standard bm monthly report - 201012
TRANSCRIPT
BUILDING MATERIALS PRICES
November-2010 December-2010and
Building Materials Prices for Johor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag 15.57 15.571 Bag 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorOrdinary Portland Cement, bulk
Ordinary Portland Cement in bulk 295.33 295.332 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorWhite Cement
White Cement 40 kg per bag , collection in MT 720.67 720.673 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorGranite 3/4"
Granite Aggregate 3/4" 23.33 23.334 MT 60 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorNormal River Sand
Normal River Sand- Ex 16.17 16.175 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorFine River Sand
Fine River Sand for Plastering -Ex 24.00 24.006 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorNormal Mining Sand
Normal Mining Sand 16.17 16.177 MT 30 Ex-Factory
Page 2 of9731 January 2011
Building Materials Prices for Johor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorFine Mining Sand
Fine Mining Sand for Plastering 24.00 24.008 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorMild Steel Round Bar
Mild Steel Round Bar R10, MS146 2176.67 2233.339 MT 60 Delivered
Mild Steel Round Bar R12, MS146 2176.67 2233.3310 MT 60 Delivered
Mild Steel Round Bar R16, MS146 2076.67 2133.3311 MT 60 Delivered
Mild Steel Round Bar R20, MS146 2143.33 2200.0012 MT 60 Delivered
Mild Steel Round Bar R22, MS146 2143.33 2200.0013 MT 60 Delivered
Mild Steel Round Bar R25, MS146 2143.33 2200.0014 MT 60 Delivered
Mild Steel Round Bar R32, MS146 2143.33 2200.0015 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorHigh Tensile Deformed Bar
High Tensile Deformed Bar-Y10, MS146 2176.67 2233.3316 MT 60 Delivered
High Tensile Deformed Bar - Y12, MS146 2176.67 2233.3317 MT 60 Delivered
High Tensile Deformed Bar- Y16, MS146 2076.67 2133.3318 MT 60 Delivered
High Tensile Deformed Bar - Y20, MS146 2076.67 2133.3319 MT 60 Delivered
High Tensile Deformed Bar- Y25, MS146 2076.67 2133.3320 MT 60 Delivered
Page 3 of9731 January 2011
Building Materials Prices for Johor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorHigh Tensile Deformed Bar
High Tensile Deformed Bar- Y32, MS146 2076.67 2133.3321 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorBRC Fabric
BRC A6, MS145 5.86 6.0722 m2 30 Delivered
BRC A7, MS145 7.98 8.2623 m2 30 Delivered
BRC A8, MS145 10.45 10.8324 m2 30 Delivered
BRC A9, MS145 13.17 13.6525 m2 30 Delivered
BRC A10, MS145 16.75 17.3426 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 10,Granite
170.67 170.6727 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Granite
173.33 173.3328 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Granite
181.33 181.3329 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25,Granite
189.33 189.3330 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30,Granite
199.00 199.0031 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
210.67 210.6732 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
223.33 223.3333 m3 30 Delivered
Page 4 of9731 January 2011
Building Materials Prices for Johor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorCommon Clay Bricks
Common Clay Bricks - Pallet 0.33 0.3334 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorCement Sand Bricks
Cement Sand Brick - Pallet 0.21 0.2135 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorSmooth Face Facing Bricks
Smooth Face Facing Brick, Red 0.98 0.9836 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)
1.30 1.3037 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT
51.67 51.6738 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT
56.57 54.9739 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)
24.83 24.8340 Sheet 60 Delivered
Page 5 of9731 January 2011
Building Materials Prices for Johor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorCeramic Floor Tiles
Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1
0.85 0.8541 Piece 60 Delivered
Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1
1.79 1.7942 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorHomogeneous Ceramic Tiles
Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1
1.35 1.3543 Piece 60 Delivered
Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1
2.04 2.3144 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorPaver
Uni-Espave - 200mm x 190mm 0.88 0.8845 Piece 60 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm 0.83 0.8346 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)
4.25 4.2547 Sheet 60 Delivered
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)
7.17 7.1748 Sheet 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)
5.03 5.0349 Sheet 60 Delivered
Page 6 of9731 January 2011
Building Materials Prices for Johor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorTimber door
Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM
245.33 245.3350 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorGI Pipes
Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863
37.07 37.0751 6mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorPVC Pipes
PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628
24.75 24.7552 4mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 415.77 415.7753 100mroll
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 22.73 22.7354 5.8mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant
110.07 110.0755 No. 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorWash Hand Basin
Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan
72.30 72.3056 Set 60 Delivered
Page 7 of9731 January 2011
Building Materials Prices for Johor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorWater Closets
Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan
138.70 138.7057 Item 60 Delivered
Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse
54.07 54.0758 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''
83.40 83.4059 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorNippon
Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish
95.67 95.6760 5Litres
60 Delivered
Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo
88.73 88.7361 5Litres
60 Delivered
Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex
31.67 31.6762 7Litres
60 Delivered
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond
95.47 95.4763 5Litres
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)
3196.67 3196.6764 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)
3345.33 3345.3365 MT 60 Delivered
Page 8 of9731 January 2011
Building Materials Prices for Johor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorUniversal Beams
Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)
3433.33 3433.3366 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2548.00 2548.0067 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
JohorPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm 50.77 50.7768 Piece 60 Delivered
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade
130.77 130.7769 Piece 60 Delivered
Page 9 of9731 January 2011
Building Materials Prices for Kelantan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag 15.90 15.901 Bag 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanOrdinary Portland Cement, bulk
Ordinary Portland Cement in bulk 303.67 303.672 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanWhite Cement
White Cement 40 kg per bag , collection in MT 744.00 744.003 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanGranite 3/4"
Granite Aggregate 3/4" 24.00 24.004 MT 60 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanNormal River Sand
Normal River Sand- Ex 15.00 15.005 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanFine River Sand
Fine River Sand for Plastering -Ex 18.67 18.676 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanNormal Mining Sand
Normal Mining Sand 15.67 15.677 MT 30 Ex-Factory
Page 10 of9731 January 2011
Building Materials Prices for Kelantan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanFine Mining Sand
Fine Mining Sand for Plastering 22.00 22.008 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanMild Steel Round Bar
Mild Steel Round Bar R10, MS146 2170.00 2250.009 MT 60 Delivered
Mild Steel Round Bar R12, MS146 2170.00 2250.0010 MT 60 Delivered
Mild Steel Round Bar R16, MS146 2070.00 2150.0011 MT 60 Delivered
Mild Steel Round Bar R20, MS146 2136.67 2216.6712 MT 60 Delivered
Mild Steel Round Bar R22, MS146 2136.67 2216.6713 MT 60 Delivered
Mild Steel Round Bar R25, MS146 2136.67 2216.6714 MT 60 Delivered
Mild Steel Round Bar R32, MS146 2170.00 2216.6715 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanHigh Tensile Deformed Bar
High Tensile Deformed Bar-Y10, MS146 2170.00 2250.0016 MT 60 Delivered
High Tensile Deformed Bar - Y12, MS146 2170.00 2250.0017 MT 60 Delivered
High Tensile Deformed Bar- Y16, MS146 2070.00 2150.0018 MT 60 Delivered
High Tensile Deformed Bar - Y20, MS146 2070.00 2150.0019 MT 60 Delivered
High Tensile Deformed Bar- Y25, MS146 2070.00 2150.0020 MT 60 Delivered
Page 11 of9731 January 2011
Building Materials Prices for Kelantan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanHigh Tensile Deformed Bar
High Tensile Deformed Bar- Y32, MS146 2070.00 2150.0021 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanBRC Fabric
BRC A6, MS145 6.36 6.5722 m2 30 Delivered
BRC A7, MS145 8.65 8.9323 m2 30 Delivered
BRC A8, MS145 11.66 12.0324 m2 30 Delivered
BRC A9, MS145 14.29 14.7725 m2 30 Delivered
BRC A10, MS145 17.11 18.1826 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 10,Granite
175.67 175.6727 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Granite
175.67 175.6728 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Granite
182.67 182.6729 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25,Granite
191.00 191.0030 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30,Granite
207.67 207.6731 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
211.00 211.0032 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
223.33 223.3333 m3 30 Delivered
Page 12 of9731 January 2011
Building Materials Prices for Kelantan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanCommon Clay Bricks
Common Clay Bricks - Pallet 0.40 0.4034 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanCement Sand Bricks
Cement Sand Brick - Pallet 0.25 0.2535 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanSmooth Face Facing Bricks
Smooth Face Facing Brick, Red 1.47 1.4736 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)
1.80 1.7937 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT
52.70 52.7038 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT
57.63 57.6339 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)
