STANDARD OPERATION PROCEDURE (DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B 1 Part No 98TF07MA4001 Revision 100 Station  Product Name Rugged Tablet PC Model Name M700DM4     Product NameRugged Tablet PC Model Name: M700DM4  

Upload: hahuong

Post on 16-Apr-2019

238 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

1

Part No  98TF07MA4001  Revision  100  Station   

Product Name  Rugged Tablet PC  Model Name  M700DM4 

 

 

    

Product Name:Rugged Tablet PC 

Model Name: M700DM4 

 

Page 2: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

2

Document History  

Item  Date  Revision  Page  Description 

1  2014/11/30  100  N/A  New Document Released 

2         

3         

4         

5         

6         

7         

8         

9         

10         

11         

12         

13         

14         

15         

16         

17         

18         

19         

20         

21         

Approved by  Revised by Made by

Brain  John  Justin 

Page 3: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

3

Table of Contents 

Block Diagram ........................................................................................................................................ 4 

Notes & Tools ......................................................................................................................................... 5 

Version Control Table ............................................................................................................................. 6 

Panel & Touch Assembly ........................................................................................................................ 7 

Panel Assembly ...................................................................................................................................... 8 

Middle Plate assembly ........................................................................................................................... 9 

Wi‐Fi antenna Assembly ...................................................................................................................... 10 

CPU Board Assembly ............................................................................................................................ 11 

IO Board Assembly ............................................................................................................................... 12 

Back Cover Assembly ........................................................................................................................... 15 

LTE Antenna Assembly ......................................................................................................................... 16 

LTE Card assembly ................................................................................................................................ 17 

Cover Assembly .................................................................................................................................... 18 

Battery pack ......................................................................................................................................... 19 

Test Flow Chart .................................................................................................................................... 20 

LED & Button Test ................................................................................................................................ 21 

LCD & I/O Test ...................................................................................................................................... 22 

Sensor Test ........................................................................................................................................... 24 

GPS Test ................................................................................................................................................ 25 

RF Test .................................................................................................................................................. 26 

Battery Test .......................................................................................................................................... 27 

Camera Test .......................................................................................................................................... 28 

Six‐Sided Figure .................................................................................................................................... 29 

Packing Assembly ................................................................................................................................. 30 

 

   

Page 4: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

4

Model  98TF07MA4001  Revision  100  Station   

Operation Name  Block Diagram  Remark   

   

M700DM4-200 IO Board

90IOM7DT4102

Adapter 5V 15W 2.5ψ 9226015W05V1

MK8-200 CPU Board 90MBMK802000

M7T4IC-110 Camera Bridge 90BB7T4IC100

M7T4IK-100 Key Pad Board 90BB7T4IK000

Camera w/o LED 9B000000000H

P-Cap Touch EP0700MLS3TXCP0700MLS3

Wi-Fi Antenna 39700010000I

Panel 1024*600 500nit 111H0700EG00

4G LTE WWAN Card 9B000000004E

M7T4IM-100 Machine Pin90BB7T4IM000

M7T4IL-100 LED Board 90BB7T4IL000

GPS Antenna 397000000005

94DG12G120A0

94DG12G120B2

Battery 3.7V 5300mAh 320403704005

LED Board for Camera 9B000000000S

LTE MAIN Antenna 39700030001A

LTE AUX Antenna 39700030001B

Page 5: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

5

Part No  98TF07MA4001  Revision  100  Station   

Operation Name  Notes & Tools  Remark   

 

 

 

 

 

 

 

       

 

 

 

 

 

 

 

 

 

 

ATTENTION:  Remarks 

1. Please put on a pair white ESD glove when working.   

2. Please put on the ESD belt when working.   

3. Pay attention to the torque of electric screw driver.   

4. Make sure all screws are tight without loose.   

5. No thread stripped happen.   

Tools:  Remarks 

1. Electric Screwdriver (refer to MIPD015 Electric Screwdriver Torque 

Calibration Standard Procedure)  

2. White ESD glove   

3. ESD belt   

4. Hot Glue Gun   

Note:  Remarks 

Please refer to the detailed BOM (include BIOS & Recovery CD) from the 

EIP system.  

