96

1 250 253.00 176.60 525.00 98.11 96.15

2 250 253.00 169.50 526.50 94.17 96.43

STN. 500 506.00 346.102 1051.50 96.14 96.29

1 210 209.00 115.11 405.25 76.13 88.36

2 210 210.00 106.81 388.37 70.64 84.68

3 210 188.00 113.65 360.98 75.16 78.71

4 210 202.00 112.97 371.03 74.71 80.90

STN. 840 758.00 448.54 1525.62 74.16 83.16

4 KWB Extn.1 1 500 454.00 264.32 870.15 73.42 79.68

1 500 0.00 0.00 172.39 0.00 15.79

2 500 299.00 58.73 58.73 -- --

STN. 1000 299.00 58.72727 231.12 -- 15.92

6 3280 1325.17 4341.11 56.11 67.50

1 40 0.54 10.27

2 40 1.23 10.71

3 40 1.51 8.09

STN. 3.28 29.08

1 2.5 0.00 0.54

2 2.5 0.00 0.75

3 2.5 0.00 0.62

4 2.5 0.00 0.60

STN. 0.00 2.50

1 3.5 0.00 0.00

2 3.5 0.00 0.54

STN. 0.00 0.54

1 850 KW 0.42 1.303

2 850 KW 0.42 1.231

STN. 0.842 2.534

NOTE: Generation of MARWA # 2 is In-firm.

Max.

Demand

(MW)

4

Gangrel

Sikasar

KWB

Mini Micro

TOTAL THERMAL

HYDEL

2

3

Marwa TPS5

6. ENERGY GENERATED, PLF & MAX. DEMAND OF GENERATING

STATIONS/UNITS FOR THE MONTH OF JUNE-2016

Hasdeo Bango1

Hasdeo Thermal

Power Station3

Korba Thermal

Power Station,

Korba East

Dr Shyama

Prasad

Mukherjee TPS

2

Power Station Unit

No.

THERMAL

1

Energy generation (MU) PLF (%)

S.No.

Installed

Capacity

(MW)

Monthly Report Jun16

Date Max Min Average

01-Jun-16 50.12 49.78 49.98 12.50 73.96 13.54

02-Jun-16 50.07 49.84 49.96 15.63 81.25 3.13

03-Jun-16 50.11 49.79 49.99 10.42 71.88 17.71

04-Jun-16 50.10 49.87 49.99 4.17 83.33 12.50

05-Jun-16 50.13 49.89 50.01 1.04 73.96 25.00

06-Jun-16 50.13 49.85 50.03 1.04 66.67 32.29

07-Jun-16 50.19 49.91 50.03 0.00 69.79 30.21

08-Jun-16 50.15 49.88 50.02 1.04 86.46 12.50

09-Jun-16 50.24 49.87 50.01 3.13 72.92 23.96

10-Jun-16 50.13 49.86 50.03 2.08 63.54 34.38

11-Jun-16 50.17 49.90 50.03 0.00 71.88 28.13

12-Jun-16 50.15 49.81 50.01 4.17 72.92 22.92

13-Jun-16 50.17 49.86 50.02 5.21 69.79 25.00

14-Jun-16 50.13 49.82 50.02 3.13 61.46 35.42

15-Jun-16 50.16 49.81 50.01 3.13 81.25 15.63

16-Jun-16 50.17 49.72 50.00 13.54 70.83 15.63

17-Jun-16 50.14 49.72 49.99 8.33 73.96 17.71

18-Jun-16 50.13 49.78 49.98 12.50 77.08 10.42

19-Jun-16 50.13 49.90 50.02 0.00 75.00 25.00

20-Jun-16 50.18 49.78 50.00 4.17 76.04 19.79

21-Jun-16 50.10 49.87 50.01 1.04 75.00 23.96

22-Jun-16 50.18 49.91 50.02 0.00 77.08 22.92

23-Jun-16 50.08 49.88 50.00 1.04 94.79 4.17

24-Jun-16 50.06 49.85 49.99 2.08 96.88 1.04

25-Jun-16 50.09 49.78 49.99 10.42 82.29 7.29

26-Jun-16 50.10 49.83 50.00 3.13 89.58 7.29

27-Jun-16 50.14 49.84 50.02 4.17 67.71 28.13

28-Jun-16 50.13 49.82 50.01 3.13 76.04 20.83

29-Jun-16 50.10 49.75 50.00 5.21 77.08 17.71

30-Jun-16 50.16 49.87 50.01 2.08 80.21 17.71

Monthly 50.24 49.72 50.01 4.58 76.35 19.06

% of Time Freq.

was >50.05 Hz

7. FREQUENCY PROFILE DURING JUNE-2016

(As per block wise frequency recorded in SLDC Raipur)

FREQUENCY (Hz)% of Time

Freq. was

<49.9 Hz

% of Time

Freq. was

between 49.9

to 50.05 Hz

Monthly Report Jun16

Station UNIT #

INSTALLED

CAPACITY

(IN MW)

OUTAGE DATE &

TIME

SYN. DATE &

TIME

OUTAGE

(HH:MM)LOSS(IN MU) REASON

1 50 NIL NIL NIL NIL NIL

2 50 01/06/16 00:00 27/06/16 02:43 626:43:00 31.336 FOR AOH

3 50 NIL NIL NIL NIL NIL

4 50 NIL NIL NIL NIL NIL

5 120 NIL NIL NIL NIL NIL

6 120 NIL NIL NIL NIL NIL

1 210 NIL NIL NIL NIL NIL

2 210 NIL NIL NIL NIL NIL

3 210 NIL NIL NIL NIL NIL

4 210 NIL NIL NIL NIL NIL

5 500 NIL NIL NIL NIL NIL

1 250 NIL NIL NIL NIL NIL

2 250 NIL NIL NIL NIL NIL

Total 31.336

8.1 PLANNED OUTAGES OF GENERATORS FOR THE MONTH OF JUNE-2016

KTPS

HTPS

DSPM

Monthly Report Jun16

StationUnit

No.

INSTALLED

CAPACITY

(IN MW)

NO.OF

TRIPPINGS

OUTAGE DATE &

TIME

SYN. DATE &

TIMEOUTAGE (HH:MM)

GENERATION

LOSS(IN MU)REASON

1 50 1 28/06/16 07:53 01/07/16 00:00 64:07:00 3.206 DUE TO TUBE LEAKAGE IN CONV S/H

2 50 0 NIL NIL NIL NIL NIL

3 50 1 06/06/16 04:18 08/06/16 21:25 65:07:00 3.256DUE TO TUBE LEAKAGE IN CONVECTIVE Ist

Stage

4 50 01/06/16 10:16 08/06/16 12:47 170:31:00 8.526 DAMAGE OF FLUE GAS DUCT

4 50 09/06/16 17:36 10/06/16 19:54 26:18:00 1.315 DUE TO OUTAGE OF MILL FAN 4B

4 50 12/06/16 21:00 14/06/16 15:47 42:47:00 2.139 DUE TO TUBE LEAKAGE IN SCREEN S/H

5 120 1 28/06/16 17:05 30/06/16 05:15 36:10:00 4.340 Tube Leakage

6 120 1 30/06/16 09:45 30/06/16 18:40 8:55:00 1.070 Gen. Xmer Earth Fault

1 210 1 01/06/16 22:10 02/06/16 22:40 24:30:00 5.145 Economizer Tube Leakage

2 210 02/06/16 23:30 04/06/16 01:35 26:05:00 5.477 Economizer Tube Leakage

2 210 12/06/16 18:17 13/06/16 13:18 19:01:00 3.993 Re-Heater Tube Leakage

2 210 17/06/16 09:31 18/06/16 02:28 16:57:00 3.560 Condenser Pr. High & Low Vacuum

2 210 18/06/16 05:50 18/06/16 07:33 1:43:00 0.361 Due to HP Control Valve closed

3 210 1 22/06/16 17:16 23/06/16 13:01 19:45:00 4.147 S/H Tube Leakage

4 210 09/06/16 08:25 10/06/16 04:20 19:55:00 4.182 S/H Tube Leakage

4 210 13/06/16 04:45 13/06/16 20:30 15:45:00 3.308 Economizer Tube Leakage

5 500 03/06/2016 15:37 04/06/2016 0:58 9:21:00 4.675Unit tripped on first cause of generatoe circuit

breaker get opened.

5 500 04/06/2016 1:07 04/06/2016 4:27 3:20:00 1.667As detailed above unit trriped on Reheater

Protection

5 500 04/06/2016 5:27 04/06/2016 7:45 2:18:00 1.150CONDENSOR PROTECTION VARIABLE SET

POINT LOW

5 500 13/06/2016 7:33 13/06/2016 12:17 4:44:00 2.367As detailed above unit tripped on "Flame Failure

Trip" Protection.

