STATE TRANSPORTATION IMPROVEMENT PROGRAM
Division 1BertieCamdenChowanCurrituckDareGatesHertfordHyde MartinNorthamptonPasquotank
PerquimansTyrrellWashington
CAMDEN
GATES
MARTIN
HYDE
DARE
TYRRELL
WASHINGTON
BERTIE CHOWAN
PERQUIMANS
CURRITUCK
PASQUOTANK
NORTHAMPTON
HERTFORD
158
158
17
64
17
13
264
25813
64
158
308
34432
343
171
37
12
42
903
46
11
45
35
94
305
ElizabethCity
TG-5252
AV-5770
F-5700
AV-5773
AV-5771
AV-5772AV-5769
B-5610
B-2500
B-5106
B-4648
B-5603
B-5508B-5600
B-5503
B-4577
B-4919
B-4920
B-4783
B-5139
B-2500B
R-5311A
R-4467 R-5740
R-5738
R-5716
R-3826
R-3620
R-5014
I-5839
R-2507C
R-2576
R-5506R-5731
R-4705
R-5739R-5717
R-5505
DRAFT STIPFY 2015-2025STI ProjectsDIVISION 1
0 10 205Miles
BRIDGES FUNDED THROUGH STI
STATEWIDE AVIATION
REGIONAL AVIATION
DIVISION AVIATION
DIVISION FERRYREGIONAL RAILDIVISION RAILREGIONAL TRANSITDIVISION TRANSITSAFETYTRANSITION *TRANSITION *INTERSTATE MAINTENANCESTATEWIDE HIGHWAYREGIONAL HIGHWAYDIVISON HIGHWAYDIVISION BIKE/PEDESTRIANINTERSTATE ROUTEUS ROUTENC ROUTESECONDARY ROADMUNICIPAL BOUNDARIESMILITARY BASENCDOT DIVISION BOUNDARYCOUNTY BOUNDARYWATER FEATURES
* Note: Reflects 108 of the Major Transition ProjectsNote: FY 2015 projects represent major projects not
let as of November 2014
COUNTY
FUTURE YEARS
F
NHPB - National Highway Performance Program (Bridge)NHPIM - National Highway Performance Program (Interstate Maintenance)O - OthersRR - Rail-Highway SafetyS (M) - State MatchSRTS - Safe Routes to School
FLPI - Federal Lands Program (Indian Reservation Roads) STP - Surface Transportation ProgramHFB - Highway Fund Bridge Replacement Program STPDA - Surface Transportation Program - Direct AttributableHP - Federal-Aid High Priority STPEB - Surface Transportation Program, Enhancements (Bike)
STPON - Surface Transportation Program Bridge (On System Bridge)STPOFF -Surface Transportation Program (Off System Bridge) PE - Preliminary EngineeringT - State Highway Trust Funds
NHP - National Highway Performance Program TAP - Transportation Alternatives Program RG - Right of Way (GARVEE)
SW - StatewideTRN -Transition Project
S - StructureU - Utilities
I - ImplementationL - LandscapingM - MitigationO - OperationsP - Paving
WAKE
NUMBERLENGTH (MILES)
DIVISION 00
R-0000
IDROUTE/CITY
US or NC RoutesON NEW LOCATION. I - InterstateWITH A BYPASS OF HOMETOWN ROUTE/CITY
Project termini and a general
SW
M1500
A
NHP
4000
FUNDING CATEGORY (1)
used for each project phase.
FUNDING SOURCE (2)
U
B3000R
FY 2017
C
(3) WORK TYPE (ACTIVITY)
A - Acquisition
with proposed work type or activity beginning in the initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
dollars.)
of a project segment indicates (Cash-Flow Funding) COMMITMENTSFUTURE
SW CBSW
One or two letter
HIGHWAY PROGRAM
UNFUNDED
NC 3 TO SR 1003SR 1003 TO NC 96
ASW
UNFUNDED
20000CRC 5000C 5000 BC B
WIDEN TO A FOUR-LANE FACILITY
A
NC 00 R7.3 R25063,450I-40 TO NC 96 EAST OF HOMETOWN.
B
FY 2025 FY 2018
700
FY 2019
DEVELOPMENTAL PROGRAMSTATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020FY 2015 FY 2016
M
TOTAL PROJECT
COST (THOU)
NHPNHP
FUN
DS
A
PRIOR YEARS COST
(THOU)
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
U 5000NHP
C10000
FY 2021
C
FY 2023 FY 2024
FY 2022
5000
9000
APD - Appalachian Development
NHPNHP
LOCATION / DESCRIPTION NHP
NHP
I-40 TO NC 3
Preliminary engineering, Right of Way, Mitigation, Utilities or Construction. break.
work description.
way, utility, mitigation and construction cost estimates
See Highway Funding Key
any project breaks.Category for the project andIdentifies the "STI" Funding
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
for an explanation of funding categories
Phases of implementation: ESTIMATED COST Preliminary engineering, right of
(1) FUNDING CATEGORY
PROJECT BREAKS
designation for project
LOCATION / DESCRIPTION
SR - Secondary Road
IDENTIFICATION NUMBER Assigned to each project at conception and remains with
BVarious - multiple routesNEW ROUTE or City
WORK TYPE (ACTIVITY) (3)
BOND (R) - Revenue Bond
HRRR - High Risk Rural Roads
L - LocalHSIP - Highway Safety Improvement Program
project until completion.
DIV - DivisionEX - Exempt
REG - RegionalHF - State Dollars (Non-STI)
F - Feasibility StudyCG - Construction (GARVEE)C - Construction
G - Grading and Structures
R - Right of Way
(2) FUNDING KEY FOR HIGHWAY FUNDING SOURCES
ER - Emergency Relief Funds
CMAQ - Congestion MitigationDP - Discretionary or Demonstration
FED - Federal Rail Funds
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
UNDER CONSTRUCTION
R-5506 3228 3228SR 1364 (LEDREW PERRY ROAD) TO CHOWAN RIVER. PAVEMENT STRENGTHENING AND RESURFACING.
