standard installation on rru_xl axiata project v 1 3
DESCRIPTION
TELECOMTRANSCRIPT
HUAWEI TECHNOLOGIES CO., LTD.
www.huawei.com
Standard Installation on RRU
XL Axiata Project
By : QC team
HUAWEI TECHNOLOGIES CO., LTD. Page 2
content
1. Installation on top
Antenna
RRU
CPRI , Power and grounding cable on top
2. Installation on bottom
CPRI, power and grounding cable on bottom
HUAWEI TECHNOLOGIES CO., LTD. Page 3
Metode
1. 3x electrical tape
2. 3x rubber
3. 3x electrical Tape
4. Tie wrap with black ties
1. Water Proof Installation
Installation on top Antenna
HUAWEI TECHNOLOGIES CO., LTD. Page 5
2. Coloring label Installation
Installation on top Antenna
Add white color label near connector
HUAWEI TECHNOLOGIES CO., LTD. Page 6
1. RRU placement
Installation on top RRU
a. RRU on new mounting bellow antenna
Add new 3 mounting bellow antenna
HUAWEI TECHNOLOGIES CO., LTD. Page 7
Installation on top RRU
1. RRU placement
b. RRU On the mounting antenna installation
HUAWEI TECHNOLOGIES CO., LTD. Page 8
Installation on top RRU
1. RRU placement
c. RRU On the leg tower Installation
HUAWEI TECHNOLOGIES CO., LTD. Page 9
Installation on top RRU
1. RRU placement
d. RRU On the Bracing tower Installation (Guide
mash type)
HUAWEI TECHNOLOGIES CO., LTD. Page 10
Installation on top RRU
2. RRU position
a. Installing the RRU on a Pole one or more RRUs can be installed on a pole.
HUAWEI TECHNOLOGIES CO., LTD. Page 11
Installation on top RRU
2. RRU position
b. Installing the RRU on a Pole one or more RRUs can be installed on a pole.
HUAWEI TECHNOLOGIES CO., LTD. Page 12
Installation on top RRU
2. RRU position
c. Installing the RRU on U-steel and Angle Steel This section describes the procedure and precautions for installing the RRU on U-steel and angel steel. U-steel and Angle Steel can be installed either on the ground or a tower and only one RRU can be installed on a piece of U-steel and Angle Steel. An RRU on U-steel and Angle Steel is installed in standard mode by default.
HUAWEI TECHNOLOGIES CO., LTD. Page 13
Installation on top RRU
2. RRU position
d. Installing the RRU on a Wall This section describes the procedure and precautions for installing the RRU on a wall. An RRU on a wall is installed in standard mode by default.
HUAWEI TECHNOLOGIES CO., LTD. Page 14
Installation on top RRU
2. RRU position
e. Installing RRU on an IFS06 This section describes the procedure and precautions for installing an RRU on an IFS06.
HUAWEI TECHNOLOGIES CO., LTD. Page 15
Installation on top RRU
2. RRU position
f. Installing the RRU on a Wall This section describes the procedure and precautions for installing the RRU on a wall. An RRU on a wall is installed in standard mode by default.
HUAWEI TECHNOLOGIES CO., LTD. Page 16
Installation on top RRU
3. RRU installation with filter
Installation filter On
Leg Tower
Use iron clamp
HUAWEI TECHNOLOGIES CO., LTD. Page 17
FILTER
Tx
Rx
Label on Jumper
Installation on top
3. RRU installation with filter
RRU
HUAWEI TECHNOLOGIES CO., LTD. Page 18
Installation on top CPRI , Power and grounding cable on top
CPRI cable connect to CPRI port 0
1. CPRI cable
HUAWEI TECHNOLOGIES CO., LTD. Page 19
Installation on top
CPRI , Power and grounding cable on top
To make shield layer power cable RRU measure from
reverse RRU cover
2. Power cable
HUAWEI TECHNOLOGIES CO., LTD. Page 20
Installation on top
CPRI , Power and grounding cable on top
3. Grounding cable
Grounding cable Install on
RRU connect to
grounding bar existing
HUAWEI TECHNOLOGIES CO., LTD. Page 21
Installation on top
CPRI , Power and grounding cable on top
4. label
Color ring & Print label standard for jumper cable & CPRI
HUAWEI TECHNOLOGIES CO., LTD. Page 22
Installation on top
CPRI , Power and grounding cable on top
4. label
Label CPRI and power cable RRU max 1 M before bending cable on horizontal cable tray
Label must be installed as close as possible to the connector
Max 1 m
HUAWEI TECHNOLOGIES CO., LTD. Page 23
Installation on top
CPRI , Power and grounding cable on top
5. Grounding clip
Install grounding clip on power cable RRU before bending between vertical tray and horizontal tray
HUAWEI TECHNOLOGIES CO., LTD. Page 24
Installation on top
CPRI , Power and grounding cable on top
5. Grounding clip
Install grounding clip on power cable RRU before bending between vertical tray and horizontal tray
HUAWEI TECHNOLOGIES CO., LTD. Page 25
Installation on top
CPRI , Power and grounding cable on top
6. Routing cable
Vertical Clamp Horizontal Clamp
Power and CPRI cable install with clam 150 cm or each cable tray step, at horizontal and
vertical tray.
