St James’s Market Service Tunnel
Damien Brennan Design Engineer Barhale plc
GE Basements and Underground Structures Conference
![Page 2: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/2.jpg)
Presentation overview
Developing a Temporary Works solution to construct and support a permanent service
tunnel between basements
![Page 3: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/3.jpg)
Presentation Content • Clients Brief
• Design Considerations
• Selection of Temporary Works Solution
• Design change
• Outline of design
• Design loading
• Technical Features
• Installation Sequence
• Construction Obstacles
• Installation Progression
• Construction Benefits
![Page 4: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/4.jpg)
Clients Brief
• Provide an underground service corridor between two eight-
storey retail and commercial blocks basements between 1 St
James’s Market (1 SJM) and 2 St James’s Market (2 SJM).
• Corridor to consist of underground reinforced concrete finish,
8m deep
• Temporary corridor/tunnel support system that is:
• Cost-effective,
• Fully designed,
• Adaptable solution that could be delivered and
• Installed safely
![Page 5: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/5.jpg)
Clients Brief
![Page 6: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/6.jpg)
Clients Brief
![Page 7: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/7.jpg)
Design Considerations
• Ground conditions: Stiff London CLAY
formation beneath 3m of soft slightly gravelly
CLAY
• Ground water was recorded below proposed
invert level of construction.
![Page 8: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/8.jpg)
Design Considerations • Site access and compound size
restrictions due to the on-going
redevelopment works for the
adjoining building on each side of
corridor.
• Ground level above tunnel profile to
be used as a storage area
![Page 9: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/9.jpg)
Design Considerations
• Design to be adaptable to change during
construction if any obstacle/unknown objects
or adverse ground conditions are encountered.
• Design to be constructible in terms of
components that can be man-handable,
delivery of installation sequence and access to
works areas
![Page 10: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/10.jpg)
Two options considered for Temporary Works Solution tunnel construction:
• Pipe Roof Method
• Timber Heading construction
Selection of Temporary Works Solution
Typical Pipe Roof Method Typical Timber Heading
![Page 11: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/11.jpg)
Pipe Roof Method • Generally shaft sunk on each end (from each basement)
• Microtunnel from centre top, proceeding in both direction if required
• Pipes to be braced/supported during excavation of soil
• Pipes fill with concrete
• Internal lined with concrete lining
• Lifting required for TBM and pipes
• Launch/reception frame required on each side for each Microtunnel launch
![Page 12: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/12.jpg)
![Page 13: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/13.jpg)
Timber Heading Construction • Drive length up to 25m
• Timber side & head boards
• Steel or timber head & side Trees
• Head boards driven and cell hand excavated and support by each setting
• Each cell connected on all sides
• Working platform required on each side on each level
• Drive direction can be changed
![Page 14: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/14.jpg)
![Page 15: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/15.jpg)
![Page 16: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/16.jpg)
Heading Option Selected
Key Reasons
• Drive direction can change if unknown obstacles
are encountered
• Conditions can be monitored and design changed
during construction
• No plant required all hand dig
• All structural elements fabricated off-site
• All structural elements are man-handable
• No constraints in terms of tunnel dimensional
change
![Page 17: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/17.jpg)
Design Change
![Page 18: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/18.jpg)
Design Outline
![Page 19: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/19.jpg)
Design Outline
![Page 20: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/20.jpg)
Design Outline
![Page 21: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/21.jpg)
Design Outline
![Page 22: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/22.jpg)
Design Loading
![Page 23: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/23.jpg)
Technical Features • Corridor/Tunnel 8m deep to invert level
• Total drive length 7.5m
• Internal Tunnel opening at 6.7m wide x 3.2m high & 2.2m high
• Main steel Headtrees, Sidetrees and Cills 152x23UC
• Maximum spacing of primary supports (Headtrees) 1.45m
• Internal heading dimensions 1.4m x 1.45m
• Total number of heading set per row 8
• Circa 350 Tonnes of hand dig soil removed during construction
• Thickness of permanent reinforced concrete skin wall of tunnel lining
350mm thick
![Page 24: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/24.jpg)
Installation Sequence
![Page 25: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/25.jpg)
Installation Sequence
![Page 26: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/26.jpg)
![Page 27: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/27.jpg)
Installation Sequence
![Page 28: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/28.jpg)
Construction Obstacles
![Page 29: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/29.jpg)
Construction Obstacles
![Page 30: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/30.jpg)
Installation Progression
![Page 31: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/31.jpg)
Installation Progression
![Page 32: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/32.jpg)
Installation Progression
![Page 33: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/33.jpg)
Installation Progression
![Page 34: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/34.jpg)
Installation Progression
![Page 35: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/35.jpg)
Installation Progression
![Page 36: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/36.jpg)
Installation Progression
![Page 37: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/37.jpg)
Installation Progression
![Page 38: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/38.jpg)
Installation Progression
![Page 39: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/39.jpg)
Installation Progression
![Page 40: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/40.jpg)
Installation Progression
![Page 41: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/41.jpg)
Installation Progression
![Page 42: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/42.jpg)
Installation Progression
![Page 43: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/43.jpg)
Installation Progression
![Page 44: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/44.jpg)
Installation Progression
![Page 45: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/45.jpg)
Installation Progression
![Page 46: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/46.jpg)
Installation Progression
![Page 47: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/47.jpg)
Installation Progression
![Page 48: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/48.jpg)
Construction Benefits
• Adaptable to change –drive direction change
• Conditions can be monitored and design changed
during construction
• No plant required all hand dig
• All structural elements fabricated off-site
• All structural elements are man-handable
• No constraints in terms of tunnel dimensional
change
![Page 49: St James Presentation short](https://reader033.vdocument.in/reader033/viewer/2022042619/58ef04411a28abc23b8b45ef/html5/thumbnails/49.jpg)
Questions?