7.3TRN
BERTIE US 17
R-5731 42943SOUTH END OF CHOWAN RIVER BRIDGE TO US 17 BUSINESS IN EDENTON. UPGRADE FREEWAY TO INTERSTATE STANDARDS.
8.5
DIV
T 3000R T 29957C C 9986
BERTIECHOWAN
US 17
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.
79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS
US 13/US 17
FEDERAL BRIDGE PROJECTS
UNDER CONSTRUCTION
B-5141 2813 2813REPLACE BRIDGE NO. 53 OVER WHITE OAK SWAMP.SW
BERTIE US 13
B-4916 1020 30REPLACE BRIDGE NO. 57 OVER QUIOCCOSION SWAMP.
HF
HFB R 90 HFB C 900
BERTIE US 13
DIVISION PURCHASE ORDER CONTRACT (DPOC)
B-5106 810 100REPLACE BRIDGE NO. 148 OVER WAHTON CREEK.
DIV
STPOFF 60R STPOFF C 650
BERTIE SR 1200(CONNARITSA ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
RURAL PROJECTSR-2414* 48568 48568EAST OF PASQUOTANK RIVER IN ELIZABETH
CITY TO EAST OF NC 34 IN BELCROSS. WIDEN TO MULTI-LANES.
5.3
A EAST OF PASQUOTANK RIVER IN ELIZABETH CITY TO SOUTH OF SR 1139 (COUNTRY CLUB ROAD) - COMPLETEB SOUTH OF SR 1139 (COUNTRY CLUB ROAD) TO EAST OF NC 34 IN BELCROSS - UNDER CONSTRUCTION
CAMDEN US 158/NC 34
R-5717 12640NC 343 IN CAMDEN COUNTY TO PROPOSED NC 168 BYPASS IN CURRITUCK COUNTY. WIDEN AND INTERSECTION IMPROVEMENTS.
10.9
DIV
T R 100 T 12540C
CAMDENCURRITUCK
SR 1227/SR 1208(SOUTH MILLS ROAD)SR 1224/SR 1223(OLD SWAMP ROAD)
URBAN PROJECTS
UNDER CONSTRUCTION
U-4438 89305 89305US 17 BUSINESS (NORTH ROAD STREET) TO EAST OF PASQUOTANK RIVER IN ELIZABETH CITY. RECONSTRUCT ROADWAY AND REPLACE BRIDGE NO.19.
0.6CAMDENPASQUOTANK
US 158
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.
79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS
US 13/US 17
1-8 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
B-4453 1435 5REPLACE BRIDGE NO. 19 OVER CREEK.
HF
HFB R 130 HFB C 1300
CAMDEN SR 1235(CAROLINA ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-9 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)
E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
RURAL PROJECTSR-5731 42943SOUTH END OF CHOWAN RIVER BRIDGE TO
US 17 BUSINESS IN EDENTON. UPGRADE FREEWAY TO INTERSTATE STANDARDS.
8.5
DIV
T 3000R T 29957C C 9986
BERTIECHOWAN
US 17
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.
79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS
US 13/US 17
FEDERAL BRIDGE PROJECTSB-5507 3123REPLACE BRIDGE NO. 24 OVER WARWICK
CREEK, BRIDGE NO. 20 OVER DILLARD CREEK, AND BRIDGE NO. 21 OVER SAND RUN.HF
HFB R 280 HFB M 43 HFB C 2800
CHOWAN NC 32
B-5501 1210REPLACE BRIDGE NO. 3 OVER PEMBROKE CREEK.
HF
HFB 110R HFB C 1100
CHOWAN SR 1200(MACEDONIA-MEXICO ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-10 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
ENHANCEMENT (CALL PROJECTS)E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE
WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
RURAL PROJECTSR-5717 12640NC 343 IN CAMDEN COUNTY TO PROPOSED
NC 168 BYPASS IN CURRITUCK COUNTY. WIDEN AND INTERSECTION IMPROVEMENTS.
10.9
DIV
T R 100 T 12540C
CAMDENCURRITUCK
SR 1227/SR 1208(SOUTH MILLS ROAD)SR 1224/SR 1223(OLD SWAMP ROAD)
1-11 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS - NORTH CAROLINA TURNPIKE AUTHORITY PROJECT
R-2576* 475477 35100MID-CURRITUCK BRIDGE, COINJOCK TO COROLLA. NEW STRUCTURE OVER CURRITUCK SOUND AND UPGRADE APPROACHES.
7.3
DIV
STP 9835RG RG 1967 RG 1967 1967RG1967RG1967RG RG 1967 RG 1967S(M) RG 3199 RG 3199 STP U 1947 STP 56030CG CG 11206 CG 11206 11206CG11206CG11206CG CG 11206 CG 11206S(M) CG 9110 CG 9110 9110CG9110CG BOND R C 59379 C 59379 59379C59379C
CURRITUCK NEW ROUTE
FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-12 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY - IN PROGRESS
R-4070 8627 8627BUXTON TO AVON. PLANNING AND ENVIRONMENTAL STUDIES FOR MAINTAINING ROADWAY. A NORTH OF SR 1231 (OLD LIGHTHOUSE ROAD) TO SOUTH OF SR 1420 (KINNAKEET DRIVE) - COMPLETE
B BUXTON TO AVON
DARE NC 12
R-3116 7000 7000NC 12 IMPROVEMENTS.
