8/8/2019 State Wise Inspection
1/2
-
8/8/2019 State Wise Inspection
2/2
No. of
inspection
calls
marked
No. of
inspections
carried out
No. of
inspection
calls
marked
No. of
inspections
carried out
No. of
inspection
calls
marked
No. of
inspections
carried out
No. of
inspection
calls
marked
No. of
inspections
carried out
No. of
inspection
calls
marked
No. of
inspections
carried out
No. of
inspection
calls
marked
No. of
inspections
carried out
No. of
inspection
calls
marked
No. of
inspection
s carried
out
No. of
inspection
calls
marked
No. of
inspections
carried out &
Report
received
TotalRejection
s
Conductor Cable Insulator Energy Meter Distribution Transformer Electric Pole Micellaneous Total inspections
DETAILS OF MATERIAL INSPECTION BY REC QUALITY MONITORS(RQM) AS ON 27.08.10
Sl.
No.
Name of the
state(s)
No. ofschemes
in XI-plan
No. of
Packages
REC Quality
Monitor (RQM)
No. of inspection
due as per the
milstones in 24
months
Materials inspections
Grand Total 332 695 3258 299 256 198 160 294 237 285 247 304 250 381 324 74 57 1835 1531 41