STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 1 Figure 1A/1B 5 Figure 5A/5B Additional Cost for Bypass: +$230,000 Additional Cost for Bypass: +$850,000 Bypass Duration: ± 4 months (Aug '17 - Nov '17) Bypass Duration: ± 10 months (Aug '17 - May '18)** Right of Way Impacts: 14000 SF Right of Way Impacts: 10100 SF 2 Figure 2A/2B 6 Figure 6A/6B Additional Cost for Bypass: +$230,000 Additional Cost for Bypass: +$1,430,000 Bypass Duration: ± 4 months (Aug '17 - Nov '17) Bypass Duration: ± 10 months (Sept '17 - June '18)** Right of Way Impacts: 14000 SF Right of Way Impacts: 18400 SF 3 Figure 3A/3B 7 Figure 7A/7B Additional Cost for Bypass: +$1,080,000 Additional Cost for Bypass: +$810,000 Bypass Duration: ± 10 months (Sept '17 - June '18)** Bypass Duration: ± 10 months (Aug '17 - May '18)** Right of Way Impacts: 14000 SF Right of Way Impacts: 10100 SF 4 Single Lane (Eastbound Only) with Pedestrian Access Figure 4A/4B 8 Full Closure Figure 8A/8B Additional Cost for Bypass: +$1,080,000 Additional Cost for Bypass: Base Value ($0) Bypass Duration: ± 10 months (Sept '17 - June '18)** Closure Duration: ± 4 months (July '17 - Oct '17) Right of Way Impacts: 14000 SF Right of Way Impacts: 14000 SF Assumptions: ▪No construction in Long Lake during fish spawning (April 1-June 30) ▪Bypass Duration includes the duration that traffic will be on the bypass. Does not include time to construct or remove the bypass. Impacts/Issues: ▪Complex traffic control with high risk to contractor/owner ▪Contractor to "clear" the bypass at AM/PM reversal ▪Potential for back ups/large number of U-turns ▪Signing needed all accesses between Wolf Pointe and Hwy 12 to indicate current traffic direction ▪Tree removal at townhome property ▪Detour signing for eastbound & westbound ▪No pedestrian access ▪Emergency vehicle access/routing ▪Partial width (2-11' lanes) built in 2017, full width completed in 2018 **Bypass will be inplace during winter months Impacts/Issues: ▪Significant tree removal at townhome property ▪Detour for westbound direction ▪Emergency vehicle access/routing ▪Complex private utility relocation (two relocations possible) ▪Partial width (2-11' lanes) built in 2017, full width completed in 2018 **Bypass will be inplace during winter months Impacts/Issues: ▪Significant tree removal at townhome property ▪Detour routing for both directions ▪No pedestrian access ▪Emergency vehicle access/routing ▪Full width constructed in Year 1 Impacts/Issues: ▪Significant tree removal at townhome property ▪Detour for eastbound direction ▪Emergency vehicle access/routing ▪Complex private utility relocation (two relocations possible) ▪Partial width (2-11' lanes) built in 2017, full width completed in 2018 **Bypass will be inplace during winter months Single Lane with Signal Control Two Lanes Single Lane (Eastbound AM/Westbound PM) Single Lane (Westbound Only) Single Lane (Eastbound Only) Single Lane (Westbound Only) with Pedestrian Access Impacts/Issues: ▪Significant tree removal at townhome property ▪Detour for eastbound direction ▪No pedestrian access ▪Emergency vehicle access/routing ▪Partial width (2-11' lanes) built in 2017, full width completed in 2018 Impacts/Issues: ▪Significant tree removal at townhome property ▪Detour for westbound direction ▪No pedestrian access ▪Emergency vehicle access/routing ▪Partial width (2-11' lanes) built in 2017, full width completed in 2018 Impacts/Issues: ▪Significant tree removal at townhome property ▪No pedestrian access ▪Significant impacts to 1605 Wayzata Blvd property ▪Complex private utility relocation (two relocations needed) ▪Partial width (2-11' lanes) built in 2017, full width completed in 2018 **Bypass will be inplace during winter months Impacts/Issues: ▪Complex traffic control with high risk to contractor/owner ▪Signal needed at 1605 Wayzata Blvd to prevent driver confusion ▪Long queue lengths/back ups/U-turns ▪Tree removal at townhome property ▪No pedestrian access ▪Partial width (2-11' lanes) built in 2017, full width completed in 2018 **Bypass will be inplace during winter months PRELIMINARY 8/13/15 SUBJECT TO CHANGE

Upload: others

Post on 20-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS

CSAH 112

1 Figure 1A/1B 5 Figure 5A/5B

Additional Cost for Bypass: +$230,000 Additional Cost for Bypass: +$850,000

Bypass Duration: ± 4 months (Aug '17 - Nov '17)

