status: draft status report for revision of iso 1328-6 (api 17f) winter meeting houston january 2010

7
Status: Draft Status report for revision of ISO 1328-6 (API 17F) Winter meeting Houston January 2010

Upload: georgiana-chandler

Post on 18-Jan-2018

216 views

Category:

Documents


0 download

DESCRIPTION

Status: Draft Table of content to be as existing standard System requirements Surface equipment Subsea equipment Interfaces Materials and fabrication Quality Testing Marking, packaging, storage and shipping

TRANSCRIPT

Page 1: Status: Draft Status report for revision of ISO 1328-6 (API 17F) Winter meeting Houston January 2010

Status: Draft

Status report for revision of ISO 1328-6 (API 17F)

Winter meeting Houston January 2010

Page 2: Status: Draft Status report for revision of ISO 1328-6 (API 17F) Winter meeting Houston January 2010

Status: Draft

Target

•The task groups (API and ISO) have an ambition of submitting an issue (DIS) for comments within end of 2009 (statement from Denver meeting)

•The task has been more comprehensive than first anticipated. The ambition now is to finalise the technical content prior to our summer meeting. (comments received that this schedule may be to ambitious)

Page 3: Status: Draft Status report for revision of ISO 1328-6 (API 17F) Winter meeting Houston January 2010

Status: Draft

Table of content to be as existing standard

•System requirements•Surface equipment•Subsea equipment•Interfaces•Materials and fabrication•Quality•Testing•Marking, packaging, storage and shipping

Page 4: Status: Draft Status report for revision of ISO 1328-6 (API 17F) Winter meeting Houston January 2010

Status: Draft

Modifications•General revision of text in document•Pressure definitions improved/clarified•Software development requirements included•Subsea processing covered •Horizontal integration covered•Statement related to SIL included•Cleanliness requirements revised•Annex C updated•Annex E revised•Annex F revised•Annex G revised•Annex H revised•EMC requirements will be revised

Page 5: Status: Draft Status report for revision of ISO 1328-6 (API 17F) Winter meeting Houston January 2010

Status: Draft

ISO task group meetings

•Kick off meeting in Oslo Norway October 2008•Celle Germany February 2009•Copenhagen Denmark June 2009•London UK October 2009•Next meeting planned in Asker Norway February 2010

API working group meetings•January 2009•June 2009• Next meeting planned in January 2010

Page 6: Status: Draft Status report for revision of ISO 1328-6 (API 17F) Winter meeting Houston January 2010

Status: Draft

ISO task group participantsProject leader Roald Loug Hansen, StatoilHydro, Norway, [email protected]• Paul Thomas, Aker Solutions, UK, [email protected]• Bruce Scott, Halliburton, , [email protected]• Cristopher Curran, BP, USA, [email protected]• Frederico Nicoletti, Subsea 7, Brazil, [email protected]• Gerhard Wilche, Cameron, Germany, [email protected]• Ian Kent, GE, UK, [email protected]• Jesper Jacobsen, Dong Energy, Denmark, [email protected]• John Bodine, Chevron, USA, [email protected]• Ken Ellis, SES, , [email protected]• Mike Theobald, BP, UK, [email protected]• Stefan Knepper, Cameron, Germany, [email protected]• Svein Lilleland, FMC, Norway, [email protected]• Sverre Corneliussen, FMC, Norway, [email protected]• Trond Bertmand, StatoilHydro, Norway, [email protected]• Werner Menz, Cameron, Germany, [email protected]• Jens-Henrik Neuenkirchen, StatoilHydro, Norway, [email protected]

Page 7: Status: Draft Status report for revision of ISO 1328-6 (API 17F) Winter meeting Houston January 2010

Status: Draft

API 17F working group–Christopher Curran, BP–Brian Skeels, FMC–David Lansbury, FMC–Jay Hursh, Aker Solutions–John Allen, GE Vetco–John Simon, Shell–Mike Brashear, Chevron–Lee Mitchell, Chevron–Richard Barratt, GE Vetco–Don Schlater, BP–Jim Metzinger, Technip

–Butch Taggart, Murphy–Al Williams, Dril-Quip–Don Ogwude, CSI–Jose D Baca ExxonMobil–Lon Ngo, Dril-Quip–Mark Marsalis, Dril-Quip–Niels Fuehrer