24.83 27.7340 Sheet 60 Delivered
Page 13 of9731 January 2011
Building Materials Prices for Kelantan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanCeramic Floor Tiles
Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1
0.85 0.8541 Piece 60 Delivered
Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1
1.79 1.7942 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanHomogeneous Ceramic Tiles
Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1
1.63 1.6343 Piece 60 Delivered
Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1
2.04 2.0444 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanPaver
Uni-Espave - 200mm x 190mm 0.92 0.9245 Piece 60 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm 0.86 0.8646 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)
4.32 4.3247 Sheet 60 Delivered
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)
7.53 7.5248 Sheet 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)
5.03 5.0349 Sheet 60 Delivered
Page 14 of9731 January 2011
Building Materials Prices for Kelantan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanTimber door
Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM
245.33 245.3350 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanGI Pipes
Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863
38.70 38.7051 6mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanPVC Pipes
PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628
28.93 28.9352 4mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 444.77 444.6753 100mroll
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 23.83 23.8354 5.8mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant
115.37 115.3755 No. 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanWash Hand Basin
Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan
75.20 75.2056 Set 60 Delivered
Page 15 of9731 January 2011
Building Materials Prices for Kelantan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanWater Closets
Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan
144.63 144.6357 Item 60 Delivered
Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse
55.53 55.5358 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''
84.63 84.6359 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanNippon
Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish
99.00 99.0060 5Litres
60 Delivered
Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo
91.07 91.0761 5Litres
60 Delivered
Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex
31.67 31.6762 7Litres
60 Delivered
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond
98.80 98.8063 5Litres
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)
3234.33 3234.3364 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)
3396.00 3396.0065 MT 60 Delivered
Page 16 of9731 January 2011
Building Materials Prices for Kelantan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanUniversal Beams
Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)
3484.00 3484.0066 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2587.67 2566.6767 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KelantanPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm 51.43 51.4368 Piece 60 Delivered
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade
132.77 132.7769 Piece 60 Delivered
Page 17 of9731 January 2011
Building Materials Prices for Kota Kinabalu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag - (30) 17.30 17.301 Bag 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluWhite Cement
White Cement 25kg per bag , collection in MT - (30) 880.00 880.002 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluGranite 3/4"
Granite Aggregate 3/4" - (30) 50.00 50.003 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluSandstone
Sandstone Aggregates 3/4" 44.33 44.334 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluNormal River Sand
Normal River Sand - Delivery 35.00 36.005 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluFine River Sand
Fine River Sand for Plastering- Delivery 38.00 40.006 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluMild Steel Round Bar
Mild Steel Round Bar R10, MS146 - (30) 2450.00 2500.007 MT 30 Delivered
Mild Steel Round Bar R12, MS146 - (30) 2400.00 2450.008 MT 30 Delivered
Page 18 of9731 January 2011
Building Materials Prices for Kota Kinabalu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluMild Steel Round Bar
Mild Steel Round Bar R16, MS146 - (30) 2250.00 2300.009 MT 30 Delivered
Mild Steel Round Bar R20, MS146 - (30) 2250.00 2300.0010 MT 30 Delivered
Mild Steel Round Bars - R25, MS146 - (30) 2250.00 2300.0011 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluHigh Tensile Deformed Bar
High Tensile Deformed Bar Y10, MS146 - (30) 2500.00 2550.0012 MT 60 Delivered
High Tensile Deformed Bar Y12, MS146 - (30) 2450.00 2500.0013 MT 60 Delivered
High Tensile Deformed Bar Y16, MS146 - (30) 2400.00 2450.0014 MT 60 Delivered
High Tensile Deformed Bar Y20, MS146 - (30) 2400.00 2450.0015 MT 60 Delivered
High Tensile Deformed Bar Y25, MS146 - (30) 2400.00 2450.0016 MT 60 Delivered
High Tensile Deformed Bar Y32, MS146 - (30) 2400.00 2450.0017 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluBRC Fabric
BRC A6, MS145 7.50 7.5018 m2 30 Delivered
BRC A7, MS145 9.50 9.5019 m2 30 Delivered
BRC A8, MS145 12.43 12.4320 m2 30 Delivered
BRC A9, MS145 15.50 15.5021 m2 30 Delivered
Page 19 of9731 January 2011
Building Materials Prices for Kota Kinabalu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluBRC Fabric
BRC A10, MS145 19.50 19.5022 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 30,Granite
294.33 294.3323 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
311.33 311.3324 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
322.67 322.6725 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluReady Mix Concrete-Sandstone
Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)
216.00 216.0026 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)
222.33 222.3327 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)
233.67 233.6728 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)
250.00 250.0029 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)
280.00 280.0030 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)
300.00 300.0031 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)
311.67 311.6732 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluCommon Clay Bricks
Common Clay Bricks - Pallet 0.34 0.3433 Piece 30 Delivered
Page 20 of9731 January 2011
Building Materials Prices for Kota Kinabalu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluCement Sand Bricks
Cement Sand Bricks - Pallet -(30) 0.32 0.3234 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluSmooth Face Facing Bricks
Smooth Face Facing Brick, Red 0.91 0.9135 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour, Local Product - (30)
1.80 1.8036 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)
55.00 55.0037 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT - (30)
53.00 55.0038 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm (Hume/Malex/UAC) - (30)
33.00 33.0039 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluCeramic Floor Tiles
Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)
1.70 1.7040 Piece 30 Delivered
Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)
3.57 3.5741 Piece 30 Delivered
Page 21 of9731 January 2011
Building Materials Prices for Kota Kinabalu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluHomogeneous Ceramic Tiles
Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)
2.97 2.9742 Piece 30 Delivered
Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)
4.93 4.9343 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluPaver
Uni-Espave- 200mm x 190mm - (30) 1.40 1.4044 Piece 30 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.37 1.3745 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)
9.50 9.5046 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)
7.60 7.6047 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluTimber door
Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)
264.00 264.0048 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluGI Pipes
Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)
64.00 64.0049 6mrun
30 Delivered
Page 22 of9731 January 2011
Building Materials Prices for Kota Kinabalu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluPVC Pipes
PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)
39.00 39.0050 6mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)
710.00 710.0051 100mroll
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 18.07 18.0752 5.8mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)
165.00 165.0053 No. 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluWash Hand Basin
Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)
40.33 40.3354 Set 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluWater Closets
Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without
68.00 68.0055 Item 30 Delivered
Water Closet Western Type - Baltimore, C-56Syphonic W.C. With S or P trap, With Cistern,
181.67 181.6756 Set 30 Delivered
Page 23 of9731 January 2011
Building Materials Prices for Kota Kinabalu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)
86.00 86.0057 Item 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluNippon
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)
100.00 100.0058 5Litres
30 Delivered
Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)
85.00 85.0059 5Litres
30 Delivered
Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)
42.00 42.0060 7Litres
30 Delivered
Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)
95.00 95.0061 5Litres
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)
2833.33 2833.3362 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)
3906.67 3906.6763 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluUniversal Beams
Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)
3400.00 3400.0064 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)
2200.00 2200.0065 MT 30 Delivered
Page 24 of9731 January 2011
Building Materials Prices for Kota Kinabalu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Kota KinabaluPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 71.00 71.0066 Piece 30 Delivered
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)
149.33 149.3367 Piece 30 Delivered
Page 25 of9731 January 2011
Building Materials Prices for Kuching
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag - (30) 15.30 15.301 Bag 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingWhite Cement
White Cement 25kg per bag , collection in MT - (30) 840.00 840.002 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingGranite 3/4"