Use Nylon screws or dispensers when assembling.     

Use hot glue gun to connect all junctions precisely.       

Expendables:  Remarks 

MIPD015 Electric Screwdriver Torque Calibration Standard Procedure     

MIPDXXX Board Gluing Standard Operating Procedure   

   

Page 6: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

6

Part No 98TF07MA4001 Revision 100 Station

Operation Name Version Control Table  Remark

Item  Device  Part Number  Model Name Firmware 

Version 

HW 

CPU Board  90MBMK802000  MK8  V200 

IO Board  90IOM7DT4102  M700DM4  V200 

Camera Bridge 

Board 90BB7T4IC100  M7T4IC  V110 

Key PAD Board  90BB7T4IK000  M7T4IK  V100 

LED Board  90BB7T4IL000  M7T4IL  V100 

Machine Pin Board  90BB7T4IM000  M7T4IM  V100 

Panel  111H0700EG00  FG07W0DSSWAGL1   

Touch  TXCP0700MLS3  EP0700MLS3   

ME 

Front Cover  90ME02000039    V100 

Rear Cover  88070T044201    V120 

Middle Plate  82W70A11T500    V150 

IO Cover  88070T261204    V100 

SW 

Android Version      4.2.1 

Baseband Version     SWI9X15C_05.05.16.00 r21040 

carmd‐fwbuild1 

Kernel Version     3.4.5 

Ryan1@SW110 #9 

Build number      ALPS.W10.24.p0 

Custom build 

Version     M700DM4_SIERRA_HWV1.3_v141125

Accessory 

Battery  320403704005     

Adapter  9226015W05V1  3A‐182WP05   

Adapter  604610606004  Europe Standard   

Camera  9B000000000H     

LED for Camera  9B000000000S     

LTE WWAN Card  9B000000004E  MC7304  05.05.16.00 Generic 

   

Page 7: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

7

Part No 98TF07MA4001 Revision 100 Station

Operation Name Panel & Touch Assembly Remark

Item Material:

A 90ME02000039

B 9117070K8000

C TXCP0700MLS3

Step Assembly Description:

1

Remove paper on the adhesive tape then

unite the Plastic cover (A) onto the Frame

(B)

2 Affixed the Touch(C) onto the Front Cover

carefully.

3 Protect the Touch sensor using insulating

tape.

Item Tools:

1 Insulating tape

Item Note:

1

 

STEP 3

STEP 1

A B

STEP 2

C

Page 8: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

8

Part No 98TF07MA4001 Revision 100 Station

Operation Name Panel Assembly  Remark

Item Material:

A 111H0700EG00

Steps Assembly Description:

1

Using W2xH0.5mm double sided adhesive

tape stick the Panel (A) around its four

sides.

2 Make sure to protect Panel cable using

insulating tape.

3

On the Panel laminated strip on the back,

measure the outer edge and stick using

W3xH0.5mm double sided foam tape. Do

not stick on the area (Marked in yellow) to

avoid over voltage.

4 Fix the Panel on the Front Cover

Item Tools:

1 Insulating Tape

2 W2xH0.5mm Double sided foam

3 W3xH0.5mm Double sided adhesive tape

Item Note:

1

Make sure to keep the area clean 

between Panel and Touch while 

attaching them together.

   

STEP 3

STEP 3, 4

STEP 1, 2

A

Page 9: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

9

Part No 98TF07MA4001 Revision 100 Station

Operation Name Middle Plate assembly  Remark

Item Material:

A 90BB7T4IK000

B 90BB7T4IL000

C 9156070K9F00

D 82W70A11T500

E 9128070K1100

Item Assembly Description:

1 Put on the Dome of the Button(C) into the

Key Pad plate(A)

2 Fix the LED plate (B) use Philips pan

screw M2 x4mm to lock the front frame.

