staar alternate 2014 administration

30
STAAR ALTERNATE 2014 ADMINISTRATION TETN # 20963 January 8, 2014

Upload: melodie-clark

Post on 03-Jan-2016

22 views

Category:

Documents


0 download

DESCRIPTION

STAAR ALTERNATE 2014 Administration. TETN # 20963 January 8, 2014. AGENDA. Final Administration Details for the Current Assessment Important Dates Participation Requirements and ARD Committee Process Changes Reporting for the 2014 Testing Results Spring Postings - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: STAAR ALTERNATE  2014  Administration

STAAR ALTERNATE

2014 ADMINISTRATION

TETN # 20963January 8, 2014

Page 2: STAAR ALTERNATE  2014  Administration

AGENDA Final Administration Details for the

Current Assessment

Important Dates

Participation Requirements and ARD Committee Process Changes

Reporting for the 2014 Testing Results

Spring Postings

Updates on the Assessment Redesign Development

Page 3: STAAR ALTERNATE  2014  Administration

TEXAS ASSESSMENT MANAGEMENT SYSTEM

Testing WindowJanuary 6, 2014 until April 18, 2014

Page 4: STAAR ALTERNATE  2014  Administration

Remind test administrators to change the school year before selecting a Test Administration to be able to locate the 2014

STAAR Alternate administration.

Page 5: STAAR ALTERNATE  2014  Administration

TEXAS ASSESSMENT MANAGEMENT SYSTEM check to see if any recent ARD decisions have

been made that would affect how the student assignments are set up in the system

ensure that student assessments are linked to the appropriate alternate assessment teacher in the Assessment Management System so evaluations can begin

unregister any students no longer being assessed with STAAR Alternate and add any new students or alternate assessment teachers

ensure that all test administrators have completed all required training before access to the Assessment Management System is provided

Page 6: STAAR ALTERNATE  2014  Administration

Monitor test administrator training by verifying that …

all training modules have been completed and the qualifications passed with 80% accuracy,

supplemental support is provided before the third attempt

is given to the teacher, and

supervision is occurring for any test administrator that has not passed all the modules but is continuing to implement the assessment.

Check to verify the training status of all test administrators on the

TrainingCenter by viewing the STAAR Alternate At-A-Glance Training & Qualification Report

Test Administrator Training

Page 7: STAAR ALTERNATE  2014  Administration

Pearson Resources to Help Link Teachers to Student Assessments

Home>Resources>Training>Texas Assessment Management

System

Page 8: STAAR ALTERNATE  2014  Administration

Monitoring Completion of Assessments

District Testing Coordinators have done a great job monitoring!

Number of registered students

Need to have “0” in these columns to ensure that all

students will be tested.

Monitor progress on the assessments.

Page 9: STAAR ALTERNATE  2014  Administration

develop and communicate the district policy on where the documentation forms will be stored

ensure that only one official documentation form exists and that all forms are stored in the same location for the campus

make sure that the test administrator knows that the form must remain secure and confidential while it is in his or her care until given to the testing coordinator for storage

secure all forms by the close of the assessment window

inform staff that forms will not be accessible after April 18, 2014 at 7:00pm CST

District Testing Coordinators must:

Storing the Documentation Forms

Test administrators should use caution when taking the documentation forms out of the classroom or building or when forms are stored on computers, laptops, or flash drives.

Page 10: STAAR ALTERNATE  2014  Administration

IMPORTANT DATES

Page 11: STAAR ALTERNATE  2014  Administration

IMPORTANT DATES The assessment window runs from January 6, 2014

until April 18, 2014. The transfer cut-off date is March 28, 2014. All documentation forms must be given to the

testing coordinator by 7:00pm CST on April 18, 2014.

The Student Evaluation tab in the Assessment Management System will be available for District Testing Coordinators, Campus Testing Coordinators, and teachers as a “View Only” status from May 19, 2014 until June 27, 2014.

Districts will receive the STAAR Alternate Standard and Operational Reports for Grades 3-8 on May 21, 2014.

Districts will receive STAAR Alternate Standard and Operational Reports for EOC on June 6, 2014.There will be no STAAR Alternate survey, Interrater

Study, or Audit this year.

Page 12: STAAR ALTERNATE  2014  Administration

PARTICIPATION REQUIREMENTS AND ARD COMMITTEE PROCESS CHANGES FOR 2015

Page 13: STAAR ALTERNATE  2014  Administration

PARTICIPATION REQUIREMENTS

The Participation Requirement documents have been updated to reflect the requirements for participating in the redesigned assessment in 2015.

The requirements are basically the same since participation in an alternate assessment is still based on No Child Left Behind and IDEA regulations.

Participation Requirement 5 was removed to accommodate the changes in the assessment from a performance task model to a standardized item-based assessment.

Page 14: STAAR ALTERNATE  2014  Administration

One person from the ARD committee will sign the front page of the document and be responsible for making sure that all sections have been discussed.

The justification section does not need to have page numbers from the IEP, but evidence must be provided for all “Yes” entries.

Page 15: STAAR ALTERNATE  2014  Administration

ARD COMMITTEE PROCESS CHANGES

The ARD committee will continue to determine if a student meets all four of the participation requirements before recommending STAAR Alternate for Spring of 2015.

