state transportation improvement program · 1 state transportation improvement program division 1...

35
1 STATE TRANSPORTATION IMPROVEMENT PROGRAM Division 1 Bertie Camden Chowan Currituck Dare Gates Hertford Hyde Martin Northampton Pasquotank Perquimans Tyrrell Washington

Upload: vanhuong

Post on 21-Oct-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

1

STATE TRANSPORTATION IMPROVEMENT PROGRAM

Division 1BertieCamdenChowanCurrituckDareGatesHertfordHyde MartinNorthamptonPasquotank

PerquimansTyrrellWashington

CAMDEN

GATES

MARTIN

HYDE

DARE

TYRRELL

WASHINGTON

BERTIE CHOWAN

PERQUIMANS

CURRITUCK

PASQUOTANK

NORTHAMPTON

HERTFORD

158

158

17

64

17

13

264

25813

64

158

308

34432

343

171

37

12

42

903

46

11

45

35

94

305

ElizabethCity

TG-5252

AV-5770

F-5700

AV-5773

AV-5771

AV-5772AV-5769

B-5610

B-2500

B-5106

B-4648

B-5603

B-5508B-5600

B-5503

B-4577

B-4919

B-4920

B-4783

B-5139

B-2500B

R-5311A

R-4467 R-5740

R-5738

R-5716

R-3826

R-3620

R-5014

I-5839

R-2507C

R-2576

R-5506R-5731

R-4705

R-5739R-5717

R-5505

DRAFT STIPFY 2015-2025STI ProjectsDIVISION 1

0 10 205Miles

BRIDGES FUNDED THROUGH STI

STATEWIDE AVIATION

REGIONAL AVIATION

DIVISION AVIATION

DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES

* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not

let as of November 2014

COUNTY

FUTURE YEARS

F

NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School

FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)

STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds

NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)

SW - StatewideTRN -Transition Project

S - StructureU - Utilities

I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving

WAKE

NUMBERLENGTH (MILES)

DIVISION 00

R-0000

IDROUTE/CITY

US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY

Project termini and a general

SW

M1500

A

NHP

4000

FUNDING CATEGORY (1)

used for each project phase.

FUNDING SOURCE (2)

U

B3000R

FY 2017

C

(3) WORK TYPE (ACTIVITY)

A - Acquisition

with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

dollars.)

of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE

SW CBSW

One or two letter

HIGHWAY PROGRAM

UNFUNDED

NC 3 TO SR 1003SR 1003 TO NC 96

ASW

UNFUNDED

20000CRC 5000C 5000 BC B

WIDEN TO A FOUR-LANE FACILITY

A

NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.

B

FY 2025 FY 2018

700

FY 2019

DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020FY 2015 FY 2016

M

TOTAL PROJECT

COST (THOU)

NHPNHP

FUN

DS

A

PRIOR YEARS COST

(THOU)

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

U 5000NHP

C10000

FY 2021

C

FY 2023 FY 2024

FY 2022

5000

9000

APD - Appalachian Development

NHPNHP

LOCATION / DESCRIPTION NHP

NHP

I-40 TO NC 3

Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.

work description.

way, utility, mitigation and construction cost estimates

See Highway Funding Key

any project breaks.Category for the project andIdentifies the "STI" Funding

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

for an explanation of funding categories

Phases of implementation: ESTIMATED COST Preliminary engineering, right of

(1) FUNDING CATEGORY

PROJECT BREAKS

designation for project

LOCATION / DESCRIPTION

SR - Secondary Road

IDENTIFICATION NUMBER Assigned to each project at conception and remains with

BVarious - multiple routesNEW ROUTE or City

WORK TYPE (ACTIVITY) (3)

BOND (R) - Revenue Bond

HRRR - High Risk Rural Roads

L - LocalHSIP - Highway Safety Improvement Program

project until completion.

DIV - DivisionEX - Exempt

REG - RegionalHF - State Dollars (Non-STI)

F - Feasibility StudyCG - Construction (GARVEE)C - Construction

G - Grading and Structures

R - Right of Way

(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES

ER - Emergency Relief Funds

CMAQ - Congestion MitigationDP - Discretionary or Demonstration

FED - Federal Rail Funds

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

UNDER CONSTRUCTION

R-5506 3228 3228SR 1364 (LEDREW PERRY ROAD) TO CHOWAN RIVER. PAVEMENT STRENGTHENING AND RESURFACING.

7.3TRN

BERTIE US 17

R-5731 42943SOUTH END OF CHOWAN RIVER BRIDGE TO US 17 BUSINESS IN EDENTON. UPGRADE FREEWAY TO INTERSTATE STANDARDS.

8.5

DIV

T 3000R T 29957C C 9986

BERTIECHOWAN

US 17

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.

79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS

US 13/US 17

FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-5141 2813 2813REPLACE BRIDGE NO. 53 OVER WHITE OAK SWAMP.SW

BERTIE US 13

B-4916 1020 30REPLACE BRIDGE NO. 57 OVER QUIOCCOSION SWAMP.

