HUAWEI TECHNOLOGIES CO., LTD.

www.huawei.com

Standard Installation on RRU

XL Axiata Project

By : QC team

HUAWEI TECHNOLOGIES CO., LTD. Page 2

content

1. Installation on top

Antenna

RRU

CPRI , Power and grounding cable on top

2. Installation on bottom

CPRI, power and grounding cable on bottom

HUAWEI TECHNOLOGIES CO., LTD. Page 3

Metode

1. 3x electrical tape

2. 3x rubber

3. 3x electrical Tape

4. Tie wrap with black ties

1. Water Proof Installation

Installation on top Antenna

HUAWEI TECHNOLOGIES CO., LTD. Page 4

2. Coloring label Installation

Installation on top Antenna

HUAWEI TECHNOLOGIES CO., LTD. Page 5

2. Coloring label Installation

Installation on top Antenna

Add white color label near connector

HUAWEI TECHNOLOGIES CO., LTD. Page 6

1. RRU placement

Installation on top RRU

a. RRU on new mounting bellow antenna

Add new 3 mounting bellow antenna

HUAWEI TECHNOLOGIES CO., LTD. Page 7

Installation on top RRU

1. RRU placement

b. RRU On the mounting antenna installation

HUAWEI TECHNOLOGIES CO., LTD. Page 8

Installation on top RRU

1. RRU placement

c. RRU On the leg tower Installation

HUAWEI TECHNOLOGIES CO., LTD. Page 9

Installation on top RRU

1. RRU placement

d. RRU On the Bracing tower Installation (Guide

mash type)

HUAWEI TECHNOLOGIES CO., LTD. Page 10

Installation on top RRU

2. RRU position

a. Installing the RRU on a Pole one or more RRUs can be installed on a pole.

HUAWEI TECHNOLOGIES CO., LTD. Page 11

Installation on top RRU

2. RRU position

b. Installing the RRU on a Pole one or more RRUs can be installed on a pole.

HUAWEI TECHNOLOGIES CO., LTD. Page 12

Installation on top RRU

2. RRU position

c. Installing the RRU on U-steel and Angle Steel This section describes the procedure and precautions for installing the RRU on U-steel and angel steel. U-steel and Angle Steel can be installed either on the ground or a tower and only one RRU can be installed on a piece of U-steel and Angle Steel. An RRU on U-steel and Angle Steel is installed in standard mode by default.

HUAWEI TECHNOLOGIES CO., LTD. Page 13

Installation on top RRU

2. RRU position

d. Installing the RRU on a Wall This section describes the procedure and precautions for installing the RRU on a wall. An RRU on a wall is installed in standard mode by default.

HUAWEI TECHNOLOGIES CO., LTD. Page 14

Installation on top RRU

2. RRU position

e. Installing RRU on an IFS06 This section describes the procedure and precautions for installing an RRU on an IFS06.

HUAWEI TECHNOLOGIES CO., LTD. Page 15

Installation on top RRU

2. RRU position

f. Installing the RRU on a Wall This section describes the procedure and precautions for installing the RRU on a wall. An RRU on a wall is installed in standard mode by default.

HUAWEI TECHNOLOGIES CO., LTD. Page 16

Installation on top RRU

3. RRU installation with filter

Installation filter On

Leg Tower

Use iron clamp

HUAWEI TECHNOLOGIES CO., LTD. Page 17

FILTER

Tx

Rx

Label on Jumper

Installation on top

3. RRU installation with filter

RRU

HUAWEI TECHNOLOGIES CO., LTD. Page 18

Installation on top CPRI , Power and grounding cable on top

CPRI cable connect to CPRI port 0

1. CPRI cable

HUAWEI TECHNOLOGIES CO., LTD. Page 19

Installation on top

CPRI , Power and grounding cable on top

To make shield layer power cable RRU measure from

reverse RRU cover

2. Power cable

HUAWEI TECHNOLOGIES CO., LTD. Page 20

Installation on top

CPRI , Power and grounding cable on top

3. Grounding cable

Grounding cable Install on

RRU connect to

grounding bar existing

HUAWEI TECHNOLOGIES CO., LTD. Page 21

Installation on top

CPRI , Power and grounding cable on top

4. label

Color ring & Print label standard for jumper cable & CPRI

HUAWEI TECHNOLOGIES CO., LTD. Page 22

Installation on top

CPRI , Power and grounding cable on top

4. label

Label CPRI and power cable RRU max 1 M before bending cable on horizontal cable tray