5 500 20/06/2016 12:12 21/06/2016 8:37 20:25:00 10.208 D. C. SUPPLY FAILURE

1 250 0 NIL NIL NIL NIL NIL

2 250 1 23/06/2016 23:06 25/06/2016 0:50 25:44:00 6.433 Boiler water wall leakage

Total 21 623:28:00 80.525

8.2 FORCED OUTAGES OF STATE GENERATING STATIONS FOR THE MONTH OF JUNE-2016

3

KTPS

DSPM

4

2

5

HTPS

Monthly Report Jun16

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF JUNE-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

1 1-Jun-16 132 KV B PHASE PT SET - I AT 220 KV S/S BHATAPARA 14:48 15:34 0:46:00

2 1-Jun-16 132 KV BARSOOR - KIRANDUL CKT No.II 17:32 17:45 0:13:00

3 2-Jun-16 220 KV DSPM - BANARI CKT 09:26 09:42 0:16:00

4 2-Jun-16 220 KV GURUR - BARSOOR CKT 16:07 16:45 0:38:00

5 2-Jun-16 132 KV JAGDALPUR - AMAGUDA CKT 17:08 17:24 0:16:00

6 2-Jun-16 132 KV JAGDALPUR - BARSOOR CKT No.I 18:20 18:25 0:05:00

7 3-Jun-16 160 MVA X-MER AT 220 KV S/S BHILAI 02:07 03:20 1:13:00

8 3-Jun-16 125 MVA X-MER NO. II AT 220 KV S/S BHILAI 02:50 03:31 0:41:00

9 3-Jun-16 160 MVA X-MER NO. I, II & III AT 220 KV S/S URLA 03:05 03:20 0:15:00

10 3-Jun-16 220 KV BHILAI - BARSOOR CKT 02/06/2016 15:42 03/06/2016 14:27 22:45:00

11 3-Jun-16 132 KV GHARGHODA - MAHAVEER ENERGY CKT 16:00 16:33 0:33:00

12 3-Jun-16 3 X 40 MVA X-MER AT 220 KV S/S BARSOOR 16:10 16:38 0:28:00

13 3-Jun-16 220 KV RAIGARH - JPL CKT NO. I 16:05 17:35 1:30:00

14 3-Jun-16 132 KV RAIGARH - SARANGARH CKT NO. I 17:07 17:37 0:30:00

15 3-Jun-16 132 KV RAIGARH - SARANGARH CKT NO. II 17:07 17:31 0:24:00

16 3-Jun-16 132 KV BHILAI RLY TRACTION NO. I & II 02:50 03:04 0:14:00

17 3-Jun-16 132 KV BHILAI - ACC CKT 02:07 02:45 0:38:00

18 3-Jun-16 132 KV BIRGAON - HIRAPOOLING CKT 02:07 13:13 11:06:00

19 4-Jun-16 132 KV AMBIKAPUR - BISHRAMPUR CKT NO. I 16:56 17:26 0:30:00

20 4-Jun-16 132 KV AMBIKAPUR - BISHRAMPUR CKT NO. II 16:46 19:30 2:44:00

21 4-Jun-16 132 KV BARSOOR - KIRANDUL CKT NO. I 18:35 19:02 0:27:00

22 5-Jun-16 220 KV KWB- MOPKA CKT 9:43 10:26 0:43:00

23 5-Jun-16 220 KV CHHURI- KOTMIKALA CKT-I 16:27 17:05 0:38:00

24 5-Jun-16 132 KV KOTMIKALA-MANENDRAGARG CKT-II 16:32 16:59 0:27:00

25 7-Jun-16 220KV BISHRAMPUR - CHHURI CKT. 07/06/2016 16:14 08/06/2016 0:13 7:59:00

26 7-Jun-16 132KV BANGO - MANENDRAGARH CKT. 16:45 18:10 1:25:00

27 7-Jun-16 132KV BANGO - BISHRAMPUR CKT. 16:45 18:18 1:33:00

28 7-Jun-16 132KV BANGO - CHHURI CKT. 16:53 17:49 0:56:00

29 7-Jun-16 132KV BANGO - JAMUNIPALI CKT. 17:27 17:45 0:18:00

30 7-Jun-16 132KV JAMUNIPALI - CHHURI CKT. 17:28 17:55 0:27:00

31 7-Jun-16 220KV RAIGARH - JPL CKT. NO. I 17:35 19:20 1:45:00

32 7-Jun-16 132KV MANENDRAGARH - BAIKUNTHPUR CKT. 18:06 18:16 0:10:00

33 7-Jun-16 132KV RAIGARH -SIKASAR CKT. 18:05 18:55 0:50:00

34 7-Jun-16 132KV DONGARGARH - BALAGHAT CKT. 19:05 20:06 1:01:00

35 7-Jun-16 132KV RR ENERGY - RAIGARH CKT. 17:38 18:16 0:38:00

Monthly Report Jun16

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF JUNE-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

36 7-Jun-16 132KV GURUR - DALLIRAJHARA CKT. 20:05 20:15 0:10:00

37 7-Jun-16 132KV GURUR - BHANUPRATAPPUR CKT. 19:55 20:05 0:10:00

38 7-Jun-16 132KV GURUR - KANKER CKT. 19:55 20:26 0:31:00

39 7-Jun-16 132KV SIMGA - CENTURI CKT. 07/06/2016 20:30 08/06/2016 1:05 4:35:00

40 7-Jun-16 220KV DSPM - SUHELA CKT. 07/06/2016 23:46 08/06/2016 12:52 13:06:00

41 8-Jun-16 132KV BANGO - MANENDRAGARH CKT. 01:16 05:30 4:14:00

42 8-Jun-16 132KV BANGO - BISHRAMPUR CKT. CKT. 01:16 06:43 5:27:00

43 8-Jun-16 132KV URLA - KACHNA CKT. 07:25 07:28 0:03:00

44 8-Jun-16 132KV JAGDALPUR - BARSOOR CKT. NO. I 15:38 15:53 0:15:00

45 8-Jun-16 132KV JAGDALPUR - BARSOOR CKT. NO. II 15:38 15:48 0:10:00

46 8-Jun-16 220KV KHEDAMARA - THELKADIH CKT. NO. I 17:41 18:06 0:25:00

47 8-Jun-16 132KV THELKADIH - DHAMDHA CKT. 17:55 18:29 0:34:00

48 8-Jun-16 132KV PULGAON - RAJNANDGAON CKT. 17:56 18:21 0:25:00

49 8-Jun-16 132/33KV 40MVA Xmer NO. II AT 220KV S/S THELKADIH 17:53 18:25 0:32:00

50 8-Jun-16 220KV KORBA(E) - BUDHIPADAR CKT. NO III 07/06/2016 18:00 08/06/2016 22:35 28:35:00

51 8-Jun-16 220KV DSPM - SUHELA CKT. 07/06/2016 23:46 08/06/2016 12:52 13:06:00

52 8-Jun-16 132KV RAIGARH - GHARGHODA CKT. 07/06/2016 18:05 08/06/2016 10:44 16:39:00

53 8-Jun-16 220KV KWB - MOPKA CKT. 07/06/2016 17:36 08/06/2016 15:35 21:59:00

54 9-Jun-16 63 MVA XMER AT 220 KV S/S URLA 08/06/2016 11:40 09/06/2016 7:36 19:56:00

55 9-Jun-16 132 KV KE (100) - RENKI CKT 15:25 16:35 1:10:00

56 9-Jun-16 132 KV KE - CHAMPA CKT No.II 16:40 16:58 0:18:00

57 9-Jun-16 400 KV BHILAI - KW EXTN. CKT 17:38 18:17 0:39:00

58 9-Jun-16 132 KV BEMETARA - KAWARDHA CKT 18:19 18:29 0:10:00

59 10-Jun-16 220 KV RAIGARH - SARAIPALI CKT No.II 19:05 19:26 0:21:00

60 10-Jun-16 132 KV KE - RANKI CKT 19:05 19:32 0:27:00

62 11-Jun-16 132 KV GURUR - BHANUPRATAPPUR CKT 10/06/2016 19:53 11/06/2016 7:20 11:27:00

63 11-Jun-16 40 MVA X-MER NO. I AT 220 KV S/S THELKADIH 07:11 07:20 0:09:00

64 11-Jun-16 220 KV KHEDAMARA - URLA CKT 16:25 16:58 0:33:00

65 11-Jun-16 220 KV PGCIL (RAIPUR) - URLA CKT 16:27 17:22 0:55:00

66 12-Jun-16 132 KV RAIGARH - ADBHAR CKT 03:10 03:35 0:25:00

67 12-Jun-16 132 KV SIMGA - CENTURY CKT 14:45 15:05 0:20:00

68 12-Jun-16 400 KV KW EXT - KHEDAMARA 16:05 17:16 1:11:00

69 12-Jun-16 132 KV RUABANDHA - JP CEMENT CKT 16:22 20:24 4:02:00

70 12-Jun-16 220 KV SUHELA - PARASWANI CKT NO. I 16:34 16:55 0:21:00

Monthly Report Jun16

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF JUNE-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

