STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil. Summer School on Wastewater Treatment Plants and Management. Lector of Civil Engeneering Department of São Carlos Federal University (UFSCar). Stabilization ponds:. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/1.jpg)
STABILIZATION PONDSSTABILIZATION PONDS
Eng. Dr. Erich Kellner
November, 7th – 2012São Carlos - Brazil
Summer School onWastewater Treatment Plants and Management
1
Lector of Civil Engeneering Department of São Carlos Federal University (UFSCar)
![Page 2: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/2.jpg)
Stabilization ponds are biological treatment systems in which stabilization of organic material is carried out by bacterial oxidation and/or photosynthetic reduction of algae.
Figure 1: Stabilization ponds – Lins (SP) - Brazil
Stabilization ponds:
2
![Page 3: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/3.jpg)
Figure 2: Configurations of wastewater treatment systems by stabilizations pondsSource: adapted from von Sperling (2000)
Basic Configurations ofWastewater Treatment Systems by Stabilization Ponds:
3
![Page 4: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/4.jpg)
Pros and Cons of using stabilization ponds:
•Simplicity to built, operate and maintain;
•Low operational cost;
•Good quality on effluent;
• Need large areas;
• Limited and dependent on weather;
• Quality of effluent varies;
PROS CONS
4
![Page 5: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/5.jpg)
Figure 3: Anaerobic Pond– São Carlos (SP) - Brazil
Anaerobic Ponds:•Basins of 3m to 5m (10 feet to 17 feet) depth receiving continuous organic load of wastewater so that anaerobic conditions are met.
•Sedimentation pond.
•High waste water loading – depletes all O2.
•Solids settle at bottom of the to pond.
•Anaerobic digestion of sludge occurs at the bottom of the pond.5
![Page 6: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/6.jpg)
Figure 4: Metabolic process in anaerobic digestionSource: adapted from Pescod (1995)
Anaerobic Ponds:Hydrolysis - Complex organics (proteins and fats broken down to simpler compounds by various bacteria
Acidogenesis (Fermentation) – Fatty acids and alcohols oxidized ,amino acids and carbohydrates fermented, produce volatile fatty acids and hydrogen
Acetogenesis – conversion of complex fatty acids to acetic acid
Methanogenesis - conversion of acetic acid to methane and CO2 and CO2 ,H2 to methane
6
![Page 7: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/7.jpg)
Anaerobic Ponds - Design Criteria:
•Time of Hydraulic Detention = between 4 to 6 days for the final plan
•Liquid depth = between 4 to 5m
•Volumetric organic load (v) = 0.08 and 0.4 kgDBO/m3pond.day
•Superficial organic load(s) > 1000 kgDBO/ha.day
•Sludge accumulation = 0.01 to 0.03 m3/inhab.year
Design is highly empirical – based on volumetric load (g BOD/m3/day) and Hydraulic Detention Time (day)
7
![Page 8: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/8.jpg)
Anaerobic Ponds - Design Criteria:
Average Air TemperatureColdest Month
(oC)
Removed DBO (%)
<10 40
10-25 2.T + 20
>25 70
Table: Expected efficiency to reduce DBO due to average air temperature in the coldest month
8
![Page 9: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/9.jpg)
Figure 5: Facultative ponds – Barretos (SP) - Brazil
Facultative Ponds:•Basins of 1.5m to 2m depth.
•To have clear water, light penetration and photosynthetic production of oxygen to decompose organic material take place easier
•Part of the solids present in the wastewater settle and are biodegradable in an anaerobic process
9
![Page 10: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/10.jpg)
Facultative Ponds:
10
![Page 11: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/11.jpg)
Facultative Pond Interactions:
Figure 6: Definition of interactions occurring in a facultative pondSource: Tchobanoglous and Schroeder (1985)
11
![Page 12: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/12.jpg)
Facultative Ponds - Design Criteria:
PRIMARY FACULTATIVE PONDS:
•Superficial application rate limit* (S) = 20.T – 60 kgDBO/ha.day**
•Expected efficiency to reduce DBO (Empirical equation based on complete mixture model)*:
Notes:•Refers to half depth in the area•Average air temperature in the coldest month (oC).
let be the efficiency (%); s superficial application rate (kgDBO/ha.day)
12
![Page 13: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/13.jpg)
SECONDARY FACULTATIVE POND:
14.T – 40 < 200 kgDBO/ha.day** p/T >17oC
•Superficial application rate limit* (S) =
350. (1,107-0,002.T)T-25 kgDBO/ha.day** p/T <17oC
•Expected efficiency to reduce DBO (Empirical equation based on complete mixture model)*:
Facultative Ponds - Design Criteria:
let be the efficiency(%); s superficial application rate (kgDBO/ha.day)
Notes:* Refers to half depth in the area.** Average air temperature in the coldest month (oC).
