1 STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.2 SUMMARY A. Section includes: 1. general specifications for producing and placing Crushed Stone Paving by mixing aggregate and aggregate binder at a central location, spreading, and compacting pavement mixture to specified lines and grades. Crushed Stone Paving includes one or more of the following types: 1. Class A – Roadways, parking lots, and areas subject to vehicular traffic; 2. Class B – Cart paths, walkways, and bike paths subject to light maintenance traffic; 3. Class C – Walking and bicycle paths, subject to pedestrian traffic only. 4. Class (X) – G5 patching: shall be of the same class as material being patched. B. Related Sections 1. Division 01 Section “Sustainable Design Requirements” 2. Division 31 Section “Earthwork” 3. Division 32 Section “Metal Edging” 4. Division 32 Section “Turf and Grasses” 5. Division 32 Section “Exterior Planting” 1.3 DEFINITIONS A. Coarse aggregate: Aggregate retained on the No. 8 sieve. B. Dry Seed: Fine aggregates spread over cured surface for loose texture C. Leveling Course: A course of pavement of variable thickness used to eliminate irregularities in the contour of an existing surface prior to placing the subsequent course. D. Mixer: A paddle or pug mill type machine approved by the aggregate binder manufacturer and capable of completely mixing aggregate binder and aggregate materials. E. Job Mix Formula: A project specific formula of aggregates or aggregate/soil mixture and aggregate binder developed by the aggregate binder manufacturer or approved laboratory. F. Fine aggregate: Aggregate passing the No. 8 sieve.

Upload: others

Post on 02-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

STABILIZEDAGGREGATEPAVING

PART1‐GENERAL

1.1 RELATEDDOCUMENTS

A. DrawingsandgeneralprovisionsoftheContract,includingGeneralandSupplementaryConditionsandDivision01SpecificationSections,applytothisSection.

1.2 SUMMARY

A. Sectionincludes:

1. generalspecificationsforproducingandplacingCrushedStonePavingbymixingaggregateandaggregatebinderatacentrallocation,spreading,andcompactingpavementmixturetospecifiedlinesandgrades.

CrushedStonePavingincludesoneormoreofthefollowingtypes:

1. ClassA–Roadways,parkinglots,andareassubjecttovehiculartraffic;2. ClassB–Cartpaths,walkways,andbikepathssubjecttolightmaintenancetraffic;3. ClassC–Walkingandbicyclepaths,subjecttopedestriantrafficonly.4. Class(X)–G5patching:shallbeofthesameclassasmaterialbeingpatched.

B. RelatedSections

1. Division01Section“SustainableDesignRequirements”2. Division31Section“Earthwork”3. Division32Section“MetalEdging”4. Division32Section“TurfandGrasses”5. Division32Section“ExteriorPlanting”

1.3 DEFINITIONS

A. Coarseaggregate:AggregateretainedontheNo.8sieve.

B. DrySeed:Fineaggregatesspreadovercuredsurfaceforloosetexture

C. LevelingCourse:Acourseofpavementofvariablethicknessusedtoeliminateirregularitiesinthecontourofanexistingsurfacepriortoplacingthesubsequentcourse.

D. Mixer:Apaddleorpugmilltypemachineapprovedbytheaggregatebindermanufacturerandcapableofcompletelymixingaggregatebinderandaggregatematerials.

E. JobMixFormula:Aprojectspecificformulaofaggregatesoraggregate/soilmixtureandaggregatebinderdevelopedbytheaggregatebindermanufacturerorapprovedlaboratory.

F. Fineaggregate:AggregatepassingtheNo.8sieve.

Page 2: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

G. Sieve:Anapparatusforlaboratoryworkinwhichtheopeningsofthemesharesquareforseparatingsizesofmaterial

H. Supplementalfineaggregate:Aggregatepassingtheno.30sieve.

I. WetSeed:Fineaggregatesspreadoverrecentlyplacedmaterialsandcompactedintolayerforthepurposeoftexturizingormodifyingsurfacefinish

1.4 GREENBUILDINGREQUIREMNTS

<DELETEIFNOTALEEDREGISTEREDPROJECT>A. Materials/productsshallcontainthemaximumamountofrecycledcontentallowedthat

retainsmaterialintegrity.

B. Preferenceshallbegiventomaterialsthataremanufactured,harvested,extracted,mined,quarried,etc.withina500mileradiusoftheprojectsite.

C. Includemanufacture’sproductdataindicatingseparatepercentages,byweight,ofpost‐consumerandpre‐consumerrecycledcontentforprojectshavingrecycledcontent.Includestatementindicatingmaterialcostsforproducts.