Power Cable Type :
300V, UL2464, 3.31mm^2,2x12AWG, Black Jacket (2
Cores: Blue, Black), 30A, Shielded Outdoor Cable
Optical Cable Type :
DLC/UPC, DLC/UPC, Single-mode, GYFJH 2B1.3 (LSZH),
60m, 7.0mm, 2 Cores, 0.03m/0.34m, 2mm, Outdoor
Protected Branch Cable
HUAWEI TECHNOLOGIES CO., LTD. Page 26
Installation on top
CPRI , Power and grounding cable on top
6. Routing cable
Power and CPRI cable install with clam 150 cm or each cable tray step, at horizontal and
vertical tray.
Vertical Clam Horizontal Clam
Cable Fastener :
Antenna Feeder Accessories, One Fastener for Fixing Six 3.3 mm^2,4 mm^2, and 8.2 mm^2 Power Cable and Optical
Fibers, Stainless Steel, RRU
HUAWEI TECHNOLOGIES CO., LTD. Page 27
Installation on bottom CPRI , Power and grounding cable on bottom
1. Routing cable outdoor
BTS 3900A and DBS 3900
HUAWEI TECHNOLOGIES CO., LTD. Page 28
Installation on bottom CPRI , Power and grounding cable on bottom
1. Routing cable outdoor
1. - Power cable rectifier to BTS
- grounding cable BTS to main busbar
- signal cable E1/T1, FE/GE, optical
- alarm cable
1 2
BTS 3900A and DBS 3900
2. - Jumper cable
- CPRI cable
- RRU power cable
HUAWEI TECHNOLOGIES CO., LTD. Page 29
Installation on bottom CPRI , Power and grounding cable on bottom
2. RRU Power cable out door
BTS 3900A and DBS 3900
Must be use MCB with capacity minimum 32A each RRU
Must be used cable 25mm if need additional MCB on Rectifier outdoor
*Note: power cable RRU direct to rectifier if not DCDU 12B yet
HUAWEI TECHNOLOGIES CO., LTD. Page 30
Installation on bottom CPRI , Power and grounding cable on bottom
2. RRU Power cable outdoor
BTS 3900A add new DCDU 12B
Must be connected to Load0, Load1 & Load2
HUAWEI TECHNOLOGIES CO., LTD. Page 31
Installation on bottom CPRI , Power and grounding cable on bottom
2. RRU Power cable outdoor
BTS 3900A add new DCDU 12B
BTS 3900A cabinet Rectifier outdoor cabinet
2
3
1
4
1. MCB on Rectifier must be 125A or 1x 80A
or 2X80A for connected to DCDU-12B depend
on design customer
2. Power connection to DCDU 12B use 1 port
or 2 port
HUAWEI TECHNOLOGIES CO., LTD. Page 32
Installation on bottom CPRI , Power and grounding cable on bottom
2. RRU Power cable outdoor
BTS 3900A add new DCDU 12B
BTS 3900A cabinet Rectifier outdoor cabinet
2
3
1
4
4. Sticking a cable claw onto the right side of the
DCDU-12B and grounding cable
3. Routing power cable from right or left side BTS
use anaconda conduit
HUAWEI TECHNOLOGIES CO., LTD. Page 33
Installation on bottom CPRI , Power and grounding cable on bottom
2. RRU Power cable outdoor
BTS 3900A DBS 3900 add new DCDU 12B
Please install ground clip RRU power cable and routing in BTS cabinet as picture above
HUAWEI TECHNOLOGIES CO., LTD. Page 34
Installation on bottom CPRI , Power and grounding cable on bottom
3. CPRI cable routing outdoor
BTS 3900A
CPRI cable
from RRU CPRI cable
from RRU
HUAWEI TECHNOLOGIES CO., LTD. Page 35
Installation on bottom CPRI , Power and grounding cable on bottom
3. CPRI cable routing
DBS 3900
CPRI cable
from RRU CPRI cable
from RRU
HUAWEI TECHNOLOGIES CO., LTD. Page 36
Installation on bottom CPRI , Power and grounding cable on bottom
3. CPRI cable routing outdoor
BTS 3900A and DBS 3900 spare CPRI cable
1. Redundant optic
cable place to
inside BTS
2. Redundant optic
cable place on
vertical bottom tray
*note= split each
redundant optic cable
per sector with ties cable
and color label
HUAWEI TECHNOLOGIES CO., LTD. Page 37
Installation on bottom CPRI , Power and grounding cable on bottom
4. Routing cable indoor
BTS 3900L, BTS 3900 and DBS 3900
When Power and CPRI cable insert to the room
must install with rubber boot (3 hole) in/outlet,
block closely and with good bending for water
drift.