A OCRACOKE ISLAND HOTSPOT. INTERIM IMPROVEMENTS - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLYB HATTERAS VILLAGE HOTSPOT. INTERIM IMPROVEMENTS - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLYH OCRACOKE TO SOUTH TERMINAL OF OREGON INLET BRIDGE - PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
DARE NC 12
R-5738 2836SR 1210 (BOB PERRY ROAD) TO IVY LANE. UPGRADE FACILITY.
1
DIV
T 100R T 2736C
DARE SR 1208(WEST KITTY HAWKROAD)
PLANNING/DESIGN IN PROGRESS
R-5014 6050 1200US 158 (CROATON HIGHWAY) TO DEAD END IN KILL DEVIL HILLS. OPERATIONAL-SAFETY IMPROVEMENTS.
4.3
DIV
STP R 500 STP C 4350
DARE SR 1217(COLLINGTON ROAD)
FEDERAL BRIDGE PROJECTSB-5610 1474REPLACE BRIDGE NO. 8 OVER CANAL.
REG
NHPB 70R NHPB 1404C
DARE NC 12
COMPLETE - RETAIN PROJECT FILE FOR GARVEE PAYOUT
B-5014 45043 37638REPAIR BRIDGE NO. 11 OVER OREGON INLET.TRN
NHPB 1481CG A CG 1481 A CG 1481 A CG 1481 A CG 1481 A
A REPAIR BRIDGE NO. 11 - COMPLETE - PAYBACK FY 2008 - FY 2019 , GARVEE BOND FUNDING $13.5 MILLIONTRNB REPAIR BRIDGE NO. 11 - COMPLETEC INSTALLATION OF CRUTCH BENT AND ADDITIONAL SCOUR PROTECTION - COMPLETED REPAIR BRIDGE NO. 11 - COMPLETEE REHABILITATION OF EXISTING STEEL CRUTCH BENTS - COMPLETE
DARE NC 12
UNDER CONSTRUCTION - GARVEE BOND FUNDING $70 MILLION; CONSTRUCTION - PAYBACK FY 2013 - FY 2024.
B-2500 622565 140675REPLACE BRIDGE NO. 11 (HERBERT C. BONNER BRIDGE) OVER OREGON INLET AND NC 12 IMPROVEMENTS.
2.7
TRN
NHPB 762U NHPB 7175CG 7175CGCG 7175 CG 7175 CG 7175 CG 7175 CG 7175 7175CG7175CG7175CG CG 7175 CG 7175S(M) 13429C C 13429 C 13429 NHPB 30214C C 30214 C 30214 C 30214 ER 10382C A NHP 20153C A NHP 3570R B ER 1530R B NHP 250U B ER 19800C B C 19800 B C 19800 B NHP 46200C B C 46200 B C 46200 B
A PHASE II, LONG-TERM IMPROVEMENTS AT PEA ISLAND. - UNDER CONSTRUCTIONTRNB PHASE II, LONG-TERM IMPROVEMENTS AT RODANTHE.TRN
DARE NC 12
B-5607 630REPLACE BRIDGE NO. 40 OVER CANAL.
HF
HFB 55R HFB 575C
DARE SR 1208(NORTH KITTY HAWK ROAD)
1-13 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MUNICIPAL BRIDGE PROJECTS
MUNICIPAL BRIDGE
B-5417 1244 199REPLACE BRIDGE NO. 17 OVER SOUTH DOGWOOD TRAIL OVER SNOW GOOSE CANAL.DIV
STPOFF 105R STPOFF C 940
DARE SOUTHERN SHORES
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-14 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)
E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
IN PROGRESS
S-5501 201 201IMPLEMENTATION OF WAYSHOWING AND VISITOR ORIENTATION.
EX
CARTERETDAREHYDE
NC 12/US 70
S-5502 212OUTER BANKS SCENIC BYWAY WAYSIDES AND INTERPRETIVE SIGNS.
TRN
DP 212C CARTERETDAREHYDE
NC 12/US 70
RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS
R-2507* 124044 66507US 158 TO THE VIRGINIA STATE LINE. WIDEN TO MULTI-LANES.
15.5 T 1800R B T 1200U B T 337M B T 23200C B T 6000R C T 1200U C T 11900C C C 11900 C
A US 158 IN WINTON TO US 158 BYPASS IN TARHEEL - UNDER CONSTRUCTIONB US 158 BYPASS IN TARHEEL TO SR 1202 (EURE ROAD-GATES SCHOOL ROAD)C SR 1202 (EURE ROAD-GATES SCHOOL ROAD) TO VIRGINIA STATE LINEDIV
GATESHERTFORD
US 13
FEDERAL BRIDGE PROJECTSB-5611 1375REPLACE BRIDGE NO. 9 OVER RUN SWAMP.
HF
HFB 125R HFB 1250C
GATES US 13
1-15 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-16 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS
R-5311* 94036 2454NC 11/NC 561 INTERSECTION NEAR AHOSKIE TO US 13/US 158/NC 45 INTERSECTION NEAR WINTON. WIDEN TO MULTI-LANES.
7.8
SW
NHP 60U A NHP 1359M A NHP C 1875 A C 1875 A HSIP C 2575 A C 2575 A NHP 665U B NHP 4425R B NHP 3073M B NHP 73100C B
A NC 11/SR 1212 (SHORT CUT ROAD) AT NC 11/SR 1213 (OLD NC 11 ROAD). CONSTRUCT INTERCHANGESWB NC 11/NC 561 INTERSECTION NEAR AHOSKIE TO US 13/US 158/NC 45 INTERSECTION NEAR WINTON
HERTFORD US 13/NC 11
PLANNING/DESIGN IN PROGRESS
R-2507* 124044 66507US 158 TO THE VIRGINIA STATE LINE. WIDEN TO MULTI-LANES.