D. Indicatelocationofmanufacturingfacilityincludingname,addressanddistancebetweenmanufacturingfacilityandtheproposedsite.Providemanufacture’sdocumentationindicatinglocationwherethebasematerialswereextracted,mined,quarried,harvested,etc.andthedistancebetweenthislocationandtheprojectsite.Alsoincludematerialcosts,excludingcostofinstallation.

1.5 REFERENCESTANDARDS

A. ASTMC‐131–StandardTestMethodforResistancetoDegradationofSmall‐SizeCoarse

AggregatebyAbrasionandImpactintheLosAngelesMachine

B. ASTMC‐136‐StandardTestMethodforSieveAnalysisofFineandCoarseAggregates

C. ASTMC140‐StandardTestMethodsforSamplingandTestingConcreteMasonryUnitsand

RelatedUnits

D. ASTMD979‐StandardPracticeforSamplingBituminousPavingMixtures

E. ASTMD1188‐StandardTestMethodforBulkSpecificGravityandDensityofCompacted

BituminousMixturesUsingParaffin‐CoatedSpecimens

F. ASTMD2419‐StandardTestMethodforSandEquivalentValueofSoilsandFineAggregate

G. ASTMD2950‐StandardTestMethodforDensityofBituminousConcreteinPlaceby

NuclearMethods

H. ASTMD3549‐StandardTestMethodforThicknessorHeightofCompactedBituminous

PavingMixtureSpecimens

I. ASTMD3665‐StandardPracticeforRandomSamplingofConstructionMaterials

J. ASTMD3744‐StandardTestMethodforAggregateDurabilityIndex

Page 3: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

K. ASTMD5444‐StandardTestMethodforMechanicalSizeAnalysisofExtractedAggregate

L. ASTMD6307‐StandardTestMethodforAsphaltContentofHot‐MixAsphaltbyIgnition

Method

M. ASTMD6926‐StandardPracticeforPreparationofBituminousSpecimensUsingMarshall

Apparatus

N. ASTMD6931‐StandardTestMethodforIndirectTensile(IDT)StrengthofBituminous

Mixtures

1.6 SUBMITTALS

A. General:MakesubmittalsincompliancewithallprovisionsofDivision01pertainingtosubmittalsandqualityassurance.

B. Receiveapprovalpriortodeliveryorinstallation.

C. ProductData: Foreachtypeofproductindicated.Submitproductliteratureortearsheetsgivingnameofproduct,manufacturer'snameandcompliancewithSpecifications.Includetechnicaldataandtestedphysicalandperformanceproperties.

1. ApprovalbytheLandscapeArchitectofsubmittedproductdataorothersubmittalsdoesnotconstitutefinalacceptance.

2. ForBaseCourse,submitMaterialCertificationandAnalysisReport.RefertoandcomplywithrequirementsspecifiedinDivision31Section–“EarthMoving”asapplicable.

3. ForStabilizedAggregatePaving,submitMaterialCertificationandSieveAnalysisReport,indicatingcompliancewithspecifications.

4. MaterialSafetyDataSheets(MSDS)forallapplicableproducts,includingbinders.

D. SampleMockups

1. Atleast14daysbeforeintendedworksubmitatminimumthefollowing:2. ProductData:Foreachtypeofproductindicated,includetechnicaldataandtested

physicalandperformanceproperties.3. Job‐MixDesigns:ForeachjobmixproposedfortheWork.4. MaterialTestReports:Foreachpavingmaterial.5. MaterialCertificates:Foreachpavingmaterial,signedbyproviders.6. QualifiedInstallers:Includealistofcompletedprojectswithprojectnamesand

addresses,ownerscontactinformation,anddescriptionofplacementofstabilizedcourses.

E. Verificationsamples

1. Ifrequired,providetheengineerwithaminimumof6”x6”samplewiththe specifiedcolor,acceptedaggregates,andfinishofthecourse.Theengineerwill reviewthesamplewithin5daysofreceipt.Ifthesampleisnotapproved,submit additionalsamplesuntilaccepted.

Page 4: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

F. Fieldsamples/Mockups

1. Ifrequired,provideafieldsamplemockupaminimumof6’x6’usingtheintended aggregatesandconstructionmethodsfortheremainderoftheproject.Constructthe mockuponlyaftertheverificationsampleandjobmixformulahavebeenapproved bytheengineer. Perform slip testing (if required) on mockup in accordance with local standards.