HF

HFB R 90 HFB C 900

BERTIE US 13

DIVISION PURCHASE ORDER CONTRACT (DPOC)

B-5106 810 100REPLACE BRIDGE NO. 148 OVER WAHTON CREEK.

DIV

STPOFF 60R STPOFF C 650

BERTIE SR 1200(CONNARITSA ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

RURAL PROJECTSR-2414* 48568 48568EAST OF PASQUOTANK RIVER IN ELIZABETH

CITY TO EAST OF NC 34 IN BELCROSS. WIDEN TO MULTI-LANES.

5.3

A EAST OF PASQUOTANK RIVER IN ELIZABETH CITY TO SOUTH OF SR 1139 (COUNTRY CLUB ROAD) - COMPLETEB SOUTH OF SR 1139 (COUNTRY CLUB ROAD) TO EAST OF NC 34 IN BELCROSS - UNDER CONSTRUCTION

CAMDEN US 158/NC 34

R-5717 12640NC 343 IN CAMDEN COUNTY TO PROPOSED NC 168 BYPASS IN CURRITUCK COUNTY. WIDEN AND INTERSECTION IMPROVEMENTS.

10.9

DIV

T R 100 T 12540C

CAMDENCURRITUCK

SR 1227/SR 1208(SOUTH MILLS ROAD)SR 1224/SR 1223(OLD SWAMP ROAD)

URBAN PROJECTS

UNDER CONSTRUCTION

U-4438 89305 89305US 17 BUSINESS (NORTH ROAD STREET) TO EAST OF PASQUOTANK RIVER IN ELIZABETH CITY. RECONSTRUCT ROADWAY AND REPLACE BRIDGE NO.19.

0.6CAMDENPASQUOTANK

US 158

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.

79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS

US 13/US 17

1-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

B-4453 1435 5REPLACE BRIDGE NO. 19 OVER CREEK.

HF

HFB R 130 HFB C 1300

CAMDEN SR 1235(CAROLINA ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

RURAL PROJECTSR-5731 42943SOUTH END OF CHOWAN RIVER BRIDGE TO

US 17 BUSINESS IN EDENTON. UPGRADE FREEWAY TO INTERSTATE STANDARDS.

8.5

DIV

T 3000R T 29957C C 9986

BERTIECHOWAN

US 17

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.

79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS

US 13/US 17

FEDERAL BRIDGE PROJECTSB-5507 3123REPLACE BRIDGE NO. 24 OVER WARWICK

CREEK, BRIDGE NO. 20 OVER DILLARD CREEK, AND BRIDGE NO. 21 OVER SAND RUN.HF

HFB R 280 HFB M 43 HFB C 2800

CHOWAN NC 32

B-5501 1210REPLACE BRIDGE NO. 3 OVER PEMBROKE CREEK.

HF

HFB 110R HFB C 1100

CHOWAN SR 1200(MACEDONIA-MEXICO ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE

WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

RURAL PROJECTSR-5717 12640NC 343 IN CAMDEN COUNTY TO PROPOSED

NC 168 BYPASS IN CURRITUCK COUNTY. WIDEN AND INTERSECTION IMPROVEMENTS.

10.9

DIV

T R 100 T 12540C

CAMDENCURRITUCK

SR 1227/SR 1208(SOUTH MILLS ROAD)SR 1224/SR 1223(OLD SWAMP ROAD)

1-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS - NORTH CAROLINA TURNPIKE AUTHORITY PROJECT

R-2576* 475477 35100MID-CURRITUCK BRIDGE, COINJOCK TO COROLLA. NEW STRUCTURE OVER CURRITUCK SOUND AND UPGRADE APPROACHES.

7.3

DIV

STP 9835RG RG 1967 RG 1967 1967RG1967RG1967RG RG 1967 RG 1967S(M) RG 3199 RG 3199 STP U 1947 STP 56030CG CG 11206 CG 11206 11206CG11206CG11206CG CG 11206 CG 11206S(M) CG 9110 CG 9110 9110CG9110CG BOND R C 59379 C 59379 59379C59379C

CURRITUCK NEW ROUTE

FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY - IN PROGRESS

R-4070 8627 8627BUXTON TO AVON. PLANNING AND ENVIRONMENTAL STUDIES FOR MAINTAINING ROADWAY. A NORTH OF SR 1231 (OLD LIGHTHOUSE ROAD) TO SOUTH OF SR 1420 (KINNAKEET DRIVE) - COMPLETE

B BUXTON TO AVON

DARE NC 12

R-3116 7000 7000NC 12 IMPROVEMENTS.

A OCRACOKE ISLAND HOTSPOT. INTERIM IMPROVEMENTS - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLYB HATTERAS VILLAGE HOTSPOT. INTERIM IMPROVEMENTS - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLYH OCRACOKE TO SOUTH TERMINAL OF OREGON INLET BRIDGE - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

DARE NC 12

R-5738 2836SR 1210 (BOB PERRY ROAD) TO IVY LANE. UPGRADE FACILITY.

