Page 1: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

1

State of the Project

SHARELIFE

Delft, April 29th 2008

(Mathis Schröder)

Page 2: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

2

Page 3: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

3

Agenda

Timeline: detailed schedule

Translation and Certification

Country pilot feedback

Country pilot results

Page 4: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

4

Tasks and Timetable(from March 2007)

Phase 1: First Pre-Test by December 2007First survey draft: finished in July 2007

Programming: finished in September 2007

1st pilot : finished successfully in September/October 2007

2nd pilot: not in the field in January 2008, “in-house” testing

Phase 2: Main Survey ready by November 2008survey revision and translation for country pilots: March 2008

country pre-testing: July 2008

Phase 3: “First Results” by December 2009data collection finished: June 2009

cleaning and first evaluation: November 2009

Page 5: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

5

Timeline – Pre-Test

Translations (LMU open): Version 3.5 (changes from pilot): May 2nd to May 9th Version 3.6 (pre-test version): May 16th to May

23rd

SMS/CAPI versions scheduled release: Version 3.5 (generic): May 6th

-> feedback until May 12th Version 3.5 (country): May 16th (Translation!) Version 3.6 (generic): May 16th

Version 3.6 (country): May 30th (Translation!)

SMS Server: First version released May 9th Final generic version May 16th

Page 6: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

6

Timeline – Pre-Test

Fieldwork material: SRC prepares To be delivered by May 13th

Preload database: Prepared by MEA by May 16th Checked by Agencies until pre-test starts in June

TTT: Server SMS: May 19th, Frankfurt Airport, 10:30-16:00 Make sure Survey Agencies know! May 27th-29th in Mannheim

Page 7: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

7

Timeline – Pre-Test

Pre-Test Field Duration: National Training Sessions (NTS) from June 2nd to 13th Deliver Data by July 18th (50 days after TTT)

After the pre-test… Evaluation of pre-test results in August Edesheim 21./22.8. Translate the changes to final version

TTT September 23rd – 26th in Mannheim

Main Field Duration: Start in October/November 2008 Be finished by March/April 2009

Page 8: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

8

Translation

Page 9: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

9

Adaptation

Certification Done externally by cApStAn Received a subset of the translated questions Evaluate adaptations using the generic questionnaire 14 Items in the first round, for all countries Based on first round results, second round with 11

Items 5 out of 10 versions went into second round Overall, some flaws were found, some questioning

the comparability of the questions across countries

For the LMU 3.5, each country will receive the results of the certification separately tomorrow (4-30)

Page 10: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

10

Pilot - Feedback

Thanks to all CTLs for providing feedback!

The interviewer feedback is mainly positive Interview enjoyable Almost no technical breakdowns Flexible modules order was not used Corrections were made via the calendar The search tool is not used…

Page 11: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

11

0 20 40 60 80 100 120

SE

DK

DE

FR

BE_FR

NL

AT

IT

ES

GR

CZ

PL

Total

Minutes

Median

Mean

Length by Country

Page 12: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

12

Length by Region

0.0

05.0

1.0

15.0

2.0

25

0 50 100 150 200X

North WestEast South

Group Mean Median NEast 50.42 46.33 72North 84.87 76.00 61South 55.93 52.22 87West 67.40 63.26 150

Page 13: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

13

Length by Module

2.83

2.03

8.88

3.23

12.38

3.33

0.93

1.13

5.33

6.10

3.25

3.85

3.02

11.79

3.65

14.92

3.68

1.32

1.45

6.42

6.80

4.11

0 3 6 9 12 15

Children

Partner

Accommodation

Child SES

Work (no WQ/DQ)

Work Quality

Work Disability

Financial

Health

Health Care

General Life

Minutes

Median

Mean

Page 14: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

14

Accommodation

0 5 10 15 20 25

SE

DK

DE

FR

BE_FR

NL

AT

IT

ES

GR

CZ

PL

Total

Length of AC Module

Median

Mean

7.297.854.676.948.907.434.523.535.904.003.003.855.66

Page 15: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

15

Work

0 5 10 15 20 25 30

SE

DK

DE

FR

BE_FR

NL

AT

IT

ES

GR

CZ

PL

Total

Length of RE Module

Median

Mean

3.233.002.792.682.483.072.421.752.401.762.422.212.51

Page 16: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

16

Age

52

54

56

58

60

62

64

66

68

70

< 58 59 - 66 67 - 73 74 - 82 > 83

Age Groups

Min

utes

Median

Mean

Page 17: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

17

Length Summary

We are overall OK in terms of time

What happened in Denmark?

Some quick stats: 2% > 2.5 h4% > 2 h

15% > 1.5 h 26% < 45 min

3% < 30 min

But: still add CV and Grip Strength

Page 18: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

18

And what now…?

Cuts or changes have already been made in the… AC module: moves starting at age 10 RE module: some questions out, clarified others (ISCO) HS module: deleted some questions, combined others HC module: major cuts in the loops for preventive care RC module: cut the stillbirths and abortion loop RP module: improved the marriage section

Addition in the GL-module on persecution Thanks to Radim and Michal for pointing this out One general filter and then some follow up questions

Page 19: State of the Project SHARELIFE Delft, April 29th 2008 (Mathis Schröder)

19

And what now…?

Thanks!