2. Provideawrittenreporttotheengineeroutliningthemixingandconstructionmethodsusedduringconstructionofthemockup. Asaminimumprovidethe followinginformation:

a. Methodofproportioningaggregateandbindermaterial.b. Equipmentusedformixing.c. Mixingtime(afteradditionofallingredients)d. Timebetweenmixing,placement,andinitialandfinalcompaction.e. Determinethemaximumamountoftimebetweenmixingandplacementduringthemockup.

f. Placementofseeding(ifrequired).Providenamesofindividualsseedingandrate(s)used.

G. Constructthemockupontheprojectinalocationapprovedbytheengineer.Allowtheengineer7daystoreviewandacceptorrejectthecompletedmockup.Donotbeginworkuntilthemockuphasbeenaccepted.

H. ProductCertificates:Foreachkindofaccessory,frommanufacturer.

1. SubmitforeachmanufactureditemortreatmentofthisSectionorrequiredtocompleteStabilizedAggregatePavingwork.Includedescriptiveinformation,testreports,andotherdataofmanufacturer.(Submitproductliteratureortearsheetsgivingnameofproduct,manufacturer'snameandcompliancewithSpecifications.)

2. ForBaseCourse,submitmaterialCertificationandAnalysisReport.RefertoandcomplywithrequirementsspecifiedinSection0XXXX–SitePreparationasapprovedapplicable.

I. JOBMIXFORMULA

1. For each class designation specified in the bid schedule, provide combinations ofgranular or granular/soil mixtures as applicable. Perform all required sourceaggregatequalitytestingpriortosubmissionofmaterialforJobMixFormula(JMF).

2. Submit a150 lb. sampleof theproposedaggregatesoraggregate/soilmixturesatleast2weekspriortomockuporconstructionwhicheverisapplicable,toaggregatebindermanufacturerorapprovedaccreditedmaterialslaboratory.

Page 5: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

3. Allow two weeks for suitability evaluation of proposed aggregate material. Theresulting m i x t u r e ( s ) s h a l l b e c om e t h e J ob JMF(s) for the project andshallconformtothefollowingtable:

Mixdesignation ClassA ClassB ClassCMaterialtypeandgradation(table2) A‐C A‐D A‐DSandEquivalent(min.)ASTMD2419 45 35 30DurabilityIndex(min.)ASTMD3744 45 35 35LosAngelesAbrasion(max.)ASTMC131

45 50 50

DryTensileStrength(PSI,min.)ASTMD6931

325 225 125

CompressiveStrength(PSI,min)ASTMC140

2000 1500 1000

MoistureDensityRelationship‐ASTMD1557

Determineoptimummoisturecontentofaggregatemixture*

*Thedeterminationofoptimummoisturecontentshallbeonlyforidentifyingthemaximumamountofmoisturepermissibleduringmixingandplacement.Moistureinaggregateoraggregate/soilmixturesshallbelimitedto10%oftheoptimummoistureatthetimeofmixing.Donotaddwatertodrymaterialwhenlessthan10%ofoptimummoistureisobservedinaggregates.

4. IfplansrequirethefinalsurfacetoincludeseedingprovideintheJMFanotationregardingseedmaterial.Theseedisnotrequiredtobeincludedinsamplesfortensileorcompressivestrength.

1.7 QUALITYCONTROLANDASSURANCE

A. ManufacturerQualifications:engageafirmexperiencedinmanufacturingstabilizedaggregatepavementaggregatebindersimilartothatindicatedforthisprojectandwitharecordofsuccessfulin‐serviceperformance.

B. InstallerQualifications:engageanexperiencedinstallerwhohassuccessfullycompletedpavingsimilarinmaterial,design,andextenttothatindicatedforthisprojectandwitharecordofsuccessfulin‐serviceperformance.TheinstallermusthavecompletedtrainingthroughTechniSoilandreceivedacertificateofproficiencypriortoproductiononsite.

C. TechnicalRepresentative:Ifrequested,provideatechnicalrepresentativefromTechniSoilIndustrialonsiteforthefirstdayofplacement.Providetheengineerwiththecontactinformationofthetechnicalrepresentativepriortobeginningconstruction.Providethetechnicalrepresentativeonsitewithintwodaysifdirectedbytheengineerorowner’srepresentative.

D. Pre‐InstallationConference:Beforebeginningpavingwork,scheduleandconductameetingatthesitetoreviewthefieldconstructedmockups,theContractDocuments,theapprovedsubmittalsandothermatterspertinenttotheparticularinstallation.PresentwillbetheLandscapeArchitect,theOwner’sRepresentative,theContractor,theinstaller,the

Page 6: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

installer'sfieldforemanandmanufacturer'srepresentative.InformtheLandscapeArchitectten(10)businessdaysinadvanceofthescheduledmeetingtime.