1

DIV

T 100R T 2736C

DARE SR 1208(WEST KITTY HAWKROAD)

PLANNING/DESIGN IN PROGRESS

R-5014 6050 1200US 158 (CROATON HIGHWAY) TO DEAD END IN KILL DEVIL HILLS. OPERATIONAL-SAFETY IMPROVEMENTS.

4.3

DIV

STP R 500 STP C 4350

DARE SR 1217(COLLINGTON ROAD)

FEDERAL BRIDGE PROJECTSB-5610 1474REPLACE BRIDGE NO. 8 OVER CANAL.

REG

NHPB 70R NHPB 1404C

DARE NC 12

COMPLETE - RETAIN PROJECT FILE FOR GARVEE PAYOUT

B-5014 45043 37638REPAIR BRIDGE NO. 11 OVER OREGON INLET.TRN

NHPB 1481CG A CG 1481 A CG 1481 A CG 1481 A CG 1481 A

A REPAIR BRIDGE NO. 11 - COMPLETE - PAYBACK FY 2008 - FY 2019 , GARVEE BOND FUNDING $13.5 MILLIONTRNB REPAIR BRIDGE NO. 11 - COMPLETEC INSTALLATION OF CRUTCH BENT AND ADDITIONAL SCOUR PROTECTION - COMPLETED REPAIR BRIDGE NO. 11 - COMPLETEE REHABILITATION OF EXISTING STEEL CRUTCH BENTS - COMPLETE

DARE NC 12

UNDER CONSTRUCTION - GARVEE BOND FUNDING $70 MILLION; CONSTRUCTION - PAYBACK FY 2013 - FY 2024.

B-2500 622565 140675REPLACE BRIDGE NO. 11 (HERBERT C. BONNER BRIDGE) OVER OREGON INLET AND NC 12 IMPROVEMENTS.

2.7

TRN

NHPB 762U NHPB 7175CG 7175CGCG 7175 CG 7175 CG 7175 CG 7175 CG 7175 7175CG7175CG7175CG CG 7175 CG 7175S(M) 13429C C 13429 C 13429 NHPB 30214C C 30214 C 30214 C 30214 ER 10382C A NHP 20153C A NHP 3570R B ER 1530R B NHP 250U B ER 19800C B C 19800 B C 19800 B NHP 46200C B C 46200 B C 46200 B

A PHASE II, LONG-TERM IMPROVEMENTS AT PEA ISLAND. - UNDER CONSTRUCTIONTRNB PHASE II, LONG-TERM IMPROVEMENTS AT RODANTHE.TRN

DARE NC 12

B-5607 630REPLACE BRIDGE NO. 40 OVER CANAL.

HF

HFB 55R HFB 575C

DARE SR 1208(NORTH KITTY HAWK ROAD)

1-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MUNICIPAL BRIDGE PROJECTS

MUNICIPAL BRIDGE

B-5417 1244 199REPLACE BRIDGE NO. 17 OVER SOUTH DOGWOOD TRAIL OVER SNOW GOOSE CANAL.DIV

STPOFF 105R STPOFF C 940

DARE SOUTHERN SHORES

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)

IN PROGRESS

S-5501 201 201IMPLEMENTATION OF WAYSHOWING AND VISITOR ORIENTATION.

EX

CARTERETDAREHYDE

NC 12/US 70

S-5502 212OUTER BANKS SCENIC BYWAY WAYSIDES AND INTERPRETIVE SIGNS.

TRN

DP 212C CARTERETDAREHYDE

NC 12/US 70

RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS

R-2507* 124044 66507US 158 TO THE VIRGINIA STATE LINE. WIDEN TO MULTI-LANES.

15.5 T 1800R B T 1200U B T 337M B T 23200C B T 6000R C T 1200U C T 11900C C C 11900 C

A US 158 IN WINTON TO US 158 BYPASS IN TARHEEL - UNDER CONSTRUCTIONB US 158 BYPASS IN TARHEEL TO SR 1202 (EURE ROAD-GATES SCHOOL ROAD)C SR 1202 (EURE ROAD-GATES SCHOOL ROAD) TO VIRGINIA STATE LINEDIV

GATESHERTFORD

US 13

FEDERAL BRIDGE PROJECTSB-5611 1375REPLACE BRIDGE NO. 9 OVER RUN SWAMP.

HF

HFB 125R HFB 1250C

GATES US 13

1-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS

R-5311* 94036 2454NC 11/NC 561 INTERSECTION NEAR AHOSKIE TO US 13/US 158/NC 45 INTERSECTION NEAR WINTON. WIDEN TO MULTI-LANES.

7.8

SW

NHP 60U A NHP 1359M A NHP C 1875 A C 1875 A HSIP C 2575 A C 2575 A NHP 665U B NHP 4425R B NHP 3073M B NHP 73100C B

A NC 11/SR 1212 (SHORT CUT ROAD) AT NC 11/SR 1213 (OLD NC 11 ROAD). CONSTRUCT INTERCHANGESWB NC 11/NC 561 INTERSECTION NEAR AHOSKIE TO US 13/US 158/NC 45 INTERSECTION NEAR WINTON

HERTFORD US 13/NC 11

PLANNING/DESIGN IN PROGRESS

R-2507* 124044 66507US 158 TO THE VIRGINIA STATE LINE. WIDEN TO MULTI-LANES.