Granite Aggregate 3/4" - (30) 33.33 33.333 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingLimestone
Limestone Aggregates 3/4" 26.67 26.674 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingNormal River Sand
Normal River Sand - Delivery 28.67 28.675 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingFine River Sand
Fine River Sand for Plastering- Delivery 33.00 33.006 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingMild Steel Round Bar
Mild Steel Round Bar R10, MS146 - (30) 2500.00 2500.007 MT 30 Delivered
Mild Steel Round Bar R12, MS146 - (30) 2450.00 2450.008 MT 30 Delivered
Page 26 of9731 January 2011
Building Materials Prices for Kuching
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingMild Steel Round Bar
Mild Steel Round Bar R16, MS146 - (30) 2400.00 2400.009 MT 30 Delivered
Mild Steel Round Bar R20, MS146 - (30) 2400.00 2400.0010 MT 30 Delivered
Mild Steel Round Bars - R25, MS146 - (30) 2400.00 2400.0011 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingHigh Tensile Deformed Bar
High Tensile Deformed Bar Y10, MS146 - (30) 2500.00 2500.0012 MT 60 Delivered
High Tensile Deformed Bar Y12, MS146 - (30) 2450.00 2450.0013 MT 60 Delivered
High Tensile Deformed Bar Y16, MS146 - (30) 2400.00 2400.0014 MT 60 Delivered
High Tensile Deformed Bar Y20, MS146 - (30) 2400.00 2400.0015 MT 60 Delivered
High Tensile Deformed Bar Y25, MS146 - (30) 2400.00 2400.0016 MT 60 Delivered
High Tensile Deformed Bar Y32, MS146 - (30) 2400.00 2400.0017 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingBRC Fabric
BRC A6, MS145 7.00 7.0018 m2 30 Delivered
BRC A7, MS145 9.17 9.1719 m2 30 Delivered
BRC A8, MS145 12.00 12.0020 m2 30 Delivered
BRC A9, MS145 15.07 15.0721 m2 30 Delivered
Page 27 of9731 January 2011
Building Materials Prices for Kuching
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingBRC Fabric
BRC A10, MS145 18.50 18.5022 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 30,Granite
280.00 280.0023 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
300.00 300.0024 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
311.67 311.6725 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingReady Mix Concrete-Sandstone
Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)
216.00 216.0026 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)
222.00 222.0027 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)
233.00 233.0028 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)
250.00 250.0029 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)
260.00 260.0030 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)
280.67 280.6731 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)
283.33 283.3332 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingCommon Clay Bricks
Common Clay Bricks - Pallet 0.33 0.3333 Piece 30 Delivered
Page 28 of9731 January 2011
Building Materials Prices for Kuching
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingCement Sand Bricks
Cement Sand Bricks - Pallet -(30) 0.31 0.3134 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour, Shanta- (30)
1.25 1.2535 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)
54.00 54.0036 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT - (30)
56.33 56.3337 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm (3'') DoubleWidth, Grey 1065mm x 2440mm - (30)
32.33 32.3338 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingCeramic Floor Tiles
Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)
1.00 1.0039 Piece 30 Delivered
Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)
3.00 3.0040 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingHomogeneous Ceramic Tiles
Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)
2.97 2.9741 Piece 30 Delivered
Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)
4.20 4.2042 Piece 30 Delivered
Page 29 of9731 January 2011
Building Materials Prices for Kuching
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingHomogeneous Ceramic Tiles
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingPaver
Uni-Espave- 200mm x 190mm - (30) 1.07 1.0743 Piece 30 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 0.97 0.9744 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)
8.93 9.0045 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)
7.50 7.5046 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingTimber door
Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)
298.33 298.3347 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingGI Pipes
Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)
57.00 57.0048 6mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingPVC Pipes
PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)
38.00 38.0049 6mrun
30 Delivered
Page 30 of9731 January 2011
Building Materials Prices for Kuching
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)
713.33 713.3350 100mroll
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 17.67 17.6751 5.8mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)
159.33 159.3352 No. 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingWash Hand Basin
Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)
53.00 53.0053 Set 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingWater Closets
Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without
62.00 63.0054 Item 30 Delivered
Water Closet Western Type - Camelot C - 74Washdown W.C With S-trap, With Cistern.White
195.00 195.0055 Set 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)
74.67 74.6756 Item 30 Delivered
Page 31 of9731 January 2011
Building Materials Prices for Kuching
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingNippon
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)
99.33 99.3357 5Litres
30 Delivered
Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)
81.33 81.3358 5Litres
30 Delivered
Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)
32.00 32.0059 7Litres
30 Delivered
Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)
75.00 75.0060 5Litres
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)
2985.00 2985.0061 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)
3133.33 3133.3362 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingUniversal Beams
Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)
3560.00 3560.0063 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)
2960.00 2960.0064 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 67.00 67.0065 Piece 30 Delivered
Page 32 of9731 January 2011
Building Materials Prices for Kuching
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
KuchingPlywood
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)
153.33 153.3366 Piece 30 Delivered
Page 33 of9731 January 2011
Building Materials Prices for Miri
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag - (30) 16.80 16.801 Bag 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriWhite Cement
White Cement 25kg per bag , collection in MT - (30) 860.00 860.002 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriLimestone
Limestone Aggregates 3/4" 32.00 32.003 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriNormal River Sand
Normal River Sand - Delivery 31.00 31.004 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriFine River Sand
Fine River Sand for Plastering- Delivery 34.00 34.005 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriMild Steel Round Bar
Mild Steel Round Bar R10, MS146 - (30) 2600.00 2600.006 MT 30 Delivered
Mild Steel Round Bar R12, MS146 - (30) 2550.00 2550.007 MT 30 Delivered
Mild Steel Round Bar R16, MS146 - (30) 2500.00 2500.008 MT 30 Delivered
Mild Steel Round Bar R20, MS146 - (30) 2500.00 2500.009 MT 30 Delivered
Page 34 of9731 January 2011
Building Materials Prices for Miri
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriMild Steel Round Bar
Mild Steel Round Bars - R25, MS146 - (30) 2500.00 2500.0010 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriHigh Tensile Deformed Bar
High Tensile Deformed Bar Y10, MS146 - (30) 2600.00 2600.0011 MT 60 Delivered
High Tensile Deformed Bar Y12, MS146 - (30) 2550.00 2550.0012 MT 60 Delivered
High Tensile Deformed Bar Y16, MS146 - (30) 2450.00 2450.0013 MT 60 Delivered
High Tensile Deformed Bar Y20, MS146 - (30) 2450.00 2450.0014 MT 60 Delivered
High Tensile Deformed Bar Y25, MS146 - (30) 2450.00 2450.0015 MT 60 Delivered
High Tensile Deformed Bar Y32, MS146 - (30) 2450.00 2450.0016 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriBRC Fabric
BRC A6, MS145 8.17 8.1717 m2 30 Delivered
BRC A7, MS145 10.60 10.6018 m2 30 Delivered
BRC A8, MS145 13.33 13.3319 m2 30 Delivered
BRC A9, MS145 16.50 16.5020 m2 30 Delivered
BRC A10, MS145 20.50 20.5021 m2 30 Delivered
Page 35 of9731 January 2011
Building Materials Prices for Miri
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 30,Granite
293.67 293.6722 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
315.33 315.3323 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
321.00 321.0024 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriReady Mix Concrete-Sandstone
Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)
219.00 219.0025 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)
234.33 234.3326 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)
247.00 247.0027 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)
258.33 258.3328 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)
268.67 268.6729 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)
282.33 282.3330 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)
292.33 292.3331 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriCommon Clay Bricks
Common Clay Bricks - Pallet 0.33 0.3332 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriCement Sand Bricks
Cement Sand Bricks - Pallet -(30) 0.32 0.3233 Piece 30 Delivered
Page 36 of9731 January 2011
Building Materials Prices for Miri
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour, Shanta- (30)
1.30 1.3034 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)
53.00 53.0035 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT - (30)
62.00 62.0036 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm (3'') DoubleWidth, Grey 1065mm x 2440mm - (30)
32.67 32.6737 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriCeramic Floor Tiles
Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)
1.00 1.0038 Piece 30 Delivered
Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)
3.00 3.0039 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriHomogeneous Ceramic Tiles
Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)
3.20 3.2040 Piece 30 Delivered
Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)
4.50 4.5041 Piece 30 Delivered