15.5 T 1800R B T 1200U B T 337M B T 23200C B T 6000R C T 1200U C T 11900C C C 11900 C
A US 158 IN WINTON TO US 158 BYPASS IN TARHEEL - UNDER CONSTRUCTIONB US 158 BYPASS IN TARHEEL TO SR 1202 (EURE ROAD-GATES SCHOOL ROAD)C SR 1202 (EURE ROAD-GATES SCHOOL ROAD) TO VIRGINIA STATE LINEDIV
GATESHERTFORD
US 13
UNDER CONSTRUCTION
R-2583* 52593 52593MURFREESBORO BYPASS TO US 13 WEST OF WINTON. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.
8HERTFORD US 158
FEDERAL BRIDGE PROJECTSB-5605 2365REPLACE BRIDGE NO. 31 OVER SEABOARD
COAST LINE RAILROAD.HF
HFB R 215 HFB 2150C
HERTFORD US 13
B-5609 2007REPLACE BRIDGE NO. 28 OVER CUTAWHISKIE SWAMP.
HF
HFB 180R HFB 2M HFB 1825C
HERTFORD SR 1137(LIVERMAN MILLROAD)
B-5603 2662REPLACE BRIDGE NO. 137 OVER MEHERRIN RIVER OVERFLOW.
DIV
STPOFF 127R STPOFF C 2535
HERTFORD SR 1311(BOONE'S BRIDGE ROAD)
B-5608 5007REPLACE BRIDGE NO. 10 OVER MEHERRIN RIVER.
HF
HFB 455R HFB 2M HFB 4550C
HERTFORD SR 1311(BOONE'S BRIDGE ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-17 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
FEDERAL BRIDGE PROJECTSB-5602 2640REPLACE BRIDGE NO. 8 OVER BURGESS
MILL CREEK.HF
HFB R 240 HFB 2400C
HYDE US 264
B-5508 1400REPLACE BRIDGE NO. 21 OVER CANAL.
DIV
STPOFF R 125 STPOFF C 1275
HYDE SR 1311(NORTH LAKE ROAD)
DIVISION PURCHASE ORDER CONTRACT
B-5600 324REPLACE BRIDGE NO. 79 OVER CANAL.
DIV
STPOFF R 15 STPOFF 309C
HYDE SR 1319(ROPER LANE)
1-18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)S-5502 212OUTER BANKS SCENIC BYWAY WAYSIDES
AND INTERPRETIVE SIGNS.
TRN
DP 212C CARTERETDAREHYDE
NC 12/US 70
1-19 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ROADSIDE ENVIRONMENTAL PROJECTS (SCENIC)
IN PROGRESS
S-5501 201 201IMPLEMENTATION OF WAYSHOWING AND VISITOR ORIENTATION.
EX
CARTERETDAREHYDE
NC 12/US 70
RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS
R-3826 14649 1194SR 1182 (EAST COLLEGE ROAD) TO NC 125 NORTHWEST OF WILLIAMSTON. TWO LANES, PART ON NEW LOCATION.
2.5
DIV
STP 2400R STP 255U STP C 10800
MARTIN NC 125
PLANNING/DESIGN IN PROGRESS
R-4705 11200NC 903 TO SR 1182 (EAST COLLEGE ROAD). UPGRADE FACILITY.
9.6
DIV
STP R 4000 STP 7200C
MARTIN SR 1142(PRISON CAMPROAD)
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.
79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS
US 13/US 17
SCHEDULED FOR FEASIBILITY STUDY
FS-1504A SR 1003 (ROLESVILLE ROAD) IN WAKE COUNTY TO US 17 IN WILLIAMSTON. UPGRADE TO INTERSTATE STANDARDS.
86.5EDGECOMBEFRANKLINMARTINNASHWAKE
US 64
FEDERAL BRIDGE PROJECTSB-5503 900REPLACE BRIDGE NO. 53 OVER COLLIE
SWAMP.REG
STPOFF R 80 STPOFF C 820
MARTIN NC 125
B-4577 984 129REPLACE BRIDGE NO. 71 OVER FLAT SWAMP.
DIV
STPOFF R 80 STPOFF C 775
MARTIN SR 1159(FLAT SWAMP ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-20 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
INTERSTATE PROJECTS
PROJECT COMPLETE - GARVEE BOND FUNDING $2.7 MILLION; PAYBACK FY 2007 - FY 2018
I-4913 6532 5268NORTH OF HALIFAX COUNTY LINE (MILE POST 175) TO THE VIRGINIA STATE LINE (MILE POST 181.3). PAVEMENT REHABILITATION.
6.3TRN
NHP 316CG CG 316 CG 316 CG 316 NORTHAMPTON I-95
I-5839 2100HALIFAX COUNTY LINE TO SR 1201 (MACON PRICE RD). PAVEMENT REHABILITATION.
4.6SW
NHPIM C 2100 NORTHAMPTON I-95
RURAL PROJECTS
PLANNING/DESIGN IN PROGRESS
R-2582* 137639 16711I-95/NC 46 IN ROANOKE RAPIDS TO SR 1333 (MT. CARMEL CHURCH ROAD) EAST OF JACKSON. WIDEN TO MULTI-LANES WITH BYPASS OF JACKSON, SOME NEW LOCATION.
15.2 T 54000C A T 5400R B T 128M B T 61400C B
A I-95/NC 46 IN ROANOKE RAPIDS TO SR 1312 (ST. JOHN CHURCH ROAD) IN NORTHAMPTON COUNTY - RIGHT OF WAY IN PROGRESSB SR 1312 (ST. JOHN CHURCH ROAD) TO SR 1333 (MT. CARMEL CHURCH ROAD) EAST OF JACKSON
NORTHAMPTON US 158/NC 46
UNDER CONSTRUCTION
R-5505 3143 3143NC 305 TO US 158. PAVEMENT STRENGTHENING AND RESURFACING.