15.5 T 1800R B T 1200U B T 337M B T 23200C B T 6000R C T 1200U C T 11900C C C 11900 C

A US 158 IN WINTON TO US 158 BYPASS IN TARHEEL - UNDER CONSTRUCTIONB US 158 BYPASS IN TARHEEL TO SR 1202 (EURE ROAD-GATES SCHOOL ROAD)C SR 1202 (EURE ROAD-GATES SCHOOL ROAD) TO VIRGINIA STATE LINEDIV

GATESHERTFORD

US 13

UNDER CONSTRUCTION

R-2583* 52593 52593MURFREESBORO BYPASS TO US 13 WEST OF WINTON. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.

8HERTFORD US 158

FEDERAL BRIDGE PROJECTSB-5605 2365REPLACE BRIDGE NO. 31 OVER SEABOARD

COAST LINE RAILROAD.HF

HFB R 215 HFB 2150C

HERTFORD US 13

B-5609 2007REPLACE BRIDGE NO. 28 OVER CUTAWHISKIE SWAMP.

HF

HFB 180R HFB 2M HFB 1825C

HERTFORD SR 1137(LIVERMAN MILLROAD)

B-5603 2662REPLACE BRIDGE NO. 137 OVER MEHERRIN RIVER OVERFLOW.

DIV

STPOFF 127R STPOFF C 2535

HERTFORD SR 1311(BOONE'S BRIDGE ROAD)

B-5608 5007REPLACE BRIDGE NO. 10 OVER MEHERRIN RIVER.

HF

HFB 455R HFB 2M HFB 4550C

HERTFORD SR 1311(BOONE'S BRIDGE ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

FEDERAL BRIDGE PROJECTSB-5602 2640REPLACE BRIDGE NO. 8 OVER BURGESS

MILL CREEK.HF

HFB R 240 HFB 2400C

HYDE US 264

B-5508 1400REPLACE BRIDGE NO. 21 OVER CANAL.

DIV

STPOFF R 125 STPOFF C 1275

HYDE SR 1311(NORTH LAKE ROAD)

DIVISION PURCHASE ORDER CONTRACT

B-5600 324REPLACE BRIDGE NO. 79 OVER CANAL.

DIV

STPOFF R 15 STPOFF 309C

HYDE SR 1319(ROPER LANE)

1-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)S-5502 212OUTER BANKS SCENIC BYWAY WAYSIDES

AND INTERPRETIVE SIGNS.

TRN

DP 212C CARTERETDAREHYDE

NC 12/US 70

1-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)

IN PROGRESS

S-5501 201 201IMPLEMENTATION OF WAYSHOWING AND VISITOR ORIENTATION.

EX

CARTERETDAREHYDE

NC 12/US 70

RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS

R-3826 14649 1194SR 1182 (EAST COLLEGE ROAD) TO NC 125 NORTHWEST OF WILLIAMSTON. TWO LANES, PART ON NEW LOCATION.

2.5

DIV

STP 2400R STP 255U STP C 10800

MARTIN NC 125

PLANNING/DESIGN IN PROGRESS

R-4705 11200NC 903 TO SR 1182 (EAST COLLEGE ROAD). UPGRADE FACILITY.

9.6

DIV

STP R 4000 STP 7200C

MARTIN SR 1142(PRISON CAMPROAD)

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.

79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS

US 13/US 17

SCHEDULED FOR FEASIBILITY STUDY

FS-1504A SR 1003 (ROLESVILLE ROAD) IN WAKE COUNTY TO US 17 IN WILLIAMSTON. UPGRADE TO INTERSTATE STANDARDS.

86.5EDGECOMBEFRANKLINMARTINNASHWAKE

US 64

FEDERAL BRIDGE PROJECTSB-5503 900REPLACE BRIDGE NO. 53 OVER COLLIE

SWAMP.REG

STPOFF R 80 STPOFF C 820

MARTIN NC 125

B-4577 984 129REPLACE BRIDGE NO. 71 OVER FLAT SWAMP.

DIV

STPOFF R 80 STPOFF C 775

MARTIN SR 1159(FLAT SWAMP ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

INTERSTATE PROJECTS

PROJECT COMPLETE - GARVEE BOND FUNDING $2.7 MILLION; PAYBACK FY 2007 - FY 2018

I-4913 6532 5268NORTH OF HALIFAX COUNTY LINE (MILE POST 175) TO THE VIRGINIA STATE LINE (MILE POST 181.3). PAVEMENT REHABILITATION.

6.3TRN

NHP 316CG CG 316 CG 316 CG 316 NORTHAMPTON I-95

I-5839 2100HALIFAX COUNTY LINE TO SR 1201 (MACON PRICE RD). PAVEMENT REHABILITATION.