Label must be installed as close as possible to the connector

Max 1 m

HUAWEI TECHNOLOGIES CO., LTD. Page 23

Installation on top

CPRI , Power and grounding cable on top

5. Grounding clip

Install grounding clip on power cable RRU before bending between vertical tray and horizontal tray

HUAWEI TECHNOLOGIES CO., LTD. Page 24

Installation on top

CPRI , Power and grounding cable on top

5. Grounding clip

Install grounding clip on power cable RRU before bending between vertical tray and horizontal tray

HUAWEI TECHNOLOGIES CO., LTD. Page 25

Installation on top

CPRI , Power and grounding cable on top

6. Routing cable

Vertical Clamp Horizontal Clamp

Power and CPRI cable install with clam 150 cm or each cable tray step, at horizontal and

vertical tray.

Power Cable Type :

300V, UL2464, 3.31mm^2,2x12AWG, Black Jacket (2

Cores: Blue, Black), 30A, Shielded Outdoor Cable

Optical Cable Type :

DLC/UPC, DLC/UPC, Single-mode, GYFJH 2B1.3 (LSZH),

60m, 7.0mm, 2 Cores, 0.03m/0.34m, 2mm, Outdoor

Protected Branch Cable

HUAWEI TECHNOLOGIES CO., LTD. Page 26

Installation on top

CPRI , Power and grounding cable on top

6. Routing cable

Power and CPRI cable install with clam 150 cm or each cable tray step, at horizontal and

vertical tray.

Vertical Clam Horizontal Clam

Cable Fastener :

Antenna Feeder Accessories, One Fastener for Fixing Six 3.3 mm^2,4 mm^2, and 8.2 mm^2 Power Cable and Optical

Fibers, Stainless Steel, RRU

HUAWEI TECHNOLOGIES CO., LTD. Page 27

Installation on bottom CPRI , Power and grounding cable on bottom

1. Routing cable outdoor

BTS 3900A and DBS 3900

HUAWEI TECHNOLOGIES CO., LTD. Page 28

Installation on bottom CPRI , Power and grounding cable on bottom

1. Routing cable outdoor

1. - Power cable rectifier to BTS

- grounding cable BTS to main busbar

- signal cable E1/T1, FE/GE, optical

- alarm cable

1 2

BTS 3900A and DBS 3900

2. - Jumper cable

- CPRI cable

- RRU power cable

HUAWEI TECHNOLOGIES CO., LTD. Page 29

Installation on bottom CPRI , Power and grounding cable on bottom

2. RRU Power cable out door

BTS 3900A and DBS 3900

Must be use MCB with capacity minimum 32A each RRU

Must be used cable 25mm if need additional MCB on Rectifier outdoor

*Note: power cable RRU direct to rectifier if not DCDU 12B yet

HUAWEI TECHNOLOGIES CO., LTD. Page 30

Installation on bottom CPRI , Power and grounding cable on bottom

2. RRU Power cable outdoor

BTS 3900A add new DCDU 12B

Must be connected to Load0, Load1 & Load2

HUAWEI TECHNOLOGIES CO., LTD. Page 31

Installation on bottom CPRI , Power and grounding cable on bottom

2. RRU Power cable outdoor

BTS 3900A add new DCDU 12B

BTS 3900A cabinet Rectifier outdoor cabinet

2

3

1

4

1. MCB on Rectifier must be 125A or 1x 80A

or 2X80A for connected to DCDU-12B depend

on design customer

2. Power connection to DCDU 12B use 1 port

or 2 port

HUAWEI TECHNOLOGIES CO., LTD. Page 32

Installation on bottom CPRI , Power and grounding cable on bottom

2. RRU Power cable outdoor

BTS 3900A add new DCDU 12B

BTS 3900A cabinet Rectifier outdoor cabinet

2

3

1

4

4. Sticking a cable claw onto the right side of the

DCDU-12B and grounding cable

3. Routing power cable from right or left side BTS

use anaconda conduit

HUAWEI TECHNOLOGIES CO., LTD. Page 33

Installation on bottom CPRI , Power and grounding cable on bottom

2. RRU Power cable outdoor

BTS 3900A DBS 3900 add new DCDU 12B

Please install ground clip RRU power cable and routing in BTS cabinet as picture above

