STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India
O/O Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road,
Patiala – 147 001 Telefax:- 0175-2216980
No. SEAC/CEE(HQ)/3284-93 Dated 27.7.2012
To
1. Dr.(Smt.) Neelima Jerath, Executive Director, Punjab State Council for Science and Technology, Sector 26, Chandigarh.
Chairman (SEAC)
2. Shri Anil Kumar Sondhi, Deptt. of Soil & Water Conservation, Pb., Chief Conservators of Soils (Retd) Flat No. 149, Kendriya Vihar-II, Sector-25, Panchkula
Member (SEAC)
3. Shri Harbax Singh, Chief Town Planner (Retd.), H.No.2917, Sector-42C, Chandigarh-160036
Member (SEAC)
4. Prof. P. Thareja, Head, Department of Mineral & Metallurgical Engineering, PEC University of Technology # 701, PEC University of Technology Campus, Chandigarh.
Member (SEAC)
5. Shri Darshan Singh Jaidka, Chief Engineer (Retd.) Department of Water Supply & Sanitation, Pb. H.No.316, Urban Estate, Phase-I, Patiala.
Member (SEAC)
6. Dr.(Smt.) Jatinder Kaur Arora, Additional Director, Punjab State Council for Science & Technology, Sector 26, Chandigarh.
Member (SEAC)
7. Er. Malvinder Singh, FIE, Chief Environmental Engineer (Retd.), Punjab Pollution Control Board, Patiala. # 10, Gill Enclave, Near Hira Nagar, Patiala.
Member (SEAC)
2
8. Dr. Satwinder Singh Marwaha, Chief Executive Officer, Punjab Biotechnology Incubator, SCO 7-8, Top Floor, Phase-V, SAS Nagar (Mohali) – 160 059
Member (SEAC)
9. Dr. Vineet Kumar, Professor, Department of Chemical Engineering, Indian Institute of Technology, Roorkee-247667.
Member (SEAC)
10. Dr. R.M. Mathur, Director, Central Pulp & Paper Research Institute Post Box no.174, Paper Mill Board, Himmat Nagar, Saharanpur- 247 001 (U.P.)
Member (SEAC)
Subject: Proceedings of the 62nd meeting of State Level Expert
Appraisal Committee held on 21.07.2012 at 10.00 AM in the
Committee Room, Punjab Pollution Control Board, Vatavaran
Bhawan, Nabha Road, Patiala.
Enclosed, please find herewith, a copy of the proceedings of the 62nd
meeting of State Level Expert Appraisal Committee held on 21.07.2012 at 10.00 am
in the Committee Room, Punjab Pollution Control Board, Vatavaran Bhawan, Nabha
Road, Patiala for your information please.
DA: As above. Sd/- Secretary (SEAC)
Endst. No. 3294-99 Dated: 27.7.2012
A copy of the above is forwarded to the following for information &
necessary action:-
1. The P.S. to Chairman, Punjab Pollution Control Board, Patiala for information
of the Chairman.
2. The P.A. to Member Secretary, Punjab Pollution Control Board, Patiala for information of the Member Secretary.
3. Sh. A.S. Dogra, IFS (Retd.), Former Principal Chief Conservator of Forests,
Punjab, Currently Consultant, Forestry & Natural Resource Management,
Chairman, State Level Environment Impact Assessment Authority, # 256,
Sector 37-A, Chandigarh- 160 036.
3
4. Sh. F. Lal Kansal, Chief Engineer (Retd.) and Ex-Chairman, Punjab Pollution
Control Board, Patiala, Member State Level Environment Impact Assessment
Authority.
5. The Member Secretary, State Level Environment Impact Assessment Authority O/o Punjab Pollution Control Board, Patiala.
6. The Asstt. Environmental Engineer (Computers), Punjab Pollution Control Board, Head Office, Patiala. She is requested to display these proceedings on the website of State Level Environment Impact Assessment Authority.
Sd/- Secretary(SEAC)
4
Proceedings of the 62nd meeting of State Level Expert Appraisal Committee held on 21.07.2012 at 10.00 AM in the Committee Room, Punjab Pollution Control Board, Vatavaran Bhawan, Nabha Road, Patiala.
The following were present in the meeting:
Sr.
No.
Name & Designation
1. Dr.(Smt.) Neelima Jerath, Executive Director, Punjab State Council for Science and Technology, Sector 26, Chandigarh.
Chairperson
2. Shri Anil Kumar Sondhi, Deptt. of Soil & Water Conservation, Punjab, SCO 92-94, Sector 17-D, Chandigarh.
Member
3. Shri Harbax Singh,
Chief Town Planner (Retd.),
H.No.2917, Sector-42C, Chandigarh-160036
Member
4. Shri Darshan Singh Jaidka, Chief Engineer (Retd.)
Department of Water Supply & Sanitation, Pb.
H.No.316, Urban Estate, Phase-I, Patiala.
Member
5. Dr.(Smt.) Jatinder Kaur Arora, Additional Director, Punjab State Council for Science & Technology, Sector 26, Chandigarh.
Member
6. Er. Malvinder Singh, FIE, Chief Environment Engineer (Retd.), Punjab Pollution Control Board, Patiala. # 10, Gill Enclave, Near Hira Nagar, Patiala
Member
7. Dr. Satwinder Singh Marwaha, Chief Executive Officer, Punjab Biotechnology Incubator, SCO 7-8, Top Floor, Phase-V, SAS Nagar (Mohali)
Member
5
8. Dr. Vineet Kumar, Professor, Department of Chemical Engineering,
Indian Institute of Technology,
Roorkee- 247 667.
Member
9. Dr. R.M. Mathur, Director, Central Pulp & Paper Research Institute Post Box no.174, Paper Mill Board, Himmat Nagar, Saharanpur- 247 001 (U.P.)
Member
10. Sh. D.K. Dua, Chief Environmental Engineer, Punjab Pollution Control Board Patiala.
Member
At the outset, the Secretary, State Level Expert Appraisal
Committee (SEAC) welcomed the members of the SEAC in its 62nd meeting.
Thereafter, the agenda items were discussed as under.
Item no. 62.01 Confirmation of the minutes of 61st meeting of State
Level Expert Appraisal Committee held on 27.06.2012.
It was informed that minutes of 61st meeting of State Level
Expert Appraisal Committee held on 27.06.2012 were circulated to the members
vide letter no. 2747-56 dated 02.07.2012. No observations have been received on
the same from any of the members, thus, the SEAC confirmed the said
proceedings.
Item no. 62.02 Action taken on the proceedings of the 61st meeting of State Level Expert Appraisal Committee held on 27.06.2012.
It was seen by the State Level Expert Appraisal Committee.
6
Item No. 62.03: Application for obtaining Environmental Clearance to establish an "Integrated Municipal Solid Waste Management Facility" at Mansa Road, Bathinda and 'Engineered Sanitary Landfill Facility' in the revenue estate of Village Mandi Khurd by Municipal Corporation, Bathinda.
The SEAC observed that:
1. The Municipal Corporation, Bathinda has applied for obtaining Environmental
Clearance under EIA notification dated 14.09.2006 for establishment of an
'Integrated Municipal Solid Waste Management Facility' at Mansa Road,
Bathinda within M.C. limits in an area of 20 acres to handle 350 TPD of MSW
and establishment of 'Engineered Sanitary Landfill Facility" in an area of 36.8
acres in the revenue estate of Village Mandi Khurd, District Bathinda.
2. The case of the Municipal Corporation, Bathinda was considered by the SEAC
in its 43rd meeting held on 19.3.2011, wherein, the Committee finalized the
'Terms of Reference' and decided to convey the same to the Municipal
Corporation for preparation of the draft rapid EIA study report. Accordingly,
'Terms of Reference' were conveyed to Municipal Corporation, Bathinda by
the SEAC vide letter no. 14994 dated 28.03.2011 after approval of the
Competent Authority.
3. The Municipal Corporation, Bathinda has submitted the draft rapid EIA study
report alongwith its summary report to the Punjab Pollution Control Board for
conducting public hearing. Accordingly, the public hearing for both sites was
conducted by the Punjab Pollution Control Board on 25.07.2011 and the
Board has sent the proceedings of both the public hearings to the SEIAA,
Punjab vide letter no. 35303 dated 29.08.2011 and letter No. 35317 dated
29.08.2011.
7
4. The Municipal Corporation, Bathinda submitted the final rapid EIA report for
both the sites. Accordingly, the Municipal Corporation, Bathinda was
requested by SEAC vide letter No. 4440 dated 18.11.2011 to attend its 53rd
meeting on 24.11.2011, which was attended by the following on behalf of
Municipal Corporation, Bathinda:
1. Sh. R.P. Gupta, Executive Engineer, M.C. Bathinda
2. Sh. Sandeep Gupta, Asstt. Engineer, M.C. Bathinda
3. Dr. R.M. Mehta, GM, M/s Voyants Solutions Pvt. Ltd., Environmental Consultant of M.C., Bathinda.
4. Sh. Yashwant Chauhan, Senior Manager M/s IL&FS,
Due to paucity of time, the case could not be taken up in the
meeting on 24.11.2011, as such, the Committee decided to roll-over the
same on 27.11.2011 with venue in the office of PSCST, Sector-26, Mahatma
Gandhi Institute, Chandigarh at 2.00 p.m
5. Following were present on behalf of Municipal Corporation, Bathinda on
27.11.2011 to present the details of EIA study:
i) Sh. R.P. Gupta, Executive Engineer, M.C. Bathinda
ii) Dr. R.M. Mehta, GM, M/s Voyants Solutions Pvt. Ltd., Environmental Consultant of M.C., Bathinda.
iii) Sh. M.K. Jha, Senior Technical Advisor of M/s IL&FS
iv) Sh. Sandeep Malhotra, Project Executive of M/s IL&FS
v) Sh. Era Singla, Asstt. Manager of M/s IL&FS
Dr. R.M. Mehta, GM, M/s Voyants Solutions Pvt. Ltd.,
Environmental Consultant of M.C., Bathinda presented the Rapid EIA study
reports of processing facility and Engineered landfill facility before the
8
Committee. The Committee noted that the Environmental Consultant of M.C.,
Bathinda had not properly prepared the presentation since he was unable to
reply the queries raised by the members of the Committee during
presentation. The Committee further noted that there are number of clerical
as well as technical errors in both rapid EIA study reports due to which the
Committee was not satisfied with the rapid EIA reports prepared by the
Environmental Consultant.
After detailed deliberations in the matter, the Committee
observed that the Municipal Corporation, Bathinda is required to submit the
following information data before appraisal of the project proposal:
i) The solid waste generation of 300 TPD of all the ULBs of Bathinda
cluster has been estimated taking into account the estimated
population in the year 2010. But as per project proposal, the
Integrated Municipal Solid Waste Management facility including
Engineered Landfill facility is meant for life span of 25 years and the
estimated population after 25 years has not been taken into account
while estimating the generation of solid waste. Therefore, the
project proposal prepared by M.C. Bathinda does not seem to be in
order as far as generation of municipal solid waste is concerned.
Therefore, the M.C. Bathinda is required to clarify why the
generation of waste after 25 years i.e. in the year 2034 has not
been taken into account for designing the Integrated Municipal Solid
Waste Management facility including Engineered Landfill facility.
ii) The characteristics of solid waste being generated have not been
analysed, which is the primary requirement to prepare sustainable
project proposal, hence, the Corporation is required to submit
9
detailed analysis of solid waste, so as to enable the Committee to
check its proposal.
iii) In the layout plan, nothing has been depicted regarding future
expansion plan of Corporation, thus, properly prepared layout plan
showing the present proposal and future expansion plan.
iv) During handling and processing of municipal solid waste, there is
likelihood of generation of odour problem in the vicinity of
processing as well as landfill facility, but no concrete solution has
been prescribed in the Environment Management Plan to control the
odour problem, as such, the Corporation is required to submit viable
proposal to control odour problem.
v) No technical details of the composting process have been given in
the EIA study reports, thus, the Corporation is required to
incorporate the same.
vi) It was informed by the Environmental Consultant that the inert solid
waste will be used to manufacture bricks, but no complete proposal
in this regard has been submitted, hence, the Corporation is
required to submit the same.
vii) As per analysis of soil samples, the soil in the Bathinda area has
been depicted as acidic, which does not seem to be in order. Thus,
the Corporation is required to re-check the analysis results of soil
samples.
viii) The Municipal Corporation, Bathinda has not properly addressed the
observations/objections raised by the public during the public
hearing alongwith material evidences, which is a statutory
10
requirement as per EIA notification dated 14.09.2006, therefore, the
Corporation is required to do the needful in this regard.
ix) The Corporation has not submitted the NOC of Airports Authority
despite the fact that the Corporation was specifically asked in the
letter vide which 'Terms of Reference' were conveyed to it. Hence,
the Corporation is required to submit the said NOC in respect of
both the sites.
x) A letter of Department of Town & Country Planning indicating the
land use surrounding the site of Integrated MSW facility to be
established at Mansa Road, Bathinda.
xi) Nothing has been mentioned in the EIA reports of both the sites
regarding the Corporate Social Responsibility (CSR), thus, the
Corporation is required to submit a detailed reply in this regard.
xii) The 'Terms of Reference' were issued to the Corporation on
28.3.2011 by SEAC for both the sites for preparation of draft EIA
reports. However, a perusal of the EIA reports indicates that the
study for baseline data was carried out in the month of February,
March & April, 2011, thus the Corporation is required to explain why
the study regarding the rapid EIA reports had been started prior to
issuance of 'Terms of Reference'.
xiii) The Engineered Landfill facility to be developed at Village Mandi
Khurd is located at a distance of 28 kms from Integrated MSW
management facility to be developed at Mansa Road, Bathinda, but
some of the sampling stations for baseline data are the same, which
is totally incorrect since as per EIA notification dated 14.09.2006,
11
study for preparation of rapid EIA report is required to be done
within a radius of 10 kms from the project site. Thus, the
Corporation is required to clarify in this regard.
xiv) Details about house to house collection of waste, segregation of
waste, primary collection centres, transfer stations and
transportation of solid waste to the Integrated Municipal Solid Waste
facility be discussed.
The Committee decided to defer the case till the reply of the
above noted observations is received. The Committee also decided that a
letter be written to Punjab Water Supply & Sanitation Department/
Department of Irrigation, Punjab to intimate the use of water of the
distributory flowing adjoining to the site of Integrated MSW management
facility to be developed at Mansa Road, Bathinda and Punjab Pollution
Control Board be written to send compliance report in respect of locational
criteria mentioned in the Manual on Municipal Solid Waste Management
published by Govt. of India, Ministry of Urban Development, New Delhi,
within 7 days.
6. The decision of the SEAC was conveyed to the Municipal Corporation vide
letter no. 49581 dated 21.12.2011. Also, the Chief Engineer, Punjab Water
Supply & Sanitation Department, Patiala and Chief Engineer (Canal), PWD
(Irrigation Branch), Sector 19, Chandigarh were requested vide letter no.
49821 dated 22.12.2011 and 49823 dated 22.12.2011,respectively, to
intimate the use of water of distributary flowing adjoining to the site of
Integrated MSW management Facility to be developed at Mansa Road
Bathinda. Furthermore, the Punjab Pollution Control Board was requested
vide letter no.49820 dated 22.12.2011 to send the compliance report in
12
respect of locational criteria as mentioned in the manual on Municipal Solid
Waste Management published by the Govt. of India, Ministry of Urban
Development, New Delhi, for both the sites, within a week positively.
7. Thereafter, the Municipal Corporation, Bathinda vide letter dated 16.02.2012
has submitted the reply of the observations of the SEAC. Also, the Punjab
Pollution Control Board vide letter no. 139 dated 01.02.2012 has submitted
the reply in connection with letter no. 49820 dated 22.12.2012 of the SEAC.
The Executive Engineer, Bathinda Canal Division, vide letter no. 19071 dated
24.02.2012 has informed that the water of the distributory flowing near the
Municipal Solid Waste dump site at Mansa Road Bathinda is used for
irrigation as well as drinking purpose by the people/ farmers of the villages.
8. The case was considered by the SEAC in its 56th meeting held on
27.02.2012, which was attended by the following on behalf of Municipal
Corporation, Bathinda:
i) Sh. R.P. Gupta, Executive Engineer, M.C. Bathinda
ii) Dr. R.M. Mehta, GM, M/s Voyants Solutions Pvt. Ltd., Environmental Consultant of M.C., Bathinda.
iii) Sh Yashwant Chauhan, Senior Manager of M/s IL&FS, Delhi. iv) Sh. Himanshu Chaturvedi, Manager of M/s IL&FS
Due to paucity of time, the case could not be taken up in the
meeting on 27.02.2012, as such, the Committee decided to roll-over the
same on 01.03.2012 with venue in the office of PSCST, Sector-26, Mahatma
Gandhi Institute, Chandigarh at 10.00 a.m.
Following were present on behalf of Municipal Corporation,
Bathinda on 01.03.2012 to present the details of EIA study:
i) Sh. R.P. Gupta, Executive Engineer, M.C. Bathinda
13
ii) Dr. R.M. Mehta, GM, M/s Voyants Solutions Pvt. Ltd., Environmental Consultant of M.C., Bathinda.
iii) Sh Yashwant Chauhan, Senior Manager of M/s IL&FS, Delhi.
iv) Sh. Himanshu Chaturvedi, Manager of M/s IL&FS
Dr. Mehta presented the details of the final EIA report before the
Committee and the SEAC observed that the Municipal Corporation, Bathinda
has not properly addressed the reply of its previous observations and the
Corporation is required to submit proper reply of the following observations
before appraisal of the project proposal:
i) The Committee was not satisfied with the reply of Municipal Corporation,
Bathinda regarding generation of MSW by each ULB of Bathinda cluster since
the actual generation of MSW by each ULB has not been co-related with the
estimated per capita generation mentioned in the CPHEEO manual on solid
waste management. Thus, the Municipal Corporation is required to submit a
complete data in this regard.
ii) 18 ULBs will contribute their solid waste to the MSW processing facility to be
developed at Mansa Road, Bathinda, but the composition/characteristics
analysis of MSW of only 4 ULBs has been done. Thus, with this data, it is
difficult to technically check the project proposal. Therefore, the Corporation
is required to submit composition/characteristics analysis of the MSW being
generated by each ULB and the overall value of each parameter of the said
analysis to arrive at the logical end.
iii) The reply submitted by Corporation to the effect that no odour problem is
likely to occur from management & handling of MSW, is not tenable since
such facility is generally a source of odour problem and to control the same,
there is a need to provide a green belt of adequate width having proper
14
species of trees, besides, spraying organic inoculants. Therefore, the
Corporation is required to submit a complete plan indicating technical details
in this regard.
iv) As per earlier data given in the EIA report, the quality of soil in the study
area was analysed as acidic in nature. The Corporation has submitted the
analysis results of soil samples indicating that the soil of the same area is
alkaline in nature, but no reasons have been given as to why the latest
analysis results of the soil samples are differing from earlier analysis results.
