standard drawing list - home | moonee valley city …/media/files/engineering services...moonee...
TRANSCRIPT
MOONEE VALLEY CITY COUNCIL (MVCC) STANDARD DRAWINGS
Drawing No. Description Date
MV 1 Grated Pit in Road Channel – Construction Details April 2007
MV 2 Concrete Kerb and Channel Sept. 2006
MV 3 Semi-Mountable Concrete Kerb & Channel Sept. 2006
MV 4 Concrete Open Invert Channels Sept. 2006
MV 5 Bluestone Kerb and Channel April 2007
MV 5A Fully Mountable Bluestone Kerb April 2007
MV 6 Bluestone Kerb and Channel April 2007
MV 7 Residential Concrete Vehicular Crossing Sept. 2006
MV 7A Special Concrete Residential Vehicular Crossing Sept. 2006
MV 7B Special Bluestone Residential Vehicular Crossing Sept. 2006
MV 8 Commercial Concrete Vehicular Crossing Sept. 2006
MV 9 Standard Concrete Layback Kerb Sept. 2006
MV 10 Bluestone Splitter Island April 2007
MV 11 Concrete Splitter Island Sept. 2006
MV 12 Concrete Splitter Island – Type B Sept. 2006
MV 13 Side Entry Pit (B Type Kerb) April 2007
MV 13A Grated Double Side Entry Pit (B Type Kerb) April 2007
MV 13B Haunched Grated Double Side Entry Pit (B Type Kerb)
April 2007
MV 13C Side Entry Pit (SM2 Type Kerb) April 2007
MV 14 Concrete Kerb Reinstatement Detail Sept. 2006
MV 15 Spare (Not used)
MV 16 Spare (Not used)
MV 17 Spare (Not used)
MV 18 Spare (Not used)
MV 19 Spare (Not used)
MV 20 Pram Crossing Detail Sept. 2006
MV 21 Pram Crossing Detail Sept. 2006
MV 22 Heavy Duty Pram Crossing Detail Sept. 2006
MV 23 Traffic Island Detail Sept. 2006
MV 24 Lawn Reinstatement Detail Sept. 2006
MV 25A (1 of 2) Standard Asphalt Watts Profile Road Hump Sept. 2006
MV 25A (2 of 2) Standard Asphalt Watts Profile Road Hump Sept. 2006
MV 25B Standard 4.0m Asphalt Flat Top Road Hump Sept. 2006
MV 25C Asphalt Flat Top Road Hump at Pedestrian Crossing
November 2005
MV 25D Asphalt Speed Cushion August 2006
MV 26 Pipe Laying and Backfill Construction Detail Sept. 2006
MV27 (1 of 3) Stormwater Drain Connections Sept. 2006
MV27 (2 of 3) Stormwater Drain Connections Sept. 2006
MV27 (3 of 3) Stormwater Drain Connections Sept. 2006
MV 28 House Drain Pipe Connections Sept. 2006
MV 29 Side Entry Pit - Construction Details April 2007
MV 29A Side Entry Pit (SM2 Type Kerb) - Construction Details
April 2007
MV 30 Junction Pit Construction Details April 2007
MV 30A Grated Junction Pit & Surround Construction Details
April 2007
MV 31 Side Entry Pit With Grate - Construction Details April 2007
MV 31A Modified Grated Side Entry Pit - Construction Details
Sept. 2006
MV 31B Modified Grated Side Entry Pit (SM2 Kerb) - Construction Details
March 2007
MV 31C Side Entry Pit With Grate (SM2 Kerb) - April 2007
Construction Details
MV 32 Haunched Junction Pit Details Up To 3.6m Depth Sept. 2006
MV 33 Grated Haunched Driveway Junction Pit – Construction Details
April 2007
MV 34 Standard Reinforced Concrete Pavement For ROW’s
Sept. 2006
MV 35 Agricultural Drain Detail December 2005
MV 36 Concrete Bike Path Detail Sept. 2006
MV 37 Anchor Block May 2006
MV 38 Brick Band & Paving Detail October 2006
MV 39 Details of Various Footpaths October 2006
MV 40 Moonee Valley Electricity Pit Lid June 2007
MV 41 Agricultural Drainage Pipes July 2007
MV 42 Typical Reinstatement Works & Stormwater Connection Details
July 2007
MV 43 Asphalt Right Of Ways Typical Sections August 2007