13.8TRN
NORTHAMPTON US 258
R-5739 8687NC 48 IN GASTON TO THE VIRGINIA STATE LINE. UPGRADE AND WIDEN EXISTING FACILITY.
10.5
DIV
T 100R T 8587C
NORTHAMPTON NC 46
1-21 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEASIBILITY STUDIES
PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY
I-5133 10034 10034CORRIDOR PLANNING AND FINANCE STUDY. SOUTH CAROLINA STATE LINE TO THE VIRGINIA STATE LINE.
CUMBERLANDHALIFAXHARNETTJOHNSTONNASHNORTHAMPTONROBESONWILSON
I-95
FEDERAL BRIDGE PROJECTSB-5502 1320REPLACE BRIDGE NO. 13 OVER MEHERRIN
RIVER.
HF
HFB 120R HFB C 1200
NORTHAMPTON SR 1339(BRANCHES BRIDGEROAD)
B-4919 771REPLACE BRIDGE NO. 14 OVER POTECASI CREEK.
DIV
STPOFF 70R STPOFF 1M STPOFF C 700
NORTHAMPTON SR 1500(FIRE TOWER ROAD)
B-4920 1022 32REPLACE BRIDGE NO. 15 OVER WILDCAT SWAMP.
DIV
STPOFF 90R STPOFF C 900
NORTHAMPTON SR 1505(NCHS EAST ROAD)
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-22 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
URBAN PROJECTS
UNDER CONSTRUCTION
U-4438 89305 89305US 17 BUSINESS (NORTH ROAD STREET) TO EAST OF PASQUOTANK RIVER IN ELIZABETH CITY. RECONSTRUCT ROADWAY AND REPLACE BRIDGE NO.19.
0.6CAMDENPASQUOTANK
US 158
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.
79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS
US 13/US 17
FEDERAL BRIDGE PROJECTS
UNDER CONSTRUCTION
B-4599 19934 19934REPLACE BRIDGE NO. 1 AND BRIDGE NO. 2 OVER KNOBBS CREEK.SW
PASQUOTANK US 17/US 158
B-4783 826 1REPLACE BRIDGE NO. 5 OVER BRANCH OF FLATTY CREEK.
DIV
STPOFF 75R STPOFF C 750
PASQUOTANK SR 1103(ESCLIP ROAD)
DIVISION PURCHASE ORDER CONTRACT (DPOC)
B-5139 650 100REPLACE BRIDGE NO. 21 OVER KNOBB'S CREEK.
DIV
STPON 50R STPON 500C
PASQUOTANK SR 1332(CREEK ROAD)
1-23 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-24 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)
E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
RURAL PROJECTSR-5716 1214SR 1301 (OLD NECK ROAD) TO SR 1302
(UNION HALL ROAD). WIDEN AND RESURFACE.
1.48
DIV
T R 100 T C 1114
PERQUIMANS SR 1300(NEW HOPE ROAD)
R-5740 784SR 1331 (RED BANK ROAD) TO SR 1300 (NEW HOPE ROAD). UPGRADE ROADWAY.
4.39
DIV
T R 50 T C 734
PERQUIMANS SR 1329(WOODVILLE ROAD)
FEASIBILITY STUDIES
SCHEDULED FOR FEASIBILITY STUDY
FS-1501A US 64 IN WILLIAMSTON TO VIRGINIA STATE LINE. UPGRADE TO INTERSTATE STANDARDS.
79BERTIECAMDENCHOWANMARTINPASQUOTANKPERQUIMANS
US 13/US 17
FEDERAL BRIDGE PROJECTSB-5604 2310REPLACE BRIDGE NO. 19 OVER BRIGHTS
MILL CREEK.HF
HFB 210R HFB 2100C
PERQUIMANS US 17 BUSINESS
PLANNING/DESIGN IN PROGRESS
R-4467 21136 2106EAST OF PERQUIMANS RIVER BRIDGE TO NC 37 IN HERTFORD. REPLACE BRIDGE NO. 8.
0.4
REG
T R 900 T U 130 T C 6000 C 6000 6000C
PERQUIMANS US 17 BUSINESS/NC 37
B-5416 850REPLACE BRIDGE NO. 29 OVER BRANCH OF PERQUIMANS RIVER.
HF
HFB R 75 HFB C 775
PERQUIMANS SR 1200(PERRY'S BRIDGE ROAD)
B-5606 2035REPLACE BRIDGE NO. 11 OVER CASTLETON CREEK.
HF
HFB 185R HFB 1850C
PERQUIMANS SR 1338(WYNNE FORK ROAD)
1-25 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
FEDERAL BRIDGE PROJECTSB-4648 1424 94REPLACE BRIDGE NO. 17 OVER RIDERS
CREEK.
DIV
STPOFF R 180 STPOFF C 1150
TYRRELL SR 1105(CROSSLANDINGROAD)
1-26 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
RURAL PROJECTS
UNDER CONSTRUCTION
R-3620 16030 16030US 64 TO NC 32. TWO LANE SHOULDER FACILITY ON NEW LOCATION.
3.3TRN
WASHINGTON NEW ROUTE
FEDERAL BRIDGE PROJECTSB-5601 3300REPLACE BRIDGE NO. 11 OVER MACKEYS
CREEK.HF
HFB R 300 HFB 3000C
WASHINGTON NC 308
1-27 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FEDERAL BRIDGE PROJECTS
PART UNDER CONSTRUCTION - BRIDGE PURCHASE ORDER CONTRACT (BPOC)
BD-5101 27227 25227DIVISION 1 PURCHASE ORDER CONTRACT BRIDGE REPLACEMENT PROJECTS AT SELECTED LOCATIONS.
DIV
STPOFF 200R STPOFF 1800C
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
MITIGATION PROJECTS
IN PROGRESS
EE-4901 19816 19816ECOSYSTEMS ENHANCEMENT PROGRAM FOR DIVISION 1 PROJECT MITIGATION.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
HAZARD ELIMINATION PROJECTS
DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS
W-5201 595 595DIVISION 1 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.