71 12-Jun-16 132 KV PARASWANI - BAGBAHARA CKT 16:33 16:59 0:26:00

72 12-Jun-16 132 KV GURUR - DALLIRAJHARA CKT 17:15 17:25 0:10:00

73 12-Jun-16 132 KV SILTARA - KACHANA CKT 15:25 15:52 0:27:00

74 12-Jun-16 132 KV PATHALGAON - JASPUR CKT 17:58 18:15 0:17:00

75 12-Jun-16 63 MVA X-MER AT 132 KV S/S HIRA POOLING SECTOR 'A' 12/06/2016 17:50 13/06/2016 1:05 7:15:00

76 12-Jun-16 132 KV SIMGA - CHAKARBHATA CKT 23:04 23:11 0:07:00

77 13-Jun-16 400 KV KW Extn - KHEDAMARA CKT 08:33 22:44 14:11:00

78 13-Jun-16 132 KV MANENDRAGARH - RLY. TRACTION NO. I 08:47 08:53 0:06:00

79 13-Jun-16 40 MVA X-MER NO. II AT 132 KV S/S BHILAI 10:40 17:54 7:14:00

80 13-Jun-16 132 KV URLA - BIRGAON CKT 14:39 14:55 0:16:00

81 13-Jun-16 132 KV URLA - BIRGAON CKT 14:58 15:27 0:29:00

82 13-Jun-16 132 KV BIRGAON - HIRA POOLING CKT 15:05 15:27 0:22:00

83 13-Jun-16 132 KV BHILAI - GUDHIYARI CKT 15:05 15:10 0:05:00

84 13-Jun-16 132 KV BHILAI - GUDHIYARI CKT 16:02 16:07 0:05:00

85 13-Jun-16 132 KV BIRGAON - SECTOR 'C' CKT 15:10 15:25 0:15:00

86 13-Jun-16 132 KV BHILAI - SIMGA CKT 15:31 15:48 0:17:00

87 13-Jun-16 160 MVA XMERNo.II AT 220 KV S/S SILTARA 15:06 15:17 0:11:00

88 13-Jun-16 400 KV KHEDAMARA - MADWA CKT 17:05 19:24 2:19:00

89 13-Jun-16 132 KV PARASWANI - KUHERA CKT 16:46 16:59 0:13:00

90 13-Jun-16 132 KV BHILAI - GUDHIYARI CKT 17:24 20:32 3:08:00

91 14-Jun-16 125 MVA X-MER AT 220 KV S/S BHATAPARA 12/06/2016 14:51 14/06/2016 14:53 48:02:00

92 14-Jun-16 400 KV KHEDAMARA - RAITA CKT NO. III 13/06/2016 14:59 14/06/2016 11:33 20:34:00

93 14-Jun-16 132 KV SILTARA - SKS CKT 13/06/2016 15:06 14/06/2016 15:16 24:10:00

94 14-Jun-16 132 KV SILTARA - JAGDAMBA CKT 13/06/2016 15:06 14/06/2016 15:16 24:10:00

95 14-Jun-16 132 KV BHILAI - SECTOR 'C' CKT 17:40 17:45 0:05:00

96 14-Jun-16 63 MVA X-MER AT 220 KV S/S URLA 17:40 22:56 5:16:00

97 14-Jun-16 160 MVA X-MER NO. I AT 220 KV S/S URLA 17:40 17:51 0:11:00

98 14-Jun-16 160 MVA X-MER NO. II AT 220 KV S/S URLA 17:40 17:52 0:12:00

99 14-Jun-16 160 MVA X-MER NO. III AT 220 KV S/S URLA 17:40 17:52 0:12:00

100 14-Jun-16 132 KV URLA - KACHNA CKT NO. I 17:40 17:55 0:15:00

101 14-Jun-16 132 KV S/S BORJHARA (TOTAL INTERRUPTION) 17:40 17:53 0:13:00

102 14-Jun-16 132 KV S/S HIRA POOLING (TOTAL INTERRUPTION) 17:40 17:50 0:10:00

103 14-Jun-16 132 KV S/S SECTOR 'C' (TOTAL INTERRUPTION) 17:40 17:45 0:05:00

104 16-Jun-16 132KV AKALTARA - RLY. TRECTION CKT.NO. I 01:30 1:35 0:05:00

Monthly Report Jun16

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF JUNE-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

105 16-Jun-1650MVR REACTER OF MADWA LINE AT 400KV S/S

KHEDAMARA14/06/2016 17:50 16/06/2016 14:38 44:48:00

106 17-Jun-16 132 KV PATTHALGAON - JASPUR CKT 14:15 14:33 0:18:00

107 17-Jun-16 132 KV SARAIPALI - SARANGARH CKT No.I 16:15 16:50 0:35:00

108 17-Jun-16 132 KV RAIGARH - SARANGARH CKT 16:15 16:34 0:19:00

109 17-Jun-16 132 KV SARAIPALI - RAIGARH CKT 16:15 16:51 0:36:00

110 17-Jun-16 132 KV MANENDRAGARH - BAIKUNTHPUR CKT 17:13 17:34 0:21:00

111 17-Jun-16 132 KV BANGO - BISHRAMPUR CKT 17:12 17:44 0:32:00

112 17-Jun-16 132 KV BISHRAMPUR - BAIKUNTHPUR CKT 17:12 17:33 0:21:00

113 17-Jun-16 400 KV BHILAI - RAITA CKT No.I 19:01 19:34 0:33:00

114 17-Jun-16 132 KV SIMGA - CHAKARBHATA CKT 19:17 19:28 0:11:00

115 17-Jun-16 132 KV URLA - KACHNA CKT 19:32 19:35 0:03:00

116 17-Jun-16 TIE BREAKER OF KHEDAMARA - RAITA CKT No.I 19:01 20:13 1:12:00

117 17-Jun-16 220 KV BHILAI - SILTARA CKT 19:27 20:20 0:53:00

118 17-Jun-16 132 KV PARASWANI - RAJIM CKT 20:20 20:30 0:10:00

119 19-Jun-16 132 KV DONGARGARH - THELKADIH CKT NO. II 12:50 13:08 0:18:00

120 19-Jun-16 132 KV DHAMDHA - RASMADA CKT 16:30 16:45 0:15:00

121 19-Jun-16 132 KV URLA - KACHANA CKT 16:45 16:50 0:05:00

122 19-Jun-16 400 KV KHEDAMARA - RAITA CKT NO. II 19/06/2016 18:13 20/06/2016 11:16 17:03:00

123 20-Jun-16 132 KV PARASWANI - RAJIM CKT 13:47 14:10 0:23:00

124 22-Jun-16 220 KV SUHELA - BANARI CKT 12:35 12:52 0:17:00

125 23-Jun-16 132KV KANKER - KONDAGAON CKT. 01:02 01:20 0:18:00

126 23-Jun-16 400KV BHILAI - MADWA CKT. 16:52 19:09 2:17:00

127 23-Jun-16 400KV MADWA - KORBA(W)EXT. CKT. 17:51 18:35 0:44:00

128 23-Jun-16 132KV KORBA(E) - CHAMPA CKT. MO. II 17:45 19:40 1:55:00

129 23-Jun-16 132KV PATHALGAON - AMBIKAPUR CKT. 18:42 19:00 0:18:00

130 23-Jun-16 132KV KORBA(E) - CHAMPA CKT. MO. I 18:20 19:41 1:21:00

131 23-Jun-16 132KV RAIGARH - SARAIPALI CKT. I 20:00 21:45 1:45:00

132 23-Jun-16 220KV KORBA(E) - BUDIPADAR CKT. NO. III 21:30 23:05 1:35:00

133 23-Jun-16 132KV GURUR - KANKER CKT. 22:15 22:25 0:10:00

134 23-Jun-16 132KV GURUR - BHANUPRATAPPUR CKT. 22:15 22:30 0:15:00

135 23-Jun-16 40MVA X-MER AT 132KV S/S BAGBAHRA 23/06/2016 22:50 24/06/2016 2:12 3:22:00

136 24-Jun-16 220KV KHEDAMARA - THELKADIH CKT. NO.I 08:09 08:27 0:18:00

137 24-Jun-16 132KV RASMADA - DHAMDHA CKT. 08:56 09:21 0:25:00

138 24-Jun-16 132KV PULGAON - RAJNANDGAON CKT. 08:57 09:10 0:13:00

Monthly Report Jun16

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF JUNE-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