E. TestingAgency:[Owner][Contractor]willengageaqualifiedindependenttestingandinspectingagencytoperformfieldtestsandinspectionsandtopreparetestreports.

F. Testingagencywillconductandinterprettestsandstateineachreportwhethertestedworkcomplieswithordeviatesfromprojectrequirements.

G. Additionaltestingandinspecting,atContractor’sexpense,willbeperformedtodeterminecompliancewithspecifiedrequirements.

H. NotifytheEngineerandtestingandinspectionagencynot lessthan48hoursinadvanceofallworkrequiringtestingorinspection.

I. Minimumtestingtobeperformedshallbe:

1. Thickness:In‐placecompactedthicknessofG5pavingcourseswillbedeterminedaccordingtoASTMD3459.Onesampleshallbetakenforeach10,000squarefeetofpaving.

2. SurfaceSmoothness:FinishedsurfaceofeachG5pavingcoursewillbetestedforcompliancewithsmoothnesstolerances.

3. Sampling:Testingagencywilltakesamplesofun‐compactedpavingmixturesandcompactedpavementaccordingtoASTMD979andASTMD5361,respectively.

4. MaximumDensity:ForeachJMFandeach5daysofpavingequalorlessthan2500tons,Testingagencyshallobtainasamplenolessthan50lbs.fordeterminationofmaximumdensityaccordingtoASTMD6926.Thesampleshallbepreparedfortestingandthreesamplesshallbecompactedwith50blowsusingaMarshallapparatus.ThemaximumdensityshallbebasedoncompactedsamplesweighedinaccordancewithASTMD1188.

5. Fielddensityofin‐placecompactedpavementmayalsobedeterminedbynuclearmethodusingtestmethodASTMD2950.Aminimumofthreetestsitesforeach1000squarefeetshallbetakenatrandomlocationsdeterminedinaccordancewithASTMD3665.

6. G5ContentandGradation.Testingagencywilltakesampleofun‐compactedpavingmixturesataminimumfrequencyofevery1,000tonsor1perpavingday,whicheverisgreater.BindercontentshallbedeterminedbyignitionmethodfollowingtheproceduresinASTMD6307(includingaggregatecorrectionfactor).GradationshallbedeterminedinaccordancewithASTMD5444.

Page 7: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

7. RemoveandreplaceorinstalladditionalG5Mixwheretestresultsormeasurementsindicatethatitdoesnotcomplywithspecifiedrequirementsofthissection.

1.8 REGULATORYREQUIREMENTS

A. Complywithallrules,regulations,lawsandordinancesoflocal,stateandfederalauthoritieshavingjurisdiction.Providelabor,materials,equipmentandservicesnecessarytomakeWorkcomplywithsuchrequirementswithoutadditionalcosttoOwner.

B. Investigatetheconditionsofpublicthoroughfaresandroadsastoavailability,clearances,loads,limits,restrictions,andotherlimitationsaffectingtransportationtoandingressandegressatthesite.Conformtoallgovernmentalregulationsregardingthetransportationofmaterialsandsecureinadvanceallnecessarypermits.

1.9 DELIVERYANDSTORAGE

A. PackagedMaterials:Deliverpackagedmaterialsinclearlymarkedcontainersshowingnetweight,guaranteedanalysisandnameofmanufacturer.Specifiedrequirementsforpackagedmaterialsapplytobulkshipments.Protectmaterialsfromdeteriorationbymoistureandtemperatureduringdeliveryandduringstorageatsite.Protectliquidcomponentsfromfreezing.

B. Protectallstoredmaterialsanditemsfromweather,carelesshandling,andvandalism.Repairorreplacedamageditems,asdeterminedbytheLandscapeArchitect.

C. Deliver,store,handleandprotectaggregateandstabilizermaterialwithprovisionfordrainageandintrusionofdirt,debris,orotherforeignmatter.

D. StoreStabilizedAggregatePavingmaterialundercovertopreventaccumulationofmoistureuntilplaced.

1.10 PROJECTCONDITIONS

A. ExistingConditions

1. Carefullyexaminethesitebeforesubmittingabid.BeinformedastothenatureandlocationoftheWork,generalandlocalconditionsincludingclimate,adjacentpropertiesandutilities,conformationsoftheground,thenatureofsubsurfaceconditions,thecharacterofequipmentandfacilitiesneededpriortoandduringexecutionoftheWork.