Thus, a proper and authentic reasoning is required to be submitted in this
regard.
v) As regards to inclusion of reply of the views/observations/suggestions given
by the public during the public hearing of processing facility at Mansa Road,
Bathinda, the same is not in order in respect of reply of the observations
raised by Sh. Daljit Singh Brar regarding effect on the quality of water
flowing in the distributory. The Executive Engineer, PWD (IB) vide letter no.
9071 dated 24.02.2012 has informed the Committee that the water of the
distributory is used for irrigation as well as drinking purposes. The
Committee noted that the surface run-off and leachate to be generated
during operation and post closure phase may affect the quality of water of
the said distributory. Besides, there is an approach to the processing facility
along the distributory and movement of vehicles may affect the quality of
water of the said distributory due to dust emissions and exhaust gases.
Thus, a complete plan to protect the quality of water of the distributory is
required to be submitted.
vi) The Municipal Corporation has not yet submitted NOC of Airports Authority of
India with regard to processing facility at Mansa Road, Bathinda and the
same is required for appraisal of the project proposal.
15
vii) The letter issued by Department of Town & Country Planning vide no. 210
dated 19.01.2012 only indicates that a provision of 15 m wide green belt has
been made along the periphery of the proposed site of the processing facility
to be located at Mansa Road, Bathinda, but this letter does not show the
land use adjoining to the said site as per the Master Plan of Bathinda.
However, the Punjab Pollution Control Board vide letter no. 139 dated
01.02.2012 has intimated that there is a residential area within a radius of
100 m from the project site, therefore, it is clear that the said site is not
conforming to the locational criteria laid down by the Govt. of India, Ministry
of Urban Development, in the manual on Municipal Solid Waste Management
since as per the said manual, the site of MSW facility should be atleast 500
m from a notified habitation area. Thus, the Corporation is required to
submit proper justification regarding non-conforming of the said site to the
locational criteria.
viii) Intimate the details for mitigation of pollution from transfer stations and
primary collection centres.
ix) Submit financial plan for construction phase, operation phase and post-
closure phase including details of bank guarantees to be taken from the
Operator of the facility for all the three phases.
x) Quantity of leachate to be generated during operation and post closure
phase and a complete plan for management & handling of the same.
xi) A complete plan for management & handling of surface run-off during rainy
season.
xii) The primary parameter i.e. C/N ratio of the solid waste to be sent to
composting section has not been calculated and nothing has been mentioned
as to which additives/material will be added in the said waste, if the C/N
16
ratio does not fall within the desired range. Therefore, the Corporation is
required to submit details in this regard.
The decision of the Committee was conveyed to the Municipal
Corporation, Bathinda vide letter no. 12223 dated 14.03.2012.
9. The case was considered by the SEAC in its 60th meeting held on
17.06.2012, which was attended by the following on behalf of M.C., Bathinda
i) Sh. R.P. Gupta, Asstt. Commissioner, M.C. Bathinda
ii) Sh. Sandeep Gupta, Asstt. Municipal Engineer, M.C., Bathinda iii) Dr. R.M. Mehta, GM, M/s Voyants Solutions Pvt. Ltd.,
Environmental Consultant of M.C., Bathinda.
Dr. Mehta presented the reply of the observations of the SEAC
but the Committee was not satisfied with the reply submitted by Municipal
Corporation, Bathinda. Sh. R.P Gupta, Asst. Commissioner, Municipal
Corporation, Bathinda informed that their Consultant has not submitted the
proper reply of the observations of the Committee inspite of repeated verbal
instructions. He requested the Committee for 10 days to submit revised final
rapid EIA report after incorporating the proper reply of the observations of
the Committee including contour plan , clearance from the Airport Authority,
affidavit for green belt towards the side of habitation ,affidavit stating that
no further habitation will be allowed around 500 m area and all illegal
habitation will be removed etc.
The Committee accepted the request of the Asst. Commissioner
and decided to defer the case till the Municipal Corporation, Bathinda
submits revised final rapid EIA reports for the "Integrated Municipal Solid
Waste Management Facility" to be developed at Mansa Road, Bathinda and
'Engineered Sanitary Landfill Facility' to be developed in the revenue estate
17
of Village Mandi Khurd by Municipal Corporation, Bathinda, after
incorporating the proper reply of the observations of the Committee. The
decision of the SEAC was conveyed to the M.C., Bathinda vide letter no.
2621 dated 21.06.2012.
10. The Municipal Corporation, Bathinda submitted the revised final rapid EIA
report after incorporating the reply of observations of the SEAC.
11. The MC, Bathinda was requested by the SEAC vide letter no.3181dated
17.07.2012 to attend its 62nd meeting on 21.07.2012 to present the details
of revised final rapid EIA report.
Following were present in the said meeting of the SEAC on behalf of
M.C., Bathinda
i) Sh. Sandeep Gupta, Project Engineer, M.C., Bathinda
ii) Dr. R.M. Mehta, GM, M/s Voyants Solutions Pvt. Ltd., Environmental Consultant of M.C., Bathinda.
Dr. Mehta presented the salient features of the revised final EIA
report as under.
(i) The Department of Local bodies Punjab has initiated the projects for
Scientific management of Municipal Solid Waste in Punjab, keeping in view
the obligations of ULB’s under MSW (M&H Rules) 2000. Pursuant to the
above objective, the State has been divided into eight regional clusters
namely Greater Mohali Development Authority (GMADA), Patiala,
Jalandhar, Ferozepur, Bathinda, Pathankot, Ludhiana and Amritsar.
(ii) Bathinda is one of the clusters comprising of Bathinda city & 17
surrounding municipal towns. There is a proposal to establish an
"Integrated MSW Management Facility at Mansa Road, Bathinda in an area
18
of 20 acres and "Engineered Sanitary Landfill Facility' in an area of 36.8
acres in the revenue estate of Village Mandi Khurd, District Bathinda.
(iii) The 'Integrated MSW Management Facility at Mansa Road, Bathinda is to
be established at the site, where the MSW is presently dumped, as such, it
is a step towards environment improvement of the said area. This site has
been earmarked for establishment of MSW facility in the notified Master
Plan of Bathinda and DTP, Bathinda vide Memo No. 210 dated 19.01.2011
has informed to the Corporation that as per the Master Plan, a green belt
of 15 m width has been proposed along the periphery of the said site. The
site located at Bathinda is also conforming to said locational criteria laid
down by the Ministry of Urban Development, Govt. of India except the
distance from the habitation area. As per Master Plan, the area surrounding
to this site is low density residential area and there are scattered houses.
The nearest residential house from the periphery of the said site is at a
distance of about 100m. The locational criteria of the said guidelines is not
mandatory requirement since as per clause no. 17.4.1 of the manual, in the
absence of the regulatory requirements, the locational criteria is suggestive
only.
(iv) The stretch of land located at Village Mandi Khurd, where an "Engineered
Sanitary Landfill Facility" is to be established, is presently lying vacant and
is surrounded by agricultural activities. This site is conforming to the
location criteria laid down by the Ministry of Urban Development, Govt. of
India.
(v) There is no Eco-sensitive areas notified under Environment (Protection)
Act, 1986, protected area notified under Wildlife (Protection) Act, 1972,
19
critically polluted areas as identified by the CPCB and Inter-State /
International Boundaries within a radius of 10 kms from the site of the
processing facility and sanitary landfill facility.
(vi) The details of the project are as under:
Features Mansa Road, Bathinda Site Mandi Khurd Site
Year Of
Establishment 1984-85 Proposed
Size of the
project
1. RDF Plant (250 TPD) Engineered Sanitary Landfill
Facility 2. Compost/Curing plant
(100TPD)
Project Cost INR 11.72 Crores INR 38.13 Crores
Land Area 20 Acres 36.8 Acres
Fuel
RDF Produced From MSW
90-100 TPD) Nil
Compost 17-20 TPD
MSW
Transportation By Private Developer (part of Project)
Power
Requirement
600 KW
Electricity requirement is only for
lighting& administrative building
(vii) The processing plant site will be designed to process 350 TPD of MSW to be
generated from 18 ULB’s during the first phase in the year 2017, as per
projected population. The capacity of this processing facility will be expanded
to process 478 TPD of MSW to be generated as per projected population in
the year 2034. The projected population for the year 2017 and 2035 has
been calculated on the basis of 2001 census and the growth rate considered
20
is on higher side if the projected population for the said years is calculated
on the basis of 2011 census, which is yet to be published.
(viii) Rapid EIA study of both sites was carried out during the period February to
April, 2011. M.C. Bathinda was aware that the rapid EIA was required as the
project was under category B-1, hence keeping in view its importance and
priority of the State Govt. to provide clean environment and in order to save
time Municipal Corporation, Bathinda took advance action and initiated rapid
study in February, 2011 based on proposed TOR.
(ix) The physical & chemical analysis has been done for seven ULBs i.e.
Bhatinda, Malout, Mansa, Talwandi Sabo, Abohar, Giddarbha and Rampura
Phul, which are the major contributors of this cluster for finalization of
processing technologies, the details of which are as under:
RDF
Component
Organic component of
composting
Inerts Recyclables Misc
40-45 % 17-20% 25-30% 6-10% About
10%
(x) The Municipal Corporation will initiate door to door segregation. The
segregated solid waste will be further processed to produce Refuse Derived
Fuel (RDF). The RDF process will be designed and adopted from the process
developed by TIFAC.
(xi) The organic fraction separated will be composted by windrow process on a
compost pad inside the project site.
21
(xii) Based on the characterization results and processing of 350 TPD of MSW
following products will be produced from MSW :
a) From 250 TPD of MSW, about 90- 100 TPD of RDF will be produced.
b) 100 TPD of organic fraction will yield 17-20 TPD of compost/manure.
c) About 75-80 TPD of inert fraction will be separated out and the same
will be transported to Engineered Sanitary Landfill Facility to be
dumped at Mandi Khurd.
d) About 15-20% of recyclables will be separated out, which will be sold
to authorized recyclers.
e) The C/N ratio of MSW samples collected from Bathinda cluster is in
the range 22:1 to 24:1. As per CPHEO Mannual, C/N Ratio of 30 is
most favourable for composting, whereas the range may vary from
26-31. Therefore, to bring the CN ratio within the prescribed range,
slaughter house wastes, blood meal, spoiled food grains, seweage
sludge and cow dung would be added to improve C/N ratio.
(xii) The total cost of the Integrated MSW facility is about 50.35 Crores (Rs.
11.72 Crores for Processing Facility and Rs.38.13 Crores for Engineered
Landfill site).
(xiii) Environmental Status
a) Air Environment:
Ambient air quality was monitored at five locations in the surroundings of the
project site for the parameters PM10, PM2.5, NOx SO2 H2S and CH4. The
mathematical modeling has been done to assess the impact of the pollutants
on the ambient air quality for the site located at Mansa Road, Bathinda, the
details of which are as under:
Sr. No.
Pollutant Background conc.
Incremental increase
Resultant conc. of pollutant in the
22
(g/m3) due to project
activities (g/m3)
ambient air after commissioning of
the plant (g/m3)
1 PM 85 2.00 87
2 SO2 16 0.31 16.31
3 NOx 26 10 36
4 CO 996 24.4 1020.4
Based on the modeling exercise under observed meteorological condition, maximum
concentrations of PM, SO2, NOx, CO due to proposed DG set are 2.0g/m3, 0.31
g/m3, 10 g/m3 and 24.4g/m3, respectively, at a distance about 200 m in the
northeast direction. The resultant concentrations of SO2, NOx and CO are well within
the NAAQS at all the receptor locations.
b) Noise Environment.
Noise levels in the impact area has been assessed. The results show that day time
noise levels exceed the limiting values due to traffic on the SH 17, which is nearby
the project site at Mansa Road, Bathinda.
For the site located at Mansa Road, Bathinda
Location Day Time Night Time
LMAX Lmin leq dB(A) leq dB(A)
Project site 61.2 48.5 52.4 37.1
Bathinda city 60.3 49.72 52.5 39.7
SH-17 64.2 49.5 52.4 37.1
NH-64 63.2 53.2 58.2 40.5
For the site located at Village Mandi Khurd, District Bathinda
23
Location Day Time Night Time
LMAX Lmin leq dB(A) leq dB(A)
Project site 61.2 48.5 52.4 37.1
NH 63.2 53.2 58.2 40.5
Ram Nagar 60.3 49.4 58.5 41.7
Ram Niwas 54.3 46.3 52.8 40.8
Kutiwal Khurd 58.7 41.3 52.3 37.1
c) Water Environment:
Water quality in the impact area has been assessed for surface water and
ground water resources. Water quality from ground sources meets the IS
10500 requirements of drinking water. Surface water quality also meets the
standards of CPCB for Class C where water after treatment can be used for
drinking purposes.
d) Soil Quality
At the time of submitting rapid EIA report, which was discussed by the SEAC
in its meeting held on 27.11.2011, names of some of the sampling stations
were inadvertently mentioned the same for both the sites, but the same was
lateron corrected as per the actual data/status. Also, the earlier results of the
soil samples, which indicated that the soil is acidic in nature, were recorded
wrongly due to typographical error by the laboratory. The soil samples were
again collected & analysed by the NABL/MoEF approved laboratory and
analysis results of which show that the soil is alkaline in nature.
(xiv) 15 m wide green belt along the periphery of the proposed processing site will
be developed to mitigate the effects of pollution and source emissions. The
predominant wind direction is from NNW and WNW and the nearby
settlements including Bhatinda city is located at the North, NNW direction of
24
the project site. Therefore the processing facility will have a minimum effect
on the habitation of Bathinda city. To prevent the odor problem, the Herbal
inoculums such as Maple, Naturevel or Gtech will be used, which are readily
available in the market.
(xv) The water of the distributory flowing adjoining to the site of the processing
facility is used for irrigation as well as drinking purposes. Therefore, to have
no effect on the quality of water of the said distributory, a properly designed
boundary wall be constructed.
(xvi) Since the level of the site is lower than the top level of the bank of
distributory, as such, there is no possibility of contamination of water in the
distributory due to leachate to be generated from the processing facility.
Further, the surface run off, of the project site will be collected by
constructing pucca lined ditches and so collected surface run off will be used
in the composting process. The leachate will be collected and treated
properly and same will be utilized in the composting section.
(xvii) The Survey of India vide letter no. 1283 dated 13.10.2011 informed that the
site of the processing facility is located at a distance of 21 km from the
nearest airport station located Village Bhaisana, District Bathinda. Also, the
site of the 'Engineered Sanitary Landfill Facility' is located at a distance of
more than 20 kms from the said Airport Station. Therefore, there is no need
to obtain NOC from the said Airport Authorities as per provisions of Municipal
Solid Waste (Management & Handling) Rules, 2000.
(xviii) Door to Door collection by all ULB’s shall prevent the mixing of organic &
inorganic waste fraction to check the odour problem. Two Bin System (For
organic & Inorganic waste) is being used in the towns. 50% of the generated
waste directly goes to the dumping sites, using Mini Tippers, only the waste
25
from the road sweeping comes to primary collection points, wherein closed
bins are provided along with one safai sewak, to prevent any littering in the
densely populated areas. Daily lifting of these bins shall be ensured by the
MCB. Besides this, sanitizers are used for preventing of flourishing of flies &
mosquitoes. Boundary walls have been provided as per the space availability
at primary Collection points.
(xix) The public hearings of both these sites were conducted by the Punjab
Pollution Control Board on 25.07.2011 and all the environmental concerns
expressed by the public during these public hearings have been addressed in
the final EIA reports.
(xx) Different species of trees will be planted in the green belt, the names of
which have been mentioned in the EIA report.
(xxi) In the layout plan of both the sites, the present proposal and future
expansion plan have been properly marked.
(xxii) Various activities related to Corporate Social Responsibility have been
delineated in the EIA report.
(xxiii) The financial plan for construction phase, operation phase and post- closure
phase for the Integrated MSW facility is as under:
Sr. No.
Activity Responsibility EMP Cost (Rs.)
1 Construction Phase:
Dust emission control
Emission reduction from equipments
Municipal Corporation Bathinda & M/s JITF Urban Infrastructure Ltd.
5.0 lac
25.0 lacs
26
Overall conservation of Environment
Green Belt development
5.0 lacs
5.0 lacs
Total 40.0 lacs
2 Operation & Maintenance Phase
Air emission of RDF Plant
Dust & Dusty Particulate matter
Effluent Treatment Plant
Control of Pathogen, Mal-odour and Fly & Insect vector
Landfill gas Management
Control of water & land pollution by Leachate
Monitoring of ground water & air ambient quality
Green Belt Maintenance
M/s JITF Urban Infrastructure Ltd.
10.0 lacs
25 lacs
5.0 lacs per year
25 lacs
5.0 lacs per year
0.5 lacs per year
10.0 Lacs
5.0 lacs
Total 85.5 Lacs
3 Post Closure Phase
Providing an appropriate final
Municipal Corporation Bathinda
27
cover & stability
Erosion management
Leachate treatment & disposal
The Committee also went through the report sent by the Punjab
Pollution Control Board vide letter No.139 dated 1.2.2012 in which it has been
mentioned that there is no Airport within a radius of 20 kms from the site of the
processing facility and sanitary landfill facility as per data submitted by the District
Town Planner. The report of the Board mentions that the site of the processing
facility is conforming to the locational criteria mentioned in the said manual except
distance from habitation area. The Committee further noticed that the proposed
site of the processing facility has been earmarked for MSW facility in the notified
Master Plan of Bathinda and the said site is used for dumping of MSW in an
unscientific manner for the last so many years, therefore, establishment of
processing facility at this site will be a step towards environment improvement.
After detailed deliberations, the SEAC observed that the project
proponent has provided adequate and satisfactory clarifications of the observations
raised by it, therefore, the Committee decided to forward the case to the SEIAA
with the recommendation to grant Environmental Clearance to Municipal
Corporation, Bathinda for establishment of ‘Integrated Municipal Solid Waste
Management Facility’ at Mansa Road, Bathinda in an area of 20 acres to handle 350
Tons/day of Municipal Solid Waste and ‘Engineered Sanitary Landfill Facility’ in an
area of 36.8 acres in the revenue estate of Village Mandi Khurd, District Bathinda
under EIA Notification dated 14.09.2006, subject to the following conditions in
addition to the proposed measures.
