stadler rail uk making headway in the uk...feb 2021 (maintenance of existing fleet) dec 2020 jan...

16
STADLER RAIL UK Hein van der Schoot, Managing Director SRS UK, Liverpool, November 2018 MAKING HEADWAY IN THE UK

Upload: others

Post on 12-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

STADLER RAIL UK

Hein van der Schoot, Managing Director SRS UK, Liverpool, November 2018

MAKING HEADWAY IN THE UK

Page 2: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

STADLER HISTORY

FROM HUMBLE ORIGINS…

1942 2018FIRST ASSEMBLY HALL

IN BUSSNANG

STADLER BUSSNANG

TODAY

2Rail Depots and Train Maintenance | Hein van der Schoot | © Stadler | 6 March 2018LEP Event | Hein van der Schoot | © Stadler | November 2018

Page 3: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

LEP Event | Hein van der Schoot | © Stadler | November 2018 3

DIVISIONSSTADLER RAIL GROUP

Consolidated turnover in 2019 (budget): £2 billion

Number of employees: 8,000

Pankow 930 EMP Siedlce (PL) 784 EMP Valencia 814 EMP Winterthur 283 EMP Switzerland

80 EMP

Algeria

80 EMP

Hungary

84 EMP

Italy

23 EMP

Netherlands

125 EMP

Poland

26 EMP

Sweden

232 EMP

UK

170 EMP

Altenrhein 935 EMP Velten 101 EMP Praha (CZE) 72 EMP ERION 40 EMP

ERION France 30 EMP

Biel 93 EMP

Salt Lake City 92 EMP Reinickendorf 61 EMP Minsk (BLR) 431 EMP Szolnok (HUN) 407 EMP

SWITZERLAND GERMANY CENTRAL EUROPE SPAIN COMPONENTS SERVICE

Bussnang 1750 EMP

Chemnitz 62 EMP (PL) 249 EMP

Page 4: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

SMILE

Title | Name | © Stadler | xx yy 2018 4

IN 40 COUNTRIES

FLIRT KISS GTW (articulated multiple units)

Regio Shuttle METRO LRV Locomotives

Tailor-made Coaches

MORE THAN 7,000 UNITS SOLD

29 >1500 >250 >600

>300

>400

>2200

>400

>500>800

LEP Event | Hein van der Schoot | © Stadler | November 2018

Page 5: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

STADLER UK

Glasgow

TSSSA (2016-2025)

Liverpool

Full Service (2017-2055)

Sheffield

Support (2017-2019)

Norwich

Full Service (2019-2026)

PROJECTS

5LEP Event | Hein van der Schoot | © Stadler | November 2018

Page 6: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

2018 2019 2020 2021 2022 2023

Feb 2021 (Maintenance of Existing Fleet)

Dec 2020

Jan 2056

Oct 2018

TODAY

Handback Existing FleetMaintenance

Existing fleet

Engineering (Design Period)

Production

New Trains

May2019

Arrival 1st Train in Liverpool

Milestones

Apr 2019

Construction office building KD Jan 2019

Depot

Construction new shed KD

STADLER IN LIVERPOOL – OVERVIEW

LEP Event | Hein van der Schoot | © Stadler | November 2018 6

Maintenance

New fleet

Page 7: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

7

Kirkdale, LiverpoolBUILDING THE NEW DEPOT

Existing depot site in Kirkdale, Liverpool

Existing wheel-lathe hall

Construction of office and storage building

Construction of the preventative maintenance hall

Three-road depot:

Two preventative roads (roof gantry, side pits, drive-through)

One overhaul road (lifting jacks to lift a complete 4-car unit, UWL)

Two new washing facilities (Kirkdale and Birkenhead)

Overnight stabling site

LEP Event | Hein van der Schoot | © Stadler | November 2018

Page 8: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

LEP Event | Hein van der Schoot | © Stadler | November 2018

KIRKDALE DEPOTWORK CONTINUING APACE

8

Page 9: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

2018 2019 2020 2021 2022 2023

Feb 2021 (Maintenance of Existing Fleet)

Dec 2020

Jan 2056

Oct 2018

TODAY

Handback Existing FleetMaintenance

Existing fleet

Engineering (Design Period)

Production

New Trains

May 2019

Arrival 1st Train in Liverpool

Milestones

Apr 2019

Construction office building KD Jan 2019

Depot

Construction new shed KD

STADLER IN LIVERPOOL – OVERVIEW

LEP Event | Hein van der Schoot | © Stadler | November 2018 9

Maintenance

New fleet

Page 10: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

LEP Event | Hein van der Schoot | © Stadler | November 2018 10

PRODUCTION NEW TRAINS

Page 11: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

LEP Event | Hein van der Schoot | © Stadler | November 2018 11

PRODUCTION NEW TRAINS

Page 12: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

LEP Event | Hein van der Schoot | © Stadler | November 2018 12

MOCK-UPNEW TRAINS

Page 13: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

2018 2019 2020 2021 2022 2023

Feb 2021 (Maintenance of Existing Fleet)

Dec 2020

Jan 2056

Oct 2018

TODAY

Handback Existing FleetMaintenance

Existing fleet

Engineering (Design Period)

Production

New Trains

May 2019

Arrival 1st Train in Liverpool

Milestones

Apr 2019

Construction office building KD Jan 2019

Depot

Construction new shed KD

STADLER IN LIVERPOOL – OVERVIEW

LEP Event | Hein van der Schoot | © Stadler | November 2018 13

Maintenance

New fleet

Page 14: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

14

NUMBER OF TRAINS IN LIVERPOOLTRANSITION FROM OLD TO NEW FLEET

76 trains, comprising two fleets at two depots to be maintained by spring 2020

LEP Event | Hein van der Schoot | © Stadler | November 2018

Page 15: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

EFFECTIVE PARTNERSHIPS ARE KEY TO

SUCCESS

LEP Event | Hein van der Schoot | © Stadler | November 2018 15

Page 16: STADLER RAIL UK MAKING HEADWAY IN THE UK...Feb 2021 (Maintenance of Existing Fleet) Dec 2020 Jan 2056 Oct 2018 TODAY Handback Existing Fleet Maintenance Existing fleet Engineering

THANK YOUFOR YOUR ATTENTION