3 Fix the Key Pad switch board into the front

frame

4

Use Philips pan screw M2x4mm(marked in

blue circle) )and Philips pan screw

M2.5x4mm(marked in green circle)and

lock the partition Middle plate(D)

5 Place the water proof O-RING (E) into the

front frame.

Item Tools:

1 Philips Pan Screw M2x4mm

2 Philips Pan Screw M2.5x4mm

Item Note:

1

   

STEP 1

A C

STEP 2, 3

B

STEP 4, 5

D E

Page 10: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

10

Part No 98TF07MA4001 Revision 100 Station

Operation Name Wi‐Fi antenna Assembly Remark

Item Material:

A 39700010000I

Steps Assembly Description:

1

Fix the Wi-Fi antenna (A) to the front

frame, the copper foil must affixed into the

middle plate and follow cable alignment

approximately left direction.

2

Use insulating tape to fix Wi-Fi antenna

cable make sure to follow proper alignment

along the line at the back and not interfere

other cable.

Item Tools:

1 Insulating tape

Item Note:

1 Note the antenna outlet and proper

alignment.

   

STEP 2

STEP 1

A

Page 11: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

11

Part No 98TF07MA4001 Revision 100 Station

Operation Name CPU Board Assembly  Remark

Item Material:

A 60ZZ60500000

B 90MBMK802000

Steps Assembly description:

1 Set up to stick on the back, the Absorbing

material (A) from the CPU Board(B)

2

On the front part of absorbing material,

must temporary not to post on the CPU

Board

Item Tools:

1

Item Note:

1

   

STEP 2

STEP 1

A

B

Page 12: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

12

Part No 98TF07MA4001 Revision 100 Station

Operation Name IO Board Assembly  Remark

Item Material:

A 90IOM7DT4102

B 9117070K9106

C 94DG12G120A0

D 94DG12G120B2

Steps Assembly Description:

1

Use Philips Screw M1.6x3mm(marked in

green circle) into CPU Board to lock IO

Board(A)

2 Cover up Rubber sponge onto Battery

Connector (marked in yellow)

3 The 12 pin point out FFC(C) connect to

CN1

4 The 12 pin on the other side

FFC(E)connect to CN4

5

IO shown in the figure (marked in red box)

stick W8xH3mm single sided Adhesive

tape(B)

Item Tools:

1 Philips Screw M1.6x3mm

Item Note:

1

   

STEP 1, 2

A

STEP 5

B B

STEP 3, 4

C

D

Page 13: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

13

Part No 98TF07MA4001 Revision 100 Station

Operation Name IO Board Assembly (一)  Remark

Item Material:

A 前述半成品

B 90BB7T4IC100

C 9163070K9002

Steps Assembly Description:

1 Connect the Touch Cable to the IO board

2 Connect the Panel Cable to the IO board.

3

Use Philip screw M2.5x4mmm (marked in

green circle) at the IO lock the middle

plate, then Connect FFC Cable and secure

with adhesive tape.

4

Connect the Camera Bridge Cable(B) and

use hot melt glue onto the fixed point, then

along the edge of the CPU Board affixed

GPS conductive fabric +Mylar(C)

Items Tools:

1 Philip Screw M2.5x4mm

2 Hot melt Glue

Items Notes:

1

   

STEP 3

STEP 1, 2

A

STEP 4

C B

Page 14: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

14

 

Part No 98TF07MA4001 Revision 100 Station

Operation Name IO Board Assembly (二)  Remark

Items Material:

A 397000000005

B 9B000000000H

C 9B000000000S

Steps Assembly Description:

1

Affixed the conductive sponge to

GPS ,then the wifi antenna must connect to

CPU Board, follow antenna alignment as

shown in the figure (marked in red)

2 The Camera(B)Across LED Board(C)must

installed to IO Board

3

The GPS antenna (A) must connected to

CPU Board then fix antenna location,

follow GPS antenna alignment as shown in

the figure.

item Tools:

1 Insulating tape

Item Note:

1

GPS antenna required along the CPU

Board perimeter routing, not above CPU

Board, do not press on top of the CPU steel

when closing the back cover to prevent

over pressure.

