State Farm Center Renovation and Addition Project
![Page 2: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/2.jpg)
Project Leadership Owner
University of Illinois F&S DIA
Construction Manager
Design Team AECOM – Architectural Thorton Tomasetti – Structural Henderson Engineers – Mechanical, Electrical ESD – Plumbing
![Page 3: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/3.jpg)
Project Specifics 160 Million Renovations and Addition
New Mechanical Spaces and Systems Reconfiguration of the arena New Luxury Seating New Ramps and Walks
6 phases 1,3,5 – Basketball Phases 2,4,6 – “Construction” Phases
Peak manpower for Phase 2 – 160 Peak manpower for Phase 4 – 250
![Page 4: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/4.jpg)
Google Earth
![Page 5: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/5.jpg)
State Farm Center12/02/2013 – 02/28/2014
Phase 1 – Site Work
Key
Construction
No Service
Ongoing
In Use
Other
![Page 6: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/6.jpg)
State Farm Center12/02/2013 – 02/28/2014
PRV RoomDemo HV-10T/C Offices
Phase 1 – Mechanical Level
Key
Construction
No Service
Ongoing
In Use
Other
![Page 7: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/7.jpg)
State Farm CenterState Farm CenterPhase 1 Construction LogisticsDecember 2013 To February 2014
St. Mary’s Road
Four
th S
tree
tFo
urth
Str
eet
St. Mary’s Road
Kirby Avenue Kirby Avenue
Orange LotNo Construction
Parking
Brown LotNo Construction
Parking
Blue LotNo Construction
Parking
N
Relocate Fence As
Work Progresses
Relocate Fence As
Work Progresses
Construction
Deliveries
B
B
B
B
B B
C C
CC
C C
C
C
C
C
C
C
C
C
C
C
C
C
B
B
B
B
B B
P
P
-6’ High chain link fence (with posts in ground)
-6’ High chain link fence, moveable fence supported by bases and sandbags and/or pins
-Primary construction truck ingress and egress
-”B” level entrance into building via stairs (must be maintained for ingress and egress)
-”C” level entrance into building via existing ramps
-Maintain pedestrian access/egress into SFC at “B” level
-Maintain pedestrian access/egress via ramps to “C” level entrance
-Public drop off-30’ Wide Sliding Gate-25’ Wide Swing Gate-25’ Wide Sliding Gate-Masonry Silo-800 AMP 120/208V Service for Trailers
G1
G7
G5
G4
G2
G6
G3
C
B
B
C
P
Relocate Fence As
Work Progresses
Relocate Fence As
Work Progresses
G5G5G5
Trailers - 15 Spaces
300’ x 60’
MM
TETE
Dumpster
Dumpster
Dumpster
Dumpster
Dumpster
Tool Trailers – 34 Spaces340’ x 60’
Storage/StagingArea
Notes: Typical Work of Phase 11) U.G. Utility Contractor shall provide, install, maintain, and reposition moveable chain link fence around all excavations, equipment, and disturbed areas during installations.
2) Any existing roads, sidewalks or pavements shall be restored via 3000 PSI concrete, 4 inches thick after underground installation to allow pedestrian or vehicle traffic.
3) U.G. Utility Contractor to provide and maintain steel road plates over areas where pavement can not be replaced to allow access to SFC.
4) U.G. Utility Contractor to schedule and coordinate work to always provide ingress and egress to the SFC “B” Level entrances and ramps to the “C” Level entrances.
B
BWest Construction Staging Area Construction Road
G8
G9
BC
B
C
Plywood Canopy
Protection
*Trades Men Parking For Phase 1 Only
G11
G11
Service Level Dock Below
B
C
Construction Field Office and Staging
RED PARKING LOT
Temporary Fence Panels
![Page 8: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/8.jpg)
Site Utilities Conflicts
![Page 9: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/9.jpg)
Site Utilities Conflicts
![Page 10: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/10.jpg)
Equipment Selection
![Page 11: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/11.jpg)
Equipment Selection
![Page 12: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/12.jpg)
State Farm CenterState Farm Center
St. Mary’s Road
Four
th S
tree
t
Kirby Avenue Kirby Avenue
Orange LotNo Construction
Parking
Brown LotConstruction Parking
(Phase 2 Only)
Blue LotNo Construction
Parking-6’ High chain link fence (with posts in ground)
-6’ High chain link fence, moveable fence supported by bases and sandbags and/or pins
-Primary construction truck ingress and egress-Public drop off
-Earth Retention
-30’ Wide Sliding Gate
-25’ Wide Swing Gate
-25’ Wide Sliding Gate
-Masonry Silo
-800 AMP 120/208V Service for Trailers
-30’ Wide Swing Gate
P
Crane Pad
Plywood Canopy
Protection
Crane Pad50’ x 100’
STAGING AREA FOR WEST
STAGING AREA FOR NORTH
STAGING AREA FOR SOUTH
STAGING AREA FOR EAST
Four
th S
tree
t
St. Mary’s Road
Construction
Deliveries
G1
G7
G2
G3
Trailers - 15 Spaces
300’ x 60’
MTE Dumpster
Dumpster
Dumpster
Dumpster
Dumpster
Tool Trailers – 34 Spaces340’ x 60’
Storage/StagingArea
G5
G5
G5
MTE
G5
30’ Wide Road< Ramp <
There will be no ramp to service
level
Contractor must provide their own cranes for hoisting
Construction hoisting access to service level after concrete floor at Level B is poured
West Construction Staging AreaNew Road
Phase 2 Construction LogisticsMarch 2014 To November 2014
Crane Pads to be constructed of CA-A plus 6” of CA-6 with
top elevation @ 749’
G13
G5
G6
G12
G10
G11
G10 G9
G4
G8
G9
*No Construction Parking
East Staging Area50’ x 200’
Crane Pad50’ x 100’
Crane Pad
New U.G. electrical ductbank, water main, and steam
installations in this area.