28
PART A – Specific conditions
I. Construction Phase
i) “Consent to establish” shall be obtained from Punjab Pollution Control Board under Air (Prevention & Control of Pollution) Act, 1981 and Water (Prevention & Control of Pollution) Act, 1974 and a copy of the same shall be submitted to the Ministry of Environment & Forests / State Level Environment Impact Assessment Authority before the start of any construction work at site.
ii) All required sanitary and hygienic measures should be in place before starting construction activities and to be maintained throughout the construction phase.
iii) A first aid room will be provided in the project both during construction and operation phase of the project.
iv) All the topsoil excavated during construction activities should be stored for use in horticulture / landscape development within the project site.
v) Disposal of muck during construction phase should not create any adverse effect on the neighboring communities and be disposed off after taking the necessary precautions for general safety and health aspects of people with the approval of competent authority.
vi) Construction spoils, including bituminous material and other hazardous material, must not be allowed to contaminate watercourses and the dump sites for such material must be secured, so that they should not leach into the ground water.
vii) The diesel generator sets to be used during construction phase should be of low sulphur diesel type and should conform to the provisions of Environment (Protection) Act, 1986 prescribed for air and noise emission standards.
viii) Vehicles hired for bringing construction material to the site and other machinery to be used during construction should be in good condition and should conform to applicable air and noise emission standards.
ix) Ambient noise levels should conform to prescribed standards both during day and night. Incremental pollution loads on the ambient air and noise quality should be closely monitored during construction phase.
x) Fly ash should be used as construction material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended on
29
August, 2003 (This condition is applicable only if the project is within 100 Km of Thermal Power Station).
xi) Ready mixed concrete should be used construction purpose as far as possible.
xii) Water demand during construction should be reduced by use of premixed concrete, curing agents and other best practices.
xiii) Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, disposal of waste water & solid waste in an environmentally sound manner, safe drinking water, medical health care, crèche etc. The housing may be in the form of temporary structures to be removed after the completion of the project.
II. Operation Phase
i) “Consent for Operate” shall be obtained from State Pollution Control Board
under Air and Water Act and a copy shall be submitted to the Ministry before
commissioning of the integrated facility.
ii) A green belt of minimum 15 m width shall be provided all around the
periphery of the project site and 5 m on the side abutting to the STP.
iii) The gas generated from the Landfill facility shall be collected and disposed/
utilized as per rules.
iv) The leachate from the facility shall be collected and treated to meet the
prescribed standards before its reuse.
v) The proponent shall obtain necessary clearance from the Groundwater
Authority for abstraction of ground water, if required.
vi) The depth of the landfill site shall be decided based on the groundwater
table at the site and permission regarding the same shall be obtained from
MoEF/PPCB.
vii) Periodical ground water/soil monitoring to check the contamination in and
around the site shall be carried out as per the provisions of Municipal Solid
Waste (Management & Handling) Rules, 2000/Punjab Pollution Control Board
requirements.
viii) Spraying of an appropriate herbal sanitizer shall be adopted for odour control
in addition to its vacuum suction and destroying in furnace.
30
ix) Proper shed shall be provided for the compost yard to prevent the rain water
coming in contact with the material in the compost yard. Periodical ground
water / soil monitoring to check the contamination in and around the site
shall be carried out as per requirements of the Punjab Pollution Control
Board.
x) All the recommendations of the EMP shall be complied with letter and spirit.
xi) The Municipal Corporation shall ensure that the project comply with all the
provisions of the Municipal Solid Waste (Management and Handling) Rules,
2000.
xii) Regular ambient air quality monitoring shall be carried out for all the
parameters mentioned in the notification dated 16th November, 2009 of the
Ministry of Environment & Forests.
xiii) The project proponent shall set up separate environmental management cell
for effective implementation of the stipulated environmental safeguard under
the supervision of a Senior Executive.
xiv) Entire organic material shall be converted into manure. Recyclable material
likewise glass, steel etc., shall be sold to recycler. Only inert material which
cannot be either composted or recycled shall be sent to the Engineered
Sanitary Landfill facility to be developed in the revenue estate of Village
Mandi Khurd, District Bathinda.
xv) The funds earmarked for the environment management plan shall be
included in the annual budget of the Municipal Corporation and this shall not
be diverted for any other purposes.
xvi) Traffic congestion near the entry and exit points from the roads adjoining the
proposed project site must be avoided. Parking should be fully internalized
and no public space should be utilized.
xvii) Effective safeguard measures shall be taken by Municipal Corporation to
ensure that the AAQ levels at various locations are within permissible limits
as prescribed by MoEF/PPCB.
xviii) Appropriate mitigative measures shall be undertaken by the Municipal
Corporation to prevent pollution of water of the distributory in consultation
with the State Pollution Control Board. It shall be ensured that there will be
no littering of solid waste from vehicles and the leachate/ surface run-off to
be generated shall be collected with the help of lined ditches & treated
31
properly, so that there should not be any impact on the quality of water of
the said distributory.
xix) The Municipal Corporation shall construct a RCC wall along the distributory of
minimum height more than the maximum height of the vehicles to be used
for transportation of solid waste/covering the distributory/conveyance of
water through closed pipeline right from starting of approach road upto the
farthest end of the site of the project to rule out the possibility of having any
impact of the transporting vehicles on the quality of water of the said
distributor.
xx) Periodical medical examination of the workers engaged in the project shall
be carried out and records maintained. For the purpose, schedule of health
examination of the workers should be drawn and followed accordingly.
xxi) Ambient noise levels should conform to prescribed standards both during day
and night. Incremental pollution loads on the ambient air and noise quality
should be closely monitored.
xxii) The Risk assessment and disaster management plan should be prepared and
implemented.
PART B – General Conditions :
I. This environmental clearance will be valid for a period of five years from the date of its issue or till the completion of the project, whichever is earlier.
II. The environmental safeguards contained in the application of the Municipal Corporation / mentioned during the presentation before State Level Environment Impact Assessment Authority/State Expert Appraisal Committee should be implemented in letter and spirit.
III. The entire cost of the environmental management plan (i.e. capital cost as well as recurring cost) will continue to be borne by the Municipal Corporation until the responsibility of environmental management plan is transferred to the occupier/residents society under proper MOU after obtaining prior permission of the Punjab Pollution Control Board.
IV. The Municipal Corporation shall also submit six monthly reports on the status of compliance of the stipulated EC conditions including results of monitored data (both in hard copies as well as by mail) to the respective Regional office of MoEF, the Zonal Office of CPCB and the SPCB/SEIAA.
32
V. Officials from the Regional Office of Ministry of Environment & Forests, Chandigarh / State Level Environment Impact Assessment Authority / State Level Expert Appraisal Committee / Punjab Pollution Control Board who would be monitoring the implementation of environmental safeguards should be given full cooperation, facilities and documents / data by the project proponents during their inspection. A complete set of all the documents submitted to State Environment Impact Assessment Authority should be forwarded to the CCF, Regional Office of Ministry of Environment & Forests, Chandigarh/State Level Environment Impact Assessment Authority.
VI. In the case of any change(s) in the scope of the project, the project would require a fresh appraisal by State Environment Impact Assessment Authority.
VII. All other statutory clearances such as the approvals for storage of diesel from Chief Controller of Explosives, Fire Department, Civil Aviation Department, Forest (Conservation) Act, 1980 and Wildlife (Protection) Act, 1972 etc. shall be obtained, by Municipal Corporation from the competent authorities including Punjab Pollution Control Board and from other statutory bodies as applicable.
VIII. The Municipal Corporation should advertise in at least two local newspapers widely circulated in the region, one of which shall be in the vernacular language informing that the project has been accorded environmental clearance and copies of clearance letters are available with the Punjab Pollution Control Board. The advertisement should be made within seven days from the day of issue of the clearance letter and a copy of the same should be forwarded to the Regional Office, Ministry of Environment & Forests, Chandigarh.
IX. These stipulations would be enforced among others under the provisions of Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, Environmental (Protection) Act, 1986, the Public Liability (Insurance) Act, 1991 and EIA Notification, 2006.
X. Environmental clearance is subject to final order of the Hon'ble Supreme Court of India in the matter of Goa Foundation Vs. Union of India in Writ Petition (Civil) No. 460 of 2004 as may be applicable to this project and decisions of any competent court, to the extent applicable.
XI. A copy of the clearance letter shall be sent by the proponent to concerned Panchayat, Zilla Parishad/ Municipal Corporation, Urban local body and the local NGO, if any, from whom suggestions / representations, if any, were
33
received while processing the proposal. The clearance letter shall also be put on the website of the Municipal Corporation by the proponent.
XII. The proponent shall upload the status of compliance of the stipulated EC conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of MoEF, the respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; PM2.5, PM10, SO2, NOx , CO, Pb, Ozone (ambient air as well as stack emissions) shall be monitored and displayed at a convenient location near the main gate of the project site in the public domain.
XIII. The Municipal Corporation shall adhere to the commitments made in the Environment Management Plan and Corporate Social Responsibility.
XIV. The State Environment Impact Assessment Authority reserves the right to add additional safeguards/ measures subsequently, if found necessary, and to take action including revoking of the environmental clearance under the provisions of the Environmental (Protection) Act, 1986, to ensure effective implementation of the suggested safeguards/ measures in a time bound and satisfactory manner.
XV. Any appeal against this environmental clearance shall lie with the National Green Tribunal, if preferred, within a period of 30 days as prescribed under Section 16 of the National Green Tribunal Act, 2010.
XVI. The Municipal Corporation shall construct pucca lined ditches for collection of surface run off and the same will be used in the composting process.
XVII. The Municipal Corporation shall ensure that the contractor/operator shall engage people of local area for operation of the facility as far as possible, so as to have opportunities of employment for them.
XVIII. The Municipal Corporation may apply for transfer of environmental clearance under EIA notification dated 14.09.2006 to the contractor/operator finalized by it to SEIAA, Punjab. However, no activity shall be undertaken by the operator/contractor till the environmental clearance is transferred in his name and he is lawfully bound to comply with the conditions of the environmental clearance.
XIX. The post closure arrangement of the facility shall be made as per the Municipal Solid Waste (Management & Handling) Rules, 2000 and "Manual on Municipal Solid Waste Management" published by the Ministry of Urban Development and Municipal Corporation will be responsible for post closure
34
of the facility and monitoring shall be done as per the Municipal Solid Waste (Management & Handling) Rules, 2000 / "Manual on Municipal Solid Waste Management" published by the Ministry of Urban Development/Punjab Pollution Control Board directions.
Item No. 62.04 Application for obtaining Environmental Clearance for development of an "Integrated Municipal Solid Waste Management Facility" by Municipal Council, Ferozepur.
The SEAC observed that:
1. The Municipal Council, Ferozepur has applied for obtaining Environmental
Clearance for establishment of an Integrated Municipal Solid Waste
Management Facility at Villlage Bir Chahal, Distt., Faridkot as required
under EIA notification dated 14/9/2006. The project is covered under
Category 7 (i) of the Schedule appended to the said notification.
2. The case was considered by the SEAC in its 48th meeting held on
11.6.2011 and the M.C. was requested by the SEAC vide letter no. 2013
dated 9.6.2011 to attend the 48th meeting of the Committee on 11.6.2011
to present the project proposal. But neither any authorized representative
of the project proponent attended the meeting on 11.6.2011 for making
presentation nor submitted any request for adjournment. As such, it was
decided by the Committee to defer the case to the next meeting of SEAC.
The decision of the SEAC was conveyed to the project proponent vide
letter no. 27704 dated 05.07.2011.
3. The case was again considered by the SEAC in its 49th meeting held on
18.7.2011, which was attended by the following on behalf of Municipal
Council, Ferozepur:
1. Sh. Vikas Dhawan, Sanitary Inspector, M.C. Ferozepur,
2. Sh. Yashwant Chauhan, Manager, IL&FS
35
The Committee noted that M/s J.M. Environet (P) Ltd.,
Gurgaon, who is the Environmental Consultant of M.C. Ferozepur, did not
come to attend the meeting. However, the representatives, who came to
present the project proposal were not aware of any technical details. The
Committee also expressed that M.C., Ferozepur took the matter very lightly
since Sanitary Inspector of M.C. Ferozepur came to present the project
proposal, who was also not aware of any technical details of the project
proposal. After detailed deliberations in the matter, the Committee observed
certain information / data are required for scoping of the project proposal.
The Committee also observed that a part of the land is under encroachment,
therefore, it should be removed before the application for issuance of TOR
for Rapid EIA study report is considered. Sh. Vikas Dhawan, Inspector, M.C.
Ferozepur informed that the said documents/data will be submitted within 15
days.
The Committee agreed to accept the request made by Sh.
Vikas Dhawan, Inspector, M.C. Ferozepur and decided to defer the case till
proper reply of the aforesaid observations, is received. The Committee also
decided that the responsible officer of the M.C., Ferozepur/Faridkot, who is
well conversant with the project proposal alongwith consultant, whose name
is in the list of Ministry of Environment & Forests, should come to present
the project proposal having proper authority letter of the Competent
Authority of M.C.
The decision of the Committee was conveyed to the MC,
Ferozepur vide letter No. 31819 dated 03.08.2011.
36
4. Thereafter, the project proponent vide letter no. 1514 dated 7.05.2012
submitted the reply of the observations of Committee, details of which are as
under:
Sr. No.
Information/data needed for further appraisal of the case
Reply submitted by the project proponent.
1. CLU status/ownership rights of
the land
A copy of the letter vide no. 2480 dated 05.10.2009 issued by the Municipal Council Faridkot to the effect that MC Faridkot accords in principle approval for allocating 18 acres of the land located at Village Bir Chail, Distt. Faridkot for setting up of MSW project including MSW transfer station.
2. Approved Layout plan/ Building
plan from Competent Authority.
Submitted and the same has been approved by MC Ferozepur.
3. Topographical map of the area
showing Contour Plan.
Submitted
4. Status of construction, if any,
alongwith photographs from all
the four sides.
Photographs showing that no construction activity has been started at site
5 500 meter radius map of the
area from periphery of project
site clearly indicating the various
industries (specifically red
category industries) and
structures lying in the area.
Submitted but the same is not proper.
6 Certificate of the Competent
Authority to the effect as to how
far Eco-sensitive and protected
A copy of the certificate issued by MC Ferozepur to the effect that there is no Eco-sensitive zone and protected area in the vicinity
37
area including wild life
sanctuaries are located.
of the site.
7 Site plan of the project showing
the following
i) Location of STP ;
ii) Solid waste storage area.
iii) Green belt
iv) Parking space
v) RWH and water recharge
pits
vi) Fire fighting equipment layout
vii) First aid room
viii) Location of Tubewells
Not submitted
8 Permission of Competent
Authority for ;
a) Water and Sewerage
connection
b) Use of Ground Water
Not submitted
9 Water balance chart for summer,
rainy and winter seasons
indicating critical requirements.
Submitted a table showing the water consumption for different processes to be undertaken but not for all the three seasons separately.
10 Availability of adequate land for
use of treated sewage and
plantation.
Not submitted
11 Analysis reports of ambient air,
ground water and noise levels
Not submitted
38
from NABL Accredited
laboratories.
12 Construction schedule
(PERT/CPM Chart)
Submitted
5. The case was considered by the SEAC in its 59th meeting held on
20.05.2012, which was attended by Mr. Ashwani Kumar, Sanitary Inspector,
who informed that Executive Officer, M.C. Ferozepur has gone to Chandigarh
to attend a case in the Hon’ble Punjab & Haryana High Court due to which
he could not attend the meeting. The Committee pointed out that the
Hon’ble Court remained closed on Sunday. In turn, the Sanitary Inspector
informed that the E.O. was not feeling well due to which he could not attend
the meeting.
The SEAC noted that Sanitary Inspector is telling a lie on one
or other pretext regarding as to why the E.O. did not attend the meeting.
Furthermore, the Sanitary Inspector was not in a position to present the
technical details of the project proposal. The Committee also noted that the
Sanitary Inspector had also attend its 49th meeting on 18.7.2011 and at that
time he could not explain the technical details of the project proposal due to
which it was decided that a responsible officer, well conversant with the
project proposal, alongwith accredited environmental consultant should come
to the Committee to present the project proposal. The said decision of the
Committee was conveyed to M.C. Ferozepur vide letter no. 31819 dated
03.08.2011. Despite this and even knowing the facts that the project is of a
great importance for the State being related to scientific disposal of
Municipal Solid Waste, the E.O., Municipal Council, Ferozepur did not bother
39
at all to attend the meeting and again deputed the Sanitary Inspector to
present the project proposal.
The Committee brought to the notice of Sanitary Inspector that
a responsible Officer well conversant with the matter should attend the
meeting of SEAC to present the project proposal being of a great importance
of the State.
After deliberations, the SEAC decided to defer the case to its
next meeting and to inform the E.O., M.C. Ferozepur that only a responsible
officer of the M.C., Ferozepur/Faridkot, who is well conversant with the
project proposal alongwith consultant, whose name is in the list of Ministry
of Environment & Forests, should come to present the project proposal
having proper authority letter of the Competent Authority of Municipal
Council.
6. The Municipal Council, Ferozepur and Faridkot was requested by the SEAC
vide letter No. 2473 dated 13.06.2012 to attend its 60th meeting on
17.06.2012. However, no representative of Municipal Council, Ferozepur and
Faridkot attended the meeting of the SEAC, as such, the SEAC decided to
defer the case to its next meeting and to inform the E.O., M.C. Ferozepur
that only a responsible officer of the M.C., Ferozepur/Faridkot, who is well
conversant with the project proposal alongwith consultant, whose name is in
the list of Ministry of Environment & Forests, should come to present the
project proposal having proper authority letter of the Competent Authority of
Municipal Council. The decision of the Committee was conveyed to the M.C.
Ferozepur/Faridkot vide letter no. 2627 dated 21.06.2012.
40
6. The case was again considered by the SEAC in its 61st meeting held on
27.06.2012, which was attended by the following on behalf of the M.C.,
Ferozepur and Faridkot:
i) Sh. Surjit Singh, E.O., M.C. Ferozepur
ii) Sh. Rohitash Garg, AME, M.C., Faridkot
The Executive Officer, Municipal Council, Ferozepur informed
that the representative of IL&FS could not attend the meeting since the
dealing person of IL&FS Sh. Yashwant Chauhan is on leave. He requested
the Committee to adjourn the case to its next meeting. After deliberations,
the Committee accepted the request of E.O., M.C. Ferozepur and decided to
defer the case to its next meeting. The decision of the SEAC was conveyed
to the M.C., Ferozepur vide letter no. 28610 dated 04.07.2012.
7. The M.C. Ferozepur & Faridkot were requested vide letter No. 3185 dated
17.07.2012 and endst no. 3186 dated 17.07.2012, respectively, to attend its
62nd meeting on 21.07.2012.
Following were present on the said meeting on behalf of M.C.
Ferozepur & Faridkot:
(i) Sh. Subhash Joshi, Executive Officer, Ferozepur
(ii) Sh. Surjit Singh, Executive Officer, Ferozepur
(iii) Sh. Hakam Singh, A.M.E., Ferozepur
(iv) Sh. Dewan Chand, Sanitary Inspector
(v) Sh. Rohitash Garg, A.M.E., M.C. Faridkot
(vi) Sh. Shashank Arora, Environmental Consultant of M/s Ind Tech House Consult, Delhi
41
(vii) Sh. Yashwant Chauhan of M/s IL&FS
Sh. Shashank Arora, Environmental Consultant of M/s Ind Tech House
Consult, Delhi, presented the project proposal before the SEAC as under:
1. M.C. Ferozepur intends to establish an 'Integrated Municipal Solid Waste
Management Facility' in an area measuring as 18 acres in the revenue estate
of Villlage Bir Chahal, Distt., Faridkot, which will cater to 18 no. of Urban
Local Bodies of Ferozepur cluster.
2. At present no activity is being undertaken at the proposed site of the project,
which is located at a distance of 36 kms from Ferozepur.
3. Total water requirement for the project is about 25 KLD, which will be met
through ground water.