2. Beawareofandcomplywithrestrictionsregardingsubsurfaceutilitiesandsubterraneanstructures,includingexcavationandloadingparameters.

3. ShouldtheContractor,inthecourseofWork,findanydiscrepanciesbetweenDrawingsandphysicalconditionsoranyomissionsorerrorsinDrawings,orinlayoutasfurnishedbytheLandscapeArchitect,itwillbehisdutytoinformtheLandscape

Page 8: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

Architectimmediatelyinwritingforclarification.Workdoneaftersuchdiscovery,unlessauthorizedbytheLandscapeArchitect,isattheContractor’srisk.

B. WorkProtectionRequirements–

1. Provideweatherprotectionduringentiretimeofplacementofpavingsystem.Maintainprotectionoverentireareasstorageandworkareastomaintainspecifiedmoisturelevels,preventwindorraindisturbanceofsettingmaterials,protectfromrun‐offfromadjacentareas,andgenerallymaintainoptimuminstallationconditions.

2. Contractorisresponsibleformeansandmethodsforsuchprotection,includingphysicalcover,worksequencingandschedulingandothermansofprotections,ascontractordeemsappropriate.

C. EnvironmentalRequirements

1. Preventwindorraindisturbanceofsettingmaterials,protectfromsheetflowfromadjacentareas,andgenerallymaintainoptimuminstallationconditions.

2. DonotinstallStabilizedAggregatePavinginconditionsofstandingwater.

3. ColdWeatherProtection:

a. Donotusefrozenmaterialsormaterialsmixedorcoatedwithiceorfrost.Donotbuildonfrozensub‐gradeorsettingbeds.

b. Temperature:DonotplaceStabilizedAggregatePavingwhentheambienttemperatureisbelow40degreesF.,orwhenthereisfrostinthebasecourse,oranyothertimewhenweatherconditionsareunsuitableforthetypeofmaterialbeingplaced.

c. RemoveandreplaceStabilizedAggregatePavingworkdamagedbyfrostorfreezing.

1.11 COORDINATIONANDSCHEDULING

A. Cooperate with other trades and arrange scheduling to avoid damage to other work,including grading, site utilities and piping, exterior concrete, landscaping and irrigationsystems.

B. Before commencing pavement operations, ascertain that utility lines, site lighting andwiring,piping,curbandgutterwork,generalgradingandheavytruckingiscompletesothatsuchoperationswillnotdamagepavingwork

C. Mask off and protect exposed building surfaces and abutting concrete from damage orstainingbypavingoperations.

Page 9: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

PART2‐PRODUCTS

2.1 BASECOURSEMATERIALS

A. Provideaggregatemixtureforaggregatebase.AggregatematerialsshallmeettherequirementsinSection703.05(a)oftheStandardSpecificationsforConstructionofRoadsandBridgesonFederalHighwayProjectsFP‐03.Alternaterequirementsforaggregatebasefoundinlocalroadconstructionstandardsmaybeusedwhenrequestedandapprovedinwritingtotheengineer.

2.2 STABILIZEDAGGREGATES

A. Providehard,durableparticlesofaggregatesmeetingtherequirementsforthespecifiedclass,color,andsize.Usematerialsandgradationsthathaveperformedsatisfactorilyinpreviousinstallationsmeetingtherequirementsofthesespecifications,andincompliancewiththesizeandsieverequirementsofTable2GradingXX(SPECIFYTHESIZEOFMATERIAL).

B. SeedingMaterial–Provideseedmaterialfortherequiredfinishasspecifiedordirectedbytheengineerandasusedinsample(s)preparedandmockup(s)completed.

C. AggregateBinder–Providealiquidaggregatebinderthatwhenmixedwithaggregatesasspecified,meetstherequirementsoftheJobMixFormula.ThebasisoftheliquidbindershallbeTechniSoilIndustrialG5.

TechniSoilIndustrial,llc.5660WestsideRoadRedding,CA96001

PART3‐EXECUTION

3.1 EXAMINATION

A. Verifytheconditions,elevations,andmeasurementsaffectingtheworkofthisSectionpriortoinstallation.Examinesurfacestoreceivestoneworkanddonotproceeduntilanydefectsdetrimentaltothefinishedworkarecorrected.NotifytheLandscapeArchitectinwritingofconditionsdetrimental topropercompletionofWork.Startingworkmeansacceptanceofexistingconditions.

B. Do not begin stabilized aggregate pavingwork until unsatisfactory conditions have beencorrectedandsubstrateisreadytoreceivepaving.

