HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Presentation Overview Project Background Contract Procurement Scope of Work Project Schedule EPA Driven
Project Components Investigation/Design Construction
Project Results
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Project BackgroundEPA Regulation on Large-Capacity
CesspoolsDOE Inventory60 Schools5 Islands
EPA Consent Agreement/Final Order Deadline
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Contract ProcurementRFP ProcurementDesign-Build DeliveryContract 320 Cesspools 55 Schools 5 Islands
CAFO Challenges
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Scope of WorkDesign-Build Contract InvestigationsDesign/PermittingConstructionReporting/Monitoring
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Project Schedule Design-Build Contract was signed March
2006 Investigations started March 2006 Design/Permitting began Early April 2006 Construction began January 2007 All cesspools are now either backfilled or
converted Two Honoka’a schools are awaiting
connection to the County system
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Investigations Investigation Teams Field Teams
2 teams Existing Conditions GPR & Other Utility locating information Cultural or Historical Elements Testing and Soils Testing Construction method feasibility
Office Team Existing information
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Site Investigations
Overgrown restrooms
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Site Investigations
GPR assisted in finding location of existing
utilities
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Site Investigations
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Design/PermittingBackground on EPA Requirement Definition of Large Capacity
Cesspools (LCCs)EPA RegulationWhy the RegulationSome Non LCCs
were converted
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Design/PermittingGoals Determine most feasible solution based on
specific site conditions Selection and proper sizing of appropriate
treatment Provide buildable construction drawings,
details, specifications and costs Provide engineering/design support and
guidance for unforeseen challenges/situations
Acquire necessary permits and approvals f li bl i
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Design/PermittingDesign Solutions Closure of cesspool; connection to County
system Closure of cesspool; installation of septic
tank and leachfield Conversion of cesspool into injection well;
installation of septic tank Conversion of cesspool into injection well;
installation of package treatment plant
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Design/PermittingChallengesVery limited existing informationBasis of Design/Design Criteria
Per capita rates not applicable
Consulted heavily with DOH WWB and SDWB
Permit acquisitionSite/Soil Conditions
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Design/PermittingDeliverables Construction Drawings & Specs Permits As-Builts Reporting information Cultural reports Project Completion
Binders
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Design/PermittingAccomplishmentsCoordinated with EPA, DOH and
County agenciesApproximately 460 Department of
Health Permits submitted 175 IWS Permits 108 Backfill and Abandon Permits 177 Injection Well Permits to Operate
As-Built/Record Drawings and closure binders for each school
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Design/Permitting
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction
Coordination of multiple sites/islandsSafetyBudget/
Schedule
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction
Project was really program; with 55 project sitesIntegrationLogisticsChange ManagementPublic Outreach and Client
Coordination
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
ConstructionChallenges
Differences in work style Acceleration/Deceleration of schedule Coordination across different islands Unforeseen archaeological and historical finds Undocumented site conditions Logistics Mother Nature Different County expectations/regulations
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction - Safety SAFETY is an integral part of Company
philosophy Our goal to provide a safe environment for not
only the workers, but for the students, staff, faculty and public
Instill the idea that safety isn’t “just a priority”, but should be a way of not only conducting business, but as a way of life
Controlled site access Provided training as needed If unsafe acts were observed, construction
was shut down
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction - Safety
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction - Safety
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction - SafetyAccomplishments
Established Safety Crew of the Month incentive/reward program
Kept children, staff, faculty, public and workers safe
Developed innovative fall prevention system Shared Value-Based Safety Training, bringing
upon a complete shift in safety performance of subcontractors
240,000 man hours worked, no lost time 2007 National Safety Council “Perfect Record
Award”
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Construction - Safety
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Project ResultsClosure of 320 cesspoolsConversion of 177 cesspools to
injection wells/seepage pits 175 septic systems 3 package treatment plants 10 schools connected to County or
Private systemsProvide support (O&M), keeping
inventory of what was built
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Project Results
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Project Result
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Project Results
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Project Results
HWEA Annual Conference March 18, 2010 HDOE Large Capacity Cesspool Closure/Conversion Project
Mahalo!
Thanks for your time.Questions?
Greg Smith | 808.635.6544 | [email protected] Barsana | 808.440.0254 | [email protected]