4. The scope of the project includes the following:
a) Direct collection of waste from waste generators, within Municipal limits
of Ferozepur.
b) Storage of MSW including street sweeping and drain cleaning waste at
secondary collection points.
c) Transportation of MSW including street sweeping and drain cleaning
waste from secondary collection points to site.
d) Receiving of MSW from Transfer stations, nearby Municipal Bodies and
Nagar Panchayats.
e) Establishment of transfer stations at Muktsar, Ferozepur and Moga.
f) Transportation of waste from transfer stations at Muktsar, Ferozepur
and Moga to the processing site at Bir Chahal Village, Faridkot.
42
g) Municipal waste processing complex to process 350 TPD MSW through
250 TPD capacity of RDF plant (to process mixed waste) and 100 TPD
capacity Compost plant (for processing of organic fraction of MSW) at
Bir Chahal Village, Faridkot.
h) Development, operation and maintenance of the Engineered Sanitary
Landfill site at Bir Chahal Village, Faridkot.
i) Disposal of Residual Inert Matter at the Engineered Sanitary landfill site.
5. The present generation of solid waste from all 18 urban local bodies has
been estimated as 281 TPD and the Integrated MSW facility will be installed
to handle 350 TPD of municipal solid waste. The refuse dried fuel will be
generated in the form of fluff having gross calorific value of 2500 to 2800
Kcal/kg of fluff. The RDF plant will be operated for 330 days in a year and
will have following operations.
Manual segregation
Shredding
Screening to separate both fine inert and some percentage of bio-
degradable matter.
Rotary conveying and as per requirements drying system.
Fines screening.
Density separate (ballistic separation)
Final crushing of light fraction to less than 100 mm size to make it a
suitable fuel for boiler, termed as RDF fluff.
Densification of a small portion of fluff into pellets for convenience of
storage and improvements of combustion of fluff in the boiler.
43
The residual organic matter from the RDF plant will be utilized in
compost plant.
6. The compost plant will be of capacity 100 TPD, which will be used to process
organic fraction of MSW and organic rejects to be generated from RDF plant.
This compost plant will be based on aerobic composting process.
7. Engineered sanitary landfill shall also be developed for disposal of processing
rejects and residual inert matter. This facility shall be designed as per the
guidelines prescribed in the Municipal Solid Waste (Management & Handling)
Rules, 2000.
8. The MC will require 400 KW of electricity, which will be taken from Punjab
State Power Corporation Limited. The MC has proposal to install 1 No. DG set
of 100 KVA and 1 no. of 125 KVA capacities, which will be used as standby
arrangement of power supply and this D.G. set will be provided with proper
acoustic enclosures.
9. The dust emissions to be generated during handling waste/movement of
vehicles will be controlled by spraying water and providing enclosures.
10. The site of the project is largely conforming to the locational criteria
suggested by the Govt. of India, Ministry of Urban Development in the
manual titled as "Manual on Municipal Solid Waste Management".
11. The slight encroachment is in the adjoining area, which is a not a part of the
project site.
12. The odour problem will be mitigated by spraying organic inoculants
The Committee considered the above said project proposal and details
as presented by the project proponents and after discussions, the following 'Terms
44
of Reference' were finalized to be suitably added to those furnished by the project
proponent:
1. Submit the details of site selection criteria adopted vis-a-vis the guidelines and the justification for selection of the proposed site.
2. Submit a 10 km radius map (on survey of India toposheet) showing co-ordinates of project site, National Highway, State Highway, district road / approach road, river, canal, natural drainage; protected areas under Wild Life (Protection) Act, archaeological site, natural lake, flood area, human settlements (with population), industries, high tension electric line, prominent wind direction (summer and winter), effluent drain, if any and ponds etc. should be presented and impacts assessed on the same.
3. Calculate the solid waste generation based on 2011 censes of all the 18 ULB's and the total solid waste to be generated after 25 years on the basis of projected population of each town, waste of which is to be handled and managed at this facility.
4. Submit composition/characteristics analysis of the Municipal solid waste of each ULB and the overall average value of each parameter of the said analysis.
5. Examine and submit the details of impact, including odour, on the drainage and nearby habitats/settlements (surroundings).
6. Submit the details of assessment of the site in view of impact on smooth movement of traffic due to transport of waste. Transportation and parking facilities should be examined.
7. Soil analysis including soil texture and soil permeability.
8. Awareness programme should be carried out to make the habitants aware regarding segregation of solid waste at the source and collection from door to door by the operator.
9. Examine and submit details of alternative technologies, if any.
10. Examine and submit details of storm water / leachate collection from processing facility, compost area and landfill area.
11. Examine and submit details of impact on water bodies / rivers / ponds and mitigative measures during rainy season.
45
12. Examine and submit details of monitoring of water quality around the processing facility, compost area and landfill area. Water analysis shall also include for nitrate, phosphate and fluoride.
13. Examine and submit details of the odour control measures at processing facility, compost area and landfill area.
14. Submit a copy of the layout plan of project site showing solid waste storage, green belt, all roads, prominent wind direction, processing plant, landfill facility, compost area & buildings etc.
15. Submit a copy of the land use certificate from the Competent Authority.
16. Submit a copy of the status of ambient air quality for all the twelve parameters prescribed by the Ministry of Environment & Forests, Delhi and surface ground water quality, soil type, cropping, pattern, land use pattern, population, socio-economic status, anticipated air and water pollution.
17. Examine and submit the details of surface hydrology and water regime and impact on the same.
18. Submit a contour map with slope analysis and drainage pattern.
19. Examine and submit the details of one complete season AAQ data (except monsoon) with the dates of monitoring, impact of the project on the AAQ of the area (including H2S, CH4). Submit the details of wind rose diagram.
20. Submit a copy of detailed plan of waste management.
21. Submit the details of Engineered Landfill Facility site including liner system to be adopted.
22. Examine and submit the details of rehabilitation/compensation package for the project effected people, if any.
23. Submit Environmental Management Plan and Environmental Monitoring Plan with costs and parameters.
24. Submit corporate responsibility plan including various activities to be undertaken, period for which the same will be implemented and responsible person(s)/Management/Association.
25. Submit financial plan for construction phase, operation phase and post closure phase including details of bank guarantees to be taken from the operator of the facility for all the three phases.
26. Intimate the name of the agency responsible for regular monitoring during operation and post monitoring phase.
46
27. Intimate the details for mitigation of pollution from transfer stations and primary collection centres.
28. Explore the possibility for reuse of plastic waste.
29. Submit complete design of embankment to be constructed to avoid flooding taking into account highest flood level of the area and explore the possibility for use of fly ash for construction of the said embankment.
30. The municipal solid waste collection, segregation, storage, transportation, processing & disposal shall be as per the provisions of the Municipal Solid Waste (Management & Handling) Rules, 2000.
31. Intimate details about house to house collection of waste, segregation of waste, primary collection centres, transfer stations and transportation of solid waste to the Integrated Municipal Solid Waste facility. Also, steps to be taken to control pollution from said activities.
32. An advisory and monitoring Committee may be constituted by the Deptt. of Local Bodies regarding construction and maintenance of the Integrated Municipal Solid Waste Treatment Facility.
The Municipal Council, Ferozepur shall prepare the draft rapid EIA
report/EMP based on above mentioned TOR in addition to TOR proposed by it. After
preparation of draft rapid EIA report/EMP, the M.C. Ferozepur shall apply to Punjab
Pollution Control Board for conduct of the public hearing as per the procedure
prescribed in Appendix-IV of the EIA Notification dated 14.09.2006. The
environmental concerns to be raised by the public during the public hearing should
be addressed in the final rapid EIA report/EMP before submission of the same to
SEIAA, Punjab as per the procedure prescribed in Appendix-V of the said
notification.
The Committee further observed that the project proponent
shall also submit the following documents alongwith draft EIA report:-
1. No Objection Certificate from pollution angle of the Punjab Pollution Control Board.
47
2. Certificate of Competent Authority to the effect as to whether there is any Eco-sensitive areas notified under Environment (Protection) Act, 1986, protected area notified under Wildlife (Protection) Act, 1972, critical polluted areas as identified by the CPCB and Inter-State / International Boundaries within a radius of 10 kms from the project site or not.
3. NOC from the nearest Airport Authorities, in case, the same is located within
a radius of 20 km from the project site.
4. Permission of CGWA for abstraction of groundwater.
5. Layout plan duly authenticated by the Competent Authority showing all
details including green belt.
6. A certificate issued by the Department of Town & Country Planning showing the land use of the site as per the Master Plan.
7. Proof of distance from existing protected area and 'No Objection certificate'
from the Department of Forest & Wildlife Preservation.
Item No. 62.05: Application for obtaining Environmental Clearance to establish an "Integrated Municipal Solid Waste Management Facility" at Village Jamsher, District Jalandhar and 'Engineered Sanitary Landfill Facility' in the revenue estate of Village Piplanwali, District Hoshiarpur by Municipal Corporation, Jalandhar.
The SEAC observed that:
1. The Municipal Corporation, Jalandhar has applied for obtaining
Environmental Clearance to establish an "Integrated Municipal Solid Waste
Management Facility" at Village Jamsher, District Jalandhar and 'Engineered
Sanitary Landfill Facility' in the revenue estate of Village Piplanwali, District
Hoshiarpur by Municipal Corporation, Jalandhar.
48
2. The case of the Municipal Corporation, Jalandhar was considered by the
SEAC in its 35th meeting held on 13.03.2010, wherein, the Committee
finalized the 'Terms of Reference' and decided to convey the same to the
Municipal Corporation for preparation of the draft rapid EIA study report.
Accordingly, 'Terms of Reference' were conveyed to Municipal Corporation,
Jalandhar by the SEAC vide letter no. 18464 dated 16.04.2010 after approval
of the Competent Authority.
3. The Municipal Corporation, Jalandhar vide letter no. CE/2099 dated
03.01.2012 has submitted the draft rapid EIA study report alongwith its
summary report to the Punjab Pollution Control Board for conduct of the
public hearing. Accordingly, the public hearings of 'Engineered Landfill
Facility' and 'Integrated Municipal Solid Waste facility' were conducted by the
Punjab Pollution Control Board on 27.09.2011 and 30.09.2011, respectively.
The Board has sent the proceedings of both the public hearings to the
SEIAA, Punjab vide letter no. 41032 dated 18.10.2011 and letter No. 41038
dated 18.10.2011.
4. The Municipal Corporation, Jalandhar has submitted 20 copies of final EIA
report.
5. The Commissioner, Municipal Corporation was requested by the SEAC vide
letter No. 2049 dated 16.01.2012 to attend its 55th meeting on 20.01.2012 to
present the project proposal.
6. The Commissioner, Municipal Corporation, Jalandhar vide letter dated
19.01.2012 informed that the Corporation is in the process of preparing
presentation and collecting relevant information, due to which the
Corporation will not be in a position to present its case in the meeting fixed
for 20th January, 2012 and requested to defer the case to the next meeting
of SEAC.
49
7. The case was considered by the SEAC in its 55th meeting held on 20.01.2012
and after discussions in the matter, the SEAC agreed to accept the request
of the Commissioner, Municipal Corporation, Jalandhar made vide letter
dated 19.01.2012 and decided to defer the case to the next meeting.
8. The case was considered by the SEAC in its 56th meeting held on
27.02.2012, which was attended by following on behalf of Municipal
Corporation, Jalandhar on 27.02.2012:
i) Er. Narinder Singh, S.E. Municipal Corporation, Jalandhar ii) Sh. Mangesh Dakhore, Environmental Consultant of M/s
SENES India Pvt. Ltd., iii) Sh Yashwant Chauhan, Senior Manager of M/s IL&FS,
Delhi. iv) Sh. Himanshu Chaturvedi, Manager of M/s IL&FS
Due to paucity of time, the case could not be taken up in the
meeting on 27.02.2012, as such, the Committee decided to roll-over the
same on 01.03.2012 with venue in the office of PSCST, Sector-26, Mahatma
Gandhi Institute, Chandigarh at 10.00 a.m.
Following were present on behalf of Municipal Corporation,
Jalandhar on 01.03.2012 to present the details of EIA study:
i) Er. Narinder Singh, S.E. Municipal Corporation, Jalandhar
ii) Sh. Mangesh Dakhore, Environmental Consultant of M/s
SENES India Pvt. Ltd.
iii) Sh. Yashwant Chauhan of M/s IL&FS
The Environmental Consultant of M.C., Jalandhar presented the
details of rapid EIA study reports of "Integrated Municipal Solid Waste
Management Facility " to be installed in the revenue estate of Village
50
Jamsher, Distt. Jalandhar and Engineered landfill facility to be established
in the revenue estate of village Piplanwali, Distt. Hoshiarpur before the
Committee. The Committee noted that the Environmental Consultant of M.C.,
Jalandhar had not properly prepared the presentation since he was unable to
reply the queries raised by the members of the Committee during
presentation. The Committee further noted that both rapid EIA study reports
do not contain certain primary information, due to which the Committee was
not satisfied with the rapid EIA reports prepared by the Environmental
Consultant.
After detailed deliberations in the matter, the Committee
observed that the Municipal Corporation, Jalandhar is required to submit the
following information/data before appraisal of the project proposal:
i) The solid waste generation of 700 TPD of all the ULBs of Jalandhar cluster
has been estimated taking into account the estimated population in the year
2009. But as per project proposal, the Integrated Municipal Solid Waste
Management facility including Engineered Landfill facility is meant for life
span of 25 years and the estimated population after 25 years has not been
taken into account while estimating the generation of solid waste. Therefore,
the project proposal prepared by M.C. Jalandhar does not seem to be in
order as far as generation of municipal solid waste is concerned. Thus, the
M.C. Jalandhar is required to clarify why the generation of solid waste after
25 years has not been taken into account for designing the Integrated
Municipal Solid Waste Management facility including Engineered Landfill
facility. Furthermore, the quantification of solid waste for designing the
facility is required to be done on the basis of actual population of 2011
census instead of estimated population in the year 2009.
51
ii) In the final EIA report, it has been mentioned that Village Nanak Pindi,
District Jalandhar is located at a distance of 200 m from the site of the
processing facility to be developed in the revenue estate of Village Jamsher,
District Jalandhar. Therefore, the said site is not conforming to the locational
criteria laid down by the Govt. of India, Ministry of Urban Development, in
the manual on Municipal Solid Waste Management since as per the said
manual, the site of MSW facility should be atleast 500 m from a notified
habitation area. Besides, Village Nanakpuri is located in the predominant
wind direction, thus, the Corporation is required to submit proper justification
regarding non-conforming of the said site to the locational criteria.
iii) During presentation, the representative of the Corporation informed that the
site of the landfill facility to be developed in the revenue estate of Village
Piplanwali, District Hoshiarpur, is located at a distance of 300 m from the
habitation area of Kirti Nagar, District Hoshiarpur. Therefore, it is clear that
the said site is not conforming to the locational criteria laid down by the
Govt. of India, Ministry of Urban Development, in the manual on Municipal
Solid Waste Management since as per the said manual, the site of MSW
facility should be atleast 500 m from a notified habitation area. Besides, Kirti
Nagar is located in the predominant wind direction, thus, the Corporation is
required to submit proper justification regarding non-conforming of the said
site to the locational criteria.
iv) As per the manual on Municipal Solid Waste Management, a zone of 500 m
around the MSW facility boundary should be declared as 'No-Development
Buffer Zone' after the location is finalization, but the Municipal Corporation,
Jalandhar has not submitted any material evidence in this regard for both
52
the sites. Therefore, the Corporation is required to submit proper material
evidence in this regard.
v) The actual solid waste generation in each ULB is required to be intimated
and the same should be co-related with the estimated per capita generation
mentioned in the "Manual on Municipal Solid Waste Management" published
by the Ministry of Urban Development.
vi) The composition / characteristics of solid waste being generated have not
been analysed, which is the primary requirement to prepare sustainable
project proposal, hence, the Corporation is required to submit
composition/characteristics analysis of solid waste being generated by each
ULB contributing to this facility and the overall average value of each
parameter, so as to enable the Committee to check the adequacy of the
proposal.
vii) In the layout plan, nothing has been depicted regarding future expansion
plan of Corporation, thus, properly prepared layout plan showing the present
proposal and future expansion plan is to be submitted.
viii) During handling and processing of municipal solid waste, there is likelihood
of generation of odour and process/fugitive emissions due to handling of
solid waste and movement of vehicles in the vicinity of processing facility,
but no technical details have been worked out to find out minimum width of
peripheral green belt to attenuate the odour and process/fugitive emissions.
Similarly, there is a need to work out width of peripheral green belt to
attenuate the odour and fugitive emissions from the landfill facility. Also,
there is a need to list out the names of the suitable species of trees to be
planted in the peripheral green belt.
53
ix) No technical details of the composting process have been given in the EIA
study reports, thus, the Corporation is required to incorporate the same.
x) The ambient air monitoring has been carried out only for PM2.5, PM10, SO2,
NOx and CO, which is required to be done for all the 12 parameters
prescribed by the MoEF.
xi) During presentation the representative of Municipal Corporation, Jalandhar
informed that the site of the project located in the revenue estate of Village
Jamsher, District Jalandhar is at a distance of 13 km from the Airport, as
such, the Corporation is required to submit NOC of Airports Authority of
India.
xii) A letter of Department of Town & Country Planning indicating the land use
surrounding the site of Integrated MSW facility to be established in the
revenue estate of Village Jamsher, District Jalandhar and landfill facility to be
developed in the revenue estate of Village Piplanwali, District Hoshiarpur.
xiii) Nothing has been mentioned in the EIA reports of both the sites regarding
the Corporate Social Responsibility (CSR), thus, the Corporation is required
to submit a detailed reply in this regard.
xiv) Quantity of leachate to be generated during operation and post closure
phase and a complete plan for management & handling of the same needs
to be given.
xv) A complete plan for management & handling of surface run-off during rainy
season be given.
xvi) Following details in respect of mathematical modeling:
54
Which sources have been taken into account for assessing the impact
on the environment.
Fuel consumption rate and its analysis.
Pollutants release rate
Stack height and stack diameter
Exit gas temperature, velocity and volume
How atmospheric stability class has been calculated?
How dispersion coefficients have been calculated?
The Committee decided to defer the case till the reply of the
above noted observations is received. The decision of the Committee was
conveyed to the project proponent vide letter No. 12228 dated 13.03.2012.
9. The Municipal Corporation Jalandhar vide letter no. SE/146 dated 12.06.2012
has submitted the reply of the observations of the SEAC.
10. The case was considered by the SEAC in its 61st meeting held on 27.06.2012,
which was attended by Sh. Narinder Singh, S.E., Municipal Corporation,
Jalandhar. He informed that the IL&FS was not aware of the meeting, as
such, no representative of IL&FS attended the meeting. He requested the
Committee to adjourn the case to its next meeting. After deliberations, the
Committee accepted the request of S.E., Municipal Corporation, Jalandhar
and decided to defer the case to its next meeting. The decision of the SEAC
was conveyed to the M.C., Jalandhar vide letter no. 28613 dated 04.07.2012.