4.6SW

NHPIM C 2100 NORTHAMPTON I-95

RURAL PROJECTS

PLANNING/DESIGN IN PROGRESS

R-2582* 137639 16711I-95/NC 46 IN ROANOKE RAPIDS TO SR 1333 (MT. CARMEL CHURCH ROAD) EAST OF JACKSON. WIDEN TO MULTI-LANES WITH BYPASS OF JACKSON, SOME NEW LOCATION.

15.2 T 54000C A T 5400R B T 128M B T 61400C B

A I-95/NC 46 IN ROANOKE RAPIDS TO SR 1312 (ST. JOHN CHURCH ROAD) IN NORTHAMPTON COUNTY - RIGHT OF WAY IN PROGRESSB SR 1312 (ST. JOHN CHURCH ROAD) TO SR 1333 (MT. CARMEL CHURCH ROAD) EAST OF JACKSON

NORTHAMPTON US 158/NC 46

UNDER CONSTRUCTION

R-5505 3143 3143NC 305 TO US 158. PAVEMENT STRENGTHENING AND RESURFACING.

13.8TRN

NORTHAMPTON US 258

R-5739 8687NC 48 IN GASTON TO THE VIRGINIA STATE LINE. UPGRADE AND WIDEN EXISTING FACILITY.

10.5

DIV

T 100R T 8587C

NORTHAMPTON NC 46

1-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEASIBILITY STUDIES

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.

CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON

I-95

FEDERAL BRIDGE PROJECTSB-5502 1320REPLACE BRIDGE NO. 13 OVER MEHERRIN

RIVER.

HF

HFB 120R HFB C 1200

NORTHAMPTON SR 1339(BRANCHES BRIDGEROAD)

B-4919 771REPLACE BRIDGE NO. 14 OVER POTECASI CREEK.

DIV

STPOFF 70R STPOFF 1M STPOFF C 700

NORTHAMPTON SR 1500(FIRE TOWER ROAD)

B-4920 1022 32REPLACE BRIDGE NO. 15 OVER WILDCAT SWAMP.

DIV

STPOFF 90R STPOFF C 900

NORTHAMPTON SR 1505(NCHS EAST ROAD)

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

URBAN PROJECTS

UNDER CONSTRUCTION

U-4438 89305 89305US 17 BUSINESS (NORTH ROAD STREET) TO EAST OF PASQUOTANK RIVER IN ELIZABETH CITY. RECONSTRUCT ROADWAY AND REPLACE BRIDGE NO.19.

0.6CAMDENPASQUOTANK

US 158

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.

79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS

US 13/US 17

FEDERAL BRIDGE PROJECTS

UNDER CONSTRUCTION

B-4599 19934 19934REPLACE BRIDGE NO. 1 AND BRIDGE NO. 2 OVER KNOBBS CREEK.SW

PASQUOTANK US 17/US 158

B-4783 826 1REPLACE BRIDGE NO. 5 OVER BRANCH OF FLATTY CREEK.

DIV

STPOFF 75R STPOFF C 750

PASQUOTANK SR 1103(ESCLIP ROAD)

DIVISION PURCHASE ORDER CONTRACT (DPOC)

B-5139 650 100REPLACE BRIDGE NO. 21 OVER KNOBB'S CREEK.

DIV

STPON 50R STPON 500C

PASQUOTANK SR 1332(CREEK ROAD)

1-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

RURAL PROJECTSR-5716 1214SR 1301 (OLD NECK ROAD) TO SR 1302

(UNION HALL ROAD). WIDEN AND RESURFACE.

1.48

DIV

T R 100 T C 1114

PERQUIMANS SR 1300(NEW HOPE ROAD)

R-5740 784SR 1331 (RED BANK ROAD) TO SR 1300 (NEW HOPE ROAD). UPGRADE ROADWAY.

4.39

DIV

T R 50 T C 734

PERQUIMANS SR 1329(WOODVILLE ROAD)

FEASIBILITY STUDIES

SCHEDULED FOR FEASIBILITY STUDY

FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.

79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS

US 13/US 17

FEDERAL BRIDGE PROJECTSB-5604 2310REPLACE BRIDGE NO. 19 OVER BRIGHTS

MILL CREEK.HF

HFB 210R HFB 2100C

PERQUIMANS US 17 BUSINESS

PLANNING/DESIGN IN PROGRESS

R-4467 21136 2106EAST OF PERQUIMANS RIVER BRIDGE TO NC 37 IN HERTFORD. REPLACE BRIDGE NO. 8.

0.4

REG

T R 900 T U 130 T C 6000 C 6000 6000C

PERQUIMANS US 17 BUSINESS/NC 37

B-5416 850REPLACE BRIDGE NO. 29 OVER BRANCH OF PERQUIMANS RIVER.

HF

HFB R 75 HFB C 775

PERQUIMANS SR 1200(PERRY'S BRIDGE ROAD)

B-5606 2035REPLACE BRIDGE NO. 11 OVER CASTLETON CREEK.