Bypass Duration: ± 10 months (Aug '17 - May '18)**

Right of Way Impacts: 14000 SF Right of Way Impacts: 10100 SF

2 Figure 2A/2B 6 Figure 6A/6B

Additional Cost for Bypass: +$230,000 Additional Cost for Bypass: +$1,430,000

Bypass Duration: ± 4 months (Aug '17 - Nov '17)

Bypass Duration: ± 10 months (Sept '17 - June '18)**

Right of Way Impacts: 14000 SF Right of Way Impacts: 18400 SF

3 Figure 3A/3B 7 Figure 7A/7B

Additional Cost for Bypass: +$1,080,000 Additional Cost for Bypass: +$810,000

Bypass Duration: ± 10 months (Sept '17 - June '18)**

Bypass Duration: ± 10 months (Aug '17 - May '18)**

Right of Way Impacts: 14000 SF Right of Way Impacts: 10100 SF

4 Single Lane (Eastbound Only) with Pedestrian Access Figure 4A/4B 8 Full Closure Figure 8A/8B

Additional Cost for Bypass: +$1,080,000 Additional Cost for Bypass: Base Value ($0)

Bypass Duration:± 10 months

(Sept '17 - June '18)**Closure Duration:

± 4 months (July '17 - Oct '17)

Right of Way Impacts: 14000 SF Right of Way Impacts: 14000 SF

Assumptions:

▪No construction in Long Lake during fish spawning (April 1-June 30)

▪Bypass Duration includes the duration that traffic will be on the bypass. Does not include time to construct or remove the bypass.

Impacts/Issues:

▪Complex traffic control with high risk to contractor/owner

▪Contractor to "clear" the bypass at AM/PM reversal

▪Potential for back ups/large number of U-turns

▪Signing needed all accesses between Wolf Pointe and Hwy 12 to indicate

current traffic direction

▪Tree removal at townhome property

▪Detour signing for eastbound & westbound

▪No pedestrian access

▪Emergency vehicle access/routing

▪Partial width (2-11' lanes) built in 2017, full width completed in 2018

**Bypass will be inplace during winter months

Impacts/Issues:

▪Significant tree removal at townhome property

▪Detour for westbound direction

▪Emergency vehicle access/routing

▪Complex private utility relocation (two relocations possible)

▪Partial width (2-11' lanes) built in 2017, full width completed in 2018

**Bypass will be inplace during winter months

Impacts/Issues:

▪Significant tree removal at townhome property

▪Detour routing for both directions

▪No pedestrian access

▪Emergency vehicle access/routing

▪Full width constructed in Year 1

Impacts/Issues:

▪Significant tree removal at townhome property

▪Detour for eastbound direction

▪Emergency vehicle access/routing

▪Complex private utility relocation (two relocations possible)

▪Partial width (2-11' lanes) built in 2017, full width completed in 2018

**Bypass will be inplace during winter months

Single Lane with Signal Control

Two Lanes

Single Lane (Eastbound AM/Westbound PM)

Single Lane (Westbound Only)

Single Lane (Eastbound Only)

Single Lane (Westbound Only) with Pedestrian Access

Impacts/Issues:

▪Significant tree removal at townhome property

▪Detour for eastbound direction

▪No pedestrian access

▪Emergency vehicle access/routing

▪Partial width (2-11' lanes) built in 2017, full width completed in 2018

Impacts/Issues:

▪Significant tree removal at townhome property

▪Detour for westbound direction

▪No pedestrian access

▪Emergency vehicle access/routing

▪Partial width (2-11' lanes) built in 2017, full width completed in 2018

Impacts/Issues:

▪Significant tree removal at townhome property

▪No pedestrian access

▪Significant impacts to 1605 Wayzata Blvd property

▪Complex private utility relocation (two relocations needed)

▪Partial width (2-11' lanes) built in 2017, full width completed in 2018

**Bypass will be inplace during winter months

Impacts/Issues:

▪Complex traffic control with high risk to contractor/owner

▪Signal needed at 1605 Wayzata Blvd to prevent driver confusion

▪Long queue lengths/back ups/U-turns

▪Tree removal at townhome property

▪No pedestrian access

▪Partial width (2-11' lanes) built in 2017, full width completed in 2018

**Bypass will be inplace during winter months

PRELIMINARY8/13/15

SUBJECT TO CHANGE

Page 2: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

FLAG

FLAG

FLAG

1605

EATING

HEALTHY

SUTTON

SEATTLE

PRODUCE

FATHERS

FOUNDING

PERI

METE

R 30 F

T

AREA 1

5 SF

AREA

= 15 SQ

'REM

= 48 SQ

'

PERIMET

ER = 30 '

PERI

METE

R 30 F

T

AREA 1

5 SF

PERI

METE

R 30 F

T

AREA 1

5 SF

PERI

METE

R 30 F

T

PERI

METE

R 30 F

T

11'

ORCHARD LA

BNSF RAILWAY

TH12

A

B

A

B

1601

1595 323

331

339

342

1345

315

330

318

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

AREA 15 SF

PERI

METE

R 30 F

T

PERIMETER 30 FT

11'