11. The MC, Bathinda was requested by the SEAC vide letter no. 30348 dated
16.07.2012 to attend its 62nd meeting on 21.07.2012 to present the details
of revised final rapid EIA report.
55
Following were present in the said meeting of the SEAC on
behalf of M.C., Bathinda
i) Er. Narinder Singh, S.E., Municipal Corporation, Jalandhar
ii) Sh. Subhradeb Pramanik, Environmental Consultant of M/s Senes Consultants India (P) Ltd.,
Sh. Subhradeb Pramanik, presented the salient features of the
revised final EIA report as under:
(i) The Department of Local bodies Punjab has initiated the projects for
scientific management of Municipal Solid Waste in Punjab, keeping in view
the obligations of ULB’s under MSW (M&H Rules) 2000. Pursuant to the
above objective, the State has been divided into eight regional clusters
namely Greater Mohali Development Authority (GMADA), Patiala, Jalandhar,
Ferozepur, Bathinda, Pathankot, Ludhiana and Amritsar.
(ii) Jalandhar is one of the clusters comprising of Jalandhar city & 25 other
ULBs. There is a proposal to establish an "Integrated MSW Management
Facility at Jamsher village, Jalandhar and "Engineered Sanitary Landfill
Facility' near Piplanwala Village, Hoshiarpur.
(iii) The 'Integrated MSW Management Facility is to be established at Jamsher
Village, Jalandhar. This site has been earmarked for establishment of MSW
facility/sanitary landfill in the notified Master Plan of Jalandhar as informed
by the Department of Town & Country Planning vide Memo No. 1327 dated
19.07.2012. The site located at Jalandhar is conforming to location criteria
laid down by the Ministry of Urban Development, Govt. of India except the
distance from the habitation area. As per Master Plan, the area surrounding
to this site is kept reserved for dairies, bee keeping, poultry farms and low
56
density residential area. The nearest residential area i.e. Nanakpindi village is
at a distance of about 200m from the periphery of the said site. The
locational criteria of the said guidelines is not mandatory requirement since
as per clause no. 17.4.1 of the manual, in the absence of the regulatory
requirements, the locational criteria is suggestive one. There is a proposal to
develop 15 m wide green belt along the periphery of the project site and
same will be designed as per the 'Guidelines for Greenbelt Development'
issued by CPCB.
(iv) The stretch of land located at Village Piplanwala, where an "Engineered
Sanitary Landfill Facility" is to be established, is presently already being used
as solid waste dumping site and is surrounded by agricultural activities. The
site located at Piplanwali, Hoshiarpur is conforming to locational criteria laid
down by the Ministry of Urban Development, Govt. of India except the
distance from the habitation area. Nearest habitation is Kirti Nagar, which is
existing at a distance of 300 m from said site. The proposed site has been
earmarked for solid waste disposal ground in approved Master Plan of
Hoshiarpur. There is a proposal to develop 15 m wide greenbelt along the
periphery of the said site as per the 'Guidelines for Greenbelt Development'
issued by CPCB.
(v) There is no Eco-sensitive area notified under Environment (Protection) Act,
1986, protected area notified under Wildlife (Protection) Act, 1972, critical
polluted areas as identified by the CPCB and Inter-State / International
Boundaries within a radius of 10 kms from the site of the processing facility
and sanitary landfill facility.
(vi) The details of the project are as under:
57
Features
MSW processing
facility at Jamsher
Village, Jalandhar
Landfill site at
Piplanwala village,
Hoshiarpur
Year Of
Establishment Proposed Proposed
Size of the
project
RDF Plant (700 TPD) Engineered Sanitary Landfill
Facility (22 acres) Biomethanation/Compost
/ Curing plant (50TPD)
Project Cost INR 99.21 Crores INR 20 Crores
Land Area 20 Acres 22 Acres
Fuel
RDF Produced From MSW
(260 TPD) Nil
Compost 6-7 TPD
MSW
Transportation By Private Developer (JITF)
Power
Requirement
2.3MW
Electricity requirement is
only for lighting&
administrative building
(vii) The processing plant site will be designed to process 750 TPD of MSW to be
generated from 26 ULB’s during the first phase in the year 2017, as per
projected population. The capacity of this processing facility will be expanded
to process 1600 TPD of MSW to be generated as per projected population in
the year 2035. The projected population for the year 2017 and 2035 has
been calculated on the basis of 2001 census and the growth rate considered
is on higher side if the projected population for the said years is calculated
on the basis of 2011 census, which is yet to be published.
58
(viii) Rapid EIA study of both sites was carried out during the winter season of
year 2011 (baseline environmental monitoring)
(ix) The physical & chemical analysis has been done for the major ULBs of this
cluster for finalization of processing technologies. The details of which are as
under:
RDF Compone
nt
Organics for
composting
Inerts Recyclables Misc
33 % 25% 35% 4% About 3%
(x) The Municipal Corporation will undertake door to door segregation. The
segregated solid waste will be further processed to produce Refuse Derived
Fuel (RDF). The RDF process will be designed and adopted from the process
developed by TIFAC.
(xi) Green Waste will be treated separately for biogas generation through bio-
methanation process.
(xii) The organic fraction separated from mixed MSW will be separated and
composted by windrow process on a compost pad inside the project site.
(xiii) Based on the characterization results and processing of 750 TPD of MSW
following products will be produced from MSW :
a) From mixed 700 TPD of MSW, about 260 TPD of RDF and 6-7 TPD of
compost/manure will be produced.
b) 50 TPD of green waste will yield approx 3000Nm3/day of biogas.
59
c) About 25% as inert fraction of MSW will be separated out and the
same will be transported to Engineered Sanitary landfill facility at
Piplanwala village.
d) About 4% of recyclables will be separated out, which will be sold to
authorized recyclers.
e) The C/N ratio of MSW samples collected from Jalandhar cluster is
approx. 25:1. As per CPHEO Mannual, C/N Ratio of 30 is most
favourable for composting, whereas the range may vary from 26-31.
Therefore, to bring the CN ratio within the prescribed range, slaughter
house wastes, blood meal, spoiled food grains, seweage sludge, and
cow dung would be added to improve C/N ratio.
(xiv) The total cost of the Integrated MSW facility is about 119.21 Crores (Rs.
99.21 Crores for Processing Facility and Rs. 20 Crores for Engineered Landfill
site).
(xv) Environmental Status
a) Air Environment:
Ambient air quality was monitored at eight locations in the surroundings of
the MSW processing facility at Jamsher and Engineered landfill site at
Hoshiarpur for the parameters such as PM2.5, PM10, SO2, NOx, CO, Methane
and Ammonia, which are expected pollutants from such type of projects. The
mathematical modeling has been carried out for PM, SO2, and NOx to assess
the impact of power plant and hot air generator on the ambient air quality,
which is given as under:
24-hour average predicted ground level concentrations (GLCs) of
pollutants due to Power Plant
S.
No. Pollutant
Background
concentration,
(g/m3)
Incremental
increase
due to
Resultant
concentration
of pollutants
60
project
(g/m3)
in the ambient
air after
commissioning
of the plant
(g/m3)
1 PM 118.39 0.92 119.31
2 SO2 9.43 1.79 11.22
3 NOx 19.75 3.63 23.38
24-hour average predicted ground level concentrations (GLCs) of
pollutants due to hot air generator
S.
No. Pollutant
Background
concentration,
(g/m3)
Incremental
increase
due to
project
(g/m3)
Resultant
concentration
of pollutants
in the ambient
air after
commissioning
of the plant
(g/m3)
1 PM 118.39 1.33 119.72
2 SO2 9.43 2.68 12.11
3 NOx 19.75 5.33 25.08
Based on the modeling exercise under observed meteorological condition, maximum
concentrations will be at a distance about 600 m in the southeast direction. The
resultant concentrations of SO2, NOx and CO are well within the NAAQS at all the
receptor locations.
b) Noise Environment.
Noise levels in the impact area has been assessed. The results show that day time
noise levels exceed the limiting values at Jamsher Village and Diwali village due to
high level of traffic noise.
61
Noise Monitoring Result – MSW processing Facility at Jamsher Village,
Jalandhar
Location
Day Time Night Time
Leq (dB(A)) Limit (dB
(A))
Leq (dB (A)) Limit (dB
(A))
Project site 52.11 55 32.2 45
Jamsher
Village
55.85 55 32.2 45
Quadianwali 47.58 55 30.37 45
Diwali 57.44 55 35.76 45
Bambianali 43.69 55 30.98 45
Noise Monitoring Result – Engineered Landfill at Piplanwali Village,
Hoshiarpur
Location
Day Time Night Time
Leq (dB(A)) Limit (dB
(A))
Leq (dB (A)) Limit (dB
(A))
Project site 49.03 55 33.43 45
Kwaspur 58.96 55 40.6 45
Pur Hiran 58.52 55 42.53 45
Rahimpur 56.11 55 39.58 45
Basi Daulat
Khan
47.39 55 31.89 45
c) Water Environment:
Water quality in the impact area has been assessed for surface water and
ground water resources. Water quality from ground sources meets the IS
62
10500-1992 requirements of drinking water. Surface water quality also meets
the standards of CPCB for Class C where water after treatment can be used
for drinking purposes.
d) Soil Quality
The soil samples were collected & analysed by the NABL/MoEF approved
laboratory and analysis results of which show that the soil is alkaline in nature.
(xvi) 15 m wide green belt along the periphery of the proposed processing site will
be developed to mitigate the effects of pollution and source emissions. The
predominant wind direction is from NW and West and the nearby settlements
i.e. Nanakpindi village is located at the Southeast direction of the project site.
To prevent the odor problem, the Herbal inoculums such as Maple, Naturevel
or Gtech will be used, which are readily available in the market.
(xvii) The surface run off, of the project site will be collected by constructing pucca
lined ditches and so collected surface run off will be used in the composting
process. The leachate will be collected and treated properly and same will be
utilized in the composting section.
(xviii) The Survey of India vide letter no. 1283 dated 13.10.2011 that the site of the
processing facility is located at a distance of 26 km from the nearest military
airbase at Adampur. However, the proposed site of the Engineered Sanitary
Landfill Facility at Village Piplanwali, which is already existing since the past 20
years, is located at a distance of about 13 km from the nearest military airbase
at Adampur, but the Ministry of Environment & Forests has considered the
case of MSW facility to be developed at Jamalpur, Ludhiana without asking the
Corporation to get the same from the Airports Authority of India. The
Municipal Corporation, Jalandhar has applied to the military airbase at
Adampur for getting the necessary permission.
63
(xix) The public hearings of the Engineered Sanitary Landfill Facility and
Processing Facility sites were conducted by the Punjab Pollution Control
Board on 27.09.2011 and 30.09.2011, respectively and all the environmental
concerns expressed by the public during these public hearings have been
addressed in the final EIA reports.
(xx) Different species of trees will be planted in the green belt, the names of
which have been mentioned in the EIA report.
(xxi) In the layout plan of both the sites, the present proposal and future
expansion plan have been properly marked.
(xxii) Various activities related to Corporate Social Responsibility have been
delineated in the EIA report.
(xxiii) A power plant of 6 MW will be installed to produce electricity from RDF.
(xxiv) The Environment management plan for construction phase, operation phase
and post- closure phase for the integrated facility is as under:
Sr. No.
Activity Responsibility
1 Construction Phase:
Dust emission control
Emission reduction from equipments
Overall conservation of Environment
Green Belt development
Municipal Corporation Jalandhar & M/s JITF Urban Infrastructure Ltd.
2 Operation & Maintenance Phase M/s JITF Urban
64
Sr. No.
Activity Responsibility
Air emission of RDF Plant
Dust & Dusty Particulate matter
Effluent Treatment Plant
Control of Pathogen, Mal Odor and Fly & Insect vector
Landfill gas Management
Control of water & land pollution by Leachate
Monitoring of ground water & air ambient quality
Green Belt Maintenance
Health safeguards
Infrastructure Ltd.
3 Post Closure Phase
Providing an appropriate final cover & stability
Erosion management
Leachate treatment & disposal
Municipal Corporation Jalandhar
The Committee observed that the site of the 'Engineered Sanitary
Landfill Facility' is conforming to the locational criteria mentioned in the manual
prepared by the Ministry of Urban Development, Govt. of India, New Delhi except
the distance form the habitation/residential area. The said site is already being used
for dumping of MSW in an unscientific manner for the past many years, therefore,
establishment of said facility at this site will be a step towards environment
improvement.
65
Furthermore, the site of the processing facility is conforming to the
locational criteria mentioned in the said manual except distance from
habitation/residential area. The submission of the Municipal Corporation to the
effect that the State of Punjab is a land locked State due to which land prices are
very high as compared to other States; this reply is tenable as it is very difficult to
identify a 20 acres chunk of land for establishment of such a facility.
After detailed deliberations, the SEAC observed that the project
proponent has provided adequate and satisfactory clarifications to the observations
raised by it, therefore, the Committee decided to forward the case to the SEIAA
with the recommendation to grant Environmental Clearance to Municipal
Corporation, Jalandhar for establishment of ‘Integrated Municipal Solid Waste
Management Facility’ in the revenue estate of Village Jamsher, Distt. Jalandhar in
an area of 20 acres to handle 750 Tons/day of Municipal Solid Waste and
‘Engineered Sanitary Landfill Facility’ in an area of 22 acres in the revenue estate of
Village Piplanwali, District Hoshiarpur under EIA Notification dated 14.09.2006,
subject to the following conditions in addition to the proposed measures.
PART A – Specific conditions
I. Construction Phase
i) “Consent to establish” shall be obtained from Punjab Pollution Control Board under Air (Prevention & Control of Pollution) Act, 1981 and Water (Prevention & Control of Pollution) Act, 1974 and a copy of the same shall be submitted to the Ministry of Environment & Forests / State Level Environment Impact Assessment Authority before the start of any construction work at site.
ii) All required sanitary and hygienic measures should be in place before starting construction activities and to be maintained throughout the construction phase.
66
iii) A first aid room will be provided in the project both during construction and operation phase of the project.
iv) All the topsoil excavated during construction activities should be stored for use in horticulture / landscape development within the project site.
v) Disposal of muck during construction phase should not create any adverse effect on the neighboring communities and be disposed off after taking the necessary precautions for general safety and health aspects of people with the approval of competent authority.
vi) Construction spoils, including bituminous material and other hazardous material, must not be allowed to contaminate watercourses and the dump sites for such material must be secured, so that they should not leach into the ground water.
vii) The diesel generator sets to be used during construction phase should be of low sulphur diesel type and should conform to the provisions of Environment (Protection) Act, 1986 prescribed for air and noise emission standards.
viii) Vehicles hired for bringing construction material to the site and other machinery to be used during construction should be in good condition and should conform to applicable air and noise emission standards.
ix) Ambient noise levels should conform to prescribed standards both during day and night. Incremental pollution loads on the ambient air and noise quality should be closely monitored during construction phase.
x) Fly ash should be used as construction material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended on August, 2003 (This condition is applicable only if the project is within 100 Km of Thermal Power Station).
xi) Ready mixed concrete should be used construction purpose as far as possible.
xii) Water demand during construction should be reduced by use of premixed concrete, curing agents and other best practices.
xiii) Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, disposal of waste water & solid waste in an environmentally sound manner, safe drinking water,
67
medical health care, crèche etc. The housing may be in the form of temporary structures to be removed after the completion of the project.
II. Operation Phase
i) “Consent for Operate” shall be obtained from State Pollution Control Board under Air and Water Act and a copy shall be submitted to the Ministry before commissioning of the integrated facility.
ii) A green belt of minimum 15 m width shall be provided all around the
periphery of the project site.
iii) The gas generated from the Landfill facility shall be collected and
disposed/ utilized as per rules.
iv) The leachate from the facility shall be collected and treated to meet the
prescribed standards before its reuse.
v) The proponent shall obtain necessary clearance from the Groundwater
Authority for abstraction of ground water, if required.
vi) The depth of the landfill site shall be decided based on the groundwater
table at the site and permission regarding the same shall be obtained
from Ministry of Environment & Forests/Punjab Pollution Control Board.
vii) Periodical ground water/soil monitoring to check the contamination in and
around the site shall be carried out as per the provisions of the Municipal
Solid Waste (Management & Handling) Rules, 2000 /Punjab Pollution
Control Board requirements.
viii) Spraying of an appropriate herbal sanitizer shall be adopted for odour
control in addition to its vacuum suction and destroying in furnace.
ix) Proper shed shall be provided for the compost yard to prevent the rain
water coming in contact with the material in the compost yard Periodical
ground water/ soil monitoring to check the contamination in and around
the site shall be carried out as per requirements of Punjab Pollution
Control Board.
x) All the recommendations of the EMP shall be complied with letter and
spirit.
xi) The Municipal Corporation shall ensure that the project complies with all
the provisions of the Municipal Solid Wastes (Management and Handling)
Rules, 2000.
68
xii) Regular ambient air quality monitoring shall be carried out for all the
parameters mentioned in the notification dated 16th November, 2009 of
the Ministry of Environment & Forests.
xiii) The project proponent shall set up separate environmental management
cell for effective implementation of the stipulated environmental
safeguard under the supervision of a Senior Executive.
xiv) Entire organic material shall be converted into manure. Recyclable
material likewise glass, steel etc., shall be sold to recycler. Only inert
material which cannot be either composted or recycled shall be sent to
the Engineered Sanitary Landfill facility to be developed in the revenue
estate of Village Piplanwali, District Hoshiarpur.
xv) The funds earmarked for the environment management plan shall be
included in the annual budget of the Municipal Corporation and this shall
not be diverted for any other purposes.
xvi) Traffic congestion near the entry and exit points from the roads adjoining
the proposed project site must be avoided. Parking should be fully
internalized and no public space should be utilized.
xvii) Effective safeguard measures shall be taken by Municipal Corporation to
ensure that the AAQ levels at various locations are within permissible
limits as prescribed by MoEF/PPCB.
xviii) Appropriate mitigative measures shall be taken by the Municipal
Corporation to prevent pollution of water of the distributory in
consultation with the State Pollution Control Board. It shall be ensured
that there will be no littering of solid waste from vehicles and the
leachate/ surface run-off to be generated shall be collected & treated
properly, so that there should not be any impact on the quality of water
of the said distributory.
xix) Periodical medical examination of the workers engaged in the project
shall be carried out and records maintained. For the purpose, schedule of
health examination of the workers should be drawn and followed
accordingly.
xx) Ambient noise levels should conform to prescribed standards both during
day and night. Incremental pollution loads on the ambient air and noise
quality should be closely monitored.
69
xxi) The risk assessment and disaster management plan should be prepared
and implemented.
PART B – General Conditions :
I. This environmental clearance will be valid for a period of five years from the date of its issue or till the completion of the project, whichever is earlier.
II. The environmental safeguards contained in the application of the Municipal Corporation / mentioned during the presentation before State Level Environment Impact Assessment Authority/State Expert Appraisal Committee should be implemented in letter and spirit.
III. The entire cost of the environmental management plan (i.e. capital cost as well as recurring cost) will continue to be borne by the Municipal Corporation until the responsibility of environmental management plan is transferred to the occupier/residents society under proper MOU after obtaining prior permission of the Punjab Pollution Control Board.
