status of j-parc neutrino project t2k (tokai-to-kamioka)
DESCRIPTION
NNN05@Aussois Apr.8, 2005. Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka). Takashi Kobayashi (KEK). Contents Introduction of T2K experiment Sensitivities Status of Construction Summary. T2K experiment. Phase2: 4 MW ?. Phase2: Hyper-K. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/1.jpg)
1T.Kobayashi (KEK)
Status of J-PARC Neutrino ProjectStatus of J-PARC Neutrino ProjectT2K (Tokai-to-Kamioka)T2K (Tokai-to-Kamioka)
Takashi Kobayashi(KEK)
[email protected], 2005
Contents1. Introduction of T2K experiment2.Sensitivities3.Status of Construction4.Summary
![Page 2: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/2.jpg)
2T.Kobayashi (KEK)
~1GeV beam(100 of K2K)
Tokai
T2K experimentT2K experiment
Physics goalsDiscovery ofe appearance Precise meas. of disappearancex
Discovery of CP violation (Phase2)
Kamioka
J-PARC0.75MW 50GeV PS
Super-K: 50 ktonWater Cherenkov
Phase2:4 MW ?
Phase2:Hyper-K
3
Long baseline neutrino oscillation experiment from Tokai to Kamioka.
![Page 3: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/3.jpg)
3T.Kobayashi (KEK)
T2K collaborationT2K collaboration
Canada:TRIUMF, U. Alberta, York U., U. Toronto,U. Victoria, U. ReginaChina:IHEP(Inst. Of High Energy Phys.)France:CEA SaclayItaly:U. Roma, U. Bari, U. Napoli, U. PadovaJapan:ICRR, U. Tokyo, KEK, Tohoku U., Hiroshima U., Kyoto U., Kobe U., Osaka City U.,
U. Tokyo, Miyagi U. of EducationKorea:Seoul National U., Chonnam National U., Dongshin U., Kangwon U.,
Kyungpook National U., KyungSang National U.,SungKyunKwan U., Yonsei U.Poland:Warsaw U.Russia:INRSpain: U. Barcelona, U. ValenciaSwitzerland:U. Geneva, ETHUK:RAL, Imperial College London, Queen Mary Westfield College London, U. LiverpoolUSA:UCI, SUNY-SB, U. Rochester, U. Pennsylvania, Boston U., CSU, Duke,
Dominguez Hills, BNL, UCB/LBL, U. Hawaii, ANL, MIT, LSU, LANL, U. Washington
Formed in May 2003 12 countries, 53 institutions
~150 collaborators Spokesperson: K.Nishikawa
2
![Page 4: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/4.jpg)
4T.Kobayashi (KEK)
HadronExperimental Facility
Materials and Life Science
Experimental Facility
Neutrino to Kamiokande
Linac(350m)
3 GeV Synchrotron(25 Hz, 1MW)
Nuclear Transmutation
MW Proton Facility : J-PARCMW Proton Facility : J-PARC
50 GeV Synchrotron(0.75 MW)
J-PARC = Japan Proton Accelerator Research Complex
Unique facility3GeV+50GeVMulti-purposesâ˘Materials and life sci.â˘Nucl. and part. phys.â˘Nucl. transmutation
Construction2001~2008
![Page 5: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/5.jpg)
5T.Kobayashi (KEK)
Location of JAERI at Tokai-village Location of JAERI at Tokai-village
TOKYO
KEK
JAERI
NARITA
KAMIOKA
Tokai-village
Tsukuba
JAERI=Japan Atomic Energy Research Institute
60km
Narita
Kamioka
Tokyo
KEK
![Page 6: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/6.jpg)
6T.Kobayashi (KEK)
decay pipe
Near detector
TargetStation
-pit280m
130m
3NBT
Neutrino facility in J-PARCNeutrino facility in J-PARCComponentsComponents Primary proton beam line
Normal conducting magnets
Superconducting arc
Proton beam monitors
Target/Horn system
Decay pipe (130m) Cover OA angle 2~3 deg.