C. Proof roll prepared subgrade surface to check for unstable areas and areas requiringadditional compaction. Compact subgrade under paving systems to a minimum 95%modifiedProctordensityASTMD1557.

Page 10: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

10 

D. Examinetheworksiteandlocationsofthework,generalandlocalconditionsincludingclimate, adjacent properties and potential conflict utilities, subsurface conditions, andequipmentandfacilitiesneededpriortoandduringtheexecutionofthework.

3.2 PREPARATION

A. Ensurealltestingdensityrequiredbycontractforthesubgradeand/orsubbasematerialhasbeenperformedandmeetsthecontractspecifications.Proof‐rollsubbaseusingheavyrollersorequipmenttolocateareasthatareunstableorthatrequirefurthercompaction.

B. Scarify, re‐grade and re‐compact surface of subgrade that is pumping or deforming asrequired to provide true levels, uniform slopes and proper total thickness of pavingrequired.

C. Removeanddisposeofanyunsuitablematerialencounteredinareastobepaved.

D. Removeloosematerialfromcompactedsub‐gradesurfaceandshapeandtrimcompactedsub‐gradeforcorrectdrainageslopes.

E. HerbicideTreatment:Applychemicalweedcontrolagentinstrictcompliancewithmanufacturer'srecommendeddosagesandapplicationinstructions.Applytocompacted,dry,subgradepriortoapplicationofaggregatebasecourse.

F. Installstabilizedsurfaceduringdryconditionsnoearlierthan48hoursafterrainfallandnosoonerthan18hourspriortorainfall.Temperaturemustbeatleast40degreesandrising.

3.3 INSTALLATION

A. BaseCourse

1. Constructcrushedaggregatebasecoursetocompactedthicknessasshownonthedrawingsatnotlessthan95%ofmaximumdrydensityasdeterminedbyASTMD1557.

2. FieldQualityControl:OwnershallengageandpayfortheservicesofaqualifiedsoilsTestingLaboratory/AgencytoperformtestingandinspectionsofBaseCoursematerialandinstallations.

B. StabilizedAggregateInstallation

1. General: Immediately before placing G5 materials, remove loose and deleteriousmaterialfromsubstratesurfaces.Ensurethatpreparedsubgradeisreadytoreceivepaving.

2. Aggregates:

Page 11: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

11 

a. AggregatesusedforconstructionshallberepresentativeofmaterialapprovedintheJobMixFormula.Stockpilesshallbeuniformingradationthroughoutandbekeptseparateofothertypesofmaterial.

b. Avoidcrosscontaminationfromothermaterialsandsources.

c. Themoisturecontentoftheaggregatesshallbeuniformandnotexceed25%oftheoptimummoisturecontentasdeterminedbyASTMD1557.Innocaseshallaggregatescontainingvisiblewaterbeusedforconstruction.

3. Mixing:

a. Stabilizedaggregatebinderandaggregatesshallbemechanicallymixedinapan,paddle,orpug‐milltypemixer.

b. Aggregatesandbindermaterialshallbeweighedandbatchedaccordingtothemixdesignormanufacturesinstruction.

c. Mixingshallcontinueuntilmixtureishomogeneousanallaggregateparticlesareuniformlycoated.Innocaseshallmixingbelessthan3minutesafterthefinaladditionofallingredients.ThesizeofthemixershallconformtoTable1.

d. Binderandaggregatesmaybemixedonacontinuousbasisprovidedmixingcomplieswiththefollowing:

1. Provideacontinuousmixingchamberorpug‐millmixingmachineaspartofthecontinuousmixingprocesswithacomputerizedflowcontrolbasedonabeltscaleormicroprocessor.

2. Equipthemixingchamberorpugmillwithpaddlesorothersuitablemixingdevicearrangedtomixtheaggregatesandbinderproducingahomogeneousmixture.

3. Aggregatesarefedfromthepickupequipmenttothemixeratauniformandcontrolledrate.

4. Useamassflow,Corioliseffecttypemeterorequivalentwithavisiblereadoutdisplay.

Table1Pavedwidth < 6’ 6’‐10’ >10’

Minimumratedmixercapacity

700lbs. 2200lbs. 5500 .

Page 12: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

12 

e. Mixingofbinderandaggregatematerialsshallbesufficientastopromotethepavingequipmentorhandplacementtooperateinacontinuousmanner.

f. Delaybetweendischargefromthemixingunittoinitialcompactionshallbecontrolledandnotexceed40minutesunlessspecificallyinstructedbythebindermanufacturerbasedontestingoftheproposedjobmixformula.