IV. The Municipal Corporation shall also submit six monthly reports on the status of compliance of the stipulated EC conditions including results of monitored data (both in hard copies as well as by mail) to the respective Regional office of MoEF, the Zonal Office of CPCB and the SPCB/SEIAA.
V. Officials from the Regional Office of Ministry of Environment & Forests, Chandigarh / State Level Environment Impact Assessment Authority / State Level Expert Appraisal Committee / Punjab Pollution Control Board who would be monitoring the implementation of environmental safeguards should be given full cooperation, facilities and documents / data by the project proponents during their inspection. A complete set of all the documents submitted to State Environment Impact Assessment Authority should be forwarded to the CCF, Regional Office of Ministry of Environment & Forests, Chandigarh/State Level Environment Impact Assessment Authority.
VI. In the case of any change(s) in the scope of the project, the project would require a fresh appraisal by State Environment Impact Assessment Authority.
VII. All other statutory clearances such as the approvals for storage of diesel from Chief Controller of Explosives, Fire Department, Civil Aviation Department, Forest (Conservation) Act, 1980 and Wildlife (Protection) Act, 1972 etc. shall be obtained, by Municipal Corporation from the competent authorities including Punjab Pollution Control Board and from other statutory bodies as applicable.
70
VIII. The Municipal Corporation should advertise in at least two local newspapers widely circulated in the region, one of which shall be in the vernacular language informing that the project has been accorded environmental clearance and copies of clearance letters are available with the Punjab Pollution Control Board. The advertisement should be made within seven days from the day of issue of the clearance letter and a copy of the same should be forwarded to the Regional Office, Ministry of Environment & Forests, Chandigarh.
IX. These stipulations would be enforced among others under the provisions of Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, Environmental (Protection) Act, 1986, the Public Liability (Insurance) Act, 1991 and EIA Notification, 2006.
X. Environmental clearance is subject to final order of the Hon'ble Supreme Court of India in the matter of Goa Foundation Vs. Union of India in Writ Petition (Civil) No. 460 of 2004 as may be applicable to this project and decisions of any competent court, to the extent applicable.
XI. A copy of the clearance letter shall be sent by the proponent to concerned Panchayat, Zilla Parishad/ Municipal Corporation, Urban local body and the local NGO, if any, from whom suggestions / representations, if any, were received while processing the proposal. The clearance letter shall also be put on the website of the Municipal Corporation by the proponent.
XII. The proponent shall upload the status of compliance of the stipulated EC conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional Office of MoEF, the respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; PM2.5, PM10, SO2, NOx , CO, Pb, Ozone (ambient air as well as stack emissions) shall be monitored and displayed at a convenient location near the main gate of the project site in the public domain.
XIII. The Municipal Corporation shall adhere to the commitments made in the Environment Management Plan and Corporate Social Responsibility.
XIV. The State Environment Impact Assessment Authority reserves the right to add additional safeguards/ measures subsequently, if found necessary, and to take action including revoking of the environmental clearance under the provisions of the Environmental (Protection) Act, 1986, to ensure effective implementation of the suggested safeguards/ measures in a time bound and satisfactory manner.
71
XV. Any appeal against this environmental clearance shall lie with the National Green Tribunal, if preferred, within a period of 30 days as prescribed under Section 16 of the National Green Tribunal Act, 2010.
XVI. The Municipal Corporation shall construct pucca lined ditches for collection of surface run off and the same will be used in the composting process.
XVII. The Municipal Corporation shall obtain permission from Military Airbase Station at Adampur before starting any construction activities at the Engineered Sanitary Landfill Facility to be developed at Village Piplanwali, District Hoshiarpur.
XVIII. The Municipal Corporation shall ensure that the contractor/operator shall engage people of local area for operation of the facility as far as possible, so as to have opportunities of employment for them.
XIX. The Municipal Corporation may apply for transfer of environmental clearance under EIA notification dated 14.09.2006 to the contractor/operator finalized by it to SEIAA, Punjab. However, no activity shall be undertaken by the operator/contractor till the environmental clearance is transferred in his name and he is lawfully bound to comply with the conditions of the environmental clearance.
XX. The Municipal Corporation shall install adequate and appropriate air pollution control device with the boiler of power plant so as to ensure the compliance of emission standards laid down by the Ministry of Environment & Forests/Punjab Pollution Control Board. The Corporation shall also take necessary steps to minimize the generation of furan and dioxin in the flue gas emissions.
XXI. The post closure arrangement of the facility shall be made as per the Municipal Solid Waste (Management & Handling) Rules, 2000 and "Manual on Municipal Solid Waste Management" published by the Ministry of Urban Development and Municipal Corporation will be responsible for post closure of the facility and monitoring shall be done as per the Municipal Solid Waste (Management & Handling) Rules, 2000 / "Manual on Municipal Solid Waste Management" published by the Ministry of Urban Development/Punjab Pollution Control Board directions.
Item No. 62.06: Application for obtaining Environmental Clearance under EIA notification dated 14.09.2006 for an Educational Complex namely "Gian Sagar Medical College & Hospital and Gian Sagar Dental College &
72
Hospital established by Gian Sagar Educational & Charitable Trust, in the revenue estate of Village Ram Nagar, Tehsil Rajpura, Distt. Patiala.
The SEAC observed that:
1. M/s Gian Sagar Educational & Charitable Trust had applied for obtaining
environmental clearance as required under EIA notification dated 14.09.2006
for the Medical College, Hospital and allied requirements such as residential
apartments in the year 2008 and the same was refused by the SEIAA Punjab
vide letter no. 32906 dated 7.10.2009 due to the fact that the layout plan of
the Educational Institution-cum-hospital was not approved by the Competent
Authority of the State.
2. Thereafter, M/s Gian Sagar Educational & Charitable Trust has applied for
obtaining Environmental Clearance under EIA notification dated 14.09.2006
for an Educational Complex namely "Gian Sagar Medical College & Hospital
and Gian Sagar Dental College & Hospital established in the revenue estate
of Village Ram Nagar, Tehsil Rajpura, Distt. Patiala. The project is covered
under category 8 (b) of the Schedule appended to the said notification.
3. The case was considered by the SEAC in its 54th meeting held on
30.12.2011, which was attended by the following on behalf of the project
proponent:
i) Sh. S.C. Tyagi, Chief Project Manager
ii) Sh. Jai Karan Sharma, Senior Manager (Admn & Liaison)
iii) Sh. Sandeep Garg, Environmental Consultant of M/s Eco Laboratories and Consultants, Mohali.
The Committee perused the minutes of 61st meeting of the
Accreditation Committee, National Accreditation Board for Education &
73
Training, Quality Council of India and noted that the accreditation of M/s Eco
Laboratories & Consultant Pvt. Ltd., Mohali has been cancelled. Therefore,
the Committee did not allow the environmental consultant of the promoter
company to make a presentation of the project proposal. The Committee
further noted that the project proponent is required to submit certain
information / data for scoping of the project proposal.
After detailed deliberations in the matter, the Committee
decided to defer the case till the project proponent submits the reply of its
observations. It was also decided to call the Medical Superintendent of
Rajindera Hospital, Patiala and Oncology Expert of PGI, Chandigarh in the
meeting of the SEAC in which the case is to be considered. The said decision
of the Committee was conveyed to the project proponent vide letter no. 392
dated 24.01.2012.
4. The project proponent vide letter no. GSMCH/11-12/150 dated 23.02.2012
has submitted reply of the observations of the SEAC, the details of which are
as under.
Sr. No.
Observations of the Committee Members
Reply of the observations
1 Whether 0.52 acres of land area, for which permission for CLU is yet to be obtained, is a part of the project proposal or not? If yes, then submit the CLU for the said area and intimate for what purpose the same will be used.
Permission to seek CLU for 0.52 acres of land area is in process with the concerned department and the said land area has been earmarked for the construction of residential complex.
2 The photographs submitted by the project proponent show that the construction of the Institute has already been
No further construction will be done without obtaining the Environmental Clearance required under the EIA notification dated 14.09.2006. The
74
completed, as such, intimate the reasons as to why the construction has been made in violation of provision of the EIA notification dated 14.09.2006 and submit an undertaking to the effect that no further construction will be done without obtaining environmental clearance required under the said notification.
project proponent has also informed that the earlier construction has been made prior to issuance of EIA notification dated 14.9.2006.
3 Whether the project proponent is yet to construct any additional building out of the total built-up area mentioned in the application for obtaining environmental clearance or not?
There is no proposal for construction of any additional building at present. Prior approval will be obtained in case any construction is made in future.
4. How much quantity of bio-medical waste is generated and how each category of bio-medical waste is being managed and handled? Further what is the status of authorization required under the Bio-medical Waste (Management & Handling) Rules, 1998.
Details have been submitted.
5. Whether any kind of hazardous waste like mercury is generated? If yes, the status of authorization under the Hazardous Wastes (Management, Handling & Transboundary Movement) Rules, 2008 and how the said
The institution is using mercury thermometers and blood pressure apparatus. If there is any breakage of the apparatus containing mercury, the same is collected and sent to Bio-medical Workshop where the Biomedical Engineer conserves it for further use in repairable blood
75
wastes are being managed and handled?
pressure apparatus. However, more than one third of blood Pressure Apparatus have been replaced by aneroid BP Apparatus in phase-1 and the remaining mercury containing apparatus will be replaced with non-mercury apparatus by the end of July, 2012.
6. Whether any kind of e-waste is generated and how the same is being managed & handled?
There is no generation of e-waste at present since the equipment purchased is fairly new and is being disposed off under exchange cost programme.
7. What are the present mode of treatment / disposal of bio-degradable, non-biodegradable and recyclable waste.
At present, the entire bio-degradable, non-bio-degradable and recyclable waste is sent to the STP. However, ETP equipments have been procured and civil work for installation of ETP is in progress and the same will be made operational by 22.03.2012.
8. What type of the industries are located within a radius of 500 m from the project site and their impact on the Institution?
There is one RCC Pipe plant within a radius of 500 m from the site of the Institute.
9. Whether any laundry plant has been installed and how much wastewater is generated from the said plant and which treatment facility has been installed for the same and what mode of disposal has been provided for the same?
The laundry plant has been installed in which the average usage of water is about 10,000 liters per day. The wastewater generated from the said plant is treated in the existing STP. However, there is a proposal to install a separate ETP for the same.
10. Whether any nuclear No nuclear (liquid/solid) waste is
76
liquid/solid waste is generated and how the same is being managed & handled and whether any permission for the same has been obtained from Atomic Energy Regulatory Board (AERB) or not?
generated in the Institute.
11. Whether any radio-active material is used or not? If yes, whether permission for the same has been obtained from AERB or not?
No radioactive material is used in the Institute.
12. How much wastewater is generated from X-ray section and how the same is being managed and handled?
No such waste is generated from the X-ray section in the Institute.
5. The project proponent was requested by the SEAC vide letter no.1086 dated
20.03.2012 to attend its 57th meeting on 27.03.2012. However, the project
proponent vide letter no 657 dated 27.3.2012 informed that the responsible
person dealing with the case had resigned and now the matter is being
looked into by Mr. S.C Tyagi, who is abroad due to some personal work.
Therefore, the promoter company will not be in a position to present the
project proposal on 27.03.2012 and requested for some more time to
present the project proposal.
In compliance to decision taken by the SEAC in its 54th meeting held
on 30.12.2011, Director, Post Graduate Institute of Medical Education Research
(PGIMER), Chandigarh and Medical Superintendent, Govt. Rajindera Hospital,
Patiala were requested vide letter no. 1086 dated 20.03.2012 and 1088 dated
77
20.03.2012, respectively to attend the 57th meeting of the SEAC on 27.03.2012, so
as to advise the Committee. Accordingly, Dr Sushmita Ghoshal, Professor, Deptt of
Radiotherapy PGIMER, Chandigarh and Dr V.K Dangwal, Associate Professor,
Department of Radiotherapy, GMC Patiala attended the said meeting of the SEAC
and informed that:
i) For setting up of radiotherapy unit and radio diagnostic centre, the hospital
is required to get the layout plan approved from Atomic Energy Regulatory
Board (AERB) before carrying out any construction activity at site. Also,
AERB issues certificate for operation of said unit/centre and inspections are
being carried out from time to time by the officials of the AERB, so as to
ensure as to whether the guidelines/regulations of the AERB are adhered
with or not.
ii) Similarly, for setting up of Nuclear Medicine Centre and X-ray units /CT scan
units, the hospital is required to get the layout plan approved from Atomic
Energy Regulatory Board (AERB) before carrying out any construction
activity at site. Also, AERB issues certificate for operation of said centre/ X-
ray/CT scan units and inspections are being carried out from time to time by
the officials of the AERB, so as to ensure as to whether the
guidelines/regulations of the AERB are adhered with or not.
iii) Only qualified person authorized from AERB can handle Nuclear medicine &
isotopes and this authorization generally remains valid for three years.
iv) Every hospital having Radiotherapy or Radio-activity unit, is required to
appoint Radiological Safety Officer (RSO), who is responsible for activities
related to the Radio-therapy and Radio-activity unit.
78
After detailed deliberations in the matter, the Committee was
of the opinion, that there is a need to ask the project proponent to submit
the reply of above-mentioned points brought out by the Experts for scoping
of the project proposal. The Committee, therefore, decided to defer the case
till the proper reply of observations of the Experts is received. The decision
of the Committee was conveyed to the project proponent vide letter No.
15921 dated 09.04.2012.
6. The project proponent submitted the reply of the observations of the
Committee, the details of which are as under:
Sr. No.
Observations of the SEAC Reply submitted by the project proponent
1. For setting up of radiotherapy unit and radio diagnostic centre, the hospital is required to get the layout plan approved from Atomic Energy Regulatory Board (AERB) before carrying out any construction activity at site. Also, AERB issues certificate for operation of said unit/centre and inspections are being carried out from time to time by the officials of the AERB, so as to ensure as to whether the guidelines/regulations of the AERB are adhered with or not.
Submitted a copy of the letter vide which layout plan has been approved by the AERB vide letter no. AERB/RSD/X-ray/ PJ / 2006 / 26444 dated 05.03.2007 and submitted a copy of layout plan photocopied in pieces, as such, nothing can be seen and concluded from the same.
2. Similarly, for setting up of Submitted a copy of letter issued by
79
Nuclear Medicine Centre and X-ray units / CT scan units, the hospital is required to get the layout plan approved from Atomic Energy Regulatory Board (AERB) before carrying out any construction activity at site. Also, AERB issues certificate for operation of said centre/ X-ray/CT scan units and inspections are being carried out from time to time by the officials of the AERB, so as to ensure as to whether the guidelines/regulations of the AERB are adhered with or not.
AERB vide No. AERB/RSD/X-ray/ PB / 2011 /7592 dated 22.06.2011, vide which the management of the hospital has been requested by the AERB to comply with the observations before installation of Mammography unit.
3. Only qualified person authorized from AERB can handle Nuclear medicine & isotopes and this authorization generally remains valid for three years.
No nuclear medicine is used in the hospital, as such, no authorization from AERB is required.
4. Every hospital having Radiotherapy or Radio-activity unit, is required to appoint Radiological Safety Officer (RSO), who is responsible for activities related to the Radio-therapy and Radio-activity unit.
No radio-therapy or radio activity unit has been installed in the hospital, as such, no RSO is required.
7. The project proponent was requested by the SEAC vide letter no. 30350
dated 16.07.2012 to attend its 62nd meeting on 21.07.2012 to present the
reply of its observations. Also, Director, Post Graduate Institute of Medical
Education Research (PGIMER), Chandigarh and Medical Superintendent,
Govt. Rajindera Hospital, Patiala were requested vide letter no. 3222 dated
80
19.07.2012 and 3223 dated 19.07.2012, respectively to attend the 57th
meeting of the SEAC on 27.03.2012, so as to advise the Committee
Following were present in the said meeting on behalf of the
project proponent:
i) Sh. A.S. Sekhon, Dean of the Institute
ii) Sh. S.C. Tyagi, Chief Project Manager of the Institute
iii) Sh. Jai Karan Sharma, Senior Manager (Admn & Liaison)
Besides above, Dr. V.K. Dangwal, Associate Professor, Department of
Radiotherapy, GMC Patiala attended the meeting and he informed that he is
satisfied with the reply submitted by the project proponent regarding the
observations of 57th meeting of the Committee. Thereafter, Sh. J.K. Sharma, AGM
submitted a letter no. GSECT/Admn/2012/43 dated 19.07.2012, in which it has
been mentioned that:
(i) Permission for CLU for additional land area (0.52 acres) in addition to 14
acres has been obtained from the Department of Town & Country Planning
vide letter no. 1605-CTP (Pb)/SP-432 (P) dated 23.04.2012 and submitted a
copy of the said permission.
(ii) The area of the project has been increased from 56.61 acres to 58.31 acres
and the revised layout plan is yet to be approved by the Competent
Authority of the State.
(iii) The construction of the project was started in the month of October, 2005
and the major construction has already been completed. The representative
of the project proponent submitted a copy of the resolution passed by the
81
Board of Trustees in which it has been stated that no further construction
will be done in the complex without obtaining the environmental clearance.
(iv) The total built up area with the revised proposal has been increased from
1,90,824.93 sqm to 2,25,212.14 sqm.
(v) There is a proposal to construct NRI Boys hostel having built up area
4771.45 sqm.
(vi) The categorywise quantity of bio-medical generated during the period
January, 2011 to December, 2011 is as under.
Sr. No Category Quantity(Kg)
1. Yellow Bags 5604
2. Red Bags 6726
3. Blue Bags 4002
4. White Waste 2839
5. Sharp 459.2
The entire bio-medical waste is being given to M/s Rainbow
Environments (P) Ltd., Village Balyali, District SAS Nagar and the
authorization from the Punjab Pollution Control Board under the Bio-Medical
Waste (Management & Handling) Rules, 1998 has been obtained and the
same is valid upto 31.03.2015.
(vii) Only source of hazardous waste is mercury from B.P. apparatus, majority of
which had been replaced with aneroid type B.P. apparatus. The old mercury
based B.P. apparatus had been sent back to the supplier.
82
(viii) The e-waste is being handled as per E-waste (Management & Handling)
Rules, 2011.
(ix) The municipal solid waste is being collected and disposed off to the Municipal
Council dumping site through a private contractor.
(x) Submitted a copy of plan showing various features within a radius of 500 m.
(xi) About 10 KLD of wastewater is generated from the laundry plant and a
separate ETP will be installed for the same.
The SEAC observed that the project proponent has now revised the
project proposal due to which there may be changes in the data / information in the
earlier application submitted by the project proponent for obtaining environmental
clearance under EIA notification dated 14.09.2006. After detailed deliberations in
the matter, the SEAC further observed that the project proponent is required to
intimate the Committee as to what will be the changes in the data / information in
the application submitted by it after revised project proposal and to submit the
revised layout plan, before scoping of the project proposal.
The Dean of the Institute requested the Committee to give 10 days to
submit the reply of observations of the Committee and revised layout plan. The
Committee agreed to accept the request of the Dean of the Institute and decided to
defer the case till the project proponent submits proper reply of its observations.