HF

HFB 185R HFB 1850C

PERQUIMANS SR 1338(WYNNE FORK ROAD)

1-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

FEDERAL BRIDGE PROJECTSB-4648 1424 94REPLACE BRIDGE NO. 17 OVER RIDERS

CREEK.

DIV

STPOFF R 180 STPOFF C 1150

TYRRELL SR 1105(CROSSLANDINGROAD)

1-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

RURAL PROJECTS

UNDER CONSTRUCTION

R-3620 16030 16030US 64 TO NC 32. TWO LANE SHOULDER FACILITY ON NEW LOCATION.

3.3TRN

WASHINGTON NEW ROUTE

FEDERAL BRIDGE PROJECTSB-5601 3300REPLACE BRIDGE NO. 11 OVER MACKEYS

CREEK.HF

HFB R 300 HFB 3000C

WASHINGTON NC 308

1-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS

PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)

BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.

DIV

STPOFF 200R STPOFF 1800C

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

MITIGATION PROJECTS

IN PROGRESS

EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

HAZARD ELIMINATION PROJECTS

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON

VARIOUS

1-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)

E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.

TRN

STPE 96C O 128C

ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE

VARIOUS

1-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

COUNTY ID

FUTURE YEARS

F

RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants

HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)

(1) FUNDING CATEGORY

DURHAM AREA

SR - Secondary Road

TRANSIT PARTNERROUTE / CITY /

NUMBER

TA-4738

LOCATION / DESCRIPTION

PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY

DIV

SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

CP

BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET

ESTIMATED COST Preliminary engineering, right of

C10000

dollars.)

of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.

way, utility, mitigation and construction cost estimates

(2) FUNDING SOURCES KEY

O - OtherL - Local

initial scheduled year. (Estimates are in thousand of

For other work types or activities see Work Type (Activity) box below.

work description. CPProject termini and a general

conception and remains with

9000

PROJECT BREAKS

CP

Various - multiple routes

A

5000

FY 2022

C

CP 3000CP

BCP 5000 B

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FY 2023 FY 2024FY 2021

STATE TRANSPORTATION IMPROVEMENT PROGRAM

FY 2020

TOTAL PROJECT

COST (THOU)

FUZFUZ

FUN

DS

A

PRIOR YEARS COST

(THOU)

ACP 700

FY 2015 FY 2016

4000CP

FY 2025

5000

BB

CP CP 5000B

UNFUNDED

NON HIGHWAY PROGRAM

ADIV

FY 2017 FY 2018

BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.

WORK TYPE (ACTIVITY) (3)Phases of implementation:

DIV C

20000

COMMITMENTSFUTURE

by funding category in current dollars. Cost may include one or more funding types. Multi-year funding

Preliminary engineering, Right of Way, UNFUNDED

BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE

with proposed work type or activity beginning in the

break.

One or two letter

CP

A

for an explanation of funding categories

FUNDING CATEGORY (1)

DIV

DIVISION 00

DEVELOPMENTAL PROGRAM

DURHAM

FY 2019

TRANSIT PARTNERROUTE / CITY /

NEW ROUTE or CityTRANSIT PARTNER

IDENTIFICATION NUMBER Assigned to each project at

US or NC RoutesI - Interstate

project until completion.

C - City

FEPD - Elderly and Persons with Disablity (5310)

FMOD - Fixed Guideway Modifications

designation for project

any project breaks.Category for the project and

LOCATION / DESCRIPTION

used for each project phase.

FUNDING SOURCE (2)

Identifies the "STI" Funding

See Highway Funding Key

FSPR - State Planning and Research

FNF - New Freedom ProgramFNS - New Starts - Capital (5309)

FMPL - Metropolitan Planning (5303)

FED - Federal Rail Funds

FLAP - Federal Lands Access Program

FUZ - Urbanized Area Formula Program (5307)

CMAQ - Congestion Mitigation

FF - Federal Ferry

FNU - Non Urbanized Area Formula Program (5311)

(3) WORK TYPE (ACTIVITY)

C - ConstructionAD - Administrative

CP - Capital

A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide

DIV - Division

DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)

NON HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

TA-6180 1194 519CAPITAL

HF

FNU 675CP BERTIEHALIFAXHERTFORDNORTHAMPTON

CHOANOKE PUBLICTRANSPORTATIONAUTHORITY

TK-6119 6504 1576ADMINISTRATION

HF

FNU 984O O 493 O 493 O 493 O 493 O 493 493O493O493O FNU

BERTIEHALIFAXHERTFORDNORTHAMPTON

CHOANOKE PUBLICTRANSPORTATIONAUTHORITY

PASSENGER RAIL PROJECTS

IN PROGRESS

P-5600 800 800NORTH CAROLINA VIRGINIA RAILROAD. UPGRADE EXISTING RAILROAD TRACK.