4. MachinePlacement

a. Useaself‐propelledpavingunitcapableofreceivingmaterialdirectlyintoahopper,transferringmaterialtoascreedandstrikingoffthematerial.

b. Placemixturewithinthetimelimitsestablishedduringthemockup.

c. MachineplaceG5mixonpreparedsurface,spreaduniformly,andstrikeoff.PlaceG5mix by hand to areas inaccessible to equipment in a manner that preventssegregationofmix.

d. Placeeachcoursetorequiredgrade,crosssection,andthicknesswhencompacted.

e. Place G5mixes surface course in singleormultiple lifts.Themaximumcompactedlift thickness shall be 4.5inches.

f. Beginapplyingmixalongcenterlineofcrownforcrownedsectionsandonhighsideofone‐wayslopes,unlessotherwisedirectedbytheengineer.

g. Regulate paver machine speed to obtain smooth, continuous surface free of pullsandtearsinG5‐pavingmat.

h. Placepavinginconsecutivestripsnotlessthan8feet(2.4m)wideunlessinfilledgestripsofalesserwidtharerequired.

i. Afterfirststriphasbeenplacedandrolled,placesucceedingstripsandextendrollingtooverlappreviousstrips.

j. Promptlycorrect surface irregularitiesin pavingcoursebehind paver. Use suitablehandtoolstoremoveexcessmaterialforminghighspots.

k. Filldepressions withG5 pavingtopreventsegregationofmix;usesuitablehandtoolstosmoothsurface.

Page 13: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

13 

l. Donotbroadcastmaterialsacrosstheplacedcoursepriortocompaction.Removeanyloosecoarseaggregatepriortocompaction.Thisdoesnotincludeseedingaggregatewhenintendedforembedmentintosurface.

m. Ifinterruptionsgreater15minutesareexpectedwhenplacingmultiplepanels,donotuse‘hotlap’constructionmethods.Edgesmustbecompactedduringtheplacementofmaterial.

n. Donotallowmaterialtoaccumulat e i n c o r n e r s o f t h e p a v i n g m a chinehopper, screed extensions, ormain screed. Caremustbe taken to ensurematerialbatchesusedintheorder theyarebatchedandreceivedbypavingmachine.

5. HandPlacement

a. DonotplacelayersofG5pavinginunrestrainedareaswiderthan5’unlessapprovedbytheengineer,owner’srepresentative,orTechnisoilIndustrial.

b. Placeaggregatemixtureinsideedgerestraintsonapreparedsub‐base.Levelmaterialtoaheightthatwhencompactedtoproperdensitytheliftthicknessandgrademeettheplansandspecificationsforslope.

c. Levelmaterialbyeitherscreedboards,asphaltrake,orotherapprovedmethods.Careshallbetakentominimizemovementofmaterialonceinitiallyplaced.

d. Donotstepinorcompactmaterialpriortousingcompactionequipment.

e. Promptly correct surface irregularities inpaving coursebehindpaver.Use suitablehandtoolstoremoveexcessmaterialforminghighspots.

f. FilldepressionswithG5pavingtopreventsegregationofmix;usesuitablehandtoolstosmoothsurface.

g. Donotbroadcastmaterialsacross theplacedcourseprior tocompaction.Any loosecoarse aggregate sha l l be removed pr ior to compact ion . Th is does not includeseedingaggregate whenintendedforembedmentintosurface.

6. Compaction

a. Compact surface immediately after placement and strike off. Complete compaction ofmixturewithin20minutesof initialpasses.Ifadditionalcompactionisneededafter20minutes,donotusevibratoryequipment.

b. CompactG5pavingwithhandtampersorapprovedvibratory‐platecompactorsinareasinaccessibletorollers.

Page 14: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

14 

c. Static roll G5 pavement with walk behind roller or ride on‐roller with two to threepasses. Startonefoot fromoutsideedgeworkingtowardscrownor fromlowerslopededge General: Begin compaction as soon as placed G5 paving will bear rollerweightwithoutexcessivedisplacement.Initialcompactionshallbefromlowertohigherslopededge.

d. Afterinitialcompactionpassiscompleted,rollerswithvibratorycapabilitiesmaybeusedtoachieverequiredcompaction.

e. Ifavibratoryrollerisusedduringfinishing,turnvibratoryoff.

f. DONOTusewaterasabondbreakerforrollingdrumsorvibratorplatecompactors.Either useintermittentcoatingsofabiodegradableoil,andorifrequired,onlyusefinematerials (‐#30meshorsimilar)fromthesamedesignorasapprovedforabondbreakerbetween compactionequipmentandG5pavementsurface.DONOTspreadfinesonun‐compacted material.Onepassmustbemadepriortospreadingbondbreakingfines.

g. Paving course shall be compacted to a density of 95% of the maximum density, determined according to ASTM D6926. Field density determination will be inaccordance withASTMD2950 (with core correlation).

h. Finish roll paved surfaces to remove roller marksandproduceasmoothsurfacewithuniformtexture.

i. Edge Shaping:Ifedgingisnotspecified,while surface is being compacted and finished,trim edges of pavement toproperalignment. BeveledgeswhileG5isun‐compacted;compactthoroughly.Ifrequired,beveledgesbetween30and45°.