Page 37 of9731 January 2011
Building Materials Prices for Miri
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriPaver
Uni-Espave- 200mm x 190mm - (30) 1.20 1.2042 Piece 30 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.10 1.1043 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)
9.33 9.3344 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)
8.00 8.0045 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriTimber door
Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)
276.67 276.6746 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriGI Pipes
Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)
61.00 61.0047 6mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriPVC Pipes
PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)
41.33 41.3348 6mrun
30 Delivered
Page 38 of9731 January 2011
Building Materials Prices for Miri
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)
735.00 735.0049 100mroll
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 17.00 17.0050 5.8mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)
167.67 167.6751 No. 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriWash Hand Basin
Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)
55.00 55.0052 Set 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriWater Closets
Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without
63.67 63.6753 Item 30 Delivered
Water Closet Western Type - Camelot C - 74Washdown W.C With S-trap, With Cistern.White
196.00 196.0054 Set 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)
72.00 72.0055 Item 30 Delivered
Page 39 of9731 January 2011
Building Materials Prices for Miri
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriNippon
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)
100.00 100.0056 5Litres
30 Delivered
Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)
85.00 85.0057 5Litres
30 Delivered
Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)
32.00 32.0058 7Litres
30 Delivered
Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)
76.00 76.0059 5Litres
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)
3083.33 3083.3360 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)
3286.67 3286.6761 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriUniversal Beams
Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)
3670.00 3670.0062 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)
3000.00 3000.0063 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 68.67 68.6764 Piece 30 Delivered
Page 40 of9731 January 2011
Building Materials Prices for Miri
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
MiriPlywood
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)
156.00 156.0065 Piece 30 Delivered
Page 41 of9731 January 2011
Building Materials Prices for Pahang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag 15.90 15.901 Bag 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangOrdinary Portland Cement, bulk
Ordinary Portland Cement in bulk 302.00 302.002 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangWhite Cement
White Cement 40 kg per bag , collection in MT 720.67 732.333 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangGranite 3/4"
Granite Aggregate 3/4" 23.33 23.334 MT 60 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangNormal River Sand
Normal River Sand- Ex 15.00 15.005 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangFine River Sand
Fine River Sand for Plastering -Ex 24.00 24.006 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangNormal Mining Sand
Normal Mining Sand 16.33 15.337 MT 30 Ex-Factory
Page 42 of9731 January 2011
Building Materials Prices for Pahang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangFine Mining Sand
Fine Mining Sand for Plastering 22.00 22.008 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangMild Steel Round Bar
Mild Steel Round Bar R10, MS146 2180.00 2250.009 MT 60 Delivered
Mild Steel Round Bar R12, MS146 2180.00 2250.0010 MT 60 Delivered
Mild Steel Round Bar R16, MS146 2080.00 2156.6711 MT 60 Delivered
Mild Steel Round Bar R20, MS146 2146.67 2223.3312 MT 60 Delivered
Mild Steel Round Bar R22, MS146 2146.67 2223.3313 MT 60 Delivered
Mild Steel Round Bar R25, MS146 2146.67 2223.3314 MT 60 Delivered
Mild Steel Round Bar R32, MS146 2146.67 2223.3315 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangHigh Tensile Deformed Bar
High Tensile Deformed Bar-Y10, MS146 2180.00 2256.6716 MT 60 Delivered
High Tensile Deformed Bar - Y12, MS146 2180.00 2256.6717 MT 60 Delivered
High Tensile Deformed Bar- Y16, MS146 2080.00 2156.6718 MT 60 Delivered
High Tensile Deformed Bar - Y20, MS146 2080.00 2156.6719 MT 60 Delivered
High Tensile Deformed Bar- Y25, MS146 2080.00 2156.6720 MT 60 Delivered
Page 43 of9731 January 2011
Building Materials Prices for Pahang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangHigh Tensile Deformed Bar
High Tensile Deformed Bar- Y32, MS146 2080.00 2156.6721 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangBRC Fabric
BRC A6, MS145 6.36 6.4822 m2 30 Delivered
BRC A7, MS145 8.65 8.8023 m2 30 Delivered
BRC A8, MS145 11.66 12.0324 m2 30 Delivered
BRC A9, MS145 14.29 14.7725 m2 30 Delivered
BRC A10, MS145 17.63 17.9026 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 10,Granite
174.67 174.6727 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Granite
174.67 174.6728 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Granite
182.00 182.0029 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25,Granite
191.00 196.3330 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30,Granite
201.00 198.0031 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
211.00 211.0032 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
223.33 223.3333 m3 30 Delivered
Page 44 of9731 January 2011
Building Materials Prices for Pahang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangCommon Clay Bricks
Common Clay Bricks - Pallet 0.35 0.3534 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangCement Sand Bricks
Cement Sand Brick - Pallet 0.22 0.2235 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangSmooth Face Facing Bricks
Smooth Face Facing Brick, Red 1.07 1.0736 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)
1.70 1.7037 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT
52.70 52.7038 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT
57.63 57.6339 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)
27.73 27.7340 Sheet 60 Delivered
Page 45 of9731 January 2011
Building Materials Prices for Pahang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangCeramic Floor Tiles
Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1
0.93 0.9341 Piece 60 Delivered
Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1
1.79 1.7942 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangHomogeneous Ceramic Tiles
Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1
1.43 1.4343 Piece 60 Delivered
Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1
2.31 2.3144 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangPaver
Uni-Espave - 200mm x 190mm 0.89 0.8945 Piece 60 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm 0.84 0.8446 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)
4.32 4.3247 Sheet 60 Delivered
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)
6.85 6.8548 Sheet 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)
5.03 5.0349 Sheet 60 Delivered
Page 46 of9731 January 2011
Building Materials Prices for Pahang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangTimber door
Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM
195.33 195.3350 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangGI Pipes
Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863
36.30 36.3051 6mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangPVC Pipes
PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628
25.18 25.1852 4mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 389.00 389.0053 100mroll
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 23.83 23.8354 5.8mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant
114.37 114.3755 No. 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangWash Hand Basin
Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan
73.67 73.6756 Set 60 Delivered
Page 47 of9731 January 2011
Building Materials Prices for Pahang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangWater Closets
Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan
144.63 144.6357 Item 60 Delivered
Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse
55.53 55.5358 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''
84.63 84.6359 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangNippon
Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish
98.27 98.2760 5Litres
60 Delivered
Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo
91.07 91.0761 5Litres
60 Delivered
Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex
31.43 31.4362 7Litres
60 Delivered
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond
97.47 97.4763 5Litres
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)
3217.67 3170.0064 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)
3230.00 3230.0065 MT 60 Delivered
Page 48 of9731 January 2011
Building Materials Prices for Pahang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangUniversal Beams
Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)
3124.67 3124.6766 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2587.67 2587.6767 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PahangPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm 50.43 50.4368 Piece 60 Delivered
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade
130.43 130.4369 Piece 60 Delivered
Page 49 of9731 January 2011
Building Materials Prices for Perak
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag 14.80 14.631 Bag 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakOrdinary Portland Cement, bulk
Ordinary Portland Cement in bulk 290.33 290.332 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakWhite Cement
White Cement 40 kg per bag , collection in MT 744.00 744.003 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakGranite 3/4"
Granite Aggregate 3/4" 24.00 24.004 MT 60 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakNormal River Sand
Normal River Sand- Ex 15.00 15.005 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakFine River Sand
Fine River Sand for Plastering -Ex 22.67 22.676 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakNormal Mining Sand
Normal Mining Sand 14.33 14.337 MT 30 Ex-Factory
Page 50 of9731 January 2011
Building Materials Prices for Perak
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakFine Mining Sand