139 24-Jun-16 132KV DONGARGARH - BALAGHAT CKT. 09:35 10:11 0:36:00

140 26-Jun-16 220 KV KHEDAMARA - BHILAI CKT No.II 25/06/2016 20:45 26/06/2016 2:34 5:49:00

141 26-Jun-16 220 KV KW - CHHURI CKT No.I 13:10 14:00 0:50:00

142 26-Jun-16 220 KV KW - CHHURI CKT No.I I 13:10 13:59 0:49:00

143 26-Jun-16 132 KV DARRI - BANGO CKT 12:58 13:20 0:22:00

144 26-Jun-16 132 KV CHHURI - BANGO CKT 12:51 14:21 1:30:00

145 26-Jun-16 220 KV KW - CHHURI CKT No.I 26/06/2016 14:48 27/06/2016 18:52 28:04:00

146 26-Jun-16 220 KV KW - MOPKA CKT 26/06/2016 16:18 27/06/2016 9:17 16:59:00

147 26-Jun-16 220 KV KW - KE CKT No.I 16:29 16:35 0:06:00

148 26-Jun-16 132 KV BHATAPARA - NAVAGARH CKT 16:02 16:31 0:29:00

149 26-Jun-16 132 KV RASMADA - DHAMDHA CKT 16:48 16:59 0:11:00

150 26-Jun-16 220 KV RAIGARH - BUDHIPADHAR CKT 16:58 17:48 0:50:00

151 26-Jun-16 132 KV MANENDRAGARH - BAIKUNTHPUR CKT 16:47 17:27 0:40:00

152 26-Jun-16 132 KV BHATAPARA - BALODA BAZAR CKT 18:08 18:30 0:22:00

153 26-Jun-16 400 KV KHEDAMARA - (PGCIL) BHATAPARA CKT 18:44 19:36 0:52:00

154 26-Jun-16 132 KV SUHELA - SHREE CEMENT CKT 18:15 18:40 0:25:00

155 26-Jun-16 132 KV PULGAON - RAJNANDGAON CKT 19:55 20:10 0:15:00

156 26-Jun-16 132 KV THELKADIH - DHAMDHA CKT 19:55 20:30 0:35:00

157 26-Jun-16 132 KV THELKADIH - RAJNANDGAON CKT 19:55 20:05 0:10:00

158 27-Jun-16 220 KV KORBA WEST - MOPKA CKT 26/06/2016 16:18 27/06/2016 9:17 16:59:00

159 27-Jun-16 220 KV KORBA EAST - CHHURI CKT NO. I & II 13:09 13:50 0:41:00

160 27-Jun-16 132 KV JAGDALPUR - KONDAGAON CKT 13:13 13:32 0:19:00

161 27-Jun-16 220 KV KW - CHHURI CKT No.I 26/06/2016 14:48 27/06/2016 18:52 28:04:00

162 27-Jun-16 132 KV THELKADIH - DHAMDHA CKT 19:45 20:00 0:15:00

163 27-Jun-16 132 KV THELKADIH - DONGARGARH CKT NO. I 19:46 20:01 0:15:00

164 27-Jun-16 132 KV THELKADIH - DONGARGARH CKT NO. II 19:46 20:35 0:49:00

165 27-Jun-16 132 KV DONGARGARH - BALAGHAT CKT 19:46 20:44 0:58:00

166 27-Jun-16 132 KV THELKADIH - RAJNANDGAON CKT 19:46 20:02 0:16:00

167 28-Jun-16 132 KV SIMGA - BHILAI CKT NO. II 00:26 00:42 0:16:00

168 28-Jun-16 220 KV RAIGARH - SARAIPALI CKT NO. I 03:36 04:09 0:33:00

169 28-Jun-16 220 KV BANARI - SUHELA CKT 06:44 07:00 0:16:00

170 28-Jun-16 220KV GURUR - BARSSOR CKT. II 27/06/2016 19:33 28/06/2016 9:12 13:39:00

171 28-Jun-16 132 KV MAHASAMUND - RAJIM CKT 27/06/2016 2:08 28/06/2016 19:46 41:38:00

172 29-Jun-16 220 KV THELKADIH - KHEDAMARA CKT 00:45 01:26 0:41:00

173 30-Jun-16 63 MVA X-MER AT 132 KV S/S KAWARDHA 12:33 12:45 0:12:00

Monthly Report Jun16

9.1 FORCED OUTAGES OF TRANSMISSION LINES FOR THE MONTH OF JUNE-2016

S.No. Date Name of Trnsmission element Tripping From ToOutage Hours

(hh:mm)

174 30-Jun-16 220 KV RAIGARH - JSPL CKT NO. II 17:45 18:25 0:40:00

175 30-Jun-16 132 KV JAGDALPUR - KONDAGAON CKT 18:32 18:47 0:15:00

Monthly Report Jun16

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF JUNE-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

1 1-Jun-16 40 MVA XMER AT 220 KV S/S BARSOOR 08:25 11:00 2:35:00

2 1-Jun-16 132 KV CHAMPA - JAIJAIPUR CKT 08:45 12:00 3:15:00

3 1-Jun-16 400 KV MAIN BUS No.II AT 400 KV S/S BHILAI 09:26 18:09 8:43:00

4 1-Jun-16 220 KV KHEDAMARA - JK LAXMI CKT 08:11 17:45 9:34:00

5 1-Jun-16 220 KV URLA - RAITA CKT 09:39 20:56 11:17:00

6 1-Jun-16 220 KV BHATAPARA - SUHELA CKT 10:03 12:27 2:24:00

7 1-Jun-16 132 KV BARSOOR - JAGDALPUR CKT No.I 09:55 12:20 2:25:00

8 1-Jun-16 132 KV BARSOOR - KINRADUL CKT No.I 10:58 13:31 2:33:00

9 1-Jun-16 132 KV BARSOOR - JAGDALPUR CKT No.II 13:45 15:02 1:17:00

10 1-Jun-16 132 KV BHATAPARA - BALODA BAZAR CKT 11:45 13:25 1:40:00

11 1-Jun-16 132 KV RAIGARH - ADBHAR CKT 12:18 19:20 7:02:00

12 1-Jun-16 132 KV BARSOOR - KIRANDUL CKT No.II 14:40 16:08 1:28:00

13 1-Jun-16 40 MVA XMER No.II AT 132 KV S/S MANENDRAGARH 31/05/2016 15:22 01/06/2016 18:06 26:44:00

14 2-Jun-16 132 KV CHAMPA - CHAPLE CKT 08:10 10:56 2:46:00

15 2-Jun-16 40 MVA XMER AT 132 KV S/S KIRANDUL 10:00 14:09 4:09:00

16 2-Jun-16 40 MVA XMER No.I AT 132 KV S/S MANENDRAGARH 08:40 19:50 11:10:00

17 2-Jun-16 132 KV SUHELA - BALODA BAZAR CKT No.II 09:29 CONTD.. ---

18 2-Jun-16 132 KV KIRANDUL - BARSOOR CKT No.I 08:18 09:25 1:07:00

19 2-Jun-16 132 KV KIRANDUL - BARSOOR CKT No.II 09:32 09:55 0:23:00

20 2-Jun-16 132 KV URLA - BAJRANG POWER CKT 09:12 12:47 3:35:00

21 2-Jun-16 40 MVA XMER AT 132 KV S/S KIRNDUL 10:00 14:09 4:09:00

22 2-Jun-16 400 KV KHEDAMARA - PGCIL MAIN CB No.I 10:40 18:47 8:07:00

23 2-Jun-16 220 KV RAIGARH - SARAIPALI CKT No.I 11:01 15:36 4:35:00

24 2-Jun-16 132 KV KIRANDUL - ESSAR STEEL CKT 12:22 13:42 1:20:00

25 2-Jun-16 400 KV KHEDAMARA - KORADI CKT 15:23 19:32 4:09:00

26 2-Jun-16 20 MVA XMER AT 132 KV S/S KIRANDUL 14:11 17:16 3:05:00

27 2-Jun-16 132 KV URLA - SECTOR A CKT (HEERA POOLING) 14:50 18:15 3:25:00

28 3-Jun-16 40 MVA X-MER AT 132 KV S/S KIRANDUL 08:57 10:40 1:43:00

29 3-Jun-16 132 KV MAIN BUS AT 132 KV S/S PATHALGAON 09:02 11:10 2:08:00

30 3-Jun-16 400 KV KWB - NTPC CKT 10:30 15:58 5:28:00

31 3-Jun-16 315 MVA ICT NO. II AT 400 KV S/S KHEDAMARA 10:23 17:35 7:12:00

32 3-Jun-16 220 KV MAIN BUS No.I AT 400 KV S/S RAITA 09:35 18:35 9:00:00

33 3-Jun-16 40 MVA XMER No.I AT 132 KV S/S DHAMDHA 10:05 15:19 5:14:00

34 3-Jun-16 220 KV RAIGARH - SARAIPALI CKT No.II 11:00 15:35 4:35:00

35 4-Jun-16 20 MVA X-MER AT 132 KV S/S JAGDALPUR 08:40 14:10 5:30:00

36 4-Jun-16 132 KV S/S SECTOR 'C' - BHILAI 10:00 16:12 6:12:00

37 4-Jun-16 63 MVA X-MER AT 132 KV S/S SECTOR 'C' 10:30 19:05 8:35:00

38 4-Jun-16 315 MVA ICT NO. I AT 400 KV S/S KHEDAMARA 10:37 13:07 2:30:00

Monthly Report Jun16

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF JUNE-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

