Page 1: Standards-based architecture as the safe choice

Thomas Schaub EUW 2014

© Landis+Gyr | 4 November 2014

Standards-based architecture as the safe choice

Page 2: Standards-based architecture as the safe choice

European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014

Smart meter rollout – a risky project

2

exchange the entire meter park

manufacturer lock-in rocketing integration costs

Page 5: Standards-based architecture as the safe choice

European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014

Interoperability providers

5

Page 6: Standards-based architecture as the safe choice

European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014

Interoperability – based on a transparent process

6

Page 7: Standards-based architecture as the safe choice

European Utility Week | Thomas Schaub | © Landis+Gyr | 4 November 2014

Interoperability - avoiding technology lock-in

7

PLC

S-FSK IEC 61034-5-1

IP v4 / IP V6

GPRS Ethernet

6lowPAN

ITU-T

G.9903

COSEM IEC 62056-6-2

DLMS IEC 62056-5-3

Communications

Functionality + Security

new

functionality

New

• use cases

• market requirements

new

technology new

technology

New

• comms media

• comms technology

Page 9: Standards-based architecture as the safe choice

Thank you for your attention