BERTIECAMDENCHOWANCURRITUCKDAREGATESHERTFORDHYDEMARTINNORTHAMPTONPASQUOTANKPERQUIMANSTYRRELLWASHINGTON
VARIOUS
1-28 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025ENHANCEMENT (CALL PROJECTS)
E-5501 224FREEDOM ROADS. INSTALL INTERACTIVE WAYSIDE SIGNAGE FOR DESIGNATED SITES.
TRN
STPE 96C O 128C
ALAMANCEBEAUFORTBRUNSWICKBUNCOMBECAMDENCHOWANCRAVENDAREDURHAMEDGECOMBEGUILFORDHALIFAXLENOIRPASQUOTANKWASHINGTONWAYNE
VARIOUS
1-29 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
COUNTY ID
FUTURE YEARS
F
RR - Rail-Highway SafetyRTAP - Rural Transit Assistance ProgramS - State I - ImpementationS (M) - State Match O - OperationsSMAP - Operating Assistance and State Maintenance Oc - OPS Funded CapitalSRTS - Safe Routes to School PE - Preliminary EngineeringSTAT - State PL - Planning / DesignSTHSR - Stimulus High Speed Rail R - Right-of-WaySTPDA - Surface Transportation Program - Direct AttributableSTPE - Surface Transportation Program, EnhancementsSTPEB - Surface Transportation Program, Enhancements (Bike)T - State Highway Trust FundsT2001 - State Rail FundsTAP - Transportation Alternatives ProgramTIGER DISC - TIGER Discretionary Grants
HP - Federal-Aid High PriorityJARC - Job Assistance and Reverse Commute (3037)
(1) FUNDING CATEGORY
DURHAM AREA
SR - Secondary Road
TRANSIT PARTNERROUTE / CITY /
NUMBER
TA-4738
LOCATION / DESCRIPTION
PASSENGER AMENITIES - BUS STOP TRANSIT AUTHORITY
DIV
SHELTERS, BENCHES, SHOP EQUIPMENTSPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
CP
BUS STOP SHELTER AND BENCHES LOCATED AT HOLLOWAY STREET
ESTIMATED COST Preliminary engineering, right of
C10000
dollars.)
of a project segment indicates (Cash-Flow Funding)Mitigation, Utilities or Construction.
way, utility, mitigation and construction cost estimates
(2) FUNDING SOURCES KEY
O - OtherL - Local
initial scheduled year. (Estimates are in thousand of
For other work types or activities see Work Type (Activity) box below.
work description. CPProject termini and a general
conception and remains with
9000
PROJECT BREAKS
CP
Various - multiple routes
A
5000
FY 2022
C
CP 3000CP
BCP 5000 B
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FY 2023 FY 2024FY 2021
STATE TRANSPORTATION IMPROVEMENT PROGRAM
FY 2020
TOTAL PROJECT
COST (THOU)
FUZFUZ
FUN
DS
A
PRIOR YEARS COST
(THOU)
ACP 700
FY 2015 FY 2016
4000CP
FY 2025
5000
BB
CP CP 5000B
UNFUNDED
NON HIGHWAY PROGRAM
ADIV
FY 2017 FY 2018
BSHOP EQUIPMENT, SPARE PARTS, ENGINES, SERVICE VEHICLES, ETC.
WORK TYPE (ACTIVITY) (3)Phases of implementation:
DIV C
20000
COMMITMENTSFUTURE
by funding category in current dollars. Cost may include one or more funding types. Multi-year funding
Preliminary engineering, Right of Way, UNFUNDED
BUS STOP SHELTER AND BENCHES LOCATED AT GREGSON AVENUE
with proposed work type or activity beginning in the
break.
One or two letter
CP
A
for an explanation of funding categories
FUNDING CATEGORY (1)
DIV
DIVISION 00
DEVELOPMENTAL PROGRAM
DURHAM
FY 2019
TRANSIT PARTNERROUTE / CITY /
NEW ROUTE or CityTRANSIT PARTNER
IDENTIFICATION NUMBER Assigned to each project at
US or NC RoutesI - Interstate
project until completion.
C - City
FEPD - Elderly and Persons with Disablity (5310)
FMOD - Fixed Guideway Modifications
designation for project
any project breaks.Category for the project and
LOCATION / DESCRIPTION
used for each project phase.
FUNDING SOURCE (2)
Identifies the "STI" Funding
See Highway Funding Key
FSPR - State Planning and Research
FNF - New Freedom ProgramFNS - New Starts - Capital (5309)
FMPL - Metropolitan Planning (5303)
FED - Federal Rail Funds
FLAP - Federal Lands Access Program
FUZ - Urbanized Area Formula Program (5307)
CMAQ - Congestion Mitigation
FF - Federal Ferry
FNU - Non Urbanized Area Formula Program (5311)
(3) WORK TYPE (ACTIVITY)
C - ConstructionAD - Administrative
CP - Capital
A - AcquisitionHF - State Dollars (Non-STI)REG - RegionalSW - Statewide
DIV - Division
DP - Discretionary or DemonstrationFBUS - Capital Program - Bus Earmark (5309)
NON HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
TA-6180 1194 519CAPITAL
HF
FNU 675CP BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLICTRANSPORTATIONAUTHORITY
TK-6119 6504 1576ADMINISTRATION
HF
FNU 984O O 493 O 493 O 493 O 493 O 493 493O493O493O FNU
BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLICTRANSPORTATIONAUTHORITY
PASSENGER RAIL PROJECTS
IN PROGRESS
P-5600 800 800NORTH CAROLINA VIRGINIA RAILROAD. UPGRADE EXISTING RAILROAD TRACK.