13
![Page 14: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/14.jpg)
Figure 7: Maturation ponds – Barretos (SP) - Brazil
Maturation Ponds:
•Basins of between 0.8m and 1.5m depth. Normally, 1.0 m depth is used.
•The main objective of maturation ponds is to remove pathogenic microrganisms present in the wastewater, which occur mainly due to sunlight in the water column.
14
![Page 15: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/15.jpg)
Maturation Ponds - Design Criteria:
•Superficial organic load (s) < 50 kgDBO/ha.day
•HDT for each pond (m) > 7 days, with at least 3 maturation ponds in sequence.
•Decrease of pathogenic microrganisms:
nmTKNoNe
1
202,6 1,19 TTK
Continuously Stirred Tank Reactor (CSTR)
15
![Page 16: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/16.jpg)
But what kind of reactor do we have here?
16
![Page 17: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/17.jpg)
AP
FP1FP2
Figure 9: Rodamina B injection in FP1 Source: Moreira (2006)
Figure 8: Stabilization Ponds in Novo Horizonte (SP)
Source: Moreira (2006)
Hydrodynamic Test:
17
![Page 18: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/18.jpg)
0,00
1,00
2,00
3,00
4,00
5,00
6,00
7,00
0,0 0,5 1,0 1,5 2,0 2,5
t/tm
C/Co
18
•Theoretical hydraulic Detention Time teórico was 164 hours.•Real hydraulic Detention Time resulted in 55 hours, with dispersion number(d) equal to 11.034.853.603 !!!.•Active volume of 33.6% (3.5h) and recuperation of dye mass of 95.6%.Source: (Kellner, Moreira & Pires, 2009).
Figure 10: Non-dimensional concentration curve of Rodamina B in function of measured time in FP1 exit
Source: Kellner, Moreira & Pires (2009).
Hydrodynamic Test:
![Page 19: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/19.jpg)
19
Temperature (oC)
Dept
h (m
)
Concentration (g/l)[Animation done from results presented by Kellner, Moreira & Pires (2009).]
Influence of Thermal Stratification in the Distribution of Rodamina B in the Water Column of FP1
![Page 20: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/20.jpg)
According to Kellner & Pires (2000), temperature gradient 0.6oC/m, in stabilization ponds with temperature of 25oC, can lead to a thermal stratification state.
Thermal Stratification of a stabilization pond affects……the useful volume,…the dispersion number,…the HDT, etc.
20
![Page 21: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/21.jpg)
Design and Operational Problems:
Figure 11: Facultative Pond built in shaded area 21
![Page 22: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/22.jpg)
Figure 12: Infiltration problem in anaerobic pond
Design and Operational Problems:
22
![Page 23: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/23.jpg)
Facultative Pond with red brown colourPossible causes:• Organic material overload• Presence of photosynthetic bacteria
that oxidates sulphyte and does not produce oxygen does not contribute to reducing BOD
Design and Operational problems:
23
![Page 24: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/24.jpg)
Facultative Pond withmilky green colour
Possible causes:• The pond is in an
autofloculation process due to increase in pH and temperature
• Precipitation of hydroxide magnesium or calcium dragging algae and other microrganisms with it
Design and Operational Problems:
24
![Page 25: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/25.jpg)
Facultative Pond with yellow green colour
Possible causes:• Growth of rotifers, protozoas or
crustaceans which feed on algae;• There could be a significant
decrease in the DO and possibly a bad odor from the anaerobic decomposition of OM.
Design and Operational Problems:
25
![Page 26: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/26.jpg)
Facultative Pond with green blue colour
Possible causes:• Significant growth of
cianobacteria;• Appearance of native certain
species which decompose easily, causing bad odors, reducing the penetration of sunlight and diminishing oxygen production.
Design and Operational Problems:
26
![Page 27: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/27.jpg)
Facultative pond with grey colour
Possible causes:• Overload of organic
material and/or short detention time
• Fermentation in sludge layer incomplete.
Design and operational problems:
27
![Page 28: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/28.jpg)
Design and operational problems::
28
Not having desanders can cause silting in the ponds
Absence of Grit Removal System
![Page 29: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/29.jpg)
Design and operational problems::
29
Absence of Grit Removal System
…is able to change the flow and wastewater in the ponds
![Page 30: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/30.jpg)
Anaerobic pond – Problems of bad odor
30
Free surface makesexchange of gases easier (CH4, H2S,…) for the atmosphere
![Page 31: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/31.jpg)
Anaerobicpond - Problems with bad odor (possibility of using methane)
31
![Page 32: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/32.jpg)
Sludge:
32
![Page 33: STABILIZATION PONDS Eng. Dr. Erich Kellner November, 7 th – 2012 São Carlos - Brazil](https://reader035.vdocument.in/reader035/viewer/2022081603/568159e8550346895dc73300/html5/thumbnails/33.jpg)
Sludge conditioning (Solution or Environmental passivity?)
33Figure: Sludge conditioning
Sludge conditioning in materia lsacks can make it passive.