Fine Mining Sand for Plastering 24.00 24.008 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakMild Steel Round Bar
Mild Steel Round Bar R10, MS146 2163.33 2240.009 MT 60 Delivered
Mild Steel Round Bar R12, MS146 2163.33 2240.0010 MT 60 Delivered
Mild Steel Round Bar R16, MS146 2063.33 2140.0011 MT 60 Delivered
Mild Steel Round Bar R20, MS146 2130.00 2206.6712 MT 60 Delivered
Mild Steel Round Bar R22, MS146 2130.00 2206.6713 MT 60 Delivered
Mild Steel Round Bar R25, MS146 2130.00 2206.6714 MT 60 Delivered
Mild Steel Round Bar R32, MS146 2130.00 2206.6715 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakHigh Tensile Deformed Bar
High Tensile Deformed Bar-Y10, MS146 2163.33 2240.0016 MT 60 Delivered
High Tensile Deformed Bar - Y12, MS146 2163.33 2240.0017 MT 60 Delivered
High Tensile Deformed Bar- Y16, MS146 2063.33 2140.0018 MT 60 Delivered
High Tensile Deformed Bar - Y20, MS146 2063.33 2140.0019 MT 60 Delivered
High Tensile Deformed Bar- Y25, MS146 2063.33 2140.0020 MT 60 Delivered
Page 51 of9731 January 2011
Building Materials Prices for Perak
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakHigh Tensile Deformed Bar
High Tensile Deformed Bar- Y32, MS146 2063.33 2140.0021 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakBRC Fabric
BRC A6, MS145 5.76 5.9722 m2 30 Delivered
BRC A7, MS145 7.83 8.1223 m2 30 Delivered
BRC A8, MS145 10.26 10.6324 m2 30 Delivered
BRC A9, MS145 12.94 13.4225 m2 30 Delivered
BRC A10, MS145 15.98 16.5326 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 10,Granite
162.67 162.6727 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Granite
165.33 165.3328 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Granite
173.33 173.3329 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25,Granite
182.00 182.0030 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30,Granite
192.33 192.3331 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
204.00 204.0032 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
212.67 212.6733 m3 30 Delivered
Page 52 of9731 January 2011
Building Materials Prices for Perak
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakCommon Clay Bricks
Common Clay Bricks - Pallet 0.31 0.3134 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakCement Sand Bricks
Cement Sand Brick - Pallet 0.22 0.2235 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakSmooth Face Facing Bricks
Smooth Face Facing Brick, Red 1.10 1.1036 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)
1.81 1.8137 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT
51.57 51.5738 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT
56.23 56.2339 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)
24.83 24.8340 Sheet 60 Delivered
Page 53 of9731 January 2011
Building Materials Prices for Perak
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakCeramic Floor Tiles
Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1
0.85 0.8541 Piece 60 Delivered
Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1
1.79 1.7942 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakHomogeneous Ceramic Tiles
Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1
1.34 1.3443 Piece 60 Delivered
Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1
2.31 2.3144 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakPaver
Uni-Espave - 200mm x 190mm 0.88 0.8845 Piece 60 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm 0.82 0.8246 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)
3.77 3.7747 Sheet 60 Delivered
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)
6.97 6.9748 Sheet 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)
5.03 5.0349 Sheet 60 Delivered
Page 54 of9731 January 2011
Building Materials Prices for Perak
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakTimber door
Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM
195.33 195.3350 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakGI Pipes
Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863
36.10 36.1051 6mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakPVC Pipes
PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628
24.65 24.6552 4mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 389.00 389.0053 100mroll
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 22.47 22.4754 5.8mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant
104.50 104.5055 No. 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakWash Hand Basin
Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan
77.00 77.0056 Set 60 Delivered
Page 55 of9731 January 2011
Building Materials Prices for Perak
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakWater Closets
Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan
138.80 138.8057 Item 60 Delivered
Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse
53.70 53.7058 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''
83.10 83.1059 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakNippon
Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish
95.17 95.1760 5Litres
60 Delivered
Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo
88.07 88.0761 5Litres
60 Delivered
Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex
30.42 30.4262 7Litres
60 Delivered
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond
94.60 94.6063 5Litres
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)
3101.67 3101.6764 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)
3176.33 3176.3365 MT 60 Delivered
Page 56 of9731 January 2011
Building Materials Prices for Perak
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakUniversal Beams
Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)
2951.33 2951.3366 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2465.00 2465.0067 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
PerakPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm 48.77 48.7768 Piece 60 Delivered
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade
130.43 130.4369 Piece 60 Delivered
Page 57 of9731 January 2011
Building Materials Prices for Pulau Pinang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag 14.80 14.571 Bag 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangOrdinary Portland Cement, bulk
Ordinary Portland Cement in bulk 282.33 285.672 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangWhite Cement
White Cement 40 kg per bag , collection in MT 744.00 744.003 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangGranite 3/4"
Granite Aggregate 3/4" 22.00 22.004 MT 60 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangNormal River Sand
Normal River Sand- Ex 14.67 14.675 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangFine River Sand
Fine River Sand for Plastering -Ex 24.00 24.006 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangNormal Mining Sand
Normal Mining Sand 15.00 14.337 MT 30 Ex-Factory
Page 58 of9731 January 2011
Building Materials Prices for Pulau Pinang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangFine Mining Sand
Fine Mining Sand for Plastering 24.00 24.008 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangMild Steel Round Bar
Mild Steel Round Bar R10, MS146 2163.33 2240.009 MT 60 Delivered
Mild Steel Round Bar R12, MS146 2163.33 2240.0010 MT 60 Delivered
Mild Steel Round Bar R16, MS146 2063.33 2140.0011 MT 60 Delivered
Mild Steel Round Bar R20, MS146 2130.00 2206.6712 MT 60 Delivered
Mild Steel Round Bar R22, MS146 2130.00 2206.6713 MT 60 Delivered
Mild Steel Round Bar R25, MS146 2130.00 2206.6714 MT 60 Delivered
Mild Steel Round Bar R32, MS146 2163.33 2206.6715 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangHigh Tensile Deformed Bar
High Tensile Deformed Bar-Y10, MS146 2163.33 2240.0016 MT 60 Delivered
High Tensile Deformed Bar - Y12, MS146 2163.33 2240.0017 MT 60 Delivered
High Tensile Deformed Bar- Y16, MS146 2063.33 2140.0018 MT 60 Delivered
High Tensile Deformed Bar - Y20, MS146 2063.33 2140.0019 MT 60 Delivered
High Tensile Deformed Bar- Y25, MS146 2063.33 2140.0020 MT 60 Delivered
Page 59 of9731 January 2011
Building Materials Prices for Pulau Pinang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangHigh Tensile Deformed Bar
High Tensile Deformed Bar- Y32, MS146 2063.33 2140.0021 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangBRC Fabric
BRC A6, MS145 5.76 5.9722 m2 30 Delivered
BRC A7, MS145 7.83 8.1223 m2 30 Delivered
BRC A8, MS145 10.26 10.6324 m2 30 Delivered
BRC A9, MS145 12.94 13.4225 m2 30 Delivered
BRC A10, MS145 16.36 16.5326 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 10,Granite
172.67 172.6727 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Granite
180.33 185.6728 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Granite
184.67 184.6729 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25,Granite
193.67 193.6730 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30,Granite
203.67 203.6731 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
215.00 215.0032 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
226.00 226.0033 m3 30 Delivered
Page 60 of9731 January 2011
Building Materials Prices for Pulau Pinang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangCommon Clay Bricks
Common Clay Bricks - Pallet 0.34 0.3434 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangCement Sand Bricks
Cement Sand Brick - Pallet 0.24 0.2435 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangSmooth Face Facing Bricks
Smooth Face Facing Brick, Red 1.12 1.1236 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)
1.74 1.7437 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT
48.83 48.8338 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT
54.37 54.3739 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)
25.83 25.8340 Sheet 60 Delivered
Page 61 of9731 January 2011
Building Materials Prices for Pulau Pinang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangCeramic Floor Tiles
Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1
0.90 0.9041 Piece 60 Delivered
Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1
1.80 1.8042 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangHomogeneous Ceramic Tiles
Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1
1.33 1.3343 Piece 60 Delivered
Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1
2.31 2.3144 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangPaver
Uni-Espave - 200mm x 190mm 0.87 0.8745 Piece 60 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm 0.79 0.7946 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)
4.05 4.0547 Sheet 60 Delivered
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)
6.69 6.6948 Sheet 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)
5.03 5.0349 Sheet 60 Delivered
Page 62 of9731 January 2011