2

The GPS antenna position must

approximately between the 2 screw hole in

the middle position.

STEP 1

STEP 3

A

STEP 2

B

C

Page 15: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

15

Part No 98TF07MA4001 Revision 100 Station

Operation Name Back Cover Assembly  Remark

Items Material:

A 61252000000K

B 88070T044201

C 88070T261204

D 90BB7T4IM000

E 916211109101

Steps Assembly Description:

1 Back Cover(B) Paste SPK with water proof

Fabric E) and fix to IP65 SPK(A)

2 Fix IO cover onto the back cover C)

3 Use black Philip screw M2x4mm (marked

in green circle) to put the Machine Pin

4 Use Water proof glue onto the Machine Pin

to secure wiring hole (marked in red)

Items Tools:

1 Black Philip screw M2x4mm

2 Water Proof Plastic

Items Note:

1

   

STEP 1

A E

B

D

C

STEP 2, 4

STEP 3

Page 16: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

16

Part No 98TF07MA4001 Revision 100 Station

Operation Name LTE Antenna Assembly  Remark

Items Material:

A 39700030001A

B 39700030001B

C 88070T164211

D 9117070K8001

Steps Assembly Description:

1

The LTE Main antenna (A) containing

copper foil and conductive foam sticker

must attached onto the back Cover then

follow illustrated antenna cable alignment

and secured with insulating tape.

2

The LTE AUX antenna(B) must follow

according to the diagram attached to BR

Cover(C)

3

Use adhesive to fix onto Cover (D) the

LTE AUX w/o antenna BR must attach to

the back cover and fix the alignment.

Items Tools:

1 Tape

Items Note:

1

   

STEP 1

A

STEP 2

B

C

STEP 3

D

Page 17: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

17

Part No 98TF07MA4001 Revision 100 Station

Operation Name LTE Card assembly    Remark

Items Material:

A 9B000000004E

Steps Assembly Description:

1 Use Philip pan Screw M2x4mm(marked in

red circle)to the LTE Card(A)

2

The LTE AUX antenna guide must attach

the conductive foam toward the bottom of

the separator as shown in the figure.

Item Tools:

1 Philip pan screw M2x4mm

Item Note:

1 The conductive foam must contact the

bottom of the separator.

   

STEP 1

A

STEP 2

STEP 2

Page 18: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

18

Part No 98TF07MA4001 Revision 100 Station

Operation Name Cover Assembly  Remark

Item Material:

A 88070T161311

Steps Assembly description:

1

The wifi antenna must connect to LTE

MAIN (marked in red box) and other wifi

antenna must connect to LTE AUX

(marked in green box)

2 Connect Machine Pin & SPK alignment. do

not block (marked in orange)Vibrator

3 Use PH dome screw M2.5x5mm (marked

in blue) at lock cover.

4

Use I-head screw M2.5x5mm (marked in

Purple and flathead screw M2.5x7mm

(marked in green) lock BR cover

5 Paste camera Lens(A)and safety stickers

etc.

Items Tools:

1 Philip dome screw M2.5x5mm

2 I -head screw M2.5x5mm

3 Flat head screw M2.5x7mm

Items Note:

1

   

STEP 1

STEP 2

STEP 3, 4, 5

A

Page 19: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

19

Part No 98TF07MA4001 Revision 100 Station

Operation Name Battery pack  Remark

Item Material:

A 320403704005

B 9128070K9100

Items Assembly Description:

1 The Battery Pack(A) affixed the battery

water proof ring(B)

2 After performing the testing process, Load

the Battery pack.