11'

PERI

METE

R 30 F

T

PERIMETER 30 FT

C

D

C

D

MA

TC

HLIN

E - S

EE B

EL

OW

MA

TC

HLIN

E - S

EE A

BO

VE

1000

scale in feet

50

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 1

_Graphic A.d

gn

Figure 1A

8/10/2015Job #

Temporary Bypass Option 1 - Single Lane (Westbound Only)

CSAH 112 - Phase 1

Hennepin County

LEGEND

CONSTRUCTION ZONE

TEMPORARY PAVEMENT

DIRECTION OF TRAFFIC FLOWTRAFFIC BARRIER

TEMPORARY BYPASS LIMITS

INPLACE RIGHT OF WAY

201

1135

1140

1145

1150

220

221

1155

1160

1165

OHWL=944.3 FT.

LONG LAKE

MA

RT

HA

LA

LO

NG

LA

KE

CR

EE

K

CE

METER

Y R

D

WOLF P

OI

NTE TR

CEMETERY RD

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

CONSTRUCTIONCLOSED DURING TRAIL ACCESS

EASEMENTTEMPORARY

TREE REMOVALSSIGNIFICANT

PRELIMINARY8/12/15

SUBJECT TO CHANGE

Page 3: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

LONG LAKE

LONG LAKE

LONG LAKE

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

FENCE

NOISE

INP MnDOT

INP R/W

INP R/W

OHW 944.3

INP 15" STM

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

1:

1

1:2

CL CSAH 112

1142+50

SINGLE LANETEMPORARY ROAD

WORK ZONE

PAVEMENT SECTION

TO EXTEND UP AND BENEATH

GEOTEXTILE SPECIAL

15'

11' 11'

INP R/W

INP R/W

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1148+50

SINGLE LANETEMPORARY ROAD

EXCAVATION (CITY)PROP WATER MAIN

15'

WORK ZONE

11' 11'

BUILDING

BLDG 31'MIN. DIST. TO

INP R/W

INP R/W

8" WM

THRU

11'

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1152+00

TWO LANESTEMPORARY ROAD

1:3

EXCAVATION (CITY)PROP WATER MAIN

26'

WORK ZONE

11' 11'

INP R/W

INP 8" WM

1:3

RETAINING

WALL 1:2

WETLAND

DELIN.

CL CSAH 112

1157+25

POND HWL 947.3

CLPROP CREEK

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

THRU

11'

THRU

11'

26'GUARDRAIL

TWO LANESPROPOSED ROAD

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 1

_Cross S

ection_

Graphic B.d

gn

Figure 1B

8/10/2015Job #

Temporary Bypass Option 1 - Cross Sections

CSAH 112 - Phase 1Hennepin County

SECTION A-A (STA. 1142+50)

SECTION D-D (STA. 1157+25)

SECTION C-C (STA. 1152+00)

SECTION B-B (STA. 1148+50)

PRELIMINARY8/12/15

SUBJECT TO CHANGE

Page 4: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

FLAG

FLAG

FLAG

1605

EATING

HEALTHY

SUTTON

SEATTLE

PRODUCE

FATHERS

FOUNDING

PERIMETER 30 FT

PERIMETER 30 FT

AREA 15 SF

PERIMETER 30 FT

REM 35 SF

AREA 15 SF

PERIMETER 30 FT

PERI

METE

R 30 F

T

AREA 1

5 SF

PERI

METE

R 30 F

T

11'

PERI

METE

R 30 F

T

ORCHARD LA

BNSF RAILWAY

TH12

A

B

A

B

1601

1595 323

331

339

342

1345

315

330

318

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

AREA 15 SF

11'

11'

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERI

METE

R 30 F

T

PERIMETER 30 FT

C

D

C

D

MA

TC

HLIN

E - S

EE B

EL

OW

MA

TC

HLIN

E - S

EE A

BO

VE

1000

scale in feet

50

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 2

_Graphic A.d

gn

Figure 2A

8/10/2015Job #

Temporary Bypass Option 2 - Single Lane (Eastbound Only)

CSAH 112 - Phase 1

Hennepin County

LEGEND

CONSTRUCTION ZONE

TEMPORARY PAVEMENT

TRAFFIC BARRIER

TEMPORARY BYPASS LIMITS

INPLACE RIGHT OF WAY

DIRECTION OF TRAFFIC FLOW

201

1135

1140

1145

1150

220

221

1155

1160

1165

OHWL=944.3 FT.