A student must have a cognitive disability, determined by an assessment specialist, and be instructed on an alternate curriculum based on prerequisite skills linked to the general education curriculum.

Students who receive special education with an eligibility code of learning disabled are still not eligible for STAAR Alternate even though STAAR Modified is no longer available.

Page 16: STAAR ALTERNATE  2014  Administration

ARD COMMITTEE PROCESS CHANGES ARD committees will continue to go over the

assurances required for decisions involving alternate assessments.

ARD committees will determine which assessments will be administered based on the student’s enrolled grade or high school course.

The ARD committee will not need to determine complexity levels because the levels are not part of the test design for the new assessment.

Accommodations for instruction still need to be determined and used as a basis for what is needed for access to the assessment.

Accommodation policies for what is allowable for the new item-based assessment will be determined after data from the pilot test is reviewed.

Page 17: STAAR ALTERNATE  2014  Administration

Each assurance must be discussed by the ARD committee and initialed by the person who signed the first page.

The document needs to be part of the IEP if the decision to administer STAAR Alternate is determined.

Dynamic fields have been added so that the form can be filled out locally on a computer.

Page 18: STAAR ALTERNATE  2014  Administration

REPORTING FOR THE 2014 TESTING RESULTS

Page 19: STAAR ALTERNATE  2014  Administration

CONFIDENTIAL STUDENT REPORTS

Page 20: STAAR ALTERNATE  2014  Administration

GROWTH MEASURE

Raw scores are grouped into stages in a similar method to that used for TAKS−Alt.

The first stage spans more scores since fewer students receive a score lower than 20.

The last stage reflects the scores for students who fall in the Accomplished category.

Raw Scores Stage0-20 1

21-29 230-38 339-47 448-57 558-67 668-77 778-84 8

Page 21: STAAR ALTERNATE  2014  Administration

The current year’s stage is compared to the prior year’s stage.

The chart shows the result of the stage comparisons.Current-Year Stage

1 2 3 4 5 6 7 8Prior-Yea

r Stage

1 M E E E E E E E2 DN M E E E E E E3 DN DN M E E E E E4 DN DN DN M E E E E5 DN DN DN DN M E E E6 DN DN DN DN DN M E E7 DN DN DN DN DN DN M E8 DN DN DN DN DN DN DN M

DN = Did Not MeetM = MetE = Exceeded

GROWTH MEASURE

Page 22: STAAR ALTERNATE  2014  Administration

STAAR PROGRESS MEASURE RESOURCES The Growth Measure described is unique to STAAR

Alternate due to the different format of the assessment from the other state assessments.

More detailed information about the STAAR Alternate Growth Measure is available on TEA’s STAAR Resources page Questions and Answers (Questions 13-15) Calculating Progress Measure Implementation Schedule (Same as that for

STAAR)

TEA Website > STAAR > STAAR Resources > STAAR Progress Measure Section

Page 23: STAAR ALTERNATE  2014  Administration

Grades 3-8

EOC

Parent Brochure for Grades 3-8Available in English and Spanish

PowerPoint available in English and Spanish

Parent Materials will be updated to explain the growth measure that will be added to the CSR this year.

PARENT TRAINING MATERIALS

Page 24: STAAR ALTERNATE  2014  Administration

SPRING POSTINGS

Page 25: STAAR ALTERNATE  2014  Administration

NEW POSTINGS FOR SPRING

Participation Requirements Documents (January)

Sample CSR (March) Parent Brochures (March) Parent Training PowerPoint

(March) Essence Statement Documents

(March)

Page 26: STAAR ALTERNATE  2014  Administration

2015 ESSENCE STATEMENTS The essence

statement documents will continue to be available for IEP planning.

These documents along with the Curriculum Framework documents will assist teachers when planning instruction for the assessment.

Ten essence statements per subject will be used to create an assessment.

Page 27: STAAR ALTERNATE  2014  Administration

UPDATES ON THE ASSESSMENT REDESIGN DEVELOPMENT

SPRING 2015

Page 28: STAAR ALTERNATE  2014  Administration

TEA and Pearson conducted a Cognitive Lab in October involving 13 districts and 45 students of varying abilities and disabilities.

TEA and Pearson used the information learned during the labs to design test items that are currently being assessed during a December-January Pilot Study.

One hundred and forty-one districts across the state are participating in the Pilot Study.

Between 300-600 students will be assessed for each of the following subjects: Grades 4 and 7 Reading Grade 7 Writing Grades 4 and 7 Math Grade 5 Science English I Algebra I US History

STAAR ALTERNATE 2015 DEVELOPMENT

Page 29: STAAR ALTERNATE  2014  Administration

STAAR ALTERNATE 2015 DEVELOPMENT

Although a standardized item-based assessment covering 6 essence statements per subject was designed for the Pilot, the design of the assessment will not be finalized until results from the Pilot Study can be evaluated.

Teachers participating in the pilot are asked to complete the survey providing TEA with valuable information about the assessment.

The assessment may look very different from the one that is being piloted.

Districts participating in the pilot are asked to return all secure test items and shred the pilot manual.

More details about the assessment will be available in fall of 2014.