Beam dump
muon monitors
Near neutrino detector
Special FeaturesSpecial Features
Superconducting Superconducting combined fucombined fu
nctionnction magnets magnets
Off-axis beamOff-axis beamConstruction: JFY2004~2008
1.Introduction
![Page 7: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/7.jpg)
7T.Kobayashi (KEK)
TargetHornsDecay Pipe
Super-K.
decay Kinematics
OA3°
OA0°OA2°
OA2.5°
Statistics at SK (OAB 2.5 deg, 1 yr, 22.5 kt)
~ 2200 tot ~ 1600 CC e ~0.4% at peak
Quasi Monochromatic Beam x 2~3 intense than NBBTuned at oscillation maximum
Narrow intense beam: Off-axis beamNarrow intense beam: Off-axis beamćŻĺ確çďź m2=3x10-3eV2
f
lux
0°
2°
2.5°3°
E (
GeV
)
1
00 2 8
p (GeV/c)5
First Application(ref.: BNL-E889 Proposal)
![Page 8: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/8.jpg)
8T.Kobayashi (KEK)
⢠Muon monitors @ ~140mâ Fast (spill-by-spill) monitoring of
beam direction/intensity⢠First near detector @280m
â Flux/spectrum/eâ intensity/direction
⢠Second near detector @ ~2kmâ Almost same E spectrum as for
SKâ Water Cherenkov can work
⢠Far detector @ 295kmâ Super-Kamiokande (50kt)
1.5km
295km
0.28km
Neutrino spectra at diff. dist
dominant syst. in K2K
p
140m0m 280m 2 km 295 km
Detector complexDetector complexNot approved!
![Page 9: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/9.jpg)
9T.Kobayashi (KEK)
Conceptual Design of Near Detector @ 280mConceptual Design of Near Detector @ 280m
Magnet + Side-MRD
Magnet + Side-MRD
P0D TPC TPC TPCFG
D
Pb-
P0D
EM calorimeter
EM calorimeter
EM
ca
lori
me
ter
Mu
on
ID h
odos
cope
FG
D+
H2O
3m1m
1m
PMT
Iron
Tracker : SciBar type Extruded Scintillator + Wave Length Shifting Fiber
Veto all surface by plastic scintillator (Fibers goes through holes.)
3m
1m
1m
20m
36m
3
2
5m
FGDMRD
~14m
SK
beam
20m
36m
3
2
5m
FGDMRD
~14m
SK
beam
⢠Off-axis detector spectrumCross sect.e contami.UA1 mag, FGD, T
PC, Ecal,..⢠On axis detector
Monitor beam dir.Grid layout
On-axis
Off-axisDetectorHole
UA1 mag
![Page 10: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/10.jpg)
10T.Kobayashi (KEK)
Far DetectorsFar Detectors
1st Phase (2009~, âĽ5yrs)Super-Kamiokande(22.5kt)
2nd Phase (201x~?)Hyper-Kamiokande(~540kt)
![Page 11: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/11.jpg)
11T.Kobayashi (KEK)
Beam eye
SK
~8km
HK
Candidate site for HK
Decay pipe
Cover this region
Common decay pipe for SK/HK covering Common decay pipe for SK/HK covering 2~3 deg OA angle2~3 deg OA angle
![Page 12: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/12.jpg)
12T.Kobayashi (KEK)
(sin(sin22 2 2))
((mm22))
Sensitivity:Sensitivity: disappearance disappearance
norm (+5%)NQE (+5%)ESK (+1%)beam shape (Âą20%)beam width (5%)
Stat. error
Stat. only
--68%CL (ln L=0.5)--90%CL (ln L=1.36)--99%CL (ln L=3.32)
Effect of systematic erroron param meas.
Goal(sin22)~0.01
(m2)~<1Ă10-4
(OA2.5(OA2.5))
Expected precision
![Page 13: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/13.jpg)
13T.Kobayashi (KEK)
Erec(GeV)
Signal+BGSignal+BG
BGBG
0 1 2 30
10
20
30
40
Sensitivity: Sensitivity: ee appearance appearance
ELmP e /27.1sin2sinsin 213
213
223
2
Discovery ofe appearance (,m)
(Pe, e)
E
1010-1-1
CHOOZCHOOZexcludedexcluded
m1
32 (
eV
2)
1010-4-4
1010-3-3
1010-2-2
sin2213
1010-2-21010-3-3 1010-1-1 11
~20~20
W/ 10% error for BG subtraction
sin2213 >0.006(90%) e
p
e
4
OA2o 5years
7
m2 = 3x10-3eV2
sin2213 = 0.1
Assuming sin223=0.5, =0, no matter
![Page 14: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/14.jpg)
14T.Kobayashi (KEK)
33 Sensitivity for CPV in T2K-II Sensitivity for CPV in T2K-II
no BGsignal stat only
(signal+BG) stat only
stat+2%syst.stat+5%syst.
stat+10%syst.