3.4 JOINTS

A. Constructjointstoensureacontinuousbondbetweenadjoiningpavingsections.ConstructjointsfreeofdepressionswithsametextureandsmoothnessasothersectionsofG5paving.

B. Forpreviousdaysjointwhereextendingoradjoiningthelayer,provideoneofthefollowing:

1. Averticalsawcutjoint;

2. DuringplacementoffreshG5materials,aftercompactioncutbackorcompactededgebyhandtoa1:1slopeensuringcontinuitywiththelaneortransverseedge;

3. A1:1slopesawcut

C. CleancontactsurfacesandapplyliquidG5binderasatackcoatbetweenlayers.CareshallbetakentonotdropliquidG5onpreviousday’slayer.Immediatelyremoveandcleananyspills.

D. Offsetlongitudinaljoints,insuccessivecourses,aminimumof6inches(150mm).

E. Offsettransversejoints,insuccessivecourses,6to12inches(150‐300mm).

Page 15: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

15 

3.5 CURING

A. Allowtimefortheplacedmaterialtocurebeforeallowingtraffictouse.Atminimumdonotallow pedestrian traffic for 24 hours. Traffic other than general pedestrian shall not beallowedontheG5pavementuntil72hoursafterplacement.

B. Duringthefirst24hoursprotectG5pavementfromspillsorirrigationoverspray.

C. Do not permit vehicular traffic on pavement until sufficient curing has occurred topreventdamagetolayer.

3.6 INSTALLATIONTOLERANCES

A. Thickness:Compact each course to produce the thickness indicated within thefollowingtolerances:

1. BaseCourse: Plusorminus¼inch(6mm).

2. SurfaceCourse: Plus¼inch(6mm),nominus.

B. SurfaceSmoothness:Compacteachcoursetoproduceasurfacesmoothnesswithinthefollowing tolerances as determined by using a 10‐foot (3‐m) straightedge appliedtransverselyorlongitudinallytopavedareas:

1. BaseCourse:¼‐inch(6mm).

2. SurfaceCourse: 3/16‐inch(5mm).

3. Crowned Surfaces: Test with crowned template centered and at right angle tocrown.

C. Correct areas failing smoothnessprior to final acceptance. Prior to correcting smoothnessobtainapprovalfromtheengineerforplannedcorrectivemethodsanddisposal.

Page 16: STABILIZED AGGREGATE PAVING - TechniSoiltechnisoil.com/wp-content/uploads/pdfs/TechniSoilG5_spec.pdf · STABILIZED AGGREGATE PAVING PART 1 ‐ GENERAL 1.1 RELATED DOCUMENTS A. Drawings

16 

Table 2

*Alternative gradations may be used provided the results of the mixture are in compliance with the specification, and the sample/job mix formula is approved by TechniSoil prior to construction. 

Aggregate Gradation for Crushed Stone Mixes* (A) 3/4” Minus Crushed Stone/Gravel Mix

Sieve Sizes Percent Passing 1” 100

3/4” 90 - 100

1/2” 70 - 90

No. 4 45 - 55

No. 8 32 - 40

No. 30 12 - 21

No. 200 3.0-7.0

(B) 1/2” Minus Crushed Stone/Gravel Mix

Sieve Sizes Percent Passing

3/4” 100

1/2” 95 - 99

3/8” 75 - 95

No. 4 55 - 66

No. 8 38 - 49

No. 30 15 - 27

No. 200 3.0-8.0

(C) 3/8” Minus Crushed Stone/Gravel Mix

Sieve Sizes Percent Passing

1/2” 100

3/8” 95 - 100

No. 4 58 - 72

No. 8 34 - 48

No. 30 18 - 32

No. 200 3.0-9.0

(D) 1/4” Minus Crushed Stone, Gravel, Sand Mix

Sieve Sizes Percent Passing

3/8” 100

No. 4 95 - 100

No. 8 72 - 77

No. 30 37 - 43

No. 200 3.0 – 9.0