TRN
BERTIEHERTFORDNORTHAMPTON
NCVA RR
PUBLIC TRANSPORTATION PROJECTSTQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND
DISABLED PERSONS
HF
FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TQ-6796 180OPERATING
HF
FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TA-6142 1522 755CAPITAL
HF
FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TK-6104 5842 1654ADMINISTRATION
HF
FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
1-33 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TM-6127 196OPERATING ASSISTANCE
HF
JARC 98O L 98O
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
PUBLIC TRANSPORTATION PROJECTSTQ-6796 180OPERATING
HF
FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS
HF
FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
TA-6142 1522 755CAPITAL
HF
FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TK-6104 5842 1654ADMINISTRATION
HF
FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TM-6127 196OPERATING ASSISTANCE
HF
JARC 98O L 98O
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
AVIATION PROJECTSAV-5773 21500LAND ACQUISITION AND VARIOUS
IMPROVEMENTS FOR RUNWAY PROTECTION ZONE.DIV
T 12900C C 6450O C 2150
CURRITUCK CURRITUCK COUNTYREGIONAL AIRPORT (ONX)
1-34 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FERRY PROJECTS
RIGHT OF WAY IN PROGRESS
F-5501 3512 1762CURRITUCK WELCOME CENTER. REPLACEMENT.
TRN
DP 1400C T 350C
CURRITUCK SR 1242(COURTHOUSE ROAD)
PUBLIC TRANSPORTATION PROJECTSTQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND
DISABLED PERSONS
HF
FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TQ-6796 180OPERATING
HF
FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TA-6142 1522 755CAPITAL
HF
FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TK-6104 5842 1654ADMINISTRATION
HF
FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TM-6127 196OPERATING ASSISTANCE
HF
JARC 98O L 98O
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
FERRY PROJECTSF-5700 12000CONSTRUCT RIVER CLASS FERRY. 0
DIV
FF C 4000 C 4000 4000C DAREHYDE
NC 12
UNDER CONSTRUCTION
F-5506 4000 4000HATTERAS FERRY DOCKS. REHABILITATE FERRY RAMPS.TRN
DARE NC 12
PUBLIC TRANSPORTATION PROJECTSTA-6539 46EXPANSION VEHICLE
HF
JARC 37CP L 9CP
DARE DARE COUNTY
TA-6107 715 124CAPITAL
HF
FNF 500CP FNU 91CP
DARE DARE COUNTY
TK-6124 1789 511ADMINISTRATION
HF
FNU 254O O 128 O 128 O 128 O 128 O 128 128O128O128O FNU
DARE DARE COUNTY
TM-6150 54OPERATING
HF
JARC 27O L 27O
DARE DARE COUNTY
1-35 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TM-6143 54OPERATING ASSISTANCE
HF
JARC 27O L 27O
DARE DARE COUNTY
TN-6101 56 56OPERATING ASSISTANCE - NEW FREEDOMHF
FNF DARE DARE COUNTY
TQ-6794 100OPERATING
HF
FEPD 50O L 50O
DARE DARE COUNTY
PUBLIC TRANSPORTATION PROJECTSTA-6164 232 28CAPITALHF
FNU 204CP GATES GATES COUNTY
TK-6129 1904 544ADMINISTRATION
HF
FNU 272O O 136 O 136 O 136 O 136 O 136 136O136O136O FNU
GATES GATES COUNTY
TM-6142 58OPERATING ASSISTANCE
HF
JARC 29CP L 29O
GATES GATES COUNTY
TM-6148 42OPERATING
HF
JARC 21O L 21O
GATES GATES COUNTY
TQ-6790 92OPERATING
HF
FEPD 46O L 46O
GATES GATES COUNTY
TQ-6154 74OPERATING ASSISTANCE
HF
FEPD 37O L 37O
GATES GATES COUNTY
AVIATION PROJECTSAV-5772 1780CONSTRUCT TAXIWAY.
DIV
T C 1602 O C 178
HERTFORD TRI COUNTYAIRPORT (ASJ)
AV-5769 500LAND ACQUISITION.
DIV
T 450R O 50R
HERTFORD TRI-COUNTY AIRPORT(ASJ)
PUBLIC TRANSPORTATION PROJECTSTA-6180 1194 519CAPITAL
HF
FNU 675CP BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLICTRANSPORTATIONAUTHORITY
TK-6119 6504 1576ADMINISTRATION
HF
FNU 984O O 493 O 493 O 493 O 493 O 493 493O493O493O FNU
BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLICTRANSPORTATIONAUTHORITY
PASSENGER RAIL PROJECTS
IN PROGRESS
P-5600 800 800NORTH CAROLINA VIRGINIA RAILROAD. UPGRADE EXISTING RAILROAD TRACK.
TRN
BERTIEHERTFORDNORTHAMPTON
NCVA RR
FERRY PROJECTS
UNDER CONSTRUCTION
F-5004 614 614OCRACOKE GANTRY. REPAIR AND REPLACE.
HYDE NC 12
1-36 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025FERRY PROJECTS
F-5700 12000CONSTRUCT RIVER CLASS FERRY. 0
DIV
FF C 4000 C 4000 4000C DAREHYDE
NC 12
UNDER CONSTRUCTION
F-5003 2410 2410SWAN QUARTER VISITORS CENTER. REPLACEMENT.TRN
HYDE NC 45
PUBLIC TRANSPORTATION PROJECTSTQ-9006 40CAPITAL - PURCHASE OF SERVICE
HF
FEPD 32CP L 4CP S 4CP
HYDE HYDE COUNTY HEALTHDEPARTNEBT
TA-6127 203 40CAPITALHF
FNU 163CP HYDE HYDE COUNTY NON-PROFIT
TK-6135 1424 400ADMINISTRATION
HF
FNU 224O O 100 O 100 O 100 O 100 O 100 100O100O100O FNU
HYDE HYDE COUNTY NON-PROFIT
TM-6141 46OPERATING ASSISTANCEHF
JARC 46O HYDE HYDE COUNTY NON-PROFIT
TA-6540 32ACCESSIBLE INFORMATION KIOSKS AST TERMINAL CENTER FOR INFORMATION BY VARIOUS FORMS INCLUDING BRAILLE AND MULTIPLE LANGUAGESHF
FNF 32CP CARTERETHYDE
NCDOT FERRY DIVISION
TG-5252 8CONSTRUCT BUS SHELTERS AND BENCHES.