LONG LAKE

MA

RT

HA

LA

LO

NG

LA

KE

CR

EE

K

CE

METER

Y R

D

WOLF P

OI

NTE TR

CEMETERY RD

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

CONSTRUCTIONCLOSED DURING TRAIL ACCESS

EASEMENTTEMPORARY

TREE REMOVALSSIGNIFICANT

PRELIMINARY8/12/15

SUBJECT TO CHANGE

Page 5: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

LONG LAKE

LONG LAKE

LONG LAKE

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

FENCE

NOISE

INP MnDOT

INP R/W

INP R/W

OHW 944.3

INP 15" STM

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

1:

1

1:2

CL CSAH 112

1142+50

SINGLE LANETEMPORARY ROAD

WORK ZONE

PAVEMENT SECTION

TO EXTEND UP AND BENEATH

GEOTEXTILE SPECIAL

15'

11' 11'

INP R/W

INP R/W

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1148+50

SINGLE LANETEMPORARY ROAD

EXCAVATION (CITY)PROP WATER MAIN

15'

WORK ZONE

11' 11'

BUILDING

BLDG 31'MIN. DIST. TO

INP R/W

INP R/W

8" WM

THRU

11'

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1152+00

TWO LANESTEMPORARY ROAD

1:3

EXCAVATION (CITY)PROP WATER MAIN

26'

WORK ZONE

11' 11'

INP R/W

INP 8" WM

1:3

RETAINING

WALL 1:2

WETLAND

DELIN.

CL CSAH 112

1157+25

POND HWL 947.3

CLPROP CREEK

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

THRU

11'

THRU

11'

26'GUARDRAIL

TWO LANESPROPOSED ROAD

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

SECTION A-A (STA. 1142+50)

SECTION D-D (STA. 1157+25)

SECTION C-C (STA. 1152+00)

SECTION B-B (STA. 1148+50)

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 2

_Cross S

ection_

Graphic B.d

gn

Figure 2B

8/10/2015Job #

Temporary Bypass Option 2 - Cross Sections

CSAH 112 - Phase 1Hennepin County PRELIMINARY

8/12/15SUBJECT TO CHANGE

Page 6: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

FLAG

FLAG

FLAG

1605

EATING

HEALTHY

SUTTON

SEATTLE

PRODUCE

FATHERS

FOUNDING

PERI

METE

R 30 F

T

AREA 1

5 SF

AREA

= 15 SQ

'REM

= 48 SQ

'

PERIMET

ER = 30 '

PERI

METE

R 30 F

T

AREA 1

5 SF

PERI

METE

R 30 F

T

AREA 1

5 SF

PERI

METE

R 30 F

T

PERI

METE

R 30 F

T

11'

5'

ORCHARD LA

BNSF RAILWAY

TH12

A

B

A

B

1601

1595 323

331

339

342

1345

315

330

318

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

AREA 15 SF

PERI

METE

R 30 F

T

PERIMETER 30 FT

11'

11'

PERI

METE

R 30 F

T

PERIMETER 30 FT

C

D

C

D

MA

TC

HLIN

E - S

EE B

EL

OW

MA

TC

HLIN

E - S

EE A

BO

VE

1000

scale in feet

50

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 3

_Graphic A.d

gn

Figure 3A

8/10/2015Job #

Temporary Bypass Option 3 - Single Lane (Westbound Only) with Pedestrian Access

CSAH 112 - Phase 1

Hennepin County

LEGEND

CONSTRUCTION ZONE

TEMPORARY PAVEMENT

TRAFFIC BARRIER

TEMPORARY SHEET PILE

TEMPORARY BYPASS LIMITS

INPLACE RIGHT OF WAY

DIRECTION OF TRAFFIC FLOW

201

1135

1140

1145

1150

220

221

1155

1160

1165

OHWL=944.3 FT.

LONG LAKE

MA

RT

HA

LA

LO

NG

LA

KE

CR

EE

K

CE

METER

Y R

D

WOLF P

OI

NTE TR

CEMETERY RD

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

(+/- 7' HIGH)SHEET PILE WALLTEMPORARY

EASEMENTTEMPORARY

TREE REMOVALSSIGNIFICANT

PRELIMINARY8/12/15

SUBJECT TO CHANGE

Page 7: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

LONG LAKE

LONG LAKE

LONG LAKE

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

THRU

11'

PILE INSTALLED

TEMPORARY SHEET

15'

WALK

5'

W/PED ACCESS

ONE LANE TEMPORARY ROAD

FENCE

NOISE

INP MnDOT

INP R/W

INP R/W

OHW 944.3

INP 15" STM

INP 8" WM

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

1:

1

1:2

CL CSAH 112

1142+50

PAVEMENT SECTION

TO EXTEND UP AND BENEATH

GEOTEXTILE SPECIAL

WORK ZONE

11'11'

INP R/W

INP R/W

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1148+50

SINGLE LANETEMPORARY ROAD

EXCAVATION (CITY)PROP WATER MAIN

15'

WORK ZONE

11' 11'

BUILDING

BLDG 31'MIN. DIST. TO

INP R/W

INP R/W

8" WM

THRU

11'

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1152+00

TWO LANESTEMPORARY ROAD

1:3

EXCAVATION (CITY)PROP WATER MAIN

26'

WORK ZONE

11' 11'

INP R/W

INP 8" WM

1:3

RETAINING

WALL 1:2

WETLAND

DELIN.

