standardisation and integrated design › wp-content › uploads › documents › ... ·...

20
standardisation and integrated design Bernd Stimpfle, formTL

Upload: others

Post on 06-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

standardisation and integrated design Bernd Stimpfle, formTL

Page 2: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

2

is a cooperatively managed engineering office with more than 20 employees under the direction of architect Gerd Schmid and consulting engineer Bernd Stimpfle.

formTL

Page 3: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

3

Is located in Radolfzell at the lake constance 2004 founded by the IPL team 2009 certificated according to TÜV Rheinland QS „Planer am Bau“ 2012 we moved into the Kesselhaus

radolfzell

formTL

Page 4: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

4

we are structural engineers and architects, specialized in the design of structures and envelopes made of flexible materials like membranes and foils we do design and engineering of - atrium roofs and façades, ice rinks arenas, building

façades, halls and stands for fairs, pedestrian bridges, convertible roofs, green houses, halls for indoor pools, sculptures, roofs for stadiums, structures for zoos, grandstands, airports

our structures are made of - steel aluminium and wood, steel cables, membranes our building coverings are made of - stainless steel fabrics, ETFE-foil, sheet metal, glass,

PC, PMMA, membrane

formTL

Page 5: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

5

At present only few national design codes for membrane structures are available. They all cover only specific types, such as air halls, temporary structures or mechanically tensioned structures with specific constraints.

Page 6: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

6

Since long time there are discussions to create a commonly agreed design code, which should provide a common sense on: Verification, design approach and quality standards Already the work of the European project TensiNet was a first step in this direction. Then in the actual TensiNet organisation started in 2008 an Specifications and Eurocode working group.

Page 7: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

7

This resulted in the CEN/TC 250 WG 5 which was formed in 2010 in order to elaborate a Eurocode on membrane structures. This working group 5 is actually preparing a SaP report, which is a background document with the actual state of the art in different countries and it gives an outlook to a future Eurocode The next step is to prepare a technical specification TS, which can become on the long run an Eurocode.

Page 8: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation - Why?

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

8

The experts in the field are able to do projects without an Eurocode, so why should we have to work on a standard?

Page 9: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation - Why?

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

9

There are as many different reasons and opinions as we have participants. A common reason is to increase the market and to have our technology seen as an established building technology and not only a niche market with high risk.

Page 10: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation - Why?

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

10

With harmonised safety levels, and commonly agreed quality standards, we improve the quality of our indstry and we avoid doubts of our clients.

Page 11: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation - Why is formTL involved?

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

11

We have lived well without an Eurocode, and for us as enginner in the membrane industry, the risk is that more and more engineers will compete with us.

Page 12: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation - Why is formTL involved?

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

12

But once they respect all the same quality standards like we do, this becomes at least a fair competition.

Page 13: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation - Why is formTL involved?

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

13

By being involved in this standardisation process, we can influence the result so that we are happy with the final result.

Page 14: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation - Why should you be involved

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

14

As mentioned earlier, there are different opinions for a Eurocode, so are for example some interested in an increased market, and wouldn‘t care about safety levels, and others are mainly interested to minimise the administration process for approval

Page 15: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Standardisation - Why should you be involved

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

15

If you contribute to an Eurocode for structural membranes, you can take part in the decison process, and have at the end a document that fits with your needs.

Page 16: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Integrated design

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

16

Membranes are often seen as cladding, treated as a pure addon. This is neglegting the impact that might be beneficial or unfavourable. The structure of the Allianz Arena for example has been designed without taking into account the cladding. Only it‘s selfweight has been taken into account. Therefore another 50% of steel was required to do the secondary structure. With an integrated design I suppose only half of this would have been required.

Page 17: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Integrated design

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

17

Also the Unilever façade has been treated as a simple façade. Therefore it was necessary to build stiff and heavy steel frames to couple the high tensile forces which could not be taken by the concrete building.

Page 18: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Integrated design

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

18

The proof engineer of the Dresden Castle ETFE roof answered to us: “I do not check the roof tiles” When we sent him our analysis of the cushions.

Page 19: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Integrated design

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

19

We know that integrated design is elementary in our business, and without, we will never get good membrane structures, and will never be economic. The standardisation process can help that the others treat our business with the required seriousness to the benefit of all.

Page 20: standardisation and integrated design › wp-content › uploads › documents › ... · 2015-07-17 · 25.03.2015 form TL ingenieure für tragwerk und leichtbau gmbh COST Working

Thank you for your attention !

25.03.2015

form TL ingenieure für tragwerk und leichtbau gmbh

COST Working Group Meeting Denkendorf – 24.03.2015

20

formTL ingenieure für tragwerk und leichtbau gmbh 78315 radolfzell | germany kesselhaus | güttinger straße 37 tel +49 7732 9464-0 [email protected] | www.form-TL.de Bernd Stimpfle, structural engineer, managing director [email protected]