39 4-Jun-16 40 MVA X-MER NO. I AT 132 KV S/S JAGDALPUR 15:00 17:55 2:55:00

40 4-Jun-16 132 KV JAGDALPUR - KONDAGAON CKT 10:42 12:22 1:40:00

41 4-Jun-16 40 MVA X-MER NO. II AT 132 KV S/S JAGDALPUR 18:01 19:53 1:52:00

42 4-Jun-16 125 MVA X-MER NO. I AT 220 KV S/S BHILAI 24/05/2016 9:20 04/06/2016 17:58 272:38:00

43 4-Jun-16 132 KV SUHELA - BALODABAZAR CKT NO. II 02/06/2016 9:29 04/06/2016 19:36 58:07:00

44 5-Jun-16 132 KV JAGDALPUR - AMAGUDA CKT NO. II 8:20 8:40 0:20:00

45 5-Jun-16 132 KV BORJHARA - PRIME ISPAT CKT 6:25 14:15 7:50:00

46 5-Jun-16 132 KV JAGDALPUR - BARSOOR CKT NO. I 8:53 9:30 0:37:00

47 5-Jun-16 132 KV BORJHARA - REAL ISPAT CKT 9:15 13:41 4:26:00

48 5-Jun-16 132 KV JAGDALPUR - BARSOOR CKT NO. II 9:35 10:05 0:30:00

49 5-Jun-16 132 KV JAGDALPUR - NAGARNAR CKT 10:15 11:00 0:45:00

50 5-Jun-16 132 KV JAGDALPUR - AMAGUDA CKT NO. I 11:06 11:45 0:39:00

51 5-Jun-16 132 KV BORJHARA - MAHAMAYA CKT 14:19 16:56 2:37:00

52 5-Jun-16 132 KV BORJHARA - BAJRANG METALLIC CKT 15:48 17:48 2:00:00

53 6-Jun-16 40 MVA X-MER AT 132 KV S/S KONDAGAON 08:06 11:06 3:00:00

54 6-Jun-16 220 KV MAIN BUS BAR -2 AT 400 KV S/S RAITA 08:40 CONDT. ---

55 6-Jun-16 400 KV BHILAI - BHADRAWATI CKT 10:32 10:45 0:13:00

56 6-Jun-16 40 MVA X-MER NO. 2 AT 132 KV S/S DHAMDHA 10:15 15:25 5:10:00

57 6-Jun-16 132 KV KONDAGAON - JAGDALPUR CKT 11:22 13:01 1:39:00

58 6-Jun-16 132 KV BAIKUNTHPUR - BISHRAMPUR CKT 11:02 18:12 7:10:00

59 6-Jun-16 400 KV KHEDAMARA - KW Extn CKT 11:53 18:49 6:56:00

60 6-Jun-16 132 KV KONDAGAON - KANKER CKT 13:05 14:01 0:56:00

61 6-Jun-16 132 KV URLA - RLY TRACTION NO. I 16:12 17:47 1:35:00

62 7-Jun-16 132KV URLA - BIRGAON CKT. 07:45 15:55 8:10:00

63 7-Jun-16 132KV BIRGAON - HEERA POOLING(SEC.A) 07:48 15:51 8:03:00

64 7-Jun-16 132KV KORBA - CHAMPA CKT.NO I 08:30 17:21 8:51:00

65 7-Jun-16 125MVA Xmer NO. II AT 220KV S/S BHILAI 09:19 CONT. ---

66 7-Jun-16 40MVA Xmer NO. I AT 132KV S/S KANKER 08:00 09:40 1:40:00

67 7-Jun-16 220KV KORBA(E) - RAIGARH CKT. 09:40 10:47 1:07:00

68 7-Jun-16 40MVA Xmer NO. II AT 132KV S/S KANKER 10:00 11:35 1:35:00

69 7-Jun-16 132KV KANKER - GURUR CKT. 12:00 13:24 1:24:00

70 7-Jun-16 220KV MAIN BUS AT 220KV S/S BARSOOR 13:27 17:35 4:08:00

71 7-Jun-16 220KV SILTARA - BHILAI CKT. 14:34 16:07 1:33:00

72 7-Jun-16 400KV KHEDAMARA - KORBA(EXT.) CKT. 06/06/2016 11:53 07/06/2016 20:31 32:38:00

73 8-Jun-16220KV KOTMIKALA - PENDRAROAD RLY. TRACTION NO.

I08/06/2016 10:21 09/06/2016 0:30 14:09:00

74 8-Jun-16 40MVA Xmer AT 132KV S/S BHANUPRATAPPUR 08:04 11:10 3:06:00

75 8-Jun-16 132KV GURUR - BHANUPRATAPPUR CKT. 11:16 13:21 2:05:00

76 8-Jun-16 MAIN BKR.400KV BHILAI - RAITA CKT. NO. I 12:02 15:06 3:04:00

Monthly Report Jun16

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF JUNE-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