CL CSAH 112

1157+25

POND HWL 947.3

CLPROP CREEK

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

THRU

11'

THRU

11'

26'GUARDRAIL

TWO LANESPROPOSED ROAD

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

SECTION A-A (STA. 1142+50)

SECTION D-D (STA. 1157+25)

SECTION C-C (STA. 1152+00)

SECTION B-B (STA. 1148+50)

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 3

_Cross S

ection_

Graphic B.d

gn

Figure 3B

8/10/2015Job #

Temporary Bypass Option 3 - Cross Sections

CSAH 112 - Phase 1Hennepin County PRELIMINARY

8/12/15SUBJECT TO CHANGE

Page 8: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

FLAG

FLAG

FLAG

1605

EATING

HEALTHY

SUTTON

SEATTLE

PRODUCE

FATHERS

FOUNDING

PERIMETER 30 FT

PERIMETER 30 FT

AREA 15 SF

PERIMETER 30 FT

REM 35 SF

AREA 15 SF

PERIMETER 30 FT

PERI

METE

R 30 F

T

AREA 1

5 SF

PERI

METE

R 30 F

T

11'

PERI

METE

R 30 F

T

5'

ORCHARD LA

BNSF RAILWAY

TH12

A

B

A

B

1601

1595 323

331

339

342

1345

315

330

318

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

AREA 15 SF

11'

11'

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERI

METE

R 30 F

T

PERIMETER 30 FT

C

D

C

D

MA

TC

HLIN

E - S

EE B

EL

OW

MA

TC

HLIN

E - S

EE A

BO

VE

1000

scale in feet

50

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 4

_Graphic A.d

gn

Figure 4A

8/10/2015Job #

Temporary Bypass Option 4 - Single Lane (Eastbound Only) with Pedestrian Access

CSAH 112 - Phase 1

Hennepin County

LEGEND

CONSTRUCTION ZONE

TEMPORARY PAVEMENT

TRAFFIC BARRIER

TEMPORARY SHEET PILE

TEMPORARY BYPASS LIMITS

INPLACE RIGHT OF WAY

DIRECTION OF TRAFFIC FLOW

201

1135

1140

1145

1150

220

221

1155

1160

1165

OHWL=944.3 FT.

LONG LAKE

MA

RT

HA

LA

LO

NG

LA

KE

CR

EE

K

CE

METER

Y R

D

WOLF P

OI

NTE TR

CEMETERY RD

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

(+/- 7' HIGH)SHEET PILE WALLTEMPORARY

EASEMENTTEMPORARY

TREE REMOVALSSIGNIFICANT

PRELIMINARY8/12/15

SUBJECT TO CHANGE

Page 9: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

LONG LAKE

LONG LAKE

LONG LAKE

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

THRU

11'

PILE INSTALLED

TEMPORARY SHEET

15'

WALK

5'

W/PED ACCESS

ONE LANE TEMPORARY ROAD

FENCE

NOISE

INP MnDOT

INP R/W

INP R/W

OHW 944.3

INP 15" STM

INP 8" WM

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

1:

1

1:2

CL CSAH 112

1142+50

PAVEMENT SECTION

TO EXTEND UP AND BENEATH

GEOTEXTILE SPECIAL

WORK ZONE

11'11'

INP R/W

INP R/W

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1148+50

SINGLE LANETEMPORARY ROAD

EXCAVATION (CITY)PROP WATER MAIN

15'

WORK ZONE

11' 11'

BUILDING

BLDG 31'MIN. DIST. TO

INP R/W

INP R/W

8" WM

THRU

11'

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1152+00

TWO LANESTEMPORARY ROAD

1:3

EXCAVATION (CITY)PROP WATER MAIN

26'

WORK ZONE

11' 11'

INP R/W

INP 8" WM

1:3

RETAINING

WALL 1:2

WETLAND

DELIN.

CL CSAH 112

1157+25

POND HWL 947.3

CLPROP CREEK

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

THRU

11'

THRU

11'

26'GUARDRAIL

TWO LANESPROPOSED ROAD

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

SECTION A-A (STA. 1142+50)

SECTION D-D (STA. 1157+25)

SECTION C-C (STA. 1152+00)

SECTION B-B (STA. 1148+50)

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 4

_Cross S

ection_

Graphic B.d

gn

Figure 4B

8/10/2015Job #

Temporary Bypass Option 4 - Cross Sections

CSAH 112 - Phase 1Hennepin County PRELIMINARY

8/12/15SUBJECT TO CHANGE

Page 10: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

FLAG

FLAG

FLAG

1605

EATING

HEALTHY

SUTTON

SEATTLE

PRODUCE

FATHERS

FOUNDING

PERI

METE

R 30 F

T

REM

35 S

F

AREA 1

5 SF

PERI

METE

R 30 F

T

AREA 1

5 SF

PERI

METE

R 30 F

T

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERIMETER 30 FT

PERIMETER 30 FT

AREA 15 SF

PERIMETER 30 FT

REM 35 SF

AREA 15 SF

PERI

METE

R 30 F

T

AREA 1

5 SF

11'