Item Tools:

1

item Note:

1

   

STEP 2

STEP 1

A B

Page 20: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

20

Part No 98TF07MA4001 Revision 100 Station

Operation Name Test Flow Chart  Remark

M700DM4 Flow Chart

   

LED & Button

LCD

I/O

Sensor

RF

Battery

Post Burn in Test

Camera

Burn in

Packing

Testing process Test Items

LED & Button

LED

Power Button

Keypad

Volume +/-

LCD Brightness

I/O

Headset

Speaker

Micro SD

Micro USB (OTG)

Touch

Sensor

G-Sensor

Gyroscope

Light Sensor

Vibrator

RF

GPS

LTE WWAN

Wi-Fi

BT

Battery Battery

Camera Camera

Flash

Page 21: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

21

Part No 98TF07MA4001 Revision 100 Station

Operation Name LED & Button Test  Remark

Steps Testing Description:

1 Check Power & Battery LED

2 Check Power Button

3 Check Keypad

4 Check Volume +/-

Items Judgment Standard:

1 Power & Battery LED must function

properly.

2 Power Button must function properly

3 Keypad must respond accurately.

4 Volume +/- Must adjust volume properly.

Items Tools:

1

Item Note:

1

   

Power Key

Press 2S Turn on

<1 Second Suspend

Resume

Long pressed

<8 second>

Forced to

Shutdown

Led Status

Battery Only Battery + DC in

ON

100%-21%: Not Bright 100% : Green light

20%-11%: Red light on 99%-3%: Orange light

10%-3%: Red light flashes

OFF

100%-21%: Not Bright 100% : Green light

20%-11%: Not Bright 99%-3%: Orange light

10%-3%: Not Bright

Power: Single Color 

Battery: Dual Color   

Page 22: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

22

Part No 98TF07MA4001 Revision 100 Station

Operation Name LCD & I/O Test  Remark

Steps Test Description:

1 Evaluate the brightness adjustment.

2 Use Micro SD 32GB or more then test if it

functions properly.

3 Insert Micro USB to evaluate into PC test

machine.

4 Use Micro USB OTG cable to connect the

mouse.

5 Using Finger separate capacitive stylus and

Touch accessories.

Item Judgment Standard:

1 required at least 425nit brightness

2 Micro SD must read properly

3 PC must able to recognize and transfer file

to the test machine.

4 OTG must function properly.

5 Touch must function properly <need to

touch the correct position>

Item Tools:

1 Brightness

2 32GB above Micro SD

3 Micro USB Cable

4 Micro USB OTG Cable

5 9B0000000326 Capacitive Touch Stylus

Item Note:

1

   

STEP 1~5

STEP 1~5

Page 23: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

23

Part No 98TF07MA4001 Revision 100 Station

Operation Name LCD & I/O Test  Remark

Steps Testing Description:

1 Perform Z-Device Test

2 Select Headset Audio and video output for

evaluation.

3 Speaker Handset Inspection

Item Judgment Standard :

1 Headset can detect and use properly.

2 Speaker can be used properly

Item Tools:

1 Z-Device Test

Item Note:

1

   

STEP 1~3

STEP 1~3

Audio and Video Output

Headset Detection

Earpiece 

Press Play Sound 

Dual‐Tone –Multi‐Frequency Volume 

Page 24: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

24

Part No 98TF07MA4001 Revision 100 Station

Operation Name Sensor Test  Remark

Steps Testing Description:

1 Perform Z-Device Test

2 Test Gravity Sensor <G-Sensor>

3 Gyroscope Measurement Inspection

Item Judgment Standard:

1 XYZ axis and movement information must

correct.

2 XYZ angle information must correct.

Item Tools:

1 Z-Device Test

Item Note:

1

STEP 1~3

STEP 1~3

Gravity Sensor 

Gravity X 

Gravity Y 

Gravity Z 

Page 25: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

25

Part No 98TF07MA4001 Revision 100 Station

Operation Name GPS Test  Remark

Steps Testing Description:

1 Perform GPS Test APP

2 Record the number of satellite and signal of

strength.