Building Materials Prices for Pulau Pinang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangTimber door
Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM
195.33 195.3350 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangGI Pipes
Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863
36.63 36.6351 6mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangPVC Pipes
PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628
24.48 24.4852 4mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 389.67 389.6753 100mroll
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 21.53 21.5354 5.8mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant
97.07 97.0755 No. 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangWash Hand Basin
Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan
76.47 76.4756 Set 60 Delivered
Page 63 of9731 January 2011
Building Materials Prices for Pulau Pinang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangWater Closets
Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan
136.43 136.4357 Item 60 Delivered
Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse
53.33 53.3358 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''
82.57 82.5759 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangNippon
Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish
95.17 95.1760 5Litres
60 Delivered
Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo
88.07 88.0761 5Litres
60 Delivered
Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex
30.42 30.4262 7Litres
60 Delivered
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond
94.60 94.6063 5Litres
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)
3078.33 3078.3364 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)
3223.00 3223.0065 MT 60 Delivered
Page 64 of9731 January 2011
Building Materials Prices for Pulau Pinang
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangUniversal Beams
Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)
2951.33 2951.3366 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2446.00 2446.0067 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
Pulau PinangPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm 48.10 48.1068 Piece 60 Delivered
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade
127.77 127.7769 Piece 60 Delivered
Page 65 of9731 January 2011
Building Materials Prices for Sandakan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag - (30) 17.30 17.301 Bag 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanWhite Cement
White Cement 25kg per bag , collection in MT - (30) 900.00 900.002 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanGranite 3/4"
Granite Aggregate 3/4" - (30) 52.33 52.333 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanSandstone
Sandstone Aggregates 3/4" 36.33 36.334 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanNormal River Sand
Normal River Sand - Delivery 35.00 35.005 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanFine River Sand
Fine River Sand for Plastering- Delivery 37.67 37.676 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanMild Steel Round Bar
Mild Steel Round Bar R10, MS146 - (30) 2450.00 2500.007 MT 30 Delivered
Mild Steel Round Bar R12, MS146 - (30) 2400.00 2450.008 MT 30 Delivered
Page 66 of9731 January 2011
Building Materials Prices for Sandakan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanMild Steel Round Bar
Mild Steel Round Bar R16, MS146 - (30) 2300.00 2350.009 MT 30 Delivered
Mild Steel Round Bar R20, MS146 - (30) 2300.00 2350.0010 MT 30 Delivered
Mild Steel Round Bars - R25, MS146 - (30) 2300.00 2350.0011 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanHigh Tensile Deformed Bar
High Tensile Deformed Bar Y10, MS146 - (30) 2500.00 2550.0012 MT 60 Delivered
High Tensile Deformed Bar Y12, MS146 - (30) 2450.00 2500.0013 MT 60 Delivered
High Tensile Deformed Bar Y16, MS146 - (30) 2400.00 2450.0014 MT 60 Delivered
High Tensile Deformed Bar Y20, MS146 - (30) 2400.00 2450.0015 MT 60 Delivered
High Tensile Deformed Bar Y25, MS146 - (30) 2400.00 2450.0016 MT 60 Delivered
High Tensile Deformed Bar Y32, MS146 - (30) 2400.00 2450.0017 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanBRC Fabric
BRC A6, MS145 7.50 7.5018 m2 30 Delivered
BRC A7, MS145 10.00 10.0019 m2 30 Delivered
BRC A8, MS145 13.00 13.0020 m2 30 Delivered
BRC A9, MS145 17.00 17.0021 m2 30 Delivered
Page 67 of9731 January 2011
Building Materials Prices for Sandakan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanBRC Fabric
BRC A10, MS145 20.43 20.4322 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 30,Granite
298.00 298.0023 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
312.00 312.0024 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
320.00 320.0025 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanReady Mix Concrete-Sandstone
Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)
235.33 235.3326 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)
251.67 251.6727 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)
274.00 274.0028 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)
286.00 286.0029 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)
290.00 290.0030 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)
300.00 300.0031 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)
305.00 305.0032 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanCommon Clay Bricks
Common Clay Bricks - Pallet 0.32 0.3233 Piece 30 Delivered
Page 68 of9731 January 2011
Building Materials Prices for Sandakan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanCement Sand Bricks
Cement Sand Bricks - Pallet -(30) 0.31 0.3134 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour, Local Product - (30)
1.70 1.7035 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)
57.00 57.0036 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT - (30)
60.00 60.0037 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm (Hume/Malex/UAC) - (30)
32.00 32.0038 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanCeramic Floor Tiles
Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)
1.68 1.6839 Piece 30 Delivered
Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)
3.60 3.6040 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanHomogeneous Ceramic Tiles
Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)
3.00 3.0041 Piece 30 Delivered
Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)
5.37 5.3742 Piece 30 Delivered
Page 69 of9731 January 2011
Building Materials Prices for Sandakan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanHomogeneous Ceramic Tiles
Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)
5.37 5.3742 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanPaver
Uni-Espave- 200mm x 190mm - (30) 1.20 1.2043 Piece 30 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.00 1.0044 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)
9.50 9.5045 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)
7.87 7.8746 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanTimber door
Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)
271.67 271.6747 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanGI Pipes
Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)
64.33 64.3348 6mrun
30 Delivered
Page 70 of9731 January 2011
Building Materials Prices for Sandakan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanPVC Pipes
PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)
41.33 41.3349 6mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)
705.00 705.0050 100mroll
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 20.00 20.0051 5.8mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)
175.00 175.0052 No. 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanWash Hand Basin
Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)
45.33 45.3353 Set 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanWater Closets
Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without
65.00 65.0054 Item 30 Delivered
Water Closet Western Type - Baltimore, C-56Syphonic W.C. With S or P trap, With Cistern,
182.00 182.0055 Set 30 Delivered
Page 71 of9731 January 2011
Building Materials Prices for Sandakan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)
85.00 85.0056 Item 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanNippon
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)
98.00 98.0057 5Litres
30 Delivered
Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)
85.00 85.0058 5Litres
30 Delivered
Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)
45.00 45.0059 7Litres
30 Delivered
Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)
98.67 98.6760 5Litres
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)
2945.00 2945.0061 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)
3985.00 3985.0062 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanUniversal Beams
Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)
3543.33 3543.3363 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)
2246.67 2246.6764 MT 30 Delivered
Page 72 of9731 January 2011
Building Materials Prices for Sandakan
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SandakanPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 70.00 70.0065 Piece 30 Delivered
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)
153.33 153.3366 Piece 30 Delivered
Page 73 of9731 January 2011
Building Materials Prices for Selangor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag 15.40 15.401 Bag 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorOrdinary Portland Cement, bulk
Ordinary Portland Cement in bulk 293.67 293.672 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorWhite Cement
White Cement 40 kg per bag , collection in MT 720.67 744.003 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorGranite 3/4"
Granite Aggregate 3/4" 23.00 23.004 MT 60 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorNormal River Sand
Normal River Sand- Ex 19.33 19.335 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorFine River Sand
Fine River Sand for Plastering -Ex 24.67 24.676 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorNormal Mining Sand
Normal Mining Sand 17.67 17.677 MT 30 Ex-Factory
Page 74 of9731 January 2011
Building Materials Prices for Selangor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorFine Mining Sand
Fine Mining Sand for Plastering 24.33 24.338 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorMild Steel Round Bar
Mild Steel Round Bar R10, MS146 2160.00 2216.679 MT 60 Delivered
Mild Steel Round Bar R12, MS146 2160.00 2216.6710 MT 60 Delivered
Mild Steel Round Bar R16, MS146 2060.00 2116.6711 MT 60 Delivered