ORCHARD LA

BNSF RAILWAY

TH12

A

B

A

B

1601

1595 323

331

339

342

1345

315

330

318

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

11'

11'11'

11'

C

D

C

D

MA

TC

HLIN

E - S

EE B

EL

OW

MA

TC

HLIN

E - S

EE A

BO

VE

1000

scale in feet

50

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 5

_Graphic A.d

gn

Figure 5A

8/10/2015Job #

Temporary Bypass Option 5 - Single Lane with Signal Control

CSAH 112 - Phase 1

Hennepin County

LEGEND

CONSTRUCTION ZONE

TEMPORARY PAVEMENT

TRAFFIC BARRIER

TEMPORARY SIGNAL

TEMPORARY BYPASS LIMITS

DIRECTION OF TRAFFIC FLOW

INPLACE RIGHT OF WAY

201

1135

1140

1145

1150

220

221

1155

1160

1165

OHWL=944.3 FT.

LONG LAKE

MA

RT

HA

LA

LO

NG

LA

KE

CR

EE

K

CE

METER

Y R

D

WOLF P

OI

NTE TR

CEMETERY RD

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

CONSTRUCTIONCLOSED DURING TRAIL ACCESS

EASEMENTTEMPORARY

REMOVALSTREE

REMOVALSTREE

PRELIMINARY8/12/15

SUBJECT TO CHANGE

Page 11: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

LONG LAKE

LONG LAKE

LONG LAKE

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

FENCE

NOISE

INP MnDOT

INP R/W

INP R/W

OHW 944.3

INP 15" STM

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

1:

1

1:2

CL CSAH 112

1142+50

SINGLE LANETEMPORARY ROAD

WORK ZONE

PAVEMENT SECTION

TO EXTEND UP AND BENEATH

GEOTEXTILE SPECIAL

15'

11' 11'

INP R/W

INP R/W

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1148+50

SINGLE LANETEMPORARY ROAD

EXCAVATION (CITY)PROP WATER MAIN

15'

WORK ZONE

11' 11'

BUILDING

BLDG 31'MIN. DIST. TO

THRU

11'

1:3

ONE LANETEMPORARY ROAD

15'

INP R/W

INP R/W

8" WM

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1152+00

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

11' 11'

INP R/W

INP 8" WM

1:3

RETAINING

WALL 1:2

WETLAND

DELIN.

CL CSAH 112

1157+25

POND HWL 947.3

CLPROP CREEK

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

THRU

11'

THRU

11'

26'GUARDRAIL

TWO LANESPROPOSED ROAD

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

SECTION A-A (STA. 1142+50)

SECTION D-D (STA. 1157+25)

SECTION C-C (STA. 1152+00)

SECTION B-B (STA. 1148+50)

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 5

_Cross S

ection_

Graphic B.d

gn

Figure 5B

8/10/2015Job #

Temporary Bypass Option 5 - Cross Sections

CSAH 112 - Phase 1Hennepin County PRELIMINARY

8/12/15SUBJECT TO CHANGE

Page 12: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

FLAG

FLAG

FLAG

1605

EATING

HEALTHY

SUTTON

SEATTLE

PRODUCE

FATHERS

FOUNDING

PERI

METE

R 30 F

T

PERI

METE

R 30 F

T

PERI

METE

R 30 F

T

AREA 1

5 SF

PERIMETER 30 FT

AREA 15 SF

PERIMETER 30 FT

PERIMETER 30 FT

PERI

METE

R 30 F

T

AREA 1

5 SF

PERI

METE

R 30 F

T

AREA 1

5 SF

PERIMETER 30 FT

AREA 15 SF

11'

11'

ORCHARD LA

BNSF RAILWAY

TH12

A

B

A

B

1601

1595 323

331

339

342

1345

315

330

318

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

AREA 15 SF

11'

11'

PERI

METE

R 30 F

T

PERIMETER 30 FT

C

D

C

D

MA

TC

HLIN

E - S

EE B

EL

OW

MA

TC

HLIN

E - S

EE A

BO

VE

1000

scale in feet

50

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 6

_Graphic A.d

gn

Figure 6A

8/10/2015Job #

Temporary Bypass Option 6 - Two Lanes

CSAH 112 - Phase 1

Hennepin County

LEGEND

CONSTRUCTION ZONE

TEMPORARY PAVEMENT

TRAFFIC BARRIER

TEMPORARY SHEET PILE

TEMPORARY BYPASS LIMITS

INPLACE RIGHT OF WAY

DIRECTION OF TRAFFIC FLOW

201

1135

1140

1145

1150

220

221

1155

1160

1165

OHWL=944.3 FT.