TRN

BERTIEHERTFORDNORTHAMPTON

NCVA RR

PUBLIC TRANSPORTATION PROJECTSTQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND

DISABLED PERSONS

HF

FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TQ-6796 180OPERATING

HF

FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TA-6142 1522 755CAPITAL

HF

FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TK-6104 5842 1654ADMINISTRATION

HF

FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

1-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TM-6127 196OPERATING ASSISTANCE

HF

JARC 98O L 98O

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

PUBLIC TRANSPORTATION PROJECTSTQ-6796 180OPERATING

HF

FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS

HF

FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

TA-6142 1522 755CAPITAL

HF

FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TK-6104 5842 1654ADMINISTRATION

HF

FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TM-6127 196OPERATING ASSISTANCE

HF

JARC 98O L 98O

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

AVIATION PROJECTSAV-5773 21500LAND ACQUISITION AND VARIOUS

IMPROVEMENTS FOR RUNWAY PROTECTION ZONE.DIV

T 12900C C 6450O C 2150

CURRITUCK CURRITUCK COUNTYREGIONAL AIRPORT (ONX)

1-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FERRY PROJECTS

RIGHT OF WAY IN PROGRESS

F-5501 3512 1762CURRITUCK WELCOME CENTER. REPLACEMENT.

TRN

DP 1400C T 350C

CURRITUCK SR 1242(COURTHOUSE ROAD)

PUBLIC TRANSPORTATION PROJECTSTQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND

DISABLED PERSONS

HF

FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TQ-6796 180OPERATING

HF

FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TA-6142 1522 755CAPITAL

HF

FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TK-6104 5842 1654ADMINISTRATION

HF

FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TM-6127 196OPERATING ASSISTANCE

HF

JARC 98O L 98O

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

FERRY PROJECTSF-5700 12000CONSTRUCT RIVER CLASS FERRY. 0

DIV

FF C 4000 C 4000 4000C DAREHYDE

NC 12

UNDER CONSTRUCTION

F-5506 4000 4000HATTERAS FERRY DOCKS. REHABILITATE FERRY RAMPS.TRN

DARE NC 12

PUBLIC TRANSPORTATION PROJECTSTA-6539 46EXPANSION VEHICLE

HF

JARC 37CP L 9CP

DARE DARE COUNTY

TA-6107 715 124CAPITAL

HF

FNF 500CP FNU 91CP

DARE DARE COUNTY

TK-6124 1789 511ADMINISTRATION

HF

FNU 254O O 128 O 128 O 128 O 128 O 128 128O128O128O FNU

DARE DARE COUNTY

TM-6150 54OPERATING

HF

JARC 27O L 27O

DARE DARE COUNTY

1-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TM-6143 54OPERATING ASSISTANCE

HF

JARC 27O L 27O

DARE DARE COUNTY

TN-6101 56 56OPERATING ASSISTANCE - NEW FREEDOMHF

FNF DARE DARE COUNTY

TQ-6794 100OPERATING

HF

FEPD 50O L 50O

DARE DARE COUNTY

PUBLIC TRANSPORTATION PROJECTSTA-6164 232 28CAPITALHF

FNU 204CP GATES GATES COUNTY

TK-6129 1904 544ADMINISTRATION

HF

FNU 272O O 136 O 136 O 136 O 136 O 136 136O136O136O FNU

GATES GATES COUNTY

TM-6142 58OPERATING ASSISTANCE

HF

JARC 29CP L 29O

GATES GATES COUNTY

TM-6148 42OPERATING

HF

JARC 21O L 21O

GATES GATES COUNTY

TQ-6790 92OPERATING

HF

FEPD 46O L 46O

GATES GATES COUNTY

TQ-6154 74OPERATING ASSISTANCE

HF

FEPD 37O L 37O

GATES GATES COUNTY

AVIATION PROJECTSAV-5772 1780CONSTRUCT TAXIWAY.

DIV

T C 1602 O C 178

HERTFORD TRI COUNTYAIRPORT (ASJ)

AV-5769 500LAND ACQUISITION.

DIV

T 450R O 50R

HERTFORD TRI-COUNTY AIRPORT(ASJ)

PUBLIC TRANSPORTATION PROJECTSTA-6180 1194 519CAPITAL

HF

FNU 675CP BERTIEHALIFAXHERTFORDNORTHAMPTON

CHOANOKE PUBLICTRANSPORTATIONAUTHORITY

TK-6119 6504 1576ADMINISTRATION

HF

FNU 984O O 493 O 493 O 493 O 493 O 493 493O493O493O FNU

BERTIEHALIFAXHERTFORDNORTHAMPTON

CHOANOKE PUBLICTRANSPORTATIONAUTHORITY

PASSENGER RAIL PROJECTS

IN PROGRESS

P-5600 800 800NORTH CAROLINA VIRGINIA RAILROAD. UPGRADE EXISTING RAILROAD TRACK.

TRN

BERTIEHERTFORDNORTHAMPTON

NCVA RR

FERRY PROJECTS

UNDER CONSTRUCTION

F-5004 614 614OCRACOKE GANTRY. REPAIR AND REPLACE.