CHOOZ excludedsin2213<0.12@m31
2~3x10-3eV2
T2K 3 discovery
3 CP sensitivity : ||>20o for sin2213>0.01 with 2% syst.
4MW, 540kt2yr for
6~7yr for
sinsin
2sin
4 13
12212
E
mACP
m212=6.9x10-5eV2
m322=2.8x10-3eV2
12=0.59423=/4
T2K-I 90%
![Page 15: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/15.jpg)
15T.Kobayashi (KEK)
Status of R&D, Status of R&D, Design, ConstructionDesign, Construction
![Page 16: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/16.jpg)
16T.Kobayashi (KEK)
January, 2005
![Page 17: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/17.jpg)
17T.Kobayashi (KEK)Jan.28, 2005
Fast extraction part
Fast extraction part
Ring orbit
Fast ext. beam
Decay Volume(excavated)
3NBT
![Page 18: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/18.jpg)
18T.Kobayashi (KEK)
50 GeV SynchrotronConstruction Area B
![Page 19: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/19.jpg)
19T.Kobayashi (KEK)
Superconducting magnetsSuperconducting magnets⢠28 combined function magnets in arc par
tâ Dipole Field: 2.587 T, Quad. Field: 18.62
T/mâ Reduce cost while keeping large accepta
nceâ Use common parts with LHC to reduce co
st/risk⢠First full size prototype completed
â Cooled, current loadedâ 7700A (ope. curr. @50GeV + 5%) achiev
ed w/o any spontaneous quenching (Mar.4)
⢠In FY2005, mass production of magnets will start
T.Ogitsu, T.Nakamoto, et.al.,Cryogenic Sci. Center, KEK
Prototype coils completed by Oct. 2004
Feb.21,2005
ăăźă ćŻăä¸ă
FH1
FQ
1
PD11.92 deg. bend
PC4PQ5 PH3
PC3 PQ3PQ4
PV2PC2 PC1
1.92 deg. bend
PD2PV1
ĺźăĺşăĺşćşçšx=49615028.58, y=69561283.94
ăăĽăźăăŞăăťăăźă ăŠă¤ăł
PQ2A PQ1
PH1PH2
ăľăšăăłăˇă§ăłĺ
(20t x 2)ăŻăŹăźăł
FV2
FQ4
FV1
FQ3
FH2
FV2
FQ2
![Page 20: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/20.jpg)
20T.Kobayashi (KEK)
Vacuum Vessel from Spain
Shell Welding Completed (Dec21,04)Shell Welding Completed (Dec21,04) Put in vertical cryostat forcooling/current loading test (Feb.21,2005)
![Page 21: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/21.jpg)
21T.Kobayashi (KEK)
Target AreaTarget Area⢠Target, horns are installed. Filled with Helium gas (reduce Tritium, NOx production)⢠Highly radio-activated (~1Sv/h, cf ~10Sv@JCO, Dose meter alarm: 0.3mSv/h)
Need remote-controlled maintenance system⢠Need cooling (Helium vessel, radiation shield,..)
![Page 22: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/22.jpg)
22T.Kobayashi (KEK)
TargetTarget⢠Carbon Graphite: 30mm(D)x900mm(L), 2 interaction length (70% int.)⢠Energy deposit: 58kJ/spill (~20kW)⢠Equivalent stress (T~200K) ~ 7MPa (<Tensile strength of 37MPa)⢠Cooled at outer surfaceR&D and Design StatusR&D and Design Status⢠Helium cooling method designed⢠Prototype of Graphite target made
â Feasibility of machining proved⢠Radiation damage of Graphite tested
Nakadaira/Ichikawa
Prototype productionPrototype production â˘Feasibility of machining Graphite testedâ˘Thin (2mm) inner cooling pipe
â˘Will be used for Helium flow test
![Page 23: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/23.jpg)
23T.Kobayashi (KEK)
1st Horn 2nd Horn 3rd Horn
TargetbeamHorn systemHorn system
Ichikawa, w/U. Colorado
⢠Focus secondary pions into decay volume⢠Field shape optimization completed⢠320kA pulse current synchronized w/ beam⢠Made of Aluminum alloy (A6061)
Perfect horn(accept. 180Âş)
T2K horn
E (GeV)
f
lux Horn On
Horn Off
![Page 24: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/24.jpg)
24T.Kobayashi (KEK)
Inner conductor of the 1st horn
Cooling power test of splay nozzle
Horn design & test statusHorn design & test status
Outer conductor of the 1st horn
One of the designs of Stripline connection