Mild Steel Round Bar R20, MS146 2126.67 2183.3312 MT 60 Delivered
Mild Steel Round Bar R22, MS146 2126.67 2183.3313 MT 60 Delivered
Mild Steel Round Bar R25, MS146 2126.67 2183.3314 MT 60 Delivered
Mild Steel Round Bar R32, MS146 2126.67 2183.3315 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorHigh Tensile Deformed Bar
High Tensile Deformed Bar-Y10, MS146 2160.00 2233.3316 MT 60 Delivered
High Tensile Deformed Bar - Y12, MS146 2160.00 2216.6717 MT 60 Delivered
High Tensile Deformed Bar- Y16, MS146 2093.33 2116.6718 MT 60 Delivered
High Tensile Deformed Bar - Y20, MS146 2060.00 2116.6719 MT 60 Delivered
High Tensile Deformed Bar- Y25, MS146 2060.00 2116.6720 MT 60 Delivered
Page 75 of9731 January 2011
Building Materials Prices for Selangor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorHigh Tensile Deformed Bar
High Tensile Deformed Bar- Y32, MS146 2060.00 2116.6721 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorBRC Fabric
BRC A6, MS145 5.86 6.0722 m2 30 Delivered
BRC A7, MS145 7.98 8.2623 m2 30 Delivered
BRC A8, MS145 10.45 10.8324 m2 30 Delivered
BRC A9, MS145 13.17 13.6525 m2 30 Delivered
BRC A10, MS145 16.24 16.8226 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 10,Granite
173.33 173.3327 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Granite
178.67 178.6728 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Granite
184.33 184.3329 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25,Granite
193.00 193.0030 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30,Granite
203.00 203.0031 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
214.00 214.0032 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
225.67 225.6733 m3 30 Delivered
Page 76 of9731 January 2011
Building Materials Prices for Selangor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorCommon Clay Bricks
Common Clay Bricks - Pallet 0.30 0.3034 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorCement Sand Bricks
Cement Sand Brick - Pallet 0.20 0.2035 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorSmooth Face Facing Bricks
Smooth Face Facing Brick, Red 1.00 1.0036 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour (Monier Elabana)
1.68 1.6837 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT
50.43 50.4338 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT
55.17 55.1739 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm x 4mm (Hume/Malex/UAC)
24.83 24.8340 Sheet 60 Delivered
Page 77 of9731 January 2011
Building Materials Prices for Selangor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorCeramic Floor Tiles
Glazed Ceramic Floor Tiles, Standard Light Colour200mm x 200mm x 8mm - Grade 1
0.85 0.8541 Piece 60 Delivered
Glazed Ceramic Floor Tiles, Standard Light Colour300mm x 300mm x 8mm - Grade 1
1.79 1.7942 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorHomogeneous Ceramic Tiles
Plain Homogeneous Floor Tiles, Standard LightColour 200mm x 200mm x 8mm - Grade 1
1.57 1.5743 Piece 60 Delivered
Plain Homogeneous Floor Tiles, Standard LightColour 300mm x 300mm x 8mm - Grade 1
2.30 2.3044 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorPaver
Uni-Espave - 200mm x 190mm 0.85 0.8545 Piece 60 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm 0.80 0.8046 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 3.2mm (UAC/ HUME/ MALEX)
4.20 4.1247 Sheet 60 Delivered
Plain Cellulose Fibre Ceiling Sheet, 610mm x1220mm x 4.5mm (UAC / Hume/ Malex)
5.93 5.9348 Sheet 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x9.5mm (Boral/Armstrong)
5.37 5.3749 Sheet 60 Delivered
Page 78 of9731 January 2011
Building Materials Prices for Selangor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorTimber door
Solid Decorative Timber Door 3' x 7' (Branded),Certified by SIRIM
195.33 195.3350 Piece 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorGI Pipes
Galvanised Iron Pipes Class A- 20mm Diameter(Maruichi), MS863
36.10 36.1051 6mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorPVC Pipes
PVC Pressure Pipes Class D, Grey Colour- 50mmDiameter (Paling), MS 628
24.02 24.0252 4mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 389.00 389.0053 100mroll
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 21.83 21.8354 5.8mrun
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - Weida Equivelant
105.53 105.5355 No. 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorWash Hand Basin
Wash Hand Basin - 560mm x 406mm, WhiteColour - Jacqueline WB 142, Claytan
69.30 69.3056 Set 60 Delivered
Page 79 of9731 January 2011
Building Materials Prices for Selangor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorWater Closets
Water Closet Western Type - WC 644, WhiteColour Without Cistern, Claytan
134.00 134.0057 Item 60 Delivered
Water Closet Eastern Type- Bengal ACBL-000,Without Cistern,White Colour, Johnson-Suisse
52.47 52.4758 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay OnType, 42'' x 18''
81.23 81.2359 Item 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorNippon
Paint - Nippon Standard Colour - Gloss Oilbase,9000 Gloss Finish
95.17 95.1760 5Litres
60 Delivered
Paint - Nippon Standard Colour - Internal EmulsionLuxury, Waterbase, Satin Glo
88.07 88.0761 5Litres
60 Delivered
Paint - Nippon - Internal Emulsion WaterbaseFinish, Standard Colour - Super Matex
30.42 30.4262 7Litres
60 Delivered
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond
94.60 94.6063 5Litres
60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m)
3091.33 3091.3364 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)
3163.33 3163.3365 MT 60 Delivered
Page 80 of9731 January 2011
Building Materials Prices for Selangor
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorUniversal Beams
Universal Beams - 356mm x 368mm x 13.33mm(162.2kg/m)
3184.67 3184.6766 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) 2469.67 2469.6767 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SelangorPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm 48.70 48.7068 Piece 60 Delivered
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade
126.50 126.5069 Piece 60 Delivered
Page 81 of9731 January 2011
Building Materials Prices for Sibu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag - (30) 15.80 15.801 Bag 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuWhite Cement
White Cement 25kg per bag , collection in MT - (30) 850.00 850.002 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuLimestone
Limestone Aggregates 3/4" 31.00 31.003 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuNormal River Sand
Normal River Sand - Delivery 30.00 30.004 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuFine River Sand
Fine River Sand for Plastering- Delivery 31.33 31.335 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuMild Steel Round Bar
Mild Steel Round Bar R10, MS146 - (30) 2550.00 2550.006 MT 30 Delivered
Mild Steel Round Bar R12, MS146 - (30) 2500.00 2500.007 MT 30 Delivered
Mild Steel Round Bar R16, MS146 - (30) 2450.00 2450.008 MT 30 Delivered
Mild Steel Round Bar R20, MS146 - (30) 2450.00 2450.009 MT 30 Delivered
Page 82 of9731 January 2011
Building Materials Prices for Sibu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuMild Steel Round Bar
Mild Steel Round Bars - R25, MS146 - (30) 2450.00 2450.0010 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuHigh Tensile Deformed Bar
High Tensile Deformed Bar Y10, MS146 - (30) 2600.00 2600.0011 MT 60 Delivered
High Tensile Deformed Bar Y12, MS146 - (30) 2550.00 2550.0012 MT 60 Delivered
High Tensile Deformed Bar Y16, MS146 - (30) 2450.00 2450.0013 MT 60 Delivered
High Tensile Deformed Bar Y20, MS146 - (30) 2450.00 2450.0014 MT 60 Delivered
High Tensile Deformed Bar Y25, MS146 - (30) 2450.00 2450.0015 MT 60 Delivered
High Tensile Deformed Bar Y32, MS146 - (30) 2450.00 2450.0016 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuBRC Fabric
BRC A6, MS145 7.53 7.5317 m2 30 Delivered
BRC A7, MS145 9.97 9.9718 m2 30 Delivered
BRC A8, MS145 12.77 12.7719 m2 30 Delivered
BRC A9, MS145 15.93 15.9320 m2 30 Delivered
BRC A10, MS145 20.00 20.0021 m2 30 Delivered
Page 83 of9731 January 2011
Building Materials Prices for Sibu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 30,Granite
293.33 293.3322 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
316.67 316.6723 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
323.33 323.3324 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuReady Mix Concrete-Sandstone
Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)
225.00 225.0025 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)
230.00 230.0026 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)
234.67 234.6727 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)
257.00 257.0028 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)
267.00 267.0029 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)
285.00 285.0030 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)
296.67 296.6731 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuCommon Clay Bricks
Common Clay Bricks - Pallet 0.32 0.3232 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuCement Sand Bricks
Cement Sand Bricks - Pallet -(30) 0.30 0.3033 Piece 30 Delivered
Page 84 of9731 January 2011
Building Materials Prices for Sibu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour, Shanta- (30)
1.20 1.2034 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)
52.00 52.0035 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT - (30)
60.00 60.0036 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm (3'') DoubleWidth, Grey 1065mm x 2440mm - (30)
31.00 31.3337 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuCeramic Floor Tiles
Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)
1.00 1.0038 Piece 30 Delivered
Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)
3.00 3.0039 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuHomogeneous Ceramic Tiles
Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)
3.00 3.0040 Piece 30 Delivered
Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)
4.50 4.5041 Piece 30 Delivered
Page 85 of9731 January 2011
Building Materials Prices for Sibu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuPaver
Uni-Espave- 200mm x 190mm - (30) 1.20 1.2042 Piece 30 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.00 1.0043 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)
9.33 9.3344 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)
8.00 8.0045 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuTimber door
Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)
265.00 265.0046 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuGI Pipes
Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)