HYDE NC 12

1-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FERRY PROJECTS

F-5700 12000CONSTRUCT RIVER CLASS FERRY. 0

DIV

FF C 4000 C 4000 4000C DAREHYDE

NC 12

UNDER CONSTRUCTION

F-5003 2410 2410SWAN QUARTER VISITORS CENTER. REPLACEMENT.TRN

HYDE NC 45

PUBLIC TRANSPORTATION PROJECTSTQ-9006 40CAPITAL - PURCHASE OF SERVICE

HF

FEPD 32CP L 4CP S 4CP

HYDE HYDE COUNTY HEALTHDEPARTNEBT

TA-6127 203 40CAPITALHF

FNU 163CP HYDE HYDE COUNTY NON-PROFIT

TK-6135 1424 400ADMINISTRATION

HF

FNU 224O O 100 O 100 O 100 O 100 O 100 100O100O100O FNU

HYDE HYDE COUNTY NON-PROFIT

TM-6141 46OPERATING ASSISTANCEHF

JARC 46O HYDE HYDE COUNTY NON-PROFIT

TA-6540 32ACCESSIBLE INFORMATION KIOSKS AST TERMINAL CENTER FOR INFORMATION BY VARIOUS FORMS INCLUDING BRAILLE AND MULTIPLE LANGUAGESHF

FNF 32CP CARTERETHYDE

NCDOT FERRY DIVISION

TG-5252 8CONSTRUCT BUS SHELTERS AND BENCHES.

DIV

T C 8HYDE OCRACOKE PARKAND RIDE

PUBLIC TRANSPORTATION PROJECTSTI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO

NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

TA-6140 387 181CAPITALHF

FNU 206CP MARTIN MARTIN COUNTY

TK-6144 2530 722ADMINISTRATION

HF

FNU 360O O 181 O 181 O 181 O 181 O 181 181O181O181O FNU

MARTIN MARTIN COUNTY

PUBLIC TRANSPORTATION PROJECTSTA-6180 1194 519CAPITAL

HF

FNU 675CP BERTIEHALIFAXHERTFORDNORTHAMPTON

CHOANOKE PUBLICTRANSPORTATIONAUTHORITY

TK-6119 6504 1576ADMINISTRATION

HF

FNU 984O O 493 O 493 O 493 O 493 O 493 493O493O493O FNU

BERTIEHALIFAXHERTFORDNORTHAMPTON

CHOANOKE PUBLICTRANSPORTATIONAUTHORITY

1-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PASSENGER RAIL PROJECTS

IN PROGRESS

P-5600 800 800NORTH CAROLINA VIRGINIA RAILROAD. UPGRADE EXISTING RAILROAD TRACK.

TRN

BERTIEHERTFORDNORTHAMPTON

NCVA RR

AVIATION PROJECTSAV-5770 4067TAXIWAY REQUIREMENTS - SOUTHSIDE

PARTIAL PARALLEL TAXIWAY.

DIV

T C 3660 O C 407

PASQUOTANK ELIZABETH CITYCOAST GUARDSTATION (ECG)

BICYCLE AND PEDESTRIAN PROJECTSEB-4991 676 126US 17 BYPASS TO PRITCHARD STREET.

CONSTRUCT GREENWAY.TRN

HP 550C PASQUOTANK ELIZABETH CITY

PUBLIC TRANSPORTATION PROJECTSTQ-6796 180OPERATING

HF

FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS

HF

FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

TA-6142 1522 755CAPITAL

HF

FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TK-6104 5842 1654ADMINISTRATION

HF

FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

1-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS

TM-6127 196OPERATING ASSISTANCE

HF

JARC 98O L 98O

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

PUBLIC TRANSPORTATION PROJECTSTQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND

DISABLED PERSONS

HF

FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TQ-6796 180OPERATING

HF

FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY

HF

FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON

GREYHOUND LINES

TA-6142 1522 755CAPITAL

HF

FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TK-6104 5842 1654ADMINISTRATION

HF

FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

TM-6127 196OPERATING ASSISTANCE

HF

JARC 98O L 98O

CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS

ALBEMARLE REGIONALHEALTH SERVICE

PUBLIC TRANSPORTATION PROJECTSTA-6220 51 41CAPITALHF

FNU 10CP TYRRELL TYRELL COUNTY

TK-6168 308 88ADMINISTRATION

HF

FNU 44O O 22 O 22 O 22 O 22 O 22 22O22O22O FNU

TYRRELL TYRELL COUNTY

1-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

NON HIGHWAY PROGRAMDIVISION 1

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS FY 2016

UNFUNDED

FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020

STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS

AV-5771 530TAXIWAY TURNAROND RUNWAY 3.

DIV

T C 477 O C 53

WASHINGTON PLYMOUTH MUNICPALAIRPORT (PMZ)

PUBLIC TRANSPORTATION PROJECTSTA-6137 225 84CAPITALHF

FNU 141CP WASHINGTON WASHINGTON COUNTY

TK-6171 1242 354ADMINISTRATION

HF

FNU 176O O 89 O 89 O 89 O 89 O 89 89O89O89O FNU

WASHINGTON WASHINGTON COUNTY

1-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES

AVAILABLE

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project