Colorado U w/
Heater imitating Inner conductor
![Page 25: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/25.jpg)
25T.Kobayashi (KEK)
Decay VolumeDecay Volume3NBT (BT bet. 3GeV&MLF) constructed in 2005
Decay Volume ~110m
OA2o
OA3oTarget Station
Dump
6m thick concrete structure
Cross section:2.2m(W)x2.8m(H)
3.0m(W)x4.6m(H)
Cooling channels(Plate coil)
beam
ConstructionStarted in 2004
Tada/Yamada
⢠Cover Off Axis angle : 2º~3º⢠Square box shape made with
water cooled iron plates (T<60ºC)⢠Filled by 1atm Helium gas⢠Construction started
â Crossing 50m part w/ 3NBT by June 15, 2005
⢠Remaining part in 2007&2008
![Page 26: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/26.jpg)
26T.Kobayashi (KEK)
Decay pipe constructionDecay pipe construction
Mar.21, 2005
Feb. 9, 2005
![Page 27: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/27.jpg)
27T.Kobayashi (KEK)
Decay volume Apr. 5Decay volume Apr. 5
![Page 28: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/28.jpg)
28T.Kobayashi (KEK)
ScheduleSchedule
Primary Beam TunnelNC mag (Prep. Sect.)1st Util. Build.(NU1)Installation Build.(NC)2nd Util. Build.(NU2)50GeV Beam Comm.SC/FF NC magsCryogenicsIntrlock/Ctrl
Decay Volume ITS (underground)TS buildingTS instrumentationTarget & HornsDecay Volume IIBeam dump CivilBeam dump Instrum.3rd Util. Build.(NU3)280m Hole/build.
280m utility
Sec
onda
ry li
neP
rimar
y lin
e
101 7
Facility Final Design
H214 7 10 1
20062004 2005 2009
7 10 11st yr 2nd yr 3rd yr
14 7 10 44
2008
4 7 10 1Last yr
2007
4 7 10 14th yr
Installaltion
Installaltion
InstallaltionInst./testing
Comm.
Comm.
Installaltion
Inst./Align/Test ope.
Inst./Test ope.
Inst./Test ope.
⢠Construction takes 5 yrs (2004~2008JFY)⢠Experiment start in 2009JFY
Now
![Page 29: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/29.jpg)
29T.Kobayashi (KEK)
SummarySummary⢠T2K Experiment
â High sensitivity superbeam experimentâ Narrow, intense beam with Off-axis techniqueâ Physics goals
e appearance: sin2213 > 0.006 (90%CL)
disappearance: (m232)~10-4eV2, (sin2223)~1%
⢠Search for CPV(phase 2): >~20deg
⢠Neutrino beam line construction started
⢠Intensive R&D and design work of beam line components
⢠Start experiment in 2009
![Page 30: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/30.jpg)
30T.Kobayashi (KEK)
Conceptual Design of 2km detectorConceptual Design of 2km detector
W.Ch.MRD
L.Ar
![Page 31: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/31.jpg)
31T.Kobayashi (KEK)
Development of sensitivity and comparison Development of sensitivity and comparison with other projectswith other projects
Sen
siti
vity
on
sin
2 2 1
3 Excluded by reactore disapp. exp
0.006 in five yr
ICARUS(CERN)
MINOS(FNAL)
K2K excluded(2003)
K2K final sens.? (2005?)
Hig
h se
ns.
Low
sen
s.w/ Design J-PARC Intensityw/ Design J-PARC Intensity
T2K 90%C.L. sensitivity
Beam power is essential to achieve this goal in timeBeam power is essential to achieve this goal in time
![Page 32: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/32.jpg)
32T.Kobayashi (KEK)
2. Recent Activities2. Recent Activities⢠Construction Started
â Decay Volume (crossing 50m part with 3NBT)
⢠Intensive R&D and design work for beam line componentsâ SC mag: 1 full size prototype made in house and 1 by companyâ Prototypes for Graphite target, horn madeâ And so on. (Later some are introduced.)
⢠Final detailed design for facilityâ Aug. 2004 ~ Mar. 2005
⢠(T2K Collaboration) Meeting in Aug. 2004â Reuse of UA1 magnet for near detector
⢠Draft budget for JFY2005 (Dec.2005)â Facility: Fullâ Instruments: Nearlly full
⢠9.9 8.15Oku\ (Not reduced, but delayed.)