60.00 60.0047 6mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuPVC Pipes
PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)
40.00 40.0048 6mrun
30 Delivered
Page 86 of9731 January 2011
Building Materials Prices for Sibu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)
721.67 721.6749 100mroll
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 17.00 17.0050 5.8mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)
165.00 165.0051 No. 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuWash Hand Basin
Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)
53.00 53.0052 Set 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuWater Closets
Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without
63.00 63.0053 Item 30 Delivered
Water Closet Western Type - Camelot C - 74Washdown W.C With S-trap, With Cistern.White
195.00 196.0054 Set 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)
72.00 72.0055 Item 30 Delivered
Page 87 of9731 January 2011
Building Materials Prices for Sibu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuNippon
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)
98.00 98.0056 5Litres
30 Delivered
Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)
83.33 83.3357 5Litres
30 Delivered
Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)
32.00 32.0058 7Litres
30 Delivered
Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)
74.67 75.0059 5Litres
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)
3100.00 3100.0060 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)
3200.00 3200.0061 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuUniversal Beams
Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)
3600.00 3600.0062 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)
3033.33 3033.3363 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 65.00 65.0064 Piece 30 Delivered
Page 88 of9731 January 2011
Building Materials Prices for Sibu
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
SibuPlywood
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)
150.00 150.0065 Piece 30 Delivered
Page 89 of9731 January 2011
Building Materials Prices for Tawau
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauOrdinary Portland Cement, bag
Ordinary Portland Cement, 50 kg bag - (30) 17.00 17.001 Bag 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauWhite Cement
White Cement 25kg per bag , collection in MT - (30) 900.00 900.002 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauGranite 3/4"
Granite Aggregate 3/4" - (30) 56.00 56.003 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauSandstone
Sandstone Aggregates 3/4" 38.00 38.004 MT 30 Ex-Factory
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauNormal River Sand
Normal River Sand - Delivery 32.00 32.005 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauFine River Sand
Fine River Sand for Plastering- Delivery 35.00 35.006 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauMild Steel Round Bar
Mild Steel Round Bar R10, MS146 - (30) 2500.00 2533.337 MT 30 Delivered
Mild Steel Round Bar R12, MS146 - (30) 2450.00 2500.008 MT 30 Delivered
Page 90 of9731 January 2011
Building Materials Prices for Tawau
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauMild Steel Round Bar
Mild Steel Round Bar R16, MS146 - (30) 2350.00 2400.009 MT 30 Delivered
Mild Steel Round Bar R20, MS146 - (30) 2350.00 2400.0010 MT 30 Delivered
Mild Steel Round Bars - R25, MS146 - (30) 2350.00 2400.0011 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauHigh Tensile Deformed Bar
High Tensile Deformed Bar Y10, MS146 - (30) 2550.00 2600.0012 MT 60 Delivered
High Tensile Deformed Bar Y12, MS146 - (30) 2500.00 2550.0013 MT 60 Delivered
High Tensile Deformed Bar Y16, MS146 - (30) 2450.00 2500.0014 MT 60 Delivered
High Tensile Deformed Bar Y20, MS146 - (30) 2450.00 2500.0015 MT 60 Delivered
High Tensile Deformed Bar Y25, MS146 - (30) 2450.00 2500.0016 MT 60 Delivered
High Tensile Deformed Bar Y32, MS146 - (30) 2450.00 2500.0017 MT 60 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauBRC Fabric
BRC A6, MS145 7.87 7.8718 m2 30 Delivered
BRC A7, MS145 10.20 10.2019 m2 30 Delivered
BRC A8, MS145 13.43 13.4320 m2 30 Delivered
BRC A9, MS145 16.43 16.4321 m2 30 Delivered
Page 91 of9731 January 2011
Building Materials Prices for Tawau
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauBRC Fabric
BRC A10, MS145 21.00 21.0022 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauReady Mix Concrete-Granite
Ready Mix Concrete - Normal Mix - Grade 30,Granite
288.00 288.0023 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Granite
300.00 300.0024 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Granite
309.33 309.3325 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauReady Mix Concrete-Sandstone
Ready Mix Concrete - Normal Mix - Grade 10 ,Sandstone - (30)
237.67 237.6726 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 15,Sandstone- (30)
255.00 255.0027 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 20,Sandstone- (30)
275.00 275.0028 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 25 ,Sandstone- (30)
277.67 277.6729 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 30 ,Sandstone- (30)
291.67 291.6730 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 35,Sandstone- (30)
300.00 300.0031 m3 30 Delivered
Ready Mix Concrete - Normal Mix - Grade 40,Sandstone- (30)
312.33 312.3332 m3 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauCommon Clay Bricks
Common Clay Bricks - Pallet 0.34 0.3433 Piece 30 Delivered
Page 92 of9731 January 2011
Building Materials Prices for Tawau
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauCement Sand Bricks
Cement Sand Bricks - Pallet -(30) 0.33 0.3334 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauConcrete Roof Tiles
Interlocking Concrete Tiles - Standard DuotoneColour, Local Product - (30)
1.70 1.7035 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauMetal Sheet Decking
MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.48mm TCT -(30)
56.33 56.3336 m2 30 Delivered
MS Decking - Lysaght Colourbond -Kliplok Hi-Ten0.53mm TCT - (30)
60.00 60.0037 m2 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauCorrugated Roofing Sheet
Corrugated Roofing Sheet- 76mm Double Width,1065mm x 2440mm (Hume/Malex/UAC) - (30)
32.33 32.3338 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauCeramic Floor Tiles
Glazed Ceramic Floor Tiles - Standard Light Colour- 200mm x 200mm x 8mm - (30)
1.65 1.6539 Piece 30 Delivered
Glazed Ceramic Tiles -Standard Light Colour300mm x 300mm x 8mm Thick - (30)
3.63 3.6340 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauHomogeneous Ceramic Tiles
Plain Homogeneous Ceramic Tiles - Standard LightColour 200mm x 200mm x 8mm Thick - (30)
3.00 3.0041 Piece 30 Delivered
Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)
5.50 5.5042 Piece 30 Delivered
Page 93 of9731 January 2011
Building Materials Prices for Tawau
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauHomogeneous Ceramic Tiles
Plain Homogeneous Ceramic Tiles - Standard LightColour 300mm x 300mm x 8mm Thick - (30)
5.50 5.5042 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauPaver
Uni-Espave- 200mm x 190mm - (30) 1.25 1.2543 Piece 30 Delivered
Uni-Pave/ Sunpave, 225mm x 112.5mm - (30) 1.10 1.1044 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauPlain Cellulose Fibre
Plain Cellulose Fibre Ceiling Sheet 1220mm x1220mm x 3.2mm - (30)
10.00 10.0045 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauGypsum Ceiling Board
Plain Gypsum Ceiling Board, 610mm x 1220mm x4.5mm (Boral/Armstrong)- (30)
8.00 8.0046 Sheet 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauTimber door
Solid Wooden Timber Door, 3' x 7' (Handmade) -(30)
275.00 275.0047 Piece 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauGI Pipes
Galvanised Iron Pipes - Class B, 20mm Diameter,MS863 - (30)
62.00 62.0048 6mrun
30 Delivered
Page 94 of9731 January 2011
Building Materials Prices for Tawau
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauPVC Pipes
PVC Pressure Pipes Class E, Grey Colour -50mmDiameter, MS 628- (30)
39.67 40.0049 6mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauHDPE Pipes
HDPE Pipe PN 10 - 50mm Diameter, MS1058 -(30)
705.00 705.0050 100mroll
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauABS Pipes
ABS Pipe PN 15 Class E - 20mm, MS1419 - (30) 21.00 21.0051 5.8mrun
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauPolytank
Polyethylene Water Tank (Polytank) - Circular, 100Gallons, MS1225 - (30)
180.00 180.0052 No. 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauWash Hand Basin
Wash Basin- Ripley L-57,White Colour, KIMWARE- (30)
45.00 45.0053 Set 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauWater Closets
Water Closet Eastern Type -Kingston 1, C-28 S/P -Squatting Pan (back inlet) S or P trap,Without
68.00 68.0054 Item 30 Delivered
Water Closet Western Type - Baltimore, C-56Syphonic W.C. With S or P trap, With Cistern,
185.00 185.0055 Set 30 Delivered
Page 95 of9731 January 2011
Building Materials Prices for Tawau
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauStainless Steel Sink
Stainless Steel Sinks - Single Bowl Single Drainer -Lay On Type, 106CM X 45CM - (30)
85.00 85.0056 Item 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauNippon
Paint - Nippon Standard Colour - External AcrylicEmulsion, Weatherbond - (30)
98.33 99.0057 5Litres
30 Delivered
Paint - Nippon Standard Colour - Internal Emulsion,Luxury, Waterbase, Satin Glo -(30)
85.00 85.0058 5Litres
30 Delivered
Paint - Nippon - Internal Emulsion Waterbase,Standard Colour - Super Matex - (30)
45.33 45.0059 7Litres
30 Delivered
Paint - Nippon -Standard Colour , Gloss Oil Base -9000 Gloss Finish - (30)
98.00 98.0060 5Litres
30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauSquare Hollow Sections
Square Hollow Sections - 50mm x 50mm x 3.0mm(4.38kg/m) -- (30)
2900.00 2900.0061 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauRectangular Hollow Sections
Rectangular Hollow Sections - 150mm x 100mm x4.5mm (16.9kg/m)- (30)
3986.67 3980.0062 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauUniversal Beams
Universal Beams - 300mm x 300mm x 3.0mm(96.73kg/m)- (30)
3566.67 3566.6763 MT 30 Delivered
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauEqual Angles
Equal Angles - 50mm x 50mm x 4mm (3.06kg/m) -(30)
2353.33 2353.3364 MT 30 Delivered
Page 96 of9731 January 2011
Building Materials Prices for Tawau
UnitCredit Term
(Days) Del or ExDescription
No.
Nov-2010(RM)
Dec-2010(RM)
TawauPlywood
Plywood - Shuttering Board, 4' x 8' x 12mm - (30) 70.00 70.0065 Piece 30 Delivered
Plywood - Shuttering Board, 4' x 8' x 25mm 1stGrade - (30)
158.33 158.3366 Piece 30 Delivered