HUAWEI TECHNOLOGIES CO., LTD. Page 34

Installation on bottom CPRI , Power and grounding cable on bottom

3. CPRI cable routing outdoor

BTS 3900A

CPRI cable

from RRU CPRI cable

from RRU

HUAWEI TECHNOLOGIES CO., LTD. Page 35

Installation on bottom CPRI , Power and grounding cable on bottom

3. CPRI cable routing

DBS 3900

CPRI cable

from RRU CPRI cable

from RRU

HUAWEI TECHNOLOGIES CO., LTD. Page 36

Installation on bottom CPRI , Power and grounding cable on bottom

3. CPRI cable routing outdoor

BTS 3900A and DBS 3900 spare CPRI cable

1. Redundant optic

cable place to

inside BTS

2. Redundant optic

cable place on

vertical bottom tray

*note= split each

redundant optic cable

per sector with ties cable

and color label

HUAWEI TECHNOLOGIES CO., LTD. Page 37

Installation on bottom CPRI , Power and grounding cable on bottom

4. Routing cable indoor

BTS 3900L, BTS 3900 and DBS 3900

When Power and CPRI cable insert to the room

must install with rubber boot (3 hole) in/outlet,

block closely and with good bending for water

drift.

HUAWEI TECHNOLOGIES CO., LTD. Page 38

Installation on bottom CPRI , Power and grounding cable on bottom

4. Routing cable indoor

BTS 3900L, BTS 3900 and DBS 3900

Power, CPRI and grounding cable no need

white conduit.

Cable lay at tray with tie wrap or clamp

HUAWEI TECHNOLOGIES CO., LTD. Page 39

Installation on bottom CPRI , Power and grounding cable on bottom

4. Routing cable indoor

BTS 3900L, BTS 3900 and DBS 3900

1. Grounding cable, Power cable DCDU and RRU in

duct cable

2. CPRI, signal and alarm cable in duct cable.

2 1

2 1

HUAWEI TECHNOLOGIES CO., LTD. Page 40

Installation on bottom CPRI , Power and grounding cable on bottom

5. Power cable RRU outdoor

BTS 3900 L add new DCDU 12B

Must be connected to Load0, Load1 & Load2

HUAWEI TECHNOLOGIES CO., LTD. Page 41

Installation on bottom CPRI , Power and grounding cable on bottom

5. Power cable RRU indoor

BTS 3900L add new DCDU 12B

BTS 3900L cabinet

Rectifier indoor cabinet

2

3

4

1

1. MCB on Rectifier must be 125A or 1x 80A

or 2X80A for connected to DCDU-12B depend

on design customer

2. Power connection to DCDU use 1 port or 2 port

HUAWEI TECHNOLOGIES CO., LTD. Page 42

Installation on bottom CPRI , Power and grounding cable on bottom

5. Power cable RRU indoor

BTS 3900L add new DCDU 12B

BTS 3900L cabinet

Rectifier indoor cabinet

2

3

4

1

4. Sticking a cable claw onto the right side of the

DCDU-12B and grounding cable

3. Routing power cable from left side BTS use duct

cable and ties cable on horizontal tray

HUAWEI TECHNOLOGIES CO., LTD. Page 43

Installation on bottom CPRI , Power and grounding cable on bottom

5. Power cable RRU indoor

BTS 3900L add new DCDU 12B

RRU power cable routing from left side in duct cable and rout to right side to DCDU 12B

HUAWEI TECHNOLOGIES CO., LTD. Page 44

Installation on bottom CPRI , Power and grounding cable on bottom

6. CPRI cable routing indoor

BTS 3900L

CPRI cable

from RRU

CPRI cable routing from right

side in duct cable to BBU

HUAWEI TECHNOLOGIES CO., LTD. Page 45

Installation on bottom CPRI , Power and grounding cable on bottom

6. CPRI cable routing outdoor

BTS 3900L and DBS 3900 spare CPRI cable

1. Redundant optic

cable place to

inside BTS

3. Redundant optic

cable place on

vertical bottom tray

*note= split each

redundant optic cable

per sector with ties cable

and color label

2. Redundant optic

cable place to

horizontal tray

(indoor type)

HUAWEI TECHNOLOGIES CO., LTD. Page 46

Installation on bottom CPRI , Power and grounding cable on bottom

7. label

Label must be installed as

close as possible to the

connector use print label:

CPRI cable, RRU Power cable,

MCB, grounding cable

www.huawei.com

THANKS