Item No. 62.07 Application for environmental clearance for Residential
Group Housing Project namely “Rosewood Green
Housing” to be developed by M/s Virat Infra Projects
Pvt. Ltd. at Vill. Sadhe Majra, Habitpur Road, Dera
Bassi, Distt. Mohali.
83
The SEAC observed that:
1. The project proponent has submitted an application for obtaining
environmental clearance required under EIA notification dated 14/9/2006 for
establishment of a Residential Group Housing Project namely “Rosewood
Green Housing” in the revenue estate of Vill. Sadhe Majra, Habitpur Road,
Dera Bassi, Distt. Mohali. The project promoter is covered under category 8
(a) of the Schedule attached to EIA notification dated 14/9/2006. The details
of the project proposal are as under:
The total area of the project is 15892.2 sq.m in which 250 no of flats
will be constructed having built-up area of 44780 sqm.
The estimated population of the residential complex will be 1250
persons.
The total water requirement shall be 169 Kl/day which will be met
through groundwater by installing one tubewell and a permission in
this regard has been granted by the CGWA vide no. 1624 dated
10.02.2010 for abstraction of 460 KLD of groundwater.
There will be about 135 KLD generation of domestic effluent, which
will be treated in a STP to be installed based on activated sludge
process. After treatment, About 121.5 KLD of the treated wastewater
will be generated, out of which 6.5 KLD of treated wastewater will be
used for irrigation, 68 KLD will be utilized for flushing purpose and
about 47 KLD will be discharged into sewer.The project proponent
has obtained NOC from Municipal Council, Dera Bassi vide letter no.
128 dated 23.01.2009 in this regard.
The total solid waste generation will be 500 Kg/day, which will be
segregated at source. The non-biodegradable component will be sold
84
out to the recyclers and the remaining solid waste will be disposed off
in the dumping yard of the M.C Dera Bassi. The project proponent
has submitted a copy of NOC issued by Municipal Council, Dera Bassi
vide no. 128 dated 23.01.2009 regarding the above.
The total energy requirement for the project will be 2122 KW, which
will be taken from Punjab State Power Corporation Limited. The
project proponent has proposed to install 2 no. D.G. sets of capacity
750 KVA each as stand-by arrangements for power supply.
The total parking area will be in an area of 10552.6 sq.m, out of
1425.6 sq.m and 9127 sq.m.,respectively, will be provided in stilt
parking and basement parking.
The ambient air monitoring has been got done from M/s Eco Pro
Engineers Pvt Ltd and the analysis results indicate that the
concentration of various pollutants such as PM2.5, PM10, SO2, NO2 and
CO is within the prescribed standards. Also, ambient noise monitoring
has been got done from the said firm and the analysis results indicate
that the noise levels during day and night times, have been measured
as 53.8 dB(A) leq and 41.7 dB(A) leq, respectively, against the
prescribed standards of 55 and 45 dB(A) leq.
2. The case was considered by the SEAC in its 44th meeting held on 26.03.2011
and the Committee decided as under:
i) The project proponent be requested not to carry out any further
construction activity at site till he obtains environmental clearance
required under EIA Notification dated 14.9.2006. The project
proponent be also requested to submit the latest photographs from all
the four sides showing the status of construction.
85
ii) The project proponent be requested to get information regarding
classification of the area from the Department of Town & Country
Planning, Punjab, in which the site of the project is located, as per
Master Plan, within 7 days.
3. The decision taken by the Committee in its 44th meeting was conveyed to the
project proponent vide letter no. 1101 dated 04.04.2011
4. Subsequently, the project proponent vide letter dated 26.07.2011 has
submitted the reply in connection with letter no. 1101 dated 04.04.2011, the
details of which are as under:
Sr. No.
Observations of the SEAC Reply submitted by the project proponent
1. The project proponent be requested not to carry out any further construction activity at site till he obtains environmental clearance as required under EIA Notification dated 14.9.2006. The project proponent be also requested to submit the latest photographs from all the four sides showing the status of construction.
Submitted photographs taken from four sides, which show that the construction work has been started at site.
2. The project proponent be requested to get information regarding classification of the area from the Department of Town & Country Planning, Punjab, in which the site of the project is located, as per Master
The project proponent has not submitted information regarding classification of area. However, the project proponent has submitted a copy of letter issued by the Chief Town Planner, Punjab vide memo No. 5139 CTP (Pb) SP-46 dated 21.07.2011, addressed to the
86
Plan, within 7 days.
project proponent, in which it has been mentioned that in the Master Plan of Dera Bassi it is clearly written that those proposed structures, which had been sanctioned by the Competent Authority, will remain the same in the Master Plan.
3. Status of CLU Submitted a copy of letter no. 1831 dated 11.12.2006 of M.C., Dera Bassi to the effect that permission for CLU in FEZ area within M.C. limits is not required.
5. The case was considered by the SEAC in its 50th meeting held on 12.8.2011,
which was attended by the following on behalf of the project proponent:
1. Wg. Cdr (Retd) Sh. Vijay Tyagi, Deputy General Manager of the promoter company
2. Sh. Sandeep Garg, Environmental Consultant of M/s Eco Laboratories and Consultants, Mohali.
Sh. Sandeep Garg, who is the Environmental Consultant
of the project proponent, presented the reply of the observations as under:
a) About 15-20% of the construction work has been completed and
further construction work has been stopped and the same will only be
started after obtaining environmental clearance under EIA Notification
dated 14.9.2006.
b) Submitted a copy of the Master Plan of Dera Bassi and the site of the
residential colony is located in the industrial zone as per the said
Master Plan. He further informed that the Chief Town Planner, Punjab
87
vide memo No. 5139 CTP (Pb) SP-46 dated 21.07.2011, has informed
that in the Master Plan of Dera Bassi it is clearly written that those
proposed structures, which had been sanctioned by the Competent
Authority, will remain the same in the Master Plan.
c) The M.C., Dera Bassi vide letter no. 1831 dated 11.12.2006 has
informed that permission for CLU is not required in FEZ area within
M.C. limits.
After detailed deliberations in the matter, the SEAC observed
that the site of the project is surrounded by the industrial zone as per the
Master Plan of Dera Bassi, as such, any type of industry can come up in the
said area, but the project proponent has not made any provision of providing
15 m wide green belt as per the stipulation laid down in the notification No.
3/6/07/STE(4)/2274 dated 25.7.2008 of the Govt. of Punjab, Deptt. of
Science, Technology, Environment & Non-conventional Energy. Moreover,
the project proponent has made construction at about 15-20' from the
boundary of the project site, thus, the project proponent is not in a position
to provide 15m wide green belt, wherever, the same is required.
Sh. Vijay Tyagi, Deputy General Manager of the promoter
company requested the Committee for one month time period for submission
of revised layout plan showing a provision of 15m green belt as per the
stipulation laid down in the notification No. 3/6/07/STE(4)/2274 dated
25.7.2008 of the Govt. of Punjab, Deptt. of Science, Technology,
Environment & Non-conventional Energy wherever, the same is required.
The Committee agreed to accept the request of the
representative of the project proponent and decided to defer the case till the
reply of the aforesaid observation is received. The decision of the Committee
88
was conveyed to the project proponent vide letter no. 3604 dated
30.08.2011.
6. Thereafter, the project proponent vide letter no. 000995 dated 02.02.2012
has submitted the reply in connection with letter no. 3604 dated 30.08.2011
of the SEAC containing the following facts:
(i) The NOC was granted by the Punjab Pollution Control Board vide
letter no. MHL/colony/86/2008/4810 dated 15.12.2008 subject to
certain conditions and following additional conditions:
The project proponent will provide a buffer of 15 m wide green
belt of broad leaved trees towards the red category industries
i.e. M/s Shakti Roll Cold Strips (P) Ltd., and M/s Hansa Tubes
(P) Ltd., as proposed in the revised layout plan submitted by
the promoter.
The project proponent shall submit the amended layout plan of
the project duly approved by the Competent Authority within
three months as per the above condition leaving necessary
green buffer and project proponent shall undertake the
construction only as per amended layout plan leaving the
necessary green buffer.
(ii) The Punjab Pollution Control Board while renewing the NOC on
17.09.2010 has waived off aforesaid both conditions keeping in view
of the facts that the site of the project is located in the mixed land use
area.
(iii) The Department of Town & Country Planning is not ready to change
the approved layout plan since the same was approved when the site
89
of the project was falling in industrial mixed zone. However, the
Department of Town & Country Planning on 27.07.2010 had amended
the Master Plan of Dera Bassi and now the site of the project is
located in the Industrial General Zone as per the said Master Plan.
7. The case was considered by the SEAC in its 56th meeting held on
27.02.2012, which was attended by Wg. Cdr (Retd) Sh. Vijay Tyagi, Deputy
General Manager of the promoter company and he informed that:
a) Three sides of the project site is surrounded by the residential project
namely “Parsvnath Greens” to be developed in the revenue estate of
Vill. Sadhe Majra, Tehsil Dera Bassi, Distt. Mohali by M/s Parsvnath
Developers Ltd.
b) There are 2 red category air polluting industries namely M/s Shakti
Roll Cold Strips (P) Ltd., and M/s Hansa Tubes (P) Ltd., at a distance
of 55 m and 97 m, respectively from the 4th side of the project site.
Therefore, on that side, the construction of some portion of the
building block will not be done to have space for providing 15 m wide
green belt of broad leaf trees due to which the built up area will
reduce from 44780 sqm to 41744 sqm. He submitted an undertaking
in writing in this regard and the same was taken on record by the
Committee. He also submitted a copy of layout plan showing provision
of 15m wide green belt.
c) About 2% (Rs.70 Lacs) of the total project cost will be spent in 5
years in a phased manner for social activities in the area. The
Director, Project Manager and Project Coordinator will be responsible
for implementation of CSR.
90
d) About Rs.58 lacs will be spent for implementation of EMP and
Rs.8Lacs per annum will be spent on account of recurring cost of EMP.
The SEAC deliberated upon the matter and looked into the
details of the layout plan meticulously and noticed that it is not clear as to
whether the boundary of this project is abutting to the boundary of the
project namely “Parsvnath Greens” to be developed in the revenue estate of
Village Sadhe Majra, Tehsil Dera Bassi, Distt. Mohali by M/s Parsvnath
Developers Ltd on three sides or there is some gap pertaining to 'Industrial
General Zone' in which an industrial plant can come up in future.
Furthermore, the project proponent has already carried out 15-20%
construction work of the project and there is need to check as to whether
there is sufficient space for providing 15m wide green belt of broad leaf trees
on the side touching to the 'Industrial General Zone' and on the side where
air polluting industries are existing within a radius of 100 m from the project
site. Therefore, there is a need to get the submission of the project
proponent verified from the Punjab Pollution Control Board to arrive at
logical end.
After detailed deliberations in the matter, the Committee
decided to get a detailed report from Punjab Pollution Control Board, within
10 days, regarding the following points before taking any further action in
the matter:
1. Layout plan showing all the air polluting industries including all other
features, within a radius of 500 m from the periphery of the project
site and their distance from the periphery of the project site.
2. Whether the boundary of the project namely “Parsvnath Greens” to be
developed in the revenue estate of Village Sadhe Majra, Tehsil Dera
91
Bassi, Distt. Mohali by M/s Parsvnath Developers Ltd is abutting to the
boundary of 'Rosewood Green Housing' or there is some gap and the
land use of the said gap as per the notified Master Plan of Dera Bassi.
Besides, present actual activities going on the said gap.
3. Land use as per notified Master Plan of Dera Bassi adjoining to the
project site on all the sides.
4. Whether there is sufficient space to provide green belt on the side of
the project which is either abutting to the 'Industrial General Zone' or
where there are existing air polluting industrial unit within a radius of
100m from the project site.
It was also decided to inform the project proponent in this
regard. The decision of the Committee was conveyed to the project
proponent vide letter No. 12226 dated 15.03.2012.
9. The Punjab Pollution Control Board vide letter no. 3179 dated 24.05.2012
has informed that the site of the project was visited on 07.04.2012 by the
Officer of the Regional Office of the Punjab Pollution Control Board at Mohali
and reported that:
(i) There are 4 units namely as M/s Hansa Tubes Pvt Ltd., M/s KSI
Medicare, M/s Crop Care and M/s Amrit Rice Mills within a distance of
500 m. During the visit, distances were checked and it was observed
that the distances from the boundary walls of M/s Hansa Tubes Pvt
Ltd. is approx 96.3m, M/s KSI Medicare is approx. 118.5m, M/s Crop
Care is approx. 172.4 m and M/s Amrit Rice Mills is approx. 311.4 m,
respectively, from the nearest boundary of the project. However, the
distances of sources of air pollution of these industries are more than
92
100m. Furthermore, M/s Shakti Roll Cold Strips Pvt Ltd., which was
within 100m from the project site, had been dismantled.
(ii) There is a gap between this project and the project namely
“Parsvnath Greens” and there are few houses constructed in this gap.
However, the land use of the gap as per the master plan of Dera Bassi
can be verified from DTP, SAS Nagar. Few existing houses are built in
the gap, however, no new construction activities are being carried out
in the said gap.
(iii) Land use as per the master plan of Dera Bassi adjoining to the project
site on all sides can be verified from DTP, SAS Nagar. The
representative of the project informed that they had obtained a
certificate from the CTP, Punjab issued vide its letter dated
21/07/2011 mentioning that in the Master Plan of Dera Bassi it is
clearly written that those proposed structures, which have been
sanctioned by the Competent Authority, they will remain in the Master
Plan as those are already shown. Moreover, as per notification no.
6312 CTP (Pb)/SP-421 dated 11/08/2009, it has been incorporated
that “Where statutory master plan has been notified under the Punjab
Regional and Town Planning and Development Act, 1995 (Amended)
2006, if any new residential, commercial, mixed land use or any other
development/construction comes up as per the earmarked zone there
is no need to keep any additional distance from the existing industry
from the environment point of view because these factors have
already been taken care of while earmarking the different land use
zones in the master plan”.
(iv) The project proponent has sufficient space to provide green belt on
93
the side of the project, which is abutting to the industry namely M/s
Hansa Tubes Pvt Ltd, which is within 100 m from the boundary of
project to the boundary of the industry, however, the source of
pollution is at a distance of more than 100 m. The representative of
the project informed that they will not construct few blocks so as to
provide green buffer towards the industry.
10. The project proponent vide letter dated 10.07.2012 has submitted a copy of
letter no. 1048-DTP (S) /MP-1 dated 20.06.2012 issued by DTP, Mohali, in
which it has been mentioned that:
"nkgdh gqsh p/Bsh ftZu fby/ rJ/ y;ok Bzpo 252 ns/ 253 o'v tkJhvfBzr, rohB
ns/ fJzv;Noh fwe; ftZu g?Id/ jB . y;ok Bzpo 222, 240, 241, 250 ns/ 251 48
whNo gog'iav o'v, rohB ns/ fJzv;Noh fwe; i'aB ftZu g?Id/ jB . fJ; b?Iv :{ia
ebk;hfce/;aB ;oNhfce/N B{z G'I tos'I spdhbh ;oNhfce/N Bk ;wfMnk ikt/" .
11. The project proponent was requested by the SEAC vide letter no. 3159 dated
17.07.2012 to attend its 62nd meeting on 21.07.2012, which was attended
by Wg. Cdr (Retd) Sh. Vijay Tyagi, Deputy General Manager of the promoter
company and he informed that as per amendments made by the Department
of Town & Country Planning, Punjab in the Master Plan of Dera Bassi vide
Notification dated 22.12.2011, the site of the project is located in the
'Industrial Mixed Zone' and in the layout plan a provision for providing 15m
wide green belt of broad leaf trees has been made towards existing air
polluting industries. However, there is no need to provide any green belt of
15 m wide green belt of broad leaf trees towards other sides since that sides
are abutting to the 'Industrial Mixed Zone' since as per bye-laws of the
Master Plan of Dera Bassi if residential is coming near the existing red
category industry in the 'Industrial Mixed Zone', then promoter of residential
94
development shall provide 15m green buffer and if in the said Zone a new
red category industry is coming near residential, the promoter of new
industry shall provide 15 m green buffer. He also stated that the promoter
company is complying with the provisions of Office Memorandum dated
07.02.2012 of the Ministry of Environment & Forests, for high rise buildings
since the necessary NOC from the Fire Station Dera Bassi has already been
obtained vide No. 183 dated 24.12.2008, width of the approach road is 18m
against the minimum requirement of 15m as the height of the building is
22.5m and the site of the project is located at a distance of 3 km from the
Fire Station.
The Committee also observed that the project proponent has already
completed the construction of the project, which is a violation of the provisions of
EIA notification dated 14.9.2006. Therefore, in compliance to Office Memorandum
dated 16.11.2010 of the Ministry of Environment & Forests, New Delhi, the project
proponent is required to submit a resolution to the effect that the violation of the
Environment (Protection) Act, 1986 for starting construction activity without
obtaining environmental clearance under EIA notification is not intentional and will
not be repeated in future. The Committee further observed that the project
proponent has provided adequate and satisfactory clarifications of the observations
raised by it, therefore, the Committee awarded 'Silver Grading' to the project
proposal and in light of aforesaid resolution, decided to forward the case to the
SEIAA, with the recommendation to grant environmental clearance to the project
proponent for construction of a residential complex in an area of 3.92 acres(for
construction of three blocks of 6 floors + ground floor each and club house having
build up area of 44,780 sqm.) in the revenue estate of Village Sadhe Majra, Tehsil
Dera Bassi , Distt S.A.S. Nagar, subject to the following conditions in addition to the
95
proposed measures. It was also decided to recommend to SEIAA to send the case
to the Govt. of Punjab, Department of Science, Technology & Environment for
initiating action under the Environment (Protection) Act, 1986 due to start of
construction work of their project without obtaining environmental clearance under
EIA notification dated 14.09.2006.
PART A – Specific conditions
I. Construction Phase
I. “Consent to establish” shall be obtained from Punjab Pollution Control Board under Air (Prevention & Control of Pollution) Act, 1981 and Water (Prevention & Control of Pollution) Act, 1974 and a copy of the same shall be submitted to the Ministry of Environment & Forests / State Level Environment Impact Assessment Authority before the start of any construction work at site.
II. All required sanitary and hygienic measures should be in place before starting construction activities and to be maintained throughout the construction phase.
III. A first aid room will be provided in the project both during construction and operation phase of the project.
IV. All the topsoil excavated during construction activities should be stored for use in horticulture / landscape development within the project site.
V. Disposal of muck during construction phase should not create any adverse effect on the neighboring communities and be disposed off after taking the necessary precautions for general safety and health aspects of people with the approval of competent authority.
VI. Construction spoils, including bituminous material and other hazardous material, must not be allowed to contaminate watercourses and the dump sites for such material must be secured, so that they should not leach into the ground water.
VII. The diesel generator sets to be used during construction phase should be of low sulphur diesel type and should conform to the provisions of Environment (Protection) Act, 1986 prescribed for air and noise emission standards.
96
VIII. Vehicles hired for bringing construction material to the site and other machinery to be used during construction should be in good condition and should conform to applicable air and noise emission standards.