Item Judgment standard:

1 Position required at least 3 or more

-40dB

2 Must attain at least 6 or more satellite

position.

Item Tools:

1 GPS Test

Item Note:

1

STEP 1~2

STEP 1~2

Page 26: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

26

Part No 98TF07MA4001 Revision 100 Station

Operation Name RF Test  Remark

Steps Testing Description:

1 Select and Evaluate WWAN signal strength

in the system.

2 Open Z-Device Test AP, View Wi-Fi signal

strength within 1 meter away.

3 Use Bluetooth headset to play music file

then test within 10 meters away.

Item Judgment Standard:

1 WWAN signal strength must be greater than

-80dBm

2 Wi-Fi signal strength is greater than -75db

AP test

3 Inspect Bluetooth is normal and not

interrupted.

Item Tools:

1 Z-Device Test

Item Note:

1

 

   

STEP 1~3

STEP 1~3

Network: 

Telecom name: 

TW Mobile 

Signal Strength: 

‐77 dBm 18 asu 

Mobile Network Type: 

UMTS 

Network Connection Info:   

Hot Point Address:    00:21:91:f6:9c:95 

Hidden SSID:      False 

IP Address:      192.168.102.152 

Connection speed:    65 Mbps 

Physical Address:    c8:aa:21:35:23:37 

Network Id:      0 

Rssi:        ‐67 db 

Page 27: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

27

Part No 98TF07MA4001 Revision 100 Station

Operation Name Battery Test  Remark

Steps Testing Description:

1 Perform Z-Device Test

2 Battery Inspection

Item Judgment Standard:

1 Battery<must discharge in normal and

correct reading.>

Item Tools:

1 Z-Device Test

Item Note:

1

   

STEP 1~2

Battery Condition:        Good 

Battery Charge:        70% 

Power Supply:         AC 

Status:           True 

Max Battery Power:        100% 

Charging Status:        Charging 

Page 28: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

28

Part No 98TF07MA4001 Revision 100 Station

Operation Name Camera Test  Remark

Steps Testing Description:

1 Perform Z-Device Test

2 Main video Camera lens Inspection.

3 Flash analysis

Item Judgment Standard:

1 Camera <Standard use and in right

direction.>

2 Flash<Can open and Close properly>

Item Tools:

1 Z-Device Test

Item Note:

1

   

STEP 1~3

STEP 1~3

Main Video Camera 

Preview Size 

Flash 

Press to turn on Flash 

Flash Mode 

Page 29: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

29

Part No 98TF07MA4001 Revision 100 Station

Operation Name Six‐Sided Figure  Remark

   

1. Front View

2.Back View

3. Top View

4. Bottom View

5. Left View

6. Right View

Page 30: STANDARD OPERATION PROCEDURE - Winmatedc.winmate.com.tw/_downloadCenter/2014/Service Portal/98TF07MA4001... · STANDARD OPERATION PROCEDURE ... MIPD015 Electric Screwdriver Torque

STANDARD OPERATION PROCEDURE 

(DO NOT COPY OR DISTRIBUTE W ITHOUT PERMISSION) FMRD33B

30

Part No 98TF07MA4001 Revision 100 Station

Operation Name Packing Assembly  Remark

Item Material:

A 9111070K2004

B 9142070K1003

C 9143070K1003

D 9226015W05V1

Steps Assembly Description::

1 Accessories: Include Adapter (D) and Power

Plug.

2 Wrap the items in ESD bag , put into EPE

Foam(A)Then Place in the box(B)

3 After fitting into the box, affixed the sticker

on the inner box

4

Fix the inner box then place onto the Outer

box(C). Then Paste stickers and relevant

sealing.

Item Tools:

1 Packaging Tape

Item Note:

1

 

A

B

STEP 1, 2, 3

D

C

STEP 4