-TAC: â Dec. 2003: Valuable advicesâ Next -TAC in Apr. 26-28, 2005
![Page 33: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/33.jpg)
33T.Kobayashi (KEK)
Expected Beam PowerExpected Beam Power
Beam Test
0.2
0.0
MW
1.0
0.8
0.6
0.4
JFY2007
ĺšłć23嚴庌 ĺšłć24嚴庌嚳ć19嚴庌 ĺšłć20嚴庌 ĺšłć21嚴庌 ĺšłć22嚴庌
Usage for Experiments
Usage for Experiments
Usage for Experiment
3 GeVNeutron and Muon Construction
Construction
Construction
KEK PSPower
Completion of200 MeV Linac
400 MeV Linac Construction
200 MeVon Day 1
Expected Beam Power at 3 GeV
400 MeVon Day 1
400 MeV installationin 2008-2010
JFY2008 JFY2009 JFY2010 JFY2011 JFY2012
Completionof T2K
50 GeVNuclear - Particle
T 2 K Experiment
![Page 34: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/34.jpg)
34T.Kobayashi (KEK)
Budget Decision for 2005 (Finance Budget Decision for 2005 (Finance Dept.)Dept.)
1) Phase 1 completion in JFY2007 is barely possible !
2) Need a big increase in JFY2006.
0
20
40
60
80
100
120
140
160
180
200
2000 2001 2002 2003 2004 2005 2006 2007 2008
KEK
Budget Proposal(December, 2004)
JAERIOku Yen
(Oku = 108)
Neutrino Completion
Budget YearPhase 1 Completion
![Page 35: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/35.jpg)
35T.Kobayashi (KEK)
Budget IssuesBudget Issues
⢠Funding for the entire JAERI has been decreased.â Yet, a big rise is needed for JFY2005 for timely completion.â Influence came to the JAERI budget reduction in JFY2005 for development
of instruments from 3.4 to 1.2 Oku Yen.⢠JAERI and JNC will merge together in October, 2005.
â Influence to us is unknown. ⢠Budget for KEK portion of J-PARC.
â Need a further increase in JFY2005.â New proposal from KEK to MEXT for the âcost associated with the
movement to Tokaiâ was approved, starting from JFY2005. (6.6 Oku Yen for JFY2005. An increased funding for JFY2006 and JFY2007 is expected.)
⢠Other Funding Source(s).â Ibaraki Prefecture decided to contribute to J-PARC by preparing 24 Oku
Yen. Primary interest: 2 neutron beam lines for industrial usage.⢠Shortage in Budget.
â Experimental devices: Little funds.â Research buildings, lodging, assembly areas, etc.: No funds.â No contingencies in Japan: Possible overrun (could be the next IAC issue).
![Page 36: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/36.jpg)
36T.Kobayashi (KEK)
ăăźă ćŻăä¸ă
FH1
FQ
1
1.92 deg. bend
1.92 deg. bend
ĺźăĺşăĺşćşçšx=49615028.58, y=69561283.94
ăăĽăźăăŞăăťăăźă ăŠă¤ăł
PQ2A
FV2
FQ4
FV1
FQ3
FH2
FV2
FQ2
Primary beam linePrimary beam line
Preparation sectionNormal conducting
750W loss
Arc Section (R=105m)SuperconductingSuperconducting combined functioncombined function magnets
â˘First application in the worldâ˘Reduce cost comp. w/ separated functionâ˘Larger acceptanceâ˘1W/m loss
Final Focusing SectionNormal conducting
250W loss
⢠Single turn fast extraction⢠8 bunches/~5s⢠3.3x1014proton/pulse⢠3.53 sec cycle =6 mm.mr, p/p=0.31% @50
GeV ⢠Total bending = 84.5o
1.Introduction
![Page 37: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/37.jpg)
37T.Kobayashi (KEK)
Sensitivity for Mixing AngleSensitivity for Mixing Angle
sin2213~0.006 (90%)
Background systematic error required to be ~ less than 10%
0.5xsin2213
sin2213~0.018 (3)
![Page 38: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/38.jpg)
38T.Kobayashi (KEK)
/ / CC interaction spectrum for CPV meas. CC interaction spectrum for CPV meas.
Wrong sign BG(x10 case)
cross sectiondifference
NC
C(/
100M
eV/2
2.5k
t/ye
ar)
: 2 years: 6.8 years
![Page 39: Status of J-PARC Neutrino Project T2K (Tokai-to-Kamioka)](https://reader037.vdocument.in/reader037/viewer/2022102909/5681361e550346895d9d9478/html5/thumbnails/39.jpg)
39T.Kobayashi (KEK)
sin2213=0.02
Very PreliminaryExpected signal and BG (SK full sim)Expected signal and BG (SK full sim)
signal background
=0 =/2 total e e
e 536 229 913 370 66 450 26
e 536 790 1782 399 657 297 430
m212=6.9x10-5eV2
m322=2.8x10-3eV2
12=0.59423=/413=0.05 (sin2213=0.01)
:2yr, :6.8yr4MW0.54Mt