EXISTING GROUND PROFILE EXISTING CROSS SECTION EXISTING HIGHWAY BOUNDARY FENCE EXISTING HIGHWAY BOUNDARY FENCE M 4 W E S T B O U N D M 4 E A S T B O U N D STAGE 1 - COMMENCE TEMPORARY SOUTH EMBANKMENT WIDENING 1. CONSTRUCT TEMPORARY SOUTH EMBANKMENT M 4 E A S T B O U N D EXISTING GROUND PROFILE TRAFFIC MANAGEMENT (WESTBOUND) STAGE 2 - INSTALL TEMPORARY WORKS AND CONSTRUCT CROSSOVERS 2. TEMPORARY WORKS TO RETAIN MOTORWAY DURING BRIDGE CONSTRUCTION TRAFFIC MANAGEMENT (EASTBOUND) TEMPORARY CENTRAL RESERVE CROSSOVERS CONSTRUCTED IN STAGE 2b. SEE FOREST TM DRAWINGS TRAFFIC MANAGEMENT (WESTBOUND) STAGE 3a - CONSTRUCTION WORKS TO NORTH SIDE OF MOTORWAY 3. EXCAVATE TOP OF MOTORWAY EMBANKMENT (3m APPROX.) 4. INSTALLATION OF CONTIGUOUS BORED PILES (INCLUDING NORTHERN WING WALL PILES) TEMPORARY EMBANKMENT 1500 MIN CONSTRUCTION TRAFFIC LANE CONTRACTOR DESIGNED TEMPORARY PILING PLATFORM TRAFFIC MANAGEMENT (WESTBOUND) TRAFFIC MANAGEMENT (EASTBOUND) STAGE 3b - CONSTRUCTION WORKS TO NORTH SIDE OF MOTORWAY 5(i). CONSTRUCTION OF REINFORCED CONCRETE CAPPING BEAM 5(ii). LIFT PRECAST CONCRETE BRIDGE BEAMS INTO POSITION 5(iii). INSTALL PERMANENT FORMWORK AND CAST INSITU CONCRETE DECK SLAB & VRS PLINTH 7(ii) INSTALL BRIDGE DECK WATERPROOFING AND CARRIAGEWAY SURFACING TEMPORARY EMBANKMENT TRAFFIC MANAGEMENT (WESTBOUND) TRAFFIC MANAGEMENT (EASTBOUND) 5(iv). COMPLETE NORTHERN PERMANENT PARAPET AND ADJOINING PERMANENT VRS 6(i) INSTALL STAGE 4 TEMPORARY SHEET PILING AND TEMPORARY VRS 7(i) CONSTRUCT TEMPORARY DRAINAGE CHANNEL STAGE 4b - CONSTRUCTION WORKS TO SOUTH SIDE OF MOTORWAY 8. REMOVAL OF SHEET PILING 9. EXCAVATE TOP OF MOTORWAY EMBANKMENT (3m APPROX.) 10. INSTALLATION OF CONTIGUOUS BORED PILES (INCLUDING SOUTHERN WING WALL PILES) TEMPORARY EMBANKMENT 600 SETBACK TRAFFIC MANAGEMENT (WESTBOUND) TRAFFIC MANAGEMENT (EASTBOUND) STAGE 4c - CONSTRUCTION WORKS TO SOUTH SIDE OF MOTORWAY 11(i). CONSTRUCTION OF REINFORCED CONCRETE CAPPING BEAM 11(iii). INSTALL PERMANENT FORMWORK AND CAST INSITU CONCRETE DECK SLAB TRAFFIC MANAGEMENT (WESTBOUND) TRAFFIC MANAGEMENT (EASTBOUND) 11(iv). COMPLETE NORTHERN PERMANENT PARAPET AND ADJOINING PERMANENT VRS TEMPORARY EMBANKMENT 13(i). INSTALL BRIDGE DECK WATERPROOFING AND CARRIAGEWAY SURFACING 11(ii). LIFT PRECAST CONCRETE BRIDGE BEAMS INTO POSITION STAGE 5a - EXCAVATION OF UNDERPASS & REINSTATEMENT OF CENTRAL RESERVE VRS REMOVE TEMPORARY EMBANKMENT 13(iv) COMPLETE CENTRAL RESERVE PERMANENT VRS AS NO FURTHER NEED FOR TRAFFIC MANAGEMENT CROSS-OVERS 14(i) EXCAVATION OF UNDERPASS TRAFFIC MANAGEMENT (EASTBOUND) TRAFFIC MANAGEMENT (WESTBOUND) SAFE WORKING ZONE FORMATION LEVEL OF PROPOSED ROAD 13(ii) REMOVE TEMPORARY SHEET PILES 13(iii) COMPLETE DECK STITCH POUR AND WATERPROOFING MOTORWAY LEVEL 5(i). CONSTRUCTION OF REINFORCED CONCRETE CAPPING BEAM 5(ii). LIFT PRECAST CONCRETE BRIDGE BEAMS INTO POSITION 5(iii). INSTALL PERMANENT FORMWORK AND CAST INSITU CONCRETE DECK SLAB & VRS PLINTH 6(ii) BACKFILL W E S T E A S T 7(ii) INSTALL BRIDGE DECK WATERPROOFING AND CARRIAGEWAY