77 8-Jun-16 132KV KANKER - BHANUPRATAPPUR TAPPING LINE 13:30 17:38 4:08:00

78 8-Jun-16 132KV CHAPLE - MONNET CKT. NO. I 14:10 16:38 2:28:00

79 8-Jun-16 132KVKANKER - KONDAGAON CKT. 17:50 18:52 1:02:00

80 9-Jun-16 132 KV SIMGA - CENTURY CKT 10:07 14:15 4:08:00

81 9-Jun-16 40 MVA XMER No.I AT 132 KV S/S RAJIM 09:13 13:30 4:17:00

82 9-Jun-16 132 KV RENKI - KONI - SV POWER CKT 09:05 11:05 2:00:00

83 9-Jun-16 40 MVA XMER No.II AT 132 KV S/S RAJIM 13:34 17:10 3:36:00

84 9-Jun-16 132 KV KE (100) - JAMNIPALI CKT No.I 12:20 14:05 1:45:00

85 9-Jun-16 220 KV RLY TRACTION No.II AT 220 KV S/S KOTMIKALA 12:30 17:45 5:15:00

86 10-Jun-16 40 MVA XMER No.III AT 132 KV S/S RAJIM 08:36 11:54 3:18:00

87 10-Jun-16 40 MVA XMER No.II AT 132 KV S/S MANA 08:30 13:15 4:45:00

88 10-Jun-16 40 MVA XMER No.I AT 132 KV S/S DHAMTARI 10:00 14:06 4:06:00

89 10-Jun-16 132 KV RAJIM - PARASWANI CKT 11:50 13:55 2:05:00

90 10-Jun-16 132 KV RAJIM - MAHASAMUND CKT 14:08 16:12 2:04:00

91 10-Jun-16 40 MVA XMER No.II AT 220 KV S/S SILTARA 10:49 20:07 9:18:00

92 11-Jun-16 132 KV BORJAHARA - PRIME ISPAT CKT 06:25 09:20 2:55:00

93 11-Jun-16 132 KV KORBA - CHAMPA CKT No.II 08:40 18:40 10:00:00

94 11-Jun-16 132 KV BORJAHARA - REAL ISPAT CKT 09:35 10:55 1:20:00

95 11-Jun-16 132 KV BHILAI - RUABANDHA CKT No.I 10:00 15:20 5:20:00

96 11-Jun-16 132 KV BORJAHARA - MAHAMAYA ISPAT CKT 11:29 12:45 1:16:00

97 11-Jun-16 132 KV BORHAHARA - BAJRANG MATALIC CKT 15:28 17:40 2:12:00

98 11-Jun-16 160 MVA XMER No.II AT 220 KV S/S SILTARA 10:29 17:54 7:25:00

99 11-Jun-16 400 KV KHEDAMARA - BHADRAWATI CKT 16:16 16:39 0:23:00

100 12-Jun-16 132 KV KACHANA - MANDIR HASAUD CKT 07:35 11:36 4:01:00

101 12-Jun-16 132 KV KORBA - CHAMPA CKT NO. II 09:17 19:00 9:43:00

102 12-Jun-16 220 KV KEB - KWB I/C NO. I 09:13 16:34 7:21:00

103 13-Jun-16 40 MVA X-MER NO. I AT 132 KV S/S DHAMTARI 10:01 15:20 5:19:00

104 13-Jun-16 160 MVA X-MER NO. I AT 220 KV S/S SILTARA 10:40 16:47 6:07:00

105 13-Jun-16 132 KV RENKI - KORBA CKT 15:10 18:48 3:38:00

106 14-Jun-16 220 KV KEB - KWB I/C NO. I 08:21 16:35 8:14:00

107 14-Jun-16 132 KV SUHELA - ULTRATECH CKT 09:35 20:30 10:55:00

108 14-Jun-16 40 MVA X-MER NO. I AT 132 KV S/S BHILAI 09:43 17:12 7:29:00

109 14-Jun-16 220 KV SUHELA - BEMETARA CKT NO. II 10:00 12:40 2:40:00

110 14-Jun-16 40 MVA X-MER AT 220 KV S/S SUHELA 12:25 14:13 1:48:00

111 14-Jun-16 160 MVA X-MER NO. I AT 220 KV S/S URLA 16:11 17:04 0:53:00

112 15-Jun-16 132KV PATHALGAON - JASPUR CKT. 07:05 09:30 2:25:00

113 15-Jun-16 220KV KORBA(W) - DSPM CKT. 08:52 18:30 9:38:00

114 15-Jun-16 40MVA Xmer NO. III AT 132KV S/S BHILAI 09:16 15:59 6:43:00

Monthly Report Jun16

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF JUNE-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

115 15-Jun-16 40MVA Xmer AT132KV S/S KASDOL 12:24 14:20 1:56:00

116 15-Jun-16 132KV BALODA BAZAR - KASDOL CKT. 17:10 18:41 1:31:00

117 16-Jun-16 132/33KV 40MVA Xmer AT KURUD (DHAMTARI) 08:37 14:15 5:38:00

118 16-Jun-16 132KV KURUD - GURUR CKT. 08:36 13:51 5:15:00

119 16-Jun-16 220KV KHEDAMARA - URLA CKT. 09:04 13:33 4:29:00

120 16-Jun-16 40MVA Xmer AT 132KV S/S RUABANDHA 09:30 16:56 7:26:00

121 16-Jun-16 125MVA 220/132KV Xmer NO. II AT 220KV S/S BHILAI 07/06/2016 9:19 16/06/2016 17:02 223:43:00

122 17-Jun-16 20 MVA XMER AT 132 KV S/S KURUD 08:32 15:22 6:50:00

123 17-Jun-16 132 KV KURUD - DHAMTARI CKT 08:35 13:05 4:30:00

124 17-Jun-16 63 MVA XMER AT 132 KV S/S RUABANDHA 09:05 14:55 5:50:00

125 17-Jun-16 400 KV KW - RAITA CKT 10:04 15:43 5:39:00

126 17-Jun-16 40 MVA XMER No.II AT 220 KV S/S DOMA 12:00 15:15 3:15:00

127 17-Jun-16 132 KV KURUD - RAJIM CKT No.II 13:08 15:20 2:12:00

128 17-Jun-16 132 KV SILTARA - SKS CKT 14:05 16:22 2:17:00

129 18-Jun-16 132 KV PATHALGAON - JASPUR CKT 08:03 15:25 7:22:00

130 18-Jun-16 132 KV MAIN BUS AT 132 KV S/S BISHRAMPUR 08:25 11:40 3:15:00

131 18-Jun-16 132 KV BIRGAON - SECTOR 'C' CKT 09:10 11:30 2:20:00

132 18-Jun-16 63 MVA XMER AT 132 KV S/S BIRGAON 09:55 16:36 6:41:00

133 18-Jun-16 63 MVA XMER No.I AT 132 KV S/S KACHNA 12:56 14:20 1:24:00

134 19-Jun-16 40 MVA XMER AT 132 KV S/S SARONA 08:40 12:30 3:50:00

135 19-Jun-16 132 KV KACHNA - SILTARA CKT 10:16 16:00 5:44:00

136 19-Jun-16 40 MVA XMER NO. III AT 220 KV S/S SARAIPALI 13:32 14:12 0:40:00

137 20-Jun-16 220 KV BHATAPARA - DOMA CKT 09:40 22:46 13:06:00

138 21-Jun-16 315 MVA ICT NO. I AT 400 KV S/S KHEDAMARA 21/06/2016 9:35 22/06/2016 17:13 31:38:00

139 21-Jun-16 400 KV RAITA - MADWA CKT 10:30 17:29 6:59:00

140 21-Jun-16 63 MVA X-MER NO. II AT 132 KV S/S KUHERA 14:50 18:57 4:07:00

141 21-Jun-16 220 KV NSPCL - BSP CKT NO. IV 10:07 15:53 5:46:00

142 22-Jun-16 40 MVA X-MER AT 132 KV S/S BAIKUNTHPUR 09:15 11:40 2:25:00

143 22-Jun-16 160 MVA X-MER AT 220 KV S/S BHATAPARA 09:26 19:48 10:22:00

144 22-Jun-16 132 KV SILTARA - GODAWARI ISPAT CKT 09:46 11:45 1:59:00

145 23-Jun-16 132KV SILTARA - NAKODA CKT. 09:40 13:05 3:25:00

146 23-Jun-16 132KV RAIGARH - ADBHAR CKT. 09:33 13:46 4:13:00

147 23-Jun-16 132KV KORBA - CHAMPA CKT. NO. I 10:30 18:18 7:48:00

148 23-Jun-16 132KV SEML CKT. AT 220KV SILTARA 13:10 15:10 2:00:00

149 23-Jun-16 220KV BHILAI - PGCIL(RAIPUR) CKT. 15:46 17:02 1:16:00

150 24-Jun-16 220KV PGCIL(RAIGARH) - RAIGARH CKT. NO. I 08:48 18:40 9:52:00

151 24-Jun-16 132KV MAIN BUS AT220KV S/S KOTMIKALA 10:35 14:35 4:00:00

152 24-Jun-16 132KV KORBA - CHAMPA CKT. NO. II 10:15 17:18 7:03:00

Monthly Report Jun16

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF JUNE-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