HUAWEI TECHNOLOGIES CO., LTD. Page 38
Installation on bottom CPRI , Power and grounding cable on bottom
4. Routing cable indoor
BTS 3900L, BTS 3900 and DBS 3900
Power, CPRI and grounding cable no need
white conduit.
Cable lay at tray with tie wrap or clamp
HUAWEI TECHNOLOGIES CO., LTD. Page 39
Installation on bottom CPRI , Power and grounding cable on bottom
4. Routing cable indoor
BTS 3900L, BTS 3900 and DBS 3900
1. Grounding cable, Power cable DCDU and RRU in
duct cable
2. CPRI, signal and alarm cable in duct cable.
2 1
2 1
HUAWEI TECHNOLOGIES CO., LTD. Page 40
Installation on bottom CPRI , Power and grounding cable on bottom
5. Power cable RRU outdoor
BTS 3900 L add new DCDU 12B
Must be connected to Load0, Load1 & Load2
HUAWEI TECHNOLOGIES CO., LTD. Page 41
Installation on bottom CPRI , Power and grounding cable on bottom
5. Power cable RRU indoor
BTS 3900L add new DCDU 12B
BTS 3900L cabinet
Rectifier indoor cabinet
2
3
4
1
1. MCB on Rectifier must be 125A or 1x 80A
or 2X80A for connected to DCDU-12B depend
on design customer
2. Power connection to DCDU use 1 port or 2 port
HUAWEI TECHNOLOGIES CO., LTD. Page 42
Installation on bottom CPRI , Power and grounding cable on bottom
5. Power cable RRU indoor
BTS 3900L add new DCDU 12B
BTS 3900L cabinet
Rectifier indoor cabinet
2
3
4
1
4. Sticking a cable claw onto the right side of the
DCDU-12B and grounding cable
3. Routing power cable from left side BTS use duct
cable and ties cable on horizontal tray
HUAWEI TECHNOLOGIES CO., LTD. Page 43
Installation on bottom CPRI , Power and grounding cable on bottom
5. Power cable RRU indoor
BTS 3900L add new DCDU 12B
RRU power cable routing from left side in duct cable and rout to right side to DCDU 12B
HUAWEI TECHNOLOGIES CO., LTD. Page 44
Installation on bottom CPRI , Power and grounding cable on bottom
6. CPRI cable routing indoor
BTS 3900L
CPRI cable
from RRU
CPRI cable routing from right
side in duct cable to BBU
HUAWEI TECHNOLOGIES CO., LTD. Page 45
Installation on bottom CPRI , Power and grounding cable on bottom
6. CPRI cable routing outdoor
BTS 3900L and DBS 3900 spare CPRI cable
1. Redundant optic
cable place to
inside BTS
3. Redundant optic
cable place on
vertical bottom tray
*note= split each
redundant optic cable
per sector with ties cable
and color label
2. Redundant optic
cable place to
horizontal tray
(indoor type)
HUAWEI TECHNOLOGIES CO., LTD. Page 46
Installation on bottom CPRI , Power and grounding cable on bottom
7. label
Label must be installed as
close as possible to the
connector use print label:
CPRI cable, RRU Power cable,
MCB, grounding cable