LONG LAKE

MA

RT

HA

LA

LO

NG

LA

KE

CR

EE

K

CE

METER

Y R

D

WOLF P

OI

NTE TR

CEMETERY RD

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

CONSTRUCTIONCLOSED DURING TRAIL ACCESS

PARKING AREAPOTENTIAL

EASEMENTTEMPORARY

EASEMENTTEMPORARY

TREE REMOVALSSIGNIFICANT

PRELIMINARY8/12/15

SUBJECT TO CHANGE

Page 13: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

LONG LAKE

LONG LAKE

LONG LAKE

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

THRU

11'

PILE INSTALLED

TEMPORARY SHEET

26'

THRU

11'

FENCE

NOISE

INP MnDOT

INP R/W

INP R/W

OHW 944.3

INP 15" STM

INP 8" WM

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

1:

1

1:2

CL CSAH 112

1142+50

PAVEMENT SECTION

TO EXTEND UP AND BENEATH

GEOTEXTILE SPECIAL

WORK ZONE TWO LANESTEMPORARY ROAD

11' 11'

THRU

11'

THRU

11'

TWO LANESTEMPORARY ROAD

26'

INP R/W

INP R/W

INP 8" WM

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1148+50

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

BUILDING

BLDG 20'MIN. DIST. TO

11' 11'

INP R/W

INP R/W

8" WM

THRU

11'

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1152+00

TWO LANESTEMPORARY ROAD

1:3

EXCAVATION (CITY)PROP WATER MAIN

26'

WORK ZONE

11' 11'

INP R/W

INP 8" WM

1:3

RETAINING

WALL 1:2

WETLAND

DELIN.

CL CSAH 112

1157+25

POND HWL 947.3

CLPROP CREEK

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

THRU

11'

THRU

11'

26'GUARDRAIL

TWO LANESPROPOSED ROAD

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

SECTION A-A (STA. 1142+50)

SECTION D-D (STA. 1157+25)

SECTION C-C (STA. 1152+00)

SECTION B-B (STA. 1148+50)

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 6

_Cross S

ection_

Graphic B.d

gn

Figure 6B

8/10/2015Job #

Temporary Bypass Option 6 - Cross Sections

CSAH 112 - Phase 1Hennepin County PRELIMINARY

8/12/15SUBJECT TO CHANGE

Page 14: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

FLAG

FLAG

FLAG

1605

EATING

HEALTHY

SUTTON

SEATTLE

PRODUCE

FATHERS

FOUNDING

PERI

METE

R 30 F

T

REM

35 S

F

AREA 1

5 SF

PERI

METE

R 30 F

T

AREA 1

5 SF

PERI

METE

R 30 F

T

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERIMETER 30 FT

PERIMETER 30 FT

AREA 15 SF

PERIMETER 30 FT

REM 35 SF

AREA 15 SF

PERI

METE

R 30 F

T

AREA 1

5 SF

11'

ORCHARD LA

BNSF RAILWAY

TH12

A

B

A

B

1601

1595 323

331

339

342

1345

315

330

318

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

11'

11'11'

11'

C

D

C

D

MA

TC

HLIN

E - S

EE B

EL

OW

MA

TC

HLIN

E - S

EE A

BO

VE

1000

scale in feet

50

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 7

_Graphic A.d

gn

Figure 7A

8/10/2015Job #

Temporary Bypass Option 7 - Single Lane (Eastbound AM/Westbound PM)

CSAH 112 - Phase 1

Hennepin County

LEGEND

CONSTRUCTION ZONE

TEMPORARY PAVEMENT

DIRECTION OF TRAFFIC FLOWTRAFFIC BARRIER

TEMPORARY BYPASS LIMITS

INPLACE RIGHT OF WAY

201

1135

1140

1145

1150

220

221

1155

1160

1165

OHWL=944.3 FT.

LONG LAKE

MA

RT

HA

LA

LO

NG

LA

KE

CR

EE

K

CE

METER

Y R

D

WOLF P

OI

NTE TR

CEMETERY RD

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

CONSTRUCTIONCLOSED DURING TRAIL ACCESS

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

EASEMENTTEMPORARY

REMOVALSTREE

REMOVALSTREE

PRELIMINARY8/12/15

SUBJECT TO CHANGE

Page 15: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

LONG LAKE

LONG LAKE

LONG LAKE

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

960

950

940

FENCE

NOISE

INP MnDOT

INP R/W

INP R/W

OHW 944.3

INP 15" STM

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

1:

1

1:2

CL CSAH 112

1142+50

SINGLE LANETEMPORARY ROAD

WORK ZONE

PAVEMENT SECTION

TO EXTEND UP AND BENEATH

GEOTEXTILE SPECIAL

15'

11' 11'

INP R/W

INP R/W

INP 8" WM

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1148+50

SINGLE LANETEMPORARY ROAD

EXCAVATION (CITY)PROP WATER MAIN

15'

WORK ZONE

11' 11'

BUILDING

BLDG 31'MIN. DIST. TO

THRU

11'

1:3

ONE LANETEMPORARY ROAD

15'

INP R/W

INP R/W

8" WM

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1152+00

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

11' 11'

INP R/W

INP 8" WM

1:3

RETAINING

WALL 1:2

WETLAND

DELIN.