153 24-Jun-16 40MVA Xmer NO. I AT132KV S/S MAGARLOD 12:20 14:58 2:38:00

154 24-Jun-16 132KV KUHERA - MANDIR HASOUD CKT. 14:10 14:57 0:47:00

155 24-Jun-16 40MVA Xmer NO. II AT132KV S/S MAGARLOD 15:02 16:40 1:38:00

156 24-Jun-16 132KV RAIGARH - CHAPLE CKT. 09:38 15:32 5:54:00

157 25-Jun-16 220 KV PGCIL RAIGARH - RAIGARH CKT No.II 07:20 15:59 8:39:00

158 25-Jun-16 132 KV BALODA BAZAR - IMAMI CEMENT CKT 08:52 18:12 9:20:00

159 25-Jun-16 132 KV RLY TRACTION No.I AT 220 KV S/SBHATAPARA 09:38 17:47 8:09:00

160 25-Jun-16 132 KV BIRGAON - HEERA POOLING CKT 10:25 12:57 2:32:00

161 25-Jun-16 40 MVA XMER AT 132 KV S/S BIRGAON 11:10 12:49 1:39:00

162 25-Jun-16 132 KV URLA - BIRGAON CKT 13:25 15:19 1:54:00

163 26-Jun-16 132 KV BHILAI - GUDHIYARI CKT 07:01 09:23 2:22:00

164 26-Jun-16 132 KV MAGARLOD - RAJIM - GARIYABAND CKT 09:47 14:28 4:41:00

165 27-Jun-16 160 MVA X-MER NO. I AT 220 KV S/S URLA 07:33 11:05 3:32:00

166 27-Jun-16 400 KV KHEDAMARA - MADWA CKT 09:15 18:07 8:52:00

167 27-Jun-16 220 KV SUHELA - PGCIL CKT No.I 10:35 13:08 2:33:00

168 27-Jun-16 63 MVA XMER No.II AT 132 KV S/S KACHANA 10:05 21:57 11:52:00

169 27-Jun-16 220 KV BHATAPARA - DOMA CKT 11:35 12:57 1:22:00

170 27-Jun-16 220 KV SUHELA - PGCIL CKT No.II 13:21 15:40 2:19:00

171 27-Jun-16 220 KV KORBA WEST - CHHURI CKT NO. II 13:30 18:53 5:23:00

172 27-Jun-16 132 KV BISHRAMPUR - PRATAPPUR CKT 14:03 15:35 1:32:00

173 27-Jun-16 132 KV BANGO - BISHRAMPUR CKT 12:09 14:58 2:49:00

174 27-Jun-16 400 KV KHEDAMARA - PGCIL BHATAPARA CKT 15:15 21:21 6:06:00

175 28-Jun-16 132 KV DCSS RAIGARH - GHARGODA CKT 8:17 17:15 8:58:00

176 28-Jun-16 100 MVA X-MER NO. I AT 220 KV S/S KOTMIKALA 10:18 19:49 9:31:00

177 28-Jun-16 220 KV SUHELA - PGCIL BHATAPARA CKT NO. III 11:10 13:39 2:29:00

178 28-Jun-16 220 KV PGCIL RAIPUR - DOMA CKT 12:24 17:06 4:42:00

179 28-Jun-16 132 KV BANGO - JAMNIPALI CKT 10:59 13:35 2:36:00

180 28-Jun-16 220 KV RAIGARH - SARAIPALI CKT 16:48 19:35 2:47:00

181 29-Jun-16 132 KV MAIN BUS AT 132 KV S/S KACHNA 07:15 09.29 215:42:36

182 29-Jun-16 160 MVA XMER AT 220 KV S/S BARSOOR 08:22 18:13 9:51:00

183 29-Jun-16 400 KV KW EXTN - KHEDAMARA CKT 09:14 18:35 9:21:00

184 29-Jun-16 132 KV BALODA BAZAR - LAFARGE CKT 09:45 23:50 14:05:00

185 29-Jun-16 132 KV MOPKA - BILASPUR CKT 09:55 14:30 4:35:00

186 29-Jun-16 220KV BHILAI -PGCIL RAIPUR CKT 12:12 21:02 8:50:00

187 29-Jun-16 132 KV PATHALGOAN - AMBIKAPUR CKT 12:05 17:02 4:57:00

188 29-Jun-16 132 KV MOPKA -SILPAHARI CKT 12:37 14:30 1:53:00

189 29-Jun-16 220 KV KE- RAIGARH CKT 13:11 13:56 0:45:00

190 29-Jun-16 220KV KE - CHHURI CKT 14:26 16:24 1:58:00

Monthly Report Jun16

9.2 PLANNED OUTAGES OF TRANSMISSION ELEMENTS FOR THE MONTH OF JUNE-2016

S.No. Date Name of the Transmission Elements FROM TOOutage Hours

(hh:mm)

191 29-Jun-16 132 KV BALODA BAZAR - KASDOL CKT 14:40 18:48 4:08:00

192 30-Jun-16 220 KV URLA - PGCIL RAIPUR CKT 09:00 14:59 5:59:00

193 30-Jun-16 220 KV MOPKA - BHATAPARA CKT 09:51 13:26 3:35:00

194 30-Jun-16 220 KV KE - BUDHIPADHAR CKT NO. II 12:00 13:36 1:36:00

195 30-Jun-16 220 KV NSPCL - BSP CKT NO. III 10:40 13:49 3:09:00

196 30-Jun-16 220 KV KE - BUDHIPADHAR CKT NO. III 14:56 16:10 1:14:00

197 30-Jun-16 400 KV KHEDAMARA - NTPC KORBA CKT NO. I 16:12 16:53 0:41:00

Monthly Report Jun16

DATE FROM TO GROUPAvg MW

ReliefDURATION

Equivalent

Load Relief in

MU

1 2-Jun-16 19:13 20:06 GROUP - F 64 0:53:00 0.06

2 2-Jun-16 19:13 20:06 GROUP - G 85.5 0:53:00 0.08

3 2-Jun-16 19:39 20:33 GROUP - H 59 0:54:00 0.05

4 2-Jun-16 19:39 20:33 GROUP - I 55 0:54:00 0.05

5 4-Jun-16 00:10 01:05 GROUP - J 29 0:55:00 0.03

6 4-Jun-16 00:10 01:05 GROUP - A 32.5 0:55:00 0.03

7 7-Jun-16 07:40 08:16 INDUSTRIAL H/T GROUP - III 12.5 0:36:00 0.01

8 13-Jun-16 07:40 08:40 GROUP - D 29.70 1:00:00 0.03

9 13-Jun-16 07:40 08:40 GROUP - C 37.00 1:00:00 0.04

10 13-Jun-16 08:05 08:40 GROUP - B 39.00 0:35:00 0.02

11 13-Jun-16 12:12 13:07 GROUP - E 72.00 0:55:00 0.07

12 13-Jun-16 12:12 13:07 GROUP - F 37.00 0:55:00 0.03

13 13-Jun-16 12:12 13:07 GROUP - G 55.00 0:55:00 0.05

14 13-Jun-16 14:40 15:55 GROUP - H 53.50 1:15:00 0.07

15 13-Jun-16 14:40 15:55 GROUP - I 44.20 1:15:00 0.06

16 13-Jun-16 14:40 15:55 GROUP - J 31.50 1:15:00 0.04

17 14-Jun-16 19:19 20:16 GROUP - A 73.00 0:57:00 0.07

18 14-Jun-16 19:19 20:16 GROUP - B 45.00 0:57:00 0.04

19 14-Jun-16 19:44 20:44 GROUP - C 46.00 1:00:00 0.05

20 15-Jun-16 19:28 20:15 GROUP-D 41.4 0:47:00 0.03

21 15-Jun-16 19:28 20:15 GROUP-E 98 0:47:00 0.08

22 16-Jun-16 19:48 20:48 GROUP - F 52.5 1:00:00 0.05

23 16-Jun-16 19:48 20:48 GROUP - G 75 1:00:00 0.08

24 16-Jun-16 19:54 20:55 GROUP - H 58 1:01:00 0.06

25 16-Jun-16 19:54 20:55 GROUP - I 48.6 1:01:00 0.05

26 17-Jun-16 18:00 20:10 INDUSTRIAL PLAN ( ALL GROUP) 44 2:10:00 0.10

27 20-Jun-16 12:27 14:01 GROUP - J 28 1:34:00 0.04

28 20-Jun-16 12:27 14:01 GROUP - A 62.5 1:34:00 0.10

29 20-Jun-16 12:27 14:01 GROUP - B 27.5 1:34:00 0.04

30 20-Jun-16 14:52 16:22 GROUP - C 36 1:30:00 0.05

31 20-Jun-16 14:52 16:22 GROUP - D 37.2 1:30:00 0.06

32 20-Jun-16 16:22 17:52 GROUP - E 51.5 1:30:00 0.08

33 20-Jun-16 16:22 17:52 GROUP - F 41 1:30:00 0.06

34 20-Jun-16 20/06/2016 17:30 21/06/2016 0:50 INDUSTRIAL PLAN ( ALL GROUP) 44.7 7:20:00 0.33

35 20-Jun-16 20/06/2016 18:50 21/06/2016 0:04 INDUSTRIAL H/T GROUP - I 138 5:14:00 0.72

36 20-Jun-16 20/06/2016 18:50 21/06/2016 0:04 INDUSTRIAL H/T GROUP - II 90 5:14:00 0.47

37 20-Jun-16 20/06/2016 19:05 21/06/2016 0:04 INDUSTRIAL H/T GROUP - III 112 4:59:00 0.56

38 20-Jun-16 20/06/2016 19:17 21/06/2016 0:04 INDUSTRIAL H/T GROUP - IV 57.1 4:47:00 0.27

39 20-Jun-16 19:20 20:03 GROUP - G 77.5 0:43:00 0.06

40 20-Jun-16 19:20 20:03 GROUP - H 45 0:43:00 0.03

41 21-Jun-16 05:38 06:38 GROUP - I 59.7 1:00:00 0.06

42 21-Jun-16 05:38 06:38 GROUP - J 30 1:00:00 0.03

43 21-Jun-16 05:38 06:38 GROUP - A 67 1:00:00 0.07

44 21-Jun-16 05:38 06:38 GROUP - B 39 1:00:00 0.04

45 21-Jun-16 06:39 07:39 GROUP - C 53 1:00:00 0.05

46 21-Jun-16 06:39 07:39 GROUP - D 41.5 1:00:00 0.04

47 21-Jun-16 19:15 22:01INDUSTRIAL PLAN ( ALL GROUP)

43.7 2:46:00 0.12

48 22-Jun-16 05:22 06:32 GROUP - E 87.50 1:10:00 0.10

49 22-Jun-16 05:22 06:32 GROUP - F 63.50 1:10:00 0.07

10. LOAD SHEDDING DONE IN JUNE-2016

Monthly Report Jun16

DATE FROM TO GROUPAvg MW

ReliefDURATION

Equivalent

Load Relief in

MU

10. LOAD SHEDDING DONE IN JUNE-2016

50 22-Jun-16 05:22 06:32 GROUP - G 72.00 1:10:00 0.08

51 22-Jun-16 18:00 23:32INDUSTRIAL PLAN ( ALL GROUP)

