state-of-the-art food processing facility …...tufco flooring (or equivalent); sloped at +/-...

7
The information contained herein has been obtained from sources we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it. A Copyright by Colliers International 2020 This flier may be reproduced only in its entirety, without modification or deletion. Colliers International 1230 Peachtree Street | Suite 800 Atlanta, GA 30309-3574 P: +1 404 888 9000 Chris Cummings National Director +1 404 877 9255 [email protected] Turner Wisehart Vice President +1 404 574 1008 [email protected] Sam Campbell Senior Associate +1 404 781 0578 [email protected] ±176,330 PROCESSING & DISTRIBUTION FACILITY colliers.com/food STATE-OF-THE-ART FOOD PROCESSING FACILITY FOR LEASE | 4322 MORELAND AVE | CONLEY, GA

Upload: others

Post on 26-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STATE-OF-THE-ART FOOD PROCESSING FACILITY …...Tufco flooring (or equivalent); sloped at +/- ¼”/ft Walking on Ceiling Above processing area for utilities and process infrastructure

The information contained herein has been obtained from sources we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it. A Copyright by Colliers International 2020 This flier may be reproduced only in its entirety, without modification or deletion.

Colliers International1230 Peachtree Street | Suite 800

Atlanta, GA 30309-3574P: +1 404 888 9000

Chris CummingsNational Director+1 404 877 [email protected]

Turner WisehartVice President+1 404 574 [email protected]

Sam CampbellSenior Associate+1 404 781 [email protected]

±176,330 PROCESSING & DISTRIBUTION FACILITY

colliers.com/foodSTATE-OF-THE-ART FOOD PROCESSING FACILITYFOR LEASE | 4322 MORELAND AVE | CONLEY, GA

Page 2: STATE-OF-THE-ART FOOD PROCESSING FACILITY …...Tufco flooring (or equivalent); sloped at +/- ¼”/ft Walking on Ceiling Above processing area for utilities and process infrastructure

STATE-OF-THE-ART FOOD PROCESSING FACILITYFOR LEASE | 4322 MORELAND AVE | CONLEY, GA

colliers.com/food

Total Building SF 251,928 SF (expandable)

Total Available SF 176,330 SF

Cooler SF 60,437 SF (5 temp zones)

Processing SF 27,550 SF (fully refrigerated)

Cold Docks SF 44,066 SF

Misc/Support SF 19,054 SF

Office SF 25,223 SF (incl. corporate 2nd level mezzanine & welfare areas)

Ceiling Heights 26’ processing38’ all other areas

Dock Doors 21

Year Built 2015/16; expansion completed 2018

Lighting Motion LED’s

FACILITY OVERVIEW

SITE FEATURES

Trailer Parking 41 striped (expandable)

Car Parking ±470 total (expandable)

Land 33 acres total

Truck CourtContinuous 10” thick x 10’ wide reinforced concrete dolly drop pads at trailer stating area

Truck Fueling Center On Site

Security Fully secured site with guard shack access

Page 3: STATE-OF-THE-ART FOOD PROCESSING FACILITY …...Tufco flooring (or equivalent); sloped at +/- ¼”/ft Walking on Ceiling Above processing area for utilities and process infrastructure

STATE-OF-THE-ART FOOD PROCESSING FACILITYFOR LEASE | 4322 MORELAND AVE | CONLEY, GA

colliers.com/food

Floor Slab8” at 4,500 PSI; armored joints at equipment doors; sealed w/ L&M Sealhard

Process Floors Tufco flooring (or equivalent); sloped at +/- ¼”/ft

Walking on Ceiling Above processing area for utilities and process infrastructure support

Floor Drains

Underground process system at trash dock, main hallway, receiving dock, tomato room, bulk loading, process room, packaging corridor and flume waste; underground piping Sch 40 PVC for future growth

Process Water

Process water system in all rooms with drains; chlorinated and non-chlorinated water distribution system above walk on ceiling with multiple drops; eight 3-person hand wash stations; 4-micron filtration system; three l0k gallon tanks for pre-process water with room for one more.

Chemical Systems Robust chemical systems in place

Floor Slab 10 mil visqeen vapor barrier included

IMP Walls 4” thick

Fire Protection ESFR wet sprinkler; 2,500 GPM fire pump

Compressed Air Two 125 HP compressors; com-pressed air drops throughout

Process Line Past user operated three high speed lines and a multi-vac line

Research lab On site

BUILDING SPECIFICATIONS REFRIGERATION SYSTEM• Single stage recirculated ammonia system (high stage)

• 24,120 Ib. ammonia charge

• 4 Frick compressors

• Refrigeration piping is on exterior of building

• Engine room, vessels and piping designed to accommodate future expansion

• Frick computer control system

• Two roof-mounted condensers with integral water tanks and pumps

EMPLOYEE/WELFARE FEATURES

• Two-story corporate office (main level 8,364 SF; 2nd level 8,437 SF)