G11
G11
G8
G9
Access to loading dock at event level
Service Level Dock Below
N
![Page 13: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/13.jpg)
03/01/2014 – 10/31/2014
BTN Work RoomLoading Dock WalkShopsSecurity
Phase 2 – Service Level
Key
Construction
No Service
Ongoing
In Use
Other
East MechanicalWest MechanicalMicro Piles from Above
![Page 14: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/14.jpg)
Earth Retention - Arena
![Page 15: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/15.jpg)
03/01/2014 – 10/31/2014
Operations OfficesSubstation A & BTunnel Abatement
Phase 2 – Mechanical Level
Key
Construction
No Service
Ongoing
In Use
Abatement
Chilled Water Main to AHU 18Demo Chiller
Generator Base
PRV RoomEast Mechanical TunnelWest Mechanical TunnelMicro Piles from Above
![Page 16: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/16.jpg)
Earth Retention – Additions
![Page 17: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/17.jpg)
Earth Retention/ Excavation - Additions
![Page 18: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/18.jpg)
Earth Retention – Soil Nail Wall
![Page 19: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/19.jpg)
Earth Retention – Soil Nail Wall
![Page 20: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/20.jpg)
Earth Retention – Soil Nail Wall
![Page 21: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/21.jpg)
Earth Retention – Soil Nail Wall
![Page 22: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/22.jpg)
Earth Retention – Soil Nail Wall
![Page 23: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/23.jpg)
Remove InsulrockEast Addition
03/01/2014 – 10/31/2014
Phase 2 – B Level Concourse
Key
Construction
No Service
Ongoing
In Use
Other
Abate Office AreasDemo Office AreasDemo Toilet LidsDomestic Water Loop
West AdditionFit Out (No Service)
South Ramps and PlazaDemo Stair Over Substation A & B
![Page 24: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/24.jpg)
Excavation – Link Tunnels
![Page 25: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/25.jpg)
Excavation – Link Tunnels
![Page 26: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/26.jpg)
Crane Usage
![Page 27: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/27.jpg)
Single Sided Forms
![Page 28: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/28.jpg)
03/01/2014 – 10/31/2014
Bowl Retention PilesNew Tunnel PilesRaker Duct Lining
Phase 2 – Event Bowl
Key
Construction
No Service
Ongoing
In Use
Preparation
Booth ExteriorVom. InfillsC-Level SeatingProvide Raker Access
Prepare Catwalk for Phase 6
![Page 29: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/29.jpg)
Raker Openings
![Page 30: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/30.jpg)
Seating Infills
![Page 31: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/31.jpg)
Seating Installation
![Page 32: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/32.jpg)
03/01/2014 – 10/31/2014
Temporary StairsDemolition of Stairs at Substation
5 Portables2 ADA RampsEast Addition
Phase 2 – C Level Concourse
Key
Construction
No Service
Ongoing
In Use
Temporary
South Ramps & PlazaWest Addition
![Page 33: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/33.jpg)
Dust Protection Tent
![Page 34: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/34.jpg)
Phase 3 Egress Plan
![Page 35: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/35.jpg)
Phase 3 – Basketball Season• Work continues on the East and West Addition
Service Level Fitout• Closeout of the Bid Package 1 Contractors• EXTENSIVE scheduling and pre-planning session
for Phase 4
![Page 36: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/36.jpg)
![Page 37: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/37.jpg)
![Page 38: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/38.jpg)
![Page 39: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/39.jpg)
Phase 4 Arena Bowl Demolition
Day 1
![Page 40: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/40.jpg)
Phase 4 Arena Bowl Demolition
Day 6
![Page 41: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/41.jpg)
NE Tunnel Excavation
![Page 42: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/42.jpg)
Tie Backs for the NE Tunnel
![Page 43: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/43.jpg)
Load Transfer Beam Placement
![Page 44: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/44.jpg)
“”Other” Work
![Page 45: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/45.jpg)
Project Challenges
Aggressive design schedule and even more aggressive construction schedule
Public client with state procurement limitations Renovation of a 50 year old building Finding qualified local manpower to be able to
support a project of this magnitude Despite all the challenges so far the project
remains on schedule and within budget.
![Page 46: State Farm Center: Renovation and Addition Project](https://reader035.vdocument.in/reader035/viewer/2022062320/55c1823ebb61ebdf5e8b45d2/html5/thumbnails/46.jpg)
Questions ?