DIV
T C 8HYDE OCRACOKE PARKAND RIDE
PUBLIC TRANSPORTATION PROJECTSTI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO
NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
TA-6140 387 181CAPITALHF
FNU 206CP MARTIN MARTIN COUNTY
TK-6144 2530 722ADMINISTRATION
HF
FNU 360O O 181 O 181 O 181 O 181 O 181 181O181O181O FNU
MARTIN MARTIN COUNTY
PUBLIC TRANSPORTATION PROJECTSTA-6180 1194 519CAPITAL
HF
FNU 675CP BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLICTRANSPORTATIONAUTHORITY
TK-6119 6504 1576ADMINISTRATION
HF
FNU 984O O 493 O 493 O 493 O 493 O 493 493O493O493O FNU
BERTIEHALIFAXHERTFORDNORTHAMPTON
CHOANOKE PUBLICTRANSPORTATIONAUTHORITY
1-37 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PASSENGER RAIL PROJECTS
IN PROGRESS
P-5600 800 800NORTH CAROLINA VIRGINIA RAILROAD. UPGRADE EXISTING RAILROAD TRACK.
TRN
BERTIEHERTFORDNORTHAMPTON
NCVA RR
AVIATION PROJECTSAV-5770 4067TAXIWAY REQUIREMENTS - SOUTHSIDE
PARTIAL PARALLEL TAXIWAY.
DIV
T C 3660 O C 407
PASQUOTANK ELIZABETH CITYCOAST GUARDSTATION (ECG)
BICYCLE AND PEDESTRIAN PROJECTSEB-4991 676 126US 17 BYPASS TO PRITCHARD STREET.
CONSTRUCT GREENWAY.TRN
HP 550C PASQUOTANK ELIZABETH CITY
PUBLIC TRANSPORTATION PROJECTSTQ-6796 180OPERATING
HF
FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND DISABLED PERSONS
HF
FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
TA-6142 1522 755CAPITAL
HF
FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TK-6104 5842 1654ADMINISTRATION
HF
FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
1-38 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025PUBLIC TRANSPORTATION PROJECTS
TM-6127 196OPERATING ASSISTANCE
HF
JARC 98O L 98O
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
PUBLIC TRANSPORTATION PROJECTSTQ-6116 1876 1056OPERATING ASSISTANCE - ELDERLY AND
DISABLED PERSONS
HF
FEPD 820O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TQ-6796 180OPERATING
HF
FEPD 180O CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TI-6104 28273 6108INTERCITY BUS FROM RALEIGH TO NORFOLK, VA VIA ELIZABETH CITY ALONG US 64, US 301, US 264, AND US 17 WITH STOPS AT RALEIGH, ROCKY MOUNT, WILSON, GREENVILLE, WASHINGTON, WILLIAMSTON, EDENTON, AND ELIZABETH CITY
HF
FNU 3669O O 2312 O 2312 O 2312 O 2312 O 2312 2312O2312O2312O BEAUFORTBERTIECHOWANEDGECOMBEFRANKLINMARTINNASHPASQUOTANKPERQUIMANSPITTWAKEWILSON
GREYHOUND LINES
TA-6142 1522 755CAPITAL
HF
FNU 767CP CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TK-6104 5842 1654ADMINISTRATION
HF
FNU 876O O 414 O 414 O 414 O 414 O 414 414O414O414O FNU
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
TM-6127 196OPERATING ASSISTANCE
HF
JARC 98O L 98O
CAMDENCHOWANCURRITUCKPASQUOTANKPERQUIMANS
ALBEMARLE REGIONALHEALTH SERVICE
PUBLIC TRANSPORTATION PROJECTSTA-6220 51 41CAPITALHF
FNU 10CP TYRRELL TYRELL COUNTY
TK-6168 308 88ADMINISTRATION
HF
FNU 44O O 22 O 22 O 22 O 22 O 22 22O22O22O FNU
TYRRELL TYRELL COUNTY
1-39 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project
NON HIGHWAY PROGRAMDIVISION 1
ROUTE/CITYCOUNTYID
LOCATION / DESCRIPTION (THOU) (THOU)NUMBER
PRIORYEARSCOST
TOTALPROJCOST
LENGTH
TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS
FUNDS FY 2016
UNFUNDED
FY 2015 FUTURE YEARSFY 2017 FY 2019FY 2018 FY 2020
STATE TRANSPORTATION PROGRAM DEVELOPMENTAL PROGRAM
FY 2021 FY 2022 FY 2023 FY 2024 FY 2025AVIATION PROJECTS
AV-5771 530TAXIWAY TURNAROND RUNWAY 3.
DIV
T C 477 O C 53
WASHINGTON PLYMOUTH MUNICPALAIRPORT (PMZ)
PUBLIC TRANSPORTATION PROJECTSTA-6137 225 84CAPITALHF
FNU 141CP WASHINGTON WASHINGTON COUNTY
TK-6171 1242 354ADMINISTRATION
HF
FNU 176O O 89 O 89 O 89 O 89 O 89 89O89O89O FNU
WASHINGTON WASHINGTON COUNTY
1-40 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES
AVAILABLE
DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project