CL CSAH 112

1157+25

POND HWL 947.3

CLPROP CREEK

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

THRU

11'

THRU

11'

26'GUARDRAIL

TWO LANESPROPOSED ROAD

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

SECTION A-A (STA. 1142+50)

SECTION D-D (STA. 1157+25)

SECTION C-C (STA. 1152+00)

SECTION B-B (STA. 1148+50)

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 7

_Cross S

ection_

Graphic B.d

gn

Figure 7B

8/10/2015Job #

Temporary Bypass Option 7 - Cross Sections

CSAH 112 - Phase 1Hennepin County PRELIMINARY

8/12/15SUBJECT TO CHANGE

Page 16: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

FLAG

FLAG

FLAG

1605

EATING

HEALTHY

SUTTON

SEATTLE

PRODUCE

FATHERS

FOUNDINGCLOSED

ROAD

F FF FF FF F F F

CLOSED

ROAD

F FF FF FF F F F

ORCHARD LA

BNSF RAILWAY

TH12

1601

1595 323

331

339

342

1345

315

330

318

FF F F F F

ROAD CLOSED

LOCAL TRAFFIC ONLY

0.2 MILES AHEAD

PERI

METE

R 30 F

T

PERIMETER 30 FT

AREA 15 SF

11'

11'

PERI

METE

R 30 F

T

PERIMETER 30 FT

PERI

METE

R 30 F

T

PERIMETER 30 FT

C

D

C

D

MA

TC

HLIN

E - S

EE B

EL

OW

MA

TC

HLIN

E - S

EE A

BO

VE

1000

scale in feet

50

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 8

_Graphic A.d

gn

Figure 8A

8/10/2015Job #

Temporary Bypass Option 8 - Full Closure

CSAH 112 - Phase 1

Hennepin County

LEGEND

CONSTRUCTION ZONE

TEMPORARY PAVEMENT

TRAFFIC BARRIER

TEMPORARY BYPASS LIMITS

INPLACE RIGHT OF WAY

DIRECTION OF TRAFFIC FLOW

201

1135

1140

1145

1150

220

221

1155

1160

1165

OHWL=944.3 FT.

LONG LAKE

MA

RT

HA

LA

LO

NG

LA

KE

CR

EE

K

CE

METER

Y R

D

WOLF P

OI

NTE TR

CEMETERY RD

CONSTRUCTIONCLOSED DURING TRAIL ACCESS

CONSTRUCTIONCLOSED DURINGDRIVEWAY ACCESS

EASEMENTTEMPORARY

TREE REMOVALSSIGNIFICANT

PRELIMINARY8/12/15

SUBJECT TO CHANGE

Page 17: STAGING MATRIX FOR TEMPORARY BYPASS OPTIONS CSAH 112 · Tree removal at townhome property Detour signing for eastbound & westbound No pedestrian access Emergency vehicle access/routing

LONG LAKE

960

950

940

960

950

940

960

950

940

960

950

940

INP R/W

INP R/W

8" WM

THRU

11'

THRU

11'

PROP RIPRAP

REMOVED VIA. LARGE CRANE

COFFERDAM INSTALLED /

TEMPORARY SHEET PILE

OHW 944.3

1:

1

1:4

CL CSAH 112

1152+00

TWO LANESTEMPORARY ROAD

1:3

EXCAVATION (CITY)PROP WATER MAIN

26'

WORK ZONE

11' 11'

INP R/W

INP 8" WM

1:3

RETAINING

WALL 1:2

WETLAND

DELIN.

CL CSAH 112

1157+25

POND HWL 947.3

CLPROP CREEK

EXCAVATION (CITY)PROP WATER MAIN

WORK ZONE

THRU

11'

THRU

11'

26'GUARDRAIL

TWO LANESPROPOSED ROAD

60 70 80607080 0 10 20 30 40 501020304050

60 70 80607080 0 10 20 30 40 501020304050

SECTION D-D (STA. 1157+25)

SECTION C-C (STA. 1152+00)

H:\

Proje

cts\8

483\C

AD

_BIM\G

raphics\Sta

gin

g\8

483_

Option 8

_Cross S

ection_

Graphic B.d

gn

Figure 8B

8/10/2015Job #

Temporary Bypass Option 8 - Cross Sections

CSAH 112 - Phase 1Hennepin County PRELIMINARY

8/12/15SUBJECT TO CHANGE