• Separate employee locker and welfare area (3,686 SF) with additional 3,686 break area

26’ TEMP CONTROLLED PROCESSING AREA WITHWALKABLE MEZZANINE ABOVE

INBOUND SHIPPING & STAGING LEADS DIRECTLY TO PROCESSING

FINISHED GOODS STORAGE FLOWS DIRECT TO SEPARATE OUTBOUND SHIPPING

Page 4: STATE-OF-THE-ART FOOD PROCESSING FACILITY …...Tufco flooring (or equivalent); sloped at +/- ¼”/ft Walking on Ceiling Above processing area for utilities and process infrastructure

STATE-OF-THE-ART FOOD PROCESSING FACILITYFOR LEASE | 4322 MORELAND AVE | CONLEY, GA

colliers.com/food

CORPORATE OFFICE ENVIRONMENT CLEAN & QUALITY BREAK AREAS TRAINING & CONFERENCE AREAS

38’ HIGH BAY COLD STORAGE METICULOUSLY MAINTAINED ENGINE ROOM WITH REDUNDANCY

ROBUST PROCESS WATER SYSTEM 4-MICRON FILTRATION

Page 5: STATE-OF-THE-ART FOOD PROCESSING FACILITY …...Tufco flooring (or equivalent); sloped at +/- ¼”/ft Walking on Ceiling Above processing area for utilities and process infrastructure

colliers.com/food

FLOOR PLAN

Cooler 60,437 SF

Cold Dock 44,066 SF

Processing 27,550 SF

Maint/Misc 19,054 SF

Office* 25,223 SF

TOTAL SQUARE FEET 176,330 SF

INBOUND SHIPPING

STATE-OF-THE-ART FOOD PROCESSING FACILITYFOR LEASE | 4322 MORELAND AVE | CONLEY, GA

Page 6: STATE-OF-THE-ART FOOD PROCESSING FACILITY …...Tufco flooring (or equivalent); sloped at +/- ¼”/ft Walking on Ceiling Above processing area for utilities and process infrastructure

STATE-OF-THE-ART FOOD PROCESSING FACILITYFOR LEASE | 4322 MORELAND AVE | CONLEY, GA

colliers.com/food

LEASED

FUEL STATION

±85,000 SF ±65,000 SF

MORELAND AVE/GA HWY 23 17,400 VPD

±170 PARKING

±75 PARKING

±26 TRAILER

±15 TRAILER 13 DH

2 DH 7 DH

NORFOLK SOUTHERN RAIL

GUARD SHACK

±20 TRAILER

±164 PARKING

Page 7: STATE-OF-THE-ART FOOD PROCESSING FACILITY …...Tufco flooring (or equivalent); sloped at +/- ¼”/ft Walking on Ceiling Above processing area for utilities and process infrastructure

The information contained herein has been obtained from sources we deem reliable. We have no reason to doubt its accuracy, but we do not guarantee it. A Copyright by Colliers International 2020 This flier may be reproduced only in its entirety, without modification or deletion.

Colliers International1230 Peachtree Street | Suite 800

Atlanta, GA 30309-3574P: +1 404 888 9000

Chris CummingsNational Director+1 404 877 [email protected]

Turner WisehartVice President+1 404 574 [email protected]

Sam CampbellSenior Associate+1 404 781 [email protected]

±176,330 PROCESSING & DISTRIBUTION FACILITY

colliers.com/foodSTATE-OF-THE-ART FOOD PROCESSING FACILITYFOR LEASE | 4322 MORELAND AVE | CONLEY, GA

• Located just 7.2 miles from Hartsfield-Jackson International Airport

• 1.8 miles to I-675

• 2.5 miles to I-285

• 9 miles to I-20

• Over 234K people within 15 minute drive time

• Over 1.4 million people within 30 minute drive time

• Over 3 million people within 45 minute drive time

• Georgia is home to 1/3 of the nation’s top 100 food processing

companies

• Georgia is home to 80+ cold chain facilities

• Georgia has been ranked the #1 state to do business by Site Selection

Magazine for 7 years in a row

• Georgia leads in workforce, global access and infrastructure

• Georgia is home to the nation’s highest-performing workforce

training program ‘Georgia Quick Start’

• Quick Start is a discretionary incentive that provides customized

workforce training to develop the skills your company needs most

LOCATION

The facility is located in a Tier 1 Job Tax Credit zone, which means

companies may be eligible for job tax credits of up to $4,000 per

new employee hired for up to 5 years.

For example, suppose a processor creates 250 jobs at the facility. The

company would be eligible for $5,000,000 over a 5 year period. This is

calculated as follows:

250 jobs x $4,000 credit/job = $1,000,000/year x 5 years =

$5,000,000 (*applicable to payroll withholding).