IX. Ambient noise levels should conform to prescribed standards both during day and night. Incremental pollution loads on the ambient air and noise quality should be closely monitored during construction phase.
X. Fly ash should be used as construction material in the construction as per the provisions of Fly Ash Notification of September, 1999 and as amended on August, 2003 (This condition is applicable only if the project is within 100 Km of Thermal Power Station).
XI. Ready mixed concrete should be used in building construction as far as possible.
XII. Water demand during construction should be reduced by use of premixed concrete, curing agents and other best practices.
XIII. Separation of drinking water supply and treated sewage supply should be done by the use of different colours.
XIV. Adequate steps shall be taken to conserve energy by limiting the use of glass, provision of proper thermal insulation and taking measures as prescribed under the Energy Conservation Building Code.
XV. The approval of competent authority shall be obtained for structural safety of the buildings due to earthquakes, adequacy of fire fighting equipments etc. as per National Building Code including protection measures from lightning.
XVI. Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel for cooking, mobile toilets, mobile STP, disposal of waste water & solid waste in an environmentally sound manner, safe drinking water, medical health care, crèche etc. The housing may be in the form of temporary structures to be removed after the completion of the project.
II. Operation Phase
I. The installation of sewage treatment plant (STP) and adequacy of disposal system should be certified by Punjab Pollution Control Board and a report in this regard should be submitted to the Ministry of Environment & Forests/State Level Environment Impact Assessment Authority before the project is commissioned for operation. The discharge of treated sewage shall
97
conform to the norms and standards prescribed by Punjab Pollution Control Board for such discharges. The project proponent shall discharge not more than 47 KLD of treated wastewater into sewer .
II. The project proponent shall provide electromagnetic flow meter at the outlet of the water supply, outlet of the STP and any pipeline to be used for re-using the treated wastewater back into the system for flushing and for horticulture purpose/green etc. and shall maintain a record of readings of each such meter on daily basis.
III. Adequate & appropriate pollution control measures should be provided to control fugitive emissions to be emitted within the commercial complex.
IV. Adequate treatment facility for drinking water shall be provided, if required.
V. Rainwater harvesting for roof run-off should be implemented. Before recharging the roof run-off, pretreatment must be done to remove suspended matter, oil and grease. However, no run off from gardens/green area/roads/pavements shall be connected with the ground water recharging system.
VI. The solid waste generated should be properly collected and segregated. The recyclable solid waste shall be sold out to the authorized vendors and inerts shall be sent to disposal facility. The Bio-degradable solid waste shall be adequately treated as per the scheme submitted by the project proponent. Prior approval of competent authority should be obtained, if required.
VII. Hazardous waste/E-waste should be disposed off as per Rules applicable and with the necessary approval of the Punjab Pollution Control Board.
VIII. The green belt design along the periphery of the plot shall achieve attenuation factor conforming to the day and night noise standards prescribed for residential land use. The open spaces inside the plot should be suitably landscaped and covered with vegetation of indigenous species/variety.
IX. The project proponent should take adequate and appropriate measures to contain the ambient air quality with in the prescribed standards. The proposal regarding mitigation measures to be taken at site should be submitted to the Ministry of Environment & Forests/ State Level Environment Impact Assessment Authority within three months.
X. Incremental pollution loads on the ambient air quality, noise and water quality should be periodically monitored after commissioning of the project.
98
XI. Application of solar energy should be incorporated for illumination of common areas, lighting for gardens and street lighting in addition to provision for solar water heating.
XII. Traffic congestion near the entry and exit points from the roads adjoining the proposed project site must be avoided. Parking should be fully internalized and no public space should be utilized.
XIII. A report on the energy conservation measures conforming to energy conservation norms finalized by Bureau of Energy Efficiency should be prepared incorporating details about machinery of air conditioning, lifts, lighting, building materials, R & U Factors etc. and submitted to the respective Regional office of MoEF, the Zonal Office of CPCB and the SPCB/SEIAA in three months time.
XIV. Environment Management Cell shall be formed during operation phase which will supervise and monitor the environment related aspects of the project.
PART B – General Conditions :
i) This environmental clearance will be valid for a period of five years from the date of its issue or till the completion of the project, whichever is earlier.
ii) The environmental safeguards contained in the application of the promoter / mentioned during the presentation before State Level Environment Impact Assessment Authority/State Expert Appraisal Committee should be implemented in letter and spirit.
iii) The entire cost of the environmental management plan (i.e. capital cost as well as recurring cost) will continue to be borne by the project proponent until the responsibility of environmental management plan is transferred to the occupier/residents society under proper MOU after obtaining prior permission of the Punjab Pollution Control Board.
iv) The project proponent shall also submit six monthly reports on the status of compliance of the stipulated EC conditions including results of monitored data (both in hard copies as well as by mail) to the respective Regional office of MoEF, the Zonal Office of CPCB and the SPCB/SEIAA.
v) Officials from the Regional Office of Ministry of Environment & Forests, Chandigarh / State Level Environment Impact Assessment Authority / State Level Expert Appraisal Committee / Punjab Pollution Control Board who would be monitoring the implementation of environmental safeguards should be given full cooperation, facilities and documents / data by the project
99
proponents during their inspection. A complete set of all the documents submitted to State Environment Impact Assessment Authority should be forwarded to the CCF, Regional Office of Ministry of Environment & Forests, Chandigarh/State Level Environment Impact Assessment Authority.
vi) In the case of any change(s) in the scope of the project, the project would require a fresh appraisal by State Environment Impact Assessment Authority.
vii) Separate distribution pipelines be laid down for use of treated effluent / raw water for horticultural/gardening purposes with different colour coding.
viii) All other statutory clearances such as the approvals for storage of diesel from Chief Controller of Explosives, Fire Department, Civil Aviation Department, Forest (Conservation) Act, 1980 and Wildlife (Protection) Act, 1972 etc. shall be obtained, by project proponents from the competent authorities including Punjab Pollution Control Board and from other statutory bodies as applicable.
ix) The project proponent should advertise in at least two local newspapers widely circulated in the region, one of which shall be in the vernacular language informing that the project has been accorded environmental clearance and copies of clearance letters are available with the Punjab Pollution Control Board. The advertisement should be made within seven days from the day of issue of the clearance letter and a copy of the same should be forwarded to the Regional Office, Ministry of Environment & Forests, Chandigarh.
x) These stipulations would be enforced among others under the provisions of Water (Prevention & Control of Pollution) Act, 1974, Air (Prevention & Control of Pollution) Act, 1981, Environmental (Protection) Act, 1986, the Public Liability (Insurance) Act, 1991 and EIA Notification, 2006.
xi) Environmental clearance is subject to final order of the Hon'ble Supreme Court of India in the matter of Goa Foundation Vs. Union of India in Writ Petition (Civil) No. 460 of 2004 as may be applicable to this project and decisions of any competent court, to the extent applicable.
xii) A copy of the clearance letter shall be sent by the proponent to concerned Panchayat, Zilla Parishad/ Municipal Corporation, Urban local body and the local NGO, if any, from whom suggestions / representations, if any, were received while processing the proposal. The clearance letter shall also be put on the website of the Company by the proponent.
xiii) The proponent shall upload the status of compliance of the stipulated EC conditions, including results of monitored data on their website and shall update the same periodically. It shall simultaneously be sent to the Regional
100
Office of MoEF, the respective Zonal Office of CPCB and the SPCB. The criteria pollutant levels namely; PM2.5, PM10, SO2, NOx , CO, Pb, Ozone (ambient air as well as stack emissions) shall be monitored and displayed at a convenient location near the main gate of the company in the public domain.
xiv) The project proponent shall adhere to the commitments made in the Environment Management Plan and Corporate Social Responsibility.
xv) The project proponent shall construct proper drainage system for the surface run-off and no sewerage system will be connected with the storm water drain.
xvi) The allotment letter to the individuals must contain the proposal regarding use of treated wastewater for flushing purpose and horticulture within their premises.
xvii) The project proponent shall comply with the conditions imposed by the Central Ground Water Authority, Ministry of Water Resources, Govt. of India, in the permission granted vide letter no. 1624 dated 10.02.2010 and shall abstract not more than 460 KLD of groundwater.
xviii) The project proponent shall comply with the conditions imposed by the Department of Town & Country Planning in the permission for CLU granted vide Memo No.466 CTP (Pb)/SP-432 dated 28.01.2005.
xix) The project proponent shall provide 15 m wide green belt of broad leaved trees towards the side where the air polluting industries are existing within a radius of 100 m from the periphery of the project site, as shown in the layout plan submitted by the promoter company.
xx) Fixtures for showers, toilet flushing and drinking should be of low flow either by use of aerators or pressure reducing devices or sensor based control in commercial area and the residents will also be motivated to adopt the said technique in their residential houses.
xxi) The State Environment Impact Assessment Authority reserves the right to add additional safeguards/ measures subsequently, if found necessary, and to take action including revoking of the environmental clearance under the provisions of the Environmental (Protection) Act, 1986, to ensure effective implementation of the suggested safeguards/ measures in a time bound and satisfactory manner.
xxii) Any appeal against this environmental clearance shall lie with the National Green Tribunal, if preferred, within a period of 30 days as prescribed under Section 16 of the National Green Tribunal Act, 2010.
101
Item No. 62.08: Application for obtaining environmental clearance for establishment of cement grinding unit of capacity 150 TPD by M/s Surya Industries in the revenue estate of at Sadiq Road, Faridkot, Distt- Faridkot.
The SEAC observed that:
1. M/s Surya Industries has applied for obtaining environmental clearance as
required under EIA Notification for establishment of a cement grinding plant
of capacity 150 TPD in the revenue estate of Sadiq Road, Faridkot, Distt.
Faridkot. The project of the promoter pertains to category 'B' and it falls
under category 3 (b) of the Schedule appended to the said Notification.
2. The case was considered by the SEAC in its 49th meeting held on 18.7.2011,
wherein, the SEAC decided to categorise the project into B1 category and
finalized the 'Terms of Reference' (TOR), which were conveyed to the project
proponent vide letter No. 32194 dated 04.08.2011 for preparation of rapid
EIA report and EMP.
3. Now, the project proponent vide letter no. S1.06/279 dated 30.06.2012 has
submitted the rapid EIA report.
4. The project proponent was requested by the SEAC vide letter no. 3179 dated
17.07.2012 to attend its 62nd meeting on 21.07.2012.
Following were present in the meeting on behalf of the project
proponent:
(i) Sh. Prem Kumar, Partner of project proponent
(ii) Sh. Sital Singh of M/s CPTL Envirotech Consultants, Chandigarh
102
Due to paucity of time, the case could not be discussed by the SEAC,
as such, it was decided to defer the case to its next meeting with the consent of the
project proponent.
Item No. 62.09 Application for obtaining Environmental Clearance
under EIA notification dated 14.09.2006 for developing
a residential complex namely “Trishla City” in the
revenue estate of Village Nabha Sahib, Tehsil
Derabassi, SAS Nagar, Punjab by M/s Trishla Buildtech
Pvt. Ltd.,
The SEAC observed that:
2. M/s Trishla Buildtech Pvt. Ltd., has applied for obtaining environmental
clearance as required under the EIA notification dated 14/9/2006 for
developing a residential complex namely “Trishla City” in the revenue estate
of Village Nabha Sahib, Tehsil Derabassi, District SAS Nagar, Punjab. The
project is covered under category 8 (a) of the Schedule appended to the said
EIA notification.
3. The case was considered by the SEAC in its 59th meeting held on
20.05.2012, which was attended by the following on behalf of the project
proponent.
(i) Mr Harish Gupta, Managing Director of the promoter company.
(ii) Mr A.K. Ummat, Environment Consultant of the promoter company.
The Committee observed that the project proponent is
required to submit certain information / data before making presentation for
appraisal of the project proposal. The decision of the SEAC was conveyed to
the project proponent vide letter no. 2385 dated 01.06.2012.
103
3. The project proponent has submitted the reply of the observations of the
SEAC, the details of which are as under:
Sr. No.
Observations of the SEAC Reply submitted by the project proponent
1. Details of Environmental Management Plan in respect of following points:
a) All mitigation measures for each item-wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project.
Submitted.
b) Compliance of various environmental regulations
Not Submitted.
c) Steps to be taken in case of emergency such as accidents at the site including fire.
Submitted.
d) For how long period the project proponent will be responsible for implementation of EMP and the name of the person(s) responsible for implementation of EMP.
During construction phase Sh. Harish Gupta, M.D. will be responsible. During operation phase either the Municipal Council or the Resident Welfare Association will be responsible. A clause in this regard has been inserted in the sale agreement of the flats.
e) Capital & recurring cost for the EMP per year and the details of funds for the same.
Submitted.
104
f) Name of the individual persons / organization, who will be responsible for implementation of EMP after the elapse of the period for which the project proponent is responsible.
Sh. Harish Gupta, M.D.
2. Permission of CGWA for abstraction of groundwater.
Yet to be obtained from CGWA.
3. Approved layout plan of the project showing the following:
i) Solid waste storage area.
ii) Parking space
iii) RWH and water recharge pits
iv) Fire fighting equipment layout
Vii) First aid room viii) Location of Tubewells
i) Marked.
ii) Marked.
iii) Marked.
iv) Marked.
v) Marked.
vi) Marked.
4. Corporate Social Responsibility indicating various activities to be undertaken, provisions of funds for the same, the period for which the same is to be implemented and the person(s) responsible for the implementation of the same.
Submitted, but the name of the person responsible for implementation of Corporate Social Responsibility has not been intimated.
105
5. Permission of PSPCL for power connection.
Permission from PSPCL for power connection has been applied for.
6. Whether the height of building tower is more than 15m or not, if yes i) Whether the permission
from fire department has been obtained
(ii) At how far distance the fire station is located from the project site
(iii) What is minimum width of the road.
i) Submitted.
ii) At a distance of 2-3 km from the site.
iii) 40 feet.
4. The project proponent was requested by the SEAC vide letter no. 3180 dated
17.07.2012 to attend its 62nd meeting on 21.07.2012. Sh. Sital Singh of M/s
CPTL Envirotech Consultants, Chandigarh attended the said meeting on
21.07.2012.
The Committee observed that the project proponent has not
submitted the reply of its following observations of 59th meeting held on
20.05.2012, as such, the appraisal of the project proposal can not be done till the
project proponent submits the reply of the said observations:
1. Compliance of various environmental regulations as regards to EMP.
2. Permission of CGWA for abstraction of groundwater
3. Period for which the Corporate Social Responsibility is to be
implemented and the person(s) responsible for the implementation of
the same.
4. Permission of PSPCL for power connection.
106
The environmental consultant of the promoter company
requested the Committee to give 10 days to submit the reply of its observations.
The Committee agreed to accept the request of the environmental consultant and
decided to defer the case till the project proponent submits proper reply of its
observations.
Item no. 62.10: Application for obtaining Environmental Clearance under EIA Notification dated 14.9.2006 for construction of a housing complex in the revenue estate of Village Mullanpur, Tehsil Kharar, District SAS Nagar by M/s Curo India Pvt. Ltd (Old Name M/s Dynamic Continental Pvt. Ltd).
The SEAC observed that:
1. M/s Dynamic Continental (P) Ltd. had applied for obtaining environmental
clearance under EIA notification for establishment of Hotel Complex at
Mullanpur, Tehsil Kharar, District Ropar and the case was considered by the
SEAC in its 46th meeting held on 24.4.2011, wherein, the representative of
the project proponent informed that the name of the company had been
changed from M/s Dynamic Continental Pvt. Ltd to M/s Curo India Pvt. Ltd.
2. Accordingly, M/s Curo India Pvt. Ltd. had applied for obtaining environmental
clearance as required under the EIA notification dated 14/9/2006 for
establishment of Hotel Complex namely “Curo North Square” at Mullanpur,
Tehsil Kharar, District SAS Nagar. This case was last considered by the SEAC
in its 56th meeting held on 27.02.2012 and the decision of the Committee
was conveyed to the project proponent vide letter no. 12221 dated
14.03.2012.
3. Now, M/s Curo India Pvt. Ltd., has applied for obtaining environmental
clearance under EIA Notification dated 14.09.2006 for construction of a
107
group housing complex in the revenue estate of Village Mullanpur, Tehsil
Kharar, District SAS Nagar. The project proponent has informed that the
earlier proposal of the promoter company for construction of a hotel complex
namely 'Curo North Square' is not feasible due to some circumstances, as
such, the promoter has planned to construct group housing complex at the
same site. The project is covered under category 8 (a) of the said
notification.
4. The project proponent was requested by the SEAC vide letter No. 3187 dated
17.07.2012 to attend its 62nd meeting on 21.07.2012.
The promoter Company vide letter dated 20.07.2012 requested to
defer the case to the next meeting of the Committee.
The Committee looked into the details of the application and observed
that the project proponent is required to submit the following information / data
before making presentation for appraisal of the project proposal.
i) Layout plan/Building plan duly approved by the Competent Authority.
ii) Photographs from all the four sides showing the construction status.
iii) 500 meter radius map of the area from periphery of project site clearly
indicating the various industries (specifically red category industries) and
structures lying in the area.
iv) Approved layout plan of the project showing the following:
Solid waste storage area. Location of STP Green belt
Parking space RWH and water recharge pits Fire fighting equipment layout
108
First aid room Location of Tubewells
v) Permission of the Competent Authority for: a) Water & sewerage connection b) Collection of Solid waste c) Use of Ground Water
vi) Water balance chart for summer, rainy and winter seasons indicating critical requirements.
vii) Availability of adequate land for use of treated sewage and plantation.
viii) Analysis reports of ambient air, ground water and noise levels from NABL /
MoEF accredited laboratories.
ix) Quantification of energy to be saved and renewable devices to be used and permission of PSPCL for power connection.
x) Drawing showing plumbing systems for use of fresh, treated and hot water
xi) Construction Schedule(PERT/CPM chart)
xi) Affidavits for ;
Constitution of Environment Monitoring Cell Use of ready mix concrete or use of fly ash during construction. To provide Fire Fighting System To provide wind breaking curtains and water sprinkling system to
minimize dust emissions. To provide adequate safety measures for the construction workers during
the construction phase.
xii) NOC of fire department indicating at how far distance the fire station is located from the project site
xiii) What is minimum width of the approach road to the project site.
xiv) Environmental Management Plan indicating the following:
a) Compliance of various environmental regulations
c) Steps to be taken in case of emergency such as accidents at the site including fire.
109
d) For how long period the project proponent will be responsible for implementation of EMP and the name of the person(s) responsible for implementation of EMP.
e) Capital & recurring cost for the EMP per year and the details of funds for the same.
f) Name of the individual persons / organization, who will be responsible for implementation of EMP after the lapse of the period for which the project proponent is responsible.
xv) Corporate Social Responsibility indicating various activities to be undertaken, provisions of funds for the same, the period for which the same is to be implemented and the person(s) responsible for the implementation of the same.
After detailed deliberations, the SEAC decided to defer the case till
the project proponent submits proper reply of above noted observations.
The meeting ended with a vote of thanks to the Chair.
****