Page 1: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Status of KEK 150MeV FFAG

M. Aiba (KEK)

For KEK FFAG Gr.

FFAG’05, 5 to 9 Dec., KURRI

Page 2: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Contents

Purpose of KEK 150MeV FFAG

Machine Parameters

Hardware  improvements

Beam extraction and 100Hz operation

Status of accelerator performance

Summary

Page 3: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Purpose of150MeV FFAG

To be a prototype FFAG for various applicationsBeam extraction from FFAG for the first time

Rapid cycling

Test experiments for applications using extracted beam

Page 4: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Machine parameters

Lattice Triplet (DFD)Number of sector 12

k-value 7.6Energy (MeV) 12→ 150 (10→ 125)

Average radius(m) 4.47→ 5.20Betatron tune Hor.: 3.69~3.80

Ver.: 1.14~1.30

Maximum field (T) F: 1.63(on orbit) D: 0.78

Page 5: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Ion source of injector cyclotronHardware improvement (1)

Ion source: DC operation Pulsed operation

Cyclotron RF

Ion source

DC operation

Pulsed operation

Cyclotron RF

Ion source

Beam from cyclotron~200sec

~10secReduce unavailable beam (injection period of FFAG is few sec)Increase peak current 3~4times

Beam from cyclotron

Page 6: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

RF systemHardware improvement (2)

Enhancement of RF system:

RF voltage: ~5kVpp ~12kVpp

Anode PS 55kW max. 300kW max.Vacuume tubeof main amp. 4CW25000A 4CW150000E

Page 7: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Drive mechanism for insertionsHardware improvement (3)

Attach drive mechanism toinjection septuminjection bumpsextraction kickerextraction septum

Extraction Septum

Position and angle can be changed while keeping vacuum.

Page 8: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Beam extraction

Fast extraction with kicker and septum

Realize 100% extraction efficiency

Top and side drawings of the septum magnet

Page 9: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Beam extraction experiment(1)Beam separation with kicker

0

0.05

0.1

0.15

0.2

0.25

0.3

5025 5030 5035 5040 5045 5050

Position [mm]

Sign

al [-

]

051026- 03t.wfm

O

Circulating beamSeparated beamwith kicker

0 30 60 90 120 150 180 210 240

- 40

- 30

- 20

- 10

0

10

20

30

40Kicker: main- 460Gauss, sub- 0Gauss

Del

ta_r

(m

m)

Theta (deg.)

Displacement of beam orbit by kicker (calculation)

Kicker

SeptumObservation

5mm*Septum field is not included in this calculation.

Page 10: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Beam extraction experiment(2)Experiment set up

Page 11: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Status of accelerator performance

First goal of accelerator developmentBeam energy: 100MeV

Rapid cycling: 100Hz

Beam current: 1nA

Status, Dec. 2005 Beam energy of100MeV has been achieved. 100Hz operation was successful. Beam current is more than 0.2nA@20Hz operation.

Basic accelerator R&D studies (design, construction, beam injection, acceleration and extraction) has been completed.

Page 12: Status of KEK 150MeV FFAG M. Aiba (KEK) For KEK FFAG Gr. FFAG’05, 5 to 9 Dec., KURRI

Summary

Many improvements since FFAG’04, KEK

Basic accelerator R&D studies has been completed.

First goal will be achieved soon.

Near future plan

Test experiments using the extracted beam

For medical application,

For ADS.