56.80 5:32:00 0.31

52 22-Jun-16 19:07 20:20 GROUP - H 54.00 1:13:00 0.07

53 22-Jun-16 19:07 20:20 GROUP - I 58.50 1:13:00 0.07

54 22-Jun-16 20:20 21:27 GROUP - J 42.50 1:07:00 0.05

55 22-Jun-16 20:20 21:27 GROUP - A 76.50 1:07:00 0.09

56 22-Jun-16 21:21 22:05 GROUP - B 37.00 0:44:00 0.03

57 22-Jun-16 21:21 22:05 GROUP - C 44.00 0:44:00 0.03

58 22-Jun-16 21:28 22:05 GROUP - D 49.20 0:37:00 0.03

59 23-Jun-16 14:29 15:29 GROUP-E 68 1:00:00 0.07

60 23-Jun-16 14:29 15:29 GROUP-F 38.2 1:00:00 0.04

61 23-Jun-16 14:29 15:29 GROUP-G 62.5 1:00:00 0.06

62 23-Jun-16 14:29 15:29 GROUP-H 45 1:00:00 0.05

63 23-Jun-16 14:34 15:34 GROUP-I 65.1 1:00:00 0.07

64 23-Jun-16 14:34 15:34 GROUP-J 33 1:00:00 0.03

65 23-Jun-16 15:00 20:06 INDUSTRIAL PLAN ( ALL GROUP) 41 5:06:00 0.21

66 23-Jun-16 23:23 23:55 GROUP-A 15 0:32:00 0.01

67 23-Jun-16 23:23 23:55 GROUP-B 20 0:32:00 0.01

68 24-Jun-16 17:30 22:48 INDUS.PLAN(ALL GROUP) 58.2 5:18:00 0.31

69 24-Jun-16 17:12 18:12 GROUP-C 40 1:00:00 0.04

70 24-Jun-16 17:12 18:12 GROUP-D 35 1:00:00 0.04

71 24-Jun-16 18:09 19:04 GROUP-E 69 0:55:00 0.06

72 24-Jun-16 18:09 19:04 GROUP-F 36 0:55:00 0.03

73 24-Jun-16 18:42 22:32 INDUSTRIAL H/T GROUP - I 142 3:50:00 0.54

74 24-Jun-16 18:42 22:32 INDUSTRIAL H/T GROUP - II 87 3:50:00 0.33

75 24-Jun-16 19:08 22:48 INDUSTRIAL H/T GROUP - III 115.5 3:40:00 0.42

76 24-Jun-16 19:08 22:48 INDUSTRIAL H/T GROUP - IV 51.7 3:40:00 0.19

77 24-Jun-16 21:15 21:50 GROUP-G 89 0:35:00 0.05

78 24-Jun-16 21:15 21:50 GROUP-H 55 0:35:00 0.03

79 25-Jun-16 18:00 23:32 INDUSTRIAL PLAN ( ALL GROUP) 38.7 5:32:00 0.21

80 25-Jun-16 18:46 22:54 INDUSTRIAL H/T GROUP - I 103 4:08:00 0.43

81 25-Jun-16 18:46 22:54 INDUSTRIAL H/T GROUP - II 86 4:08:00 0.36

82 25-Jun-16 18:57 23:11 INDUSTRIAL H/T GROUP - III 108 4:14:00 0.46

83 25-Jun-16 18:57 23:11 INDUSTRIAL H/T GROUP - IV 44.5 4:14:00 0.19

84 25-Jun-16 19:06 20:36 GROUP I 46.5 1:30:00 0.07

85 25-Jun-16 19:06 20:36 GROUP J 32 1:30:00 0.05

86 25-Jun-16 19:28 20:58 GROUP A 54 1:30:00 0.08

87 25-Jun-16 19:28 20:58 GROUP B 35 1:30:00 0.05

88 25-Jun-16 20:43 21:43 GROUP C 37 1:00:00 0.04

89 25-Jun-16 20:43 21:43 GROUP D 52.7 1:00:00 0.05

90 25-Jun-16 21:08 22:08 GROUP E 94 1:00:00 0.09

91 25-Jun-16 21:08 22:08 GROUP F 61.5 1:00:00 0.06

92 25-Jun-16 21:11 22:11 GROUP G 82.5 1:00:00 0.08

93 27-Jun-16 14:28 15:48 GROUP - H 44 1:20:00 0.06

94 27-Jun-16 14:28 15:48 GROUP - I 64.1 1:20:00 0.09

95 27-Jun-16 14:28 15:48 GROUP - J 52 1:20:00 0.07

96 27-Jun-16 15:48 17:16 GROUP - A 57 1:28:00 0.08

97 27-Jun-16 15:48 17:16 GROUP - B 42 1:28:00 0.06

98 27-Jun-16 15:48 17:16 GROUP - C 49 1:28:00 0.07

Monthly Report Jun16

DATE FROM TO GROUPAvg MW

ReliefDURATION

Equivalent

Load Relief in

MU

10. LOAD SHEDDING DONE IN JUNE-2016

99 27-Jun-16 27/06/2016 17:00 28/06/2016 0:02 INDUSTRIAL PLAN ( ALL GROUP) 30.5 7:02:00 0.21

100 27-Jun-16 16:55 17:22 GROUP - D 39.2 0:27:00 0.02

101 27-Jun-16 16:55 17:22 GROUP - E 68 0:27:00 0.03

102 27-Jun-16 18:45 23:26 INDUSTRIAL H/T GROUP - I 135 4:41:00 0.63

103 27-Jun-16 18:45 23:42 INDUSTRIAL H/T GROUP - II 92 4:57:00 0.46

104 27-Jun-16 18:50 23:44 INDUSTRIAL H/T GROUP - III 113 4:54:00 0.55

105 27-Jun-16 18:50 23:44 INDUSTRIAL H/T GROUP - IV 46 4:54:00 0.23

106 27-Jun-16 19:07 20:37 GROUP - F 66.5 1:30:00 0.10

107 27-Jun-16 19:07 20:37 GROUP - G 90 1:30:00 0.14

108 27-Jun-16 20:37 22:07 GROUP - H 55.5 1:30:00 0.08

109 27-Jun-16 20:37 22:07 GROUP - I 47.7 1:30:00 0.07

110 28-Jun-16 17:00 23:55 INDUSTRIAL PLAN ( ALL GROUP) 36 6:55:00 0.25

111 28-Jun-16 18:20 23:47 INDUSTRIAL H/T GROUP - I 138 5:27:00 0.75

112 28-Jun-16 18:20 23:47 INDUSTRIAL H/T GROUP - II 79 5:27:00 0.43

113 28-Jun-16 18:20 23:47 INDUSTRIAL H/T GROUP - III 103.5 5:27:00 0.56

114 28-Jun-16 18:25 23:47 INDUSTRIAL H/T GROUP - IV 44 5:22:00 0.24

115 28-Jun-16 19:40 21:10 GROUP - J 39 1:30:00 0.06

116 28-Jun-16 19:40 21:10 GROUP - A 63 1:30:00 0.09

117 28-Jun-16 21:35 23:05 GROUP - B 41 1:30:00 0.06

118 28-Jun-16 21:35 23:05 GROUP - C 11 1:30:00 0.02

119 28-Jun-16 22:14 23:40 GROUP - D 46 1:26:00 0.07

120 28-Jun-16 22:31 23:40 GROUP - E 102 1:09:00 0.12

121 29-Jun-16 19:51 20:51 GROUP - F 63 1:00:00 0.06

122 29-Jun-16 19:51 20:51 GROUP - G 88 1:00:00 0.09

123 29-Jun-16 19:51 20:51 GROUP - H 48.8 1:00:00 0.05

124 29-Jun-16 20:51 21:30 GROUP - I 71.1 0:39:00 0.05

125 29-Jun-16 20:51 21:30 GROUP - J 40 0:39:00 0.03

126 29-Jun-16 20:51 21:30 GROUP - A 61.5 0:39:00 0.04

127 30-Jun-16 19:07 20:07 GROUP - B 48 1:00:00 0.05

128 30-Jun-16 19:07 20:07 GROUP - C 46 1:00:00 0.05

129 30-Jun-16 19:07 20:07 GROUP - D 60 1:00:00 0.06

58.17 247:40:00 16.39

Monthly Report Jun16

11. LOAD DURATIUON CURVE: JUNE-2016

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

LOAD DURATION CURVE OF JAN-15[MAX DEMAND MET=3269 MW & MIN DEMAND MET=1959

% OF TIME

DEM

AN

D (

MW

)

LOAD DURATION CURVE OF JUNE-2016

[MAX DEMAND MET= 3398 MW & MIN DEMAND MET= 2267 MW]

% OF TIME

DEM

AN

D (

MW

)

Monthly Report Jun16