SURFACING MOTORWAY LEVEL 4. INSTALLATION OF CONTIGUOUS BORED PILES 3. EXCAVATE TOP OF MOTORWAY EMBANKMENT (3m APPROX.) TEMPORARY WORKS TO RETAIN MOTORWAY DURING BRIDGE CONSTRUCTION W E S T E A S T W E S T E A S T TEMPORARY WORKS TO RETAIN MOTORWAY DURING BRIDGE CONSTRUCTION MOTORWAY LEVEL W E S T E A S T CONSTRUCT TEMPORARY SOUTH EMBANKMENT MOTORWAY LEVEL EXISTING ELEVATION W E S T E A S T W E S T E A S T 14. EXCAVATION OF UNDERPASS FORMATION LEVEL OF PROPOSED ROAD MOTORWAY LEVEL W E S T E A S T 11(i). CONSTRUCTION OF REINFORCED CONCRETE CAPPING BEAMS 11(ii). LIFT PRECAST CONCRETE BRIDGE BEAMS INTO POSITION 11(iii). INSTALL PERMANENT FORMWORK AND CAST INSITU CONCRETE DECK SLAB 13(i). INSTALL BRIDGE DECK WATERPROOFING AND CARRIAGEWAY SURFACING 12. BACKFILL W E S T E A S T MOTORWAY LEVEL 8. REMOVAL OF SHEET PILES 9. EXCAVATE TOP OF MOTORWAY EMBANKMENT (3m APPROX.) 10. INSTALLATION OF CONTIGUOUS BORED PILES 15. INSTALLATION OF WALL DRAINAGE SYSTEM AND FACING TO PILED WALL 16. INSTALLATION OF HIGHWAY DRAINAGE AND SERVICES 17. SOUTHERN ACCESS LINK ROAD SURFACING W E S T E A S T STAGE 6 - CONSTRUCTION OF SOUTHERN ACCESS ROAD 16. INSTALLATION OF HIGHWAY DRAINAGE AND SERVICES 17. SOUTHERN ACCESS LINK ROAD SURFACING 18. LANDSCAPING OF EMBANKMENTS AND APPROACHES M 4 W E S T B O U N D M 4 E A S T B O U N D STAGE 5b - EXCAVATION OF UNDERPASS M 4 W E S T B O U N D M 4 E A S T B O U N D 14(ii) CONSTRUCT PERMANENT DUCT AND VERGE DETAIL VRS INSTALLED AT THE END OF STAGE 3b TO REMAIN AS THE PERMANENT VRS CONFIGURATION 14(ii) CONSTRUCT PERMANENT DUCT AND VERGE DETAIL P01 DRAFT ISSUE FOR CLIENT COMMENT - GCP JAS - NOTES 0100.1. REFER TO DRAWING 44771-PBA-SBR-39060-DR-CB-0110 FOR NOTES. GENERAL P02 CONSTRUCTION SEQUENCE REFINED 05.07.19 GCP JAS JWS P03 PROPPING AND TRANSITION PILES REMOVED 18.10.19 GCP JAS PC P04 UPDATED TO REFLECT DETAILED DESIGN 22.11.19 GCP JWS PC Checked Drawing Issue Status Date of 1st Issue Drawing Number Designed Revision Drawn Mark Revision Chkd Date File Location: j:\44771 - southern access m4 crossing\200 - design (all drawings)\201 - all pba drawings\1500 - bridges\44771-pba-sbr-39060-dr-cb-0103.dwg UTILITIES NOTE: The position of any existing public or private sewers, utility services, plant or apparatus shown on this drawing is believed to be correct, but no warranty to this is expressed or implied. Other such plant or apparatus may also be present but not shown. The Contractor is therefore advised to undertake their own investigation where the presence of any existing sewers, services, plant or apparatus may affect their operations. SCALING NOTE: Do not scale from this drawing. If in doubt, ask. user name: philippe, gary READING Tel: 01189 500 761 Approved Appd Drawn now part of peterbrett.com © Peter Brett Associates LLP WICHELSTOWE DEVELOPMENT, SWINDON WICHELSTOWE SOUTHERN ACCESS UNDERPASS (SMIS KEY: 39060) ILLUSTRATIVE CONSTRUCTION SEQUENCE F O R A P P R O V A L 44771-PBA-SBR-39060-DR-CB-0103 P04 22.11.2019 As Indicated JAS/AJMC GCP JAS/JWS PC Client A0 Scale

Upload: others

Post on 25-Sep-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STAGE 2 - INSTALL TEMPORARY WORKS AND CONSTRUCT … · temporary works to retain motorway during bridge construction w e s t e a s t w e s t temporary works to retain e a s t motorway

EXISTINGGROUND PROFILE

EXISTING CROSS SECTION

EXISTING HIGHWAYBOUNDARY FENCEEXISTING HIGHWAY

BOUNDARY FENCE

M 4 W E S T B O U N D M 4 E A S T B O U N D

STAGE 1 - COMMENCE TEMPORARY SOUTH EMBANKMENT WIDENING

1. CONSTRUCT TEMPORARYSOUTH EMBANKMENT

M 4 E A S T B O U N D

EXISTINGGROUND PROFILE

TRAFFIC MANAGEMENT(WESTBOUND)

STAGE 2 - INSTALL TEMPORARY WORKS AND CONSTRUCT CROSSOVERS

2. TEMPORARY WORKS TORETAIN MOTORWAY DURINGBRIDGE CONSTRUCTION

TRAFFIC MANAGEMENT(EASTBOUND)

TEMPORARY CENTRALRESERVE CROSSOVERSCONSTRUCTED IN STAGE 2b.SEE FOREST TM DRAWINGS

TRAFFIC MANAGEMENT(WESTBOUND)

STAGE 3a - CONSTRUCTION WORKS TO NORTH SIDE OF MOTORWAY

3. EXCAVATE TOP OF MOTORWAYEMBANKMENT (3m APPROX.)

4. INSTALLATION OF CONTIGUOUSBORED PILES (INCLUDINGNORTHERN WING WALL PILES)

TEMPORARYEMBANKMENT

1500MIN

CONSTRUCTIONTRAFFIC LANE

CONTRACTOR DESIGNEDTEMPORARY PILINGPLATFORM

TRAFFIC MANAGEMENT(WESTBOUND)

TRAFFIC MANAGEMENT(EASTBOUND)

STAGE 3b - CONSTRUCTION WORKS TO NORTH SIDE OF MOTORWAY

5(i). CONSTRUCTION OF REINFORCEDCONCRETE CAPPING BEAM

5(ii). LIFT PRECAST CONCRETEBRIDGE BEAMS INTO POSITION

5(iii). INSTALL PERMANENT FORMWORK AND CASTINSITU CONCRETE DECK SLAB & VRS PLINTH

7(ii) INSTALL BRIDGE DECKWATERPROOFING ANDCARRIAGEWAYSURFACING

TEMPORARYEMBANKMENT

TRAFFIC MANAGEMENT(WESTBOUND)

TRAFFIC MANAGEMENT(EASTBOUND)

5(iv). COMPLETE NORTHERN PERMANENT PARAPETAND ADJOINING PERMANENT VRS

6(i) INSTALL STAGE 4 TEMPORARY SHEETPILING AND TEMPORARY VRS

7(i) CONSTRUCT TEMPORARY DRAINAGE CHANNEL

STAGE 4b - CONSTRUCTION WORKS TOSOUTH SIDE OF MOTORWAY

8. REMOVAL OFSHEET PILING

9. EXCAVATE TOP OF MOTORWAYEMBANKMENT (3m APPROX.)

10. INSTALLATION OF CONTIGUOUSBORED PILES (INCLUDINGSOUTHERN WING WALL PILES)

TEMPORARYEMBANKMENT

600 SETBACK TRAFFIC MANAGEMENT(WESTBOUND)

TRAFFIC MANAGEMENT(EASTBOUND)

STAGE 4c - CONSTRUCTION WORKS TO SOUTH SIDE OF MOTORWAY

11(i). CONSTRUCTION OF REINFORCEDCONCRETE CAPPING BEAM

11(iii). INSTALL PERMANENT FORMWORK ANDCAST INSITU CONCRETE DECK SLAB

TRAFFIC MANAGEMENT(WESTBOUND)

TRAFFIC MANAGEMENT(EASTBOUND)

11(iv). COMPLETE NORTHERNPERMANENT PARAPETAND ADJOININGPERMANENT VRS

TEMPORARYEMBANKMENT

13(i). INSTALL BRIDGE DECK WATERPROOFINGAND CARRIAGEWAY SURFACING

11(ii). LIFT PRECASTCONCRETE BRIDGEBEAMS INTO POSITION

STAGE 5a - EXCAVATION OF UNDERPASS & REINSTATEMENT OF CENTRAL RESERVE VRS

REMOVE TEMPORARYEMBANKMENT

13(iv) COMPLETE CENTRAL RESERVEPERMANENT VRS AS NOFURTHER NEED FOR TRAFFICMANAGEMENT CROSS-OVERS

14(i) EXCAVATION OF UNDERPASS

TRAFFIC MANAGEMENT(EASTBOUND)

TRAFFIC MANAGEMENT(WESTBOUND)

SAFE WORKING ZONE

FORMATION LEVELOF PROPOSED ROAD

13(ii) REMOVE TEMPORARYSHEET PILES

13(iii) COMPLETE DECK STITCHPOUR AND WATERPROOFING

MOTORWAYLEVEL

5(i). CONSTRUCTION OF REINFORCEDCONCRETE CAPPING BEAM

5(ii). LIFT PRECAST CONCRETEBRIDGE BEAMS INTO POSITION

5(iii). INSTALL PERMANENT FORMWORK ANDCAST INSITU CONCRETE DECK SLAB &VRS PLINTH

6(ii) BACKFILL

W E S T E A S T

7(ii) INSTALL BRIDGE DECKWATERPROOFINGAND CARRIAGEWAYSURFACING

MOTORWAYLEVEL

4. INSTALLATION OFCONTIGUOUSBORED PILES

3. EXCAVATE TOP OF MOTORWAYEMBANKMENT (3m APPROX.)

TEMPORARY WORKS TO RETAINMOTORWAY DURING BRIDGECONSTRUCTION

W E S T E A S T

W E S T E A S TTEMPORARY WORKS TO RETAINMOTORWAY DURING BRIDGECONSTRUCTION

MOTORWAYLEVEL

W E S T E A S T

CONSTRUCT TEMPORARYSOUTH EMBANKMENT

MOTORWAYLEVEL

EXISTING ELEVATIONW E S T E A S T

W E S T E A S T

14. EXCAVATIONOF UNDERPASS

FORMATION LEVELOF PROPOSED ROAD

MOTORWAYLEVEL

W E S T E A S T

11(i). CONSTRUCTION OF REINFORCEDCONCRETE CAPPING BEAMS

11(ii). LIFT PRECAST CONCRETEBRIDGE BEAMS INTO POSITION

11(iii). INSTALL PERMANENT FORMWORK ANDCAST INSITU CONCRETE DECK SLAB

13(i). INSTALL BRIDGE DECKWATERPROOFING ANDCARRIAGEWAYSURFACING

12. BACKFILL

W E S T E A S T

MOTORWAYLEVEL

8. REMOVAL OFSHEET PILES

9. EXCAVATE TOP OF MOTORWAYEMBANKMENT (3m APPROX.)

10. INSTALLATION OFCONTIGUOUSBORED PILES

15. INSTALLATION OF WALLDRAINAGE SYSTEM ANDFACING TO PILED WALL

16. INSTALLATION OF HIGHWAYDRAINAGE AND SERVICES

17. SOUTHERN ACCESSLINK ROAD SURFACING

W E S T E A S T

STAGE 6 - CONSTRUCTION OF SOUTHERN ACCESS ROAD

16. INSTALLATION OF HIGHWAYDRAINAGE AND SERVICES

17. SOUTHERN ACCESSLINK ROAD SURFACING

18. LANDSCAPING OF EMBANKMENTSAND APPROACHES

M 4 W E S T B O U N D M 4 E A S T B O U N D

STAGE 5b - EXCAVATION OF UNDERPASS

M 4 W E S T B O U N D M 4 E A S T B O U N D 14(ii) CONSTRUCT PERMANENTDUCT AND VERGE DETAIL

VRS INSTALLED AT THE END OFSTAGE 3b TO REMAIN AS THEPERMANENT VRS CONFIGURATION

14(ii) CONSTRUCT PERMANENTDUCT AND VERGE DETAIL

P01 DRAFT ISSUE FOR CLIENT COMMENT

-

GCP JAS

-

NOTES

0100.1. REFER TO DRAWING 44771-PBA-SBR-39060-DR-CB-0110 FOR NOTES.

GENERAL

P02 CONSTRUCTION SEQUENCE REFINED 05.07.19 GCP JAS JWS

P03 PROPPING AND TRANSITION PILES REMOVED 18.10.19 GCP JAS PC

P04 UPDATED TO REFLECT DETAILED DESIGN 22.11.19 GCP JWS PC

Checked

Drawing Issue Status

Date of 1st Issue

Drawing Number

Designed

Revision

DrawnMark Revision ChkdDate

File Location: j:\44771 - southern access m4 crossing\200 - design (all drawings)\201 - all pba drawings\1500 - bridges\44771-pba-sbr-39060-dr-cb-0103.dwg

UTILITIES NOTE: The position of any existing public or private sewers, utility services, plant or apparatus shown on this

drawing is believed to be correct, but no warranty to this is expressed or implied. Other such plant or apparatus may also

be present but not shown. The Contractor is therefore advised to undertake their own investigation where the presence

of any existing sewers, services, plant or apparatus may affect their operations.

SCALING NOTE: Do not scale from this drawing. If in doubt, ask.

user name: philippe, gary

READINGTel: 01189 500 761

Approved

Appd

Drawn

now part of

peterbrett.com© Peter Brett Associates LLP

WICHELSTOWE DEVELOPMENT, SWINDON

WICHELSTOWE SOUTHERN ACCESS

UNDERPASS (SMIS KEY: 39060)

ILLUSTRATIVE CONSTRUCTION SEQUENCE

F O R A P P R O V A L

44771-PBA-SBR-39060-DR-CB-0103 P04

22.11.2019

As Indicated

JAS/AJMC